orr_2020_logo
ORR protects the interests of rail and road users. We are improving the safety, value, and performance of railways and roads, today and in the future.

Table 3138 - Train punctuality at recorded station stops by operator (periodic)


operator order by period key time period operator number of recorded station stops early on time within 59 seconds time to 3 time to 5 time to 10 time to 15 time to 20 time to 30 minutes 15 plus minutes 20 plus minutes 30 plus mat number of recorded station stops early maa on time within 59 seconds maa time to 3 maa time to 5 maa time to 10 maa time to 15 maa time to 20 maa time to 30 maa minutes 15 plus maa minutes 20 plus maa minutes 30 plus maa
1 2014201501 Apr 2014 to Mar 2015 (Period 01) Great Britain 4736697.0 35.64 68.70 88.43 94.38 98.23 99.17 99.55 99.83 0.83 0.45 0.17 4736697.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201502 Apr 2014 to Mar 2015 (Period 02) Great Britain 5061146.0 35.05 67.70 87.50 93.69 97.91 98.98 99.42 99.77 1.02 0.58 0.23 9797843.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201503 Apr 2014 to Mar 2015 (Period 03) Great Britain 5084203.0 35.00 67.67 87.43 93.65 97.89 98.99 99.45 99.79 1.01 0.55 0.21 14882046.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201504 Apr 2014 to Mar 2015 (Period 04) Great Britain 5123892.0 34.09 66.16 86.44 93.08 97.67 98.87 99.37 99.76 1.13 0.63 0.24 20005938.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201505 Apr 2014 to Mar 2015 (Period 05) Great Britain 5131680.0 32.78 63.95 84.38 91.54 97.03 98.56 99.20 99.69 1.44 0.80 0.31 25137618.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201506 Apr 2014 to Mar 2015 (Period 06) Great Britain 5091106.0 35.61 67.94 87.76 93.95 98.06 99.07 99.47 99.78 0.93 0.53 0.22 30228724.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201507 Apr 2014 to Mar 2015 (Period 07) Great Britain 5096271.0 32.53 63.95 84.87 92.26 97.58 98.86 99.35 99.74 1.14 0.65 0.26 35324995.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201508 Apr 2014 to Mar 2015 (Period 08) Great Britain 5080172.0 26.88 55.55 77.99 87.57 95.85 98.16 99.04 99.67 1.84 0.96 0.33 40405167.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201509 Apr 2014 to Mar 2015 (Period 09) Great Britain 5082081.0 27.86 56.96 79.44 88.74 96.34 98.35 99.12 99.67 1.65 0.88 0.33 45487248.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201510 Apr 2014 to Mar 2015 (Period 10) Great Britain 4503637.0 31.53 62.08 83.09 90.87 96.89 98.48 99.12 99.65 1.52 0.88 0.35 49990885.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201511 Apr 2014 to Mar 2015 (Period 11) Great Britain 5059874.0 32.76 63.38 83.77 91.22 97.02 98.57 99.21 99.70 1.43 0.79 0.30 55050759.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201512 Apr 2014 to Mar 2015 (Period 12) Great Britain 5118242.0 34.23 65.83 86.17 92.98 97.79 98.99 99.46 99.80 1.01 0.54 0.20 60169001.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
1 2014201513 Apr 2014 to Mar 2015 (Period 13) Great Britain 5603124.0 36.06 67.79 87.18 93.49 97.85 98.95 99.41 99.77 1.05 0.59 0.23 65772125.0 33.10 64.46 84.98 92.12 97.40 98.77 99.32 99.74 1.23 0.68 0.26
1 2015201601 Apr 2015 to Mar 2016 (Period 01) Great Britain 5835742.0 35.83 67.76 87.33 93.52 97.80 98.89 99.35 99.72 1.11 0.65 0.28 66871170.0 33.16 64.45 84.94 92.08 97.37 98.75 99.31 99.73 1.25 0.69 0.27
1 2015201602 Apr 2015 to Mar 2016 (Period 02) Great Britain 5096640.0 35.77 67.85 87.56 93.74 97.97 99.04 99.47 99.80 0.96 0.53 0.20 66906664.0 33.22 64.46 84.94 92.09 97.38 98.76 99.31 99.73 1.24 0.69 0.27
1 2015201603 Apr 2015 to Mar 2016 (Period 03) Great Britain 5176193.0 35.24 67.23 87.17 93.50 97.91 99.02 99.46 99.80 0.98 0.54 0.20 66998654.0 33.24 64.43 84.93 92.08 97.38 98.76 99.31 99.74 1.24 0.69 0.26
1 2015201604 Apr 2015 to Mar 2016 (Period 04) Great Britain 5134618.0 33.23 64.31 84.91 91.96 97.17 98.60 99.20 99.69 1.40 0.80 0.31 67009380.0 33.17 64.29 84.81 91.99 97.34 98.74 99.30 99.73 1.26 0.70 0.27
1 2015201605 Apr 2015 to Mar 2016 (Period 05) Great Britain 5162765.0 34.04 65.60 86.06 92.82 97.57 98.81 99.32 99.72 1.19 0.68 0.28 67040465.0 33.27 64.42 84.94 92.09 97.38 98.76 99.31 99.73 1.24 0.69 0.27
1 2015201606 Apr 2015 to Mar 2016 (Period 06) Great Britain 5132345.0 34.88 66.30 86.85 93.49 97.94 99.03 99.47 99.79 0.97 0.53 0.21 67081704.0 33.21 64.30 84.87 92.06 97.38 98.76 99.31 99.73 1.24 0.69 0.27
1 2015201607 Apr 2015 to Mar 2016 (Period 07) Great Britain 5181686.0 32.04 62.93 84.45 92.11 97.61 98.91 99.39 99.76 1.09 0.61 0.24 67167119.0 33.18 64.22 84.84 92.04 97.38 98.76 99.31 99.74 1.24 0.69 0.26
1 2015201608 Apr 2015 to Mar 2016 (Period 08) Great Britain 5209641.0 26.42 54.71 77.71 87.56 95.92 98.18 99.07 99.69 1.82 0.93 0.31 67296588.0 33.13 64.13 84.80 92.03 97.38 98.76 99.31 99.74 1.24 0.69 0.26
1 2015201609 Apr 2015 to Mar 2016 (Period 09) Great Britain 5243191.0 25.62 53.21 76.23 86.43 95.36 97.85 98.84 99.57 2.15 1.16 0.43 67457698.0 32.94 63.83 84.54 91.85 97.30 98.72 99.29 99.73 1.28 0.71 0.27
1 2015201610 Apr 2015 to Mar 2016 (Period 10) Great Britain 4679115.0 31.29 61.37 82.57 90.47 96.62 98.30 99.03 99.61 1.70 0.97 0.39 67633176.0 32.92 63.77 84.50 91.82 97.28 98.71 99.29 99.73 1.29 0.71 0.27
1 2015201611 Apr 2015 to Mar 2016 (Period 11) Great Britain 5292238.0 31.39 61.89 83.31 91.15 97.12 98.64 99.25 99.71 1.36 0.75 0.29 67865540.0 32.81 63.65 84.46 91.81 97.29 98.71 99.29 99.73 1.29 0.71 0.27
1 2015201612 Apr 2015 to Mar 2016 (Period 12) Great Britain 5271936.0 32.10 62.98 84.33 91.80 97.24 98.63 99.22 99.67 1.37 0.78 0.33 68019234.0 32.65 63.44 84.32 91.72 97.25 98.68 99.27 99.72 1.32 0.73 0.28
1 2015201613 Apr 2015 to Mar 2016 (Period 13) Great Britain 4796167.0 33.99 65.62 86.18 93.04 97.80 98.97 99.43 99.77 1.03 0.57 0.23 67212277.0 32.46 63.23 84.22 91.67 97.24 98.68 99.27 99.72 1.32 0.73 0.28
1 2016201701 Apr 2016 to Mar 2017 (Period 01) Great Britain 5731716.0 35.02 67.11 87.31 93.74 98.04 99.05 99.47 99.79 0.95 0.53 0.21 67108251.0 32.39 63.17 84.21 91.68 97.26 98.70 99.28 99.72 1.30 0.72 0.28
1 2016201702 Apr 2016 to Mar 2017 (Period 02) Great Britain 5311404.0 33.91 65.45 85.87 92.72 97.64 98.88 99.39 99.77 1.12 0.61 0.23 67323015.0 32.25 62.99 84.09 91.61 97.23 98.69 99.27 99.72 1.31 0.73 0.28
1 2016201703 Apr 2016 to Mar 2017 (Period 03) Great Britain 5211807.0 32.85 63.51 83.90 91.08 96.60 98.19 98.91 99.53 1.81 1.09 0.47 67358629.0 32.07 62.71 83.84 91.42 97.13 98.62 99.23 99.70 1.38 0.77 0.30
1 2016201704 Apr 2016 to Mar 2017 (Period 04) Great Britain 5307693.0 32.13 62.80 83.71 91.09 96.69 98.27 98.98 99.57 1.73 1.02 0.43 67531704.0 31.99 62.59 83.75 91.36 97.09 98.60 99.21 99.69 1.40 0.79 0.31
1 2016201705 Apr 2016 to Mar 2017 (Period 05) Great Britain 5306790.0 32.48 63.19 84.30 91.76 97.22 98.65 99.25 99.72 1.35 0.75 0.28 67675729.0 31.87 62.41 83.61 91.28 97.07 98.58 99.21 99.69 1.42 0.79 0.31
1 2016201706 Apr 2016 to Mar 2017 (Period 06) Great Britain 5360419.0 31.23 61.35 82.75 90.58 96.57 98.23 98.98 99.59 1.77 1.02 0.41 67903803.0 31.59 62.03 83.30 91.05 96.96 98.52 99.17 99.67 1.48 0.83 0.33
1 2016201707 Apr 2016 to Mar 2017 (Period 07) Great Britain 5407278.0 31.25 61.43 83.41 91.50 97.40 98.84 99.39 99.78 1.16 0.61 0.22 68129395.0 31.53 61.92 83.22 91.01 96.95 98.52 99.17 99.68 1.48 0.83 0.32
1 2016201708 Apr 2016 to Mar 2017 (Period 08) Great Britain 5379600.0 27.50 56.05 78.86 88.34 96.17 98.27 99.09 99.67 1.73 0.91 0.33 68299354.0 31.60 62.01 83.30 91.06 96.96 98.52 99.17 99.67 1.48 0.83 0.33
1 2016201709 Apr 2016 to Mar 2017 (Period 09) Great Britain 5394156.0 23.48 49.65 72.54 83.35 93.76 96.99 98.35 99.38 3.01 1.65 0.62 68450319.0 31.42 61.71 82.99 90.81 96.84 98.46 99.13 99.66 1.54 0.87 0.34
1 2016201710 Apr 2016 to Mar 2017 (Period 10) Great Britain 4871009.0 31.46 61.55 82.99 90.86 96.99 98.58 99.24 99.73 1.42 0.76 0.27 68642213.0 31.43 61.72 83.02 90.84 96.86 98.48 99.15 99.67 1.52 0.85 0.33
1 2016201711 Apr 2016 to Mar 2017 (Period 11) Great Britain 5379018.0 32.02 62.05 83.00 90.73 96.77 98.41 99.10 99.63 1.59 0.90 0.37 68728993.0 31.48 61.73 83.00 90.80 96.83 98.46 99.14 99.66 1.54 0.86 0.34
1 2016201712 Apr 2016 to Mar 2017 (Period 12) Great Britain 5505500.0 33.67 64.25 84.76 91.89 97.18 98.55 99.14 99.63 1.45 0.86 0.37 68962557.0 31.61 61.84 83.03 90.81 96.83 98.45 99.13 99.66 1.55 0.87 0.34
1 2016201713 Apr 2016 to Mar 2017 (Period 13) Great Britain 5353000.0 35.74 66.93 87.04 93.53 97.94 99.01 99.44 99.75 0.99 0.56 0.25 69519390.0 31.76 61.97 83.13 90.87 96.85 98.46 99.13 99.66 1.54 0.87 0.34
1 2017201801 Apr 2017 to Mar 2018 (Period 01) Great Britain 5700847.0 37.63 69.33 88.46 94.29 98.20 99.15 99.53 99.81 0.85 0.47 0.19 69488521.0 31.98 62.15 83.22 90.91 96.86 98.47 99.14 99.66 1.53 0.86 0.34
1 2017201802 Apr 2017 to Mar 2018 (Period 02) Great Britain 5631687.0 36.07 67.38 87.17 93.57 97.98 99.07 99.49 99.81 0.93 0.51 0.19 69808804.0 32.16 62.32 83.34 90.99 96.89 98.48 99.15 99.66 1.52 0.85 0.34
1 2017201803 Apr 2017 to Mar 2018 (Period 03) Great Britain 5618185.0 34.60 64.91 85.02 91.90 97.10 98.51 99.13 99.64 1.49 0.87 0.36 70215182.0 32.30 62.44 83.43 91.06 96.93 98.51 99.16 99.67 1.49 0.84 0.33
1 2017201804 Apr 2017 to Mar 2018 (Period 04) Great Britain 5594091.0 34.14 64.72 85.50 92.58 97.64 98.89 99.39 99.77 1.11 0.61 0.23 70501580.0 32.46 62.59 83.57 91.17 97.00 98.56 99.19 99.69 1.44 0.81 0.31
1 2017201805 Apr 2017 to Mar 2018 (Period 05) Great Britain 5711380.0 34.90 65.45 85.88 92.75 97.59 98.83 99.36 99.75 1.17 0.64 0.25 70906170.0 32.66 62.78 83.70 91.26 97.04 98.57 99.20 99.69 1.43 0.80 0.31
1 2017201806 Apr 2017 to Mar 2018 (Period 06) Great Britain 5599658.0 34.62 65.18 85.48 92.36 97.44 98.79 99.35 99.76 1.21 0.65 0.24 71145409.0 32.92 63.07 83.91 91.39 97.10 98.61 99.23 99.70 1.39 0.77 0.30
1 2017201807 Apr 2017 to Mar 2018 (Period 07) Great Britain 5630801.0 31.77 61.26 82.71 90.91 97.22 98.76 99.35 99.76 1.24 0.65 0.24 71368932.0 32.95 63.05 83.86 91.35 97.09 98.61 99.23 99.70 1.39 0.77 0.30
1 2017201808 Apr 2017 to Mar 2018 (Period 08) Great Britain 5640507.0 27.97 55.48 77.84 87.47 95.80 98.04 98.92 99.58 1.96 1.08 0.42 71629839.0 32.97 62.98 83.76 91.27 97.06 98.59 99.22 99.69 1.41 0.78 0.31
1 2017201809 Apr 2017 to Mar 2018 (Period 09) Great Britain 5680550.0 28.13 55.74 78.08 87.70 95.94 98.15 99.01 99.63 1.85 0.99 0.37 71916233.0 33.30 63.41 84.15 91.58 97.22 98.67 99.26 99.71 1.33 0.74 0.29
1 2017201810 Apr 2017 to Mar 2018 (Period 10) Great Britain 4948336.0 30.76 59.13 80.17 88.61 95.85 97.96 98.84 99.54 2.04 1.16 0.46 71993560.0 33.25 63.24 83.96 91.43 97.14 98.63 99.24 99.70 1.37 0.76 0.30
1 2017201811 Apr 2017 to Mar 2018 (Period 11) Great Britain 5657168.0 33.36 63.03 83.94 91.72 97.52 98.93 99.43 99.78 1.07 0.57 0.22 72271710.0 33.35 63.32 84.03 91.50 97.19 98.67 99.26 99.71 1.33 0.74 0.29
1 2017201812 Apr 2017 to Mar 2018 (Period 12) Great Britain 5415725.0 32.55 61.41 81.80 89.58 95.90 97.74 98.58 99.34 2.26 1.42 0.66 72181935.0 33.27 63.10 83.80 91.33 97.10 98.61 99.22 99.69 1.39 0.78 0.31
1 2017201813 Apr 2017 to Mar 2018 (Period 13) Great Britain 5641611.0 33.69 63.11 83.66 91.29 97.12 98.65 99.25 99.72 1.35 0.75 0.28 72470546.0 33.12 62.82 83.55 91.16 97.04 98.58 99.21 99.69 1.42 0.79 0.31
1 2018201901 Apr 2018 to Mar 2019 (Period 01) Great Britain 5751119.0 35.73 65.56 85.38 92.27 97.31 98.64 99.20 99.67 1.36 0.80 0.33 72520818.0 32.97 62.52 83.31 91.00 96.97 98.54 99.18 99.68 1.46 0.82 0.32
1 2018201902 Apr 2018 to Mar 2019 (Period 02) Great Britain 5736612.0 35.09 64.42 84.20 91.44 97.01 98.53 99.19 99.70 1.47 0.81 0.30 72625743.0 32.90 62.30 83.08 90.84 96.89 98.50 99.16 99.67 1.50 0.84 0.33
1 2018201903 Apr 2018 to Mar 2019 (Period 03) Great Britain 5715719.0 36.91 65.56 83.97 90.76 96.38 98.14 98.93 99.58 1.86 1.07 0.42 72723277.0 33.08 62.35 83.00 90.75 96.84 98.47 99.14 99.66 1.53 0.86 0.34
1 2018201904 Apr 2018 to Mar 2019 (Period 04) Great Britain 5769809.0 33.52 61.19 80.51 88.18 95.07 97.33 98.40 99.35 2.67 1.60 0.65 72898995.0 33.03 62.08 82.61 90.41 96.63 98.35 99.07 99.63 1.65 0.93 0.37
1 2018201905 Apr 2018 to Mar 2019 (Period 05) Great Britain 5839237.0 34.48 62.61 82.24 89.77 96.19 98.13 98.96 99.61 1.87 1.04 0.39 73026852.0 33.00 61.86 82.33 90.17 96.52 98.29 99.03 99.62 1.71 0.97 0.38
1 2018201906 Apr 2018 to Mar 2019 (Period 06) Great Britain 5816513.0 37.03 66.35 85.54 92.35 97.49 98.83 99.35 99.76 1.17 0.65 0.24 73243707.0 33.20 61.96 82.34 90.18 96.53 98.30 99.04 99.62 1.70 0.96 0.38
1 2018201907 Apr 2018 to Mar 2019 (Period 07) Great Britain 5815267.0 33.09 61.07 81.45 89.63 96.41 98.28 99.04 99.63 1.72 0.96 0.37 73428173.0 33.30 61.94 82.24 90.08 96.47 98.26 99.01 99.61 1.74 0.99 0.39
1 2018201908 Apr 2018 to Mar 2019 (Period 08) Great Britain 5757969.0 30.53 57.64 78.58 87.63 95.69 98.03 98.94 99.63 1.97 1.06 0.37 73545635.0 33.49 62.10 82.30 90.09 96.46 98.26 99.01 99.61 1.74 0.99 0.39
1 2018201909 Apr 2018 to Mar 2019 (Period 09) Great Britain 5814739.0 28.56 54.94 76.26 85.90 94.87 97.62 98.75 99.56 2.38 1.25 0.44 73679824.0 33.52 62.03 82.14 89.94 96.37 98.22 98.99 99.61 1.78 1.01 0.39
1 2018201910 Apr 2018 to Mar 2019 (Period 10) Great Britain 5190214.0 35.79 64.88 84.21 91.41 97.18 98.71 99.31 99.75 1.29 0.69 0.25 73921702.0 33.86 62.42 82.42 90.13 96.47 98.27 99.03 99.62 1.73 0.97 0.38
1 2018201911 Apr 2018 to Mar 2019 (Period 11) Great Britain 6061722.0 36.68 66.11 85.43 92.39 97.56 98.84 99.35 99.75 1.16 0.65 0.25 74326256.0 34.13 62.68 82.55 90.20 96.47 98.27 99.02 99.62 1.73 0.98 0.38
1 2018201912 Apr 2018 to Mar 2019 (Period 12) Great Britain 6132423.0 37.26 67.04 86.04 92.63 97.51 98.79 99.33 99.74 1.21 0.67 0.26 75042954.0 34.50 63.12 82.89 90.44 96.60 98.35 99.08 99.65 1.65 0.92 0.35
1 2018201913 Apr 2018 to Mar 2019 (Period 13) Great Britain 6314563.0 38.09 67.99 86.58 92.86 97.48 98.73 99.26 99.70 1.27 0.74 0.30 75715906.0 34.86 63.53 83.14 90.58 96.64 98.36 99.08 99.65 1.64 0.92 0.35
1 2019202001 Apr 2019 to Mar 2020 (Period 01) Great Britain 6051841.0 40.54 70.86 88.59 94.17 98.08 99.06 99.47 99.79 0.94 0.53 0.21 76016628.0 35.24 63.96 83.41 90.74 96.70 98.39 99.10 99.66 1.61 0.90 0.34
1 2019202002 Apr 2019 to Mar 2020 (Period 02) Great Britain 6294191.0 39.78 69.84 87.80 93.65 97.89 98.99 99.44 99.78 1.01 0.56 0.22 76574207.0 35.63 64.41 83.71 90.92 96.77 98.43 99.12 99.66 1.57 0.88 0.34
1 2019202003 Apr 2019 to Mar 2020 (Period 03) Great Britain 6327977.0 38.94 68.76 86.94 93.07 97.65 98.87 99.36 99.75 1.13 0.64 0.25 77186465.0 35.80 64.68 83.95 91.11 96.87 98.49 99.16 99.68 1.51 0.84 0.32
1 2019202004 Apr 2019 to Mar 2020 (Period 04) Great Britain 6375070.0 37.20 66.37 85.24 91.97 97.16 98.60 99.20 99.67 1.40 0.80 0.33 77791726.0 36.09 65.08 84.31 91.40 97.03 98.58 99.22 99.70 1.42 0.78 0.30
1 2019202005 Apr 2019 to Mar 2020 (Period 05) Great Britain 6267590.0 35.87 64.21 83.12 90.26 96.17 98.02 98.84 99.52 1.98 1.16 0.48 78220079.0 36.19 65.19 84.37 91.43 97.03 98.57 99.21 99.69 1.43 0.79 0.31
1 2019202006 Apr 2019 to Mar 2020 (Period 06) Great Britain 6342114.0 37.25 66.42 85.45 92.21 97.37 98.76 99.32 99.74 1.24 0.68 0.26 78745680.0 36.21 65.21 84.37 91.42 97.02 98.57 99.20 99.69 1.43 0.80 0.31
1 2019202007 Apr 2019 to Mar 2020 (Period 07) Great Britain 6342031.0 34.40 62.86 82.71 90.38 96.67 98.42 99.13 99.67 1.58 0.87 0.33 79272444.0 36.30 65.32 84.46 91.47 97.04 98.58 99.21 99.70 1.42 0.79 0.30
1 2019202008 Apr 2019 to Mar 2020 (Period 08) Great Britain 6317253.0 32.16 59.43 79.78 88.30 95.75 97.93 98.82 99.54 2.07 1.18 0.46 79831728.0 36.39 65.41 84.51 91.50 97.03 98.56 99.20 99.69 1.44 0.80 0.31
1 2019202009 Apr 2019 to Mar 2020 (Period 09) Great Britain 6227636.0 29.27 55.67 76.66 86.08 94.90 97.61 98.73 99.56 2.39 1.27 0.44 80244625.0 36.40 65.41 84.50 91.48 97.02 98.56 99.19 99.69 1.44 0.81 0.31
1 2019202010 Apr 2019 to Mar 2020 (Period 10) Great Britain 5386865.0 34.14 62.32 81.81 89.42 96.07 98.09 98.94 99.59 1.91 1.06 0.41 80441276.0 36.29 65.24 84.34 91.35 96.95 98.52 99.17 99.68 1.48 0.83 0.32
1 2019202011 Apr 2019 to Mar 2020 (Period 11) Great Britain 6345537.0 34.85 63.24 83.01 90.70 96.90 98.54 99.20 99.70 1.46 0.80 0.30 80725091.0 36.15 65.02 84.15 91.22 96.90 98.50 99.16 99.67 1.50 0.84 0.33
1 2019202012 Apr 2019 to Mar 2020 (Period 12) Great Britain 6285217.0 34.80 62.92 82.39 90.04 96.41 98.23 98.98 99.60 1.77 1.02 0.40 80877885.0 35.96 64.70 83.87 91.02 96.81 98.45 99.13 99.66 1.55 0.87 0.34
1 2019202013 Apr 2019 to Mar 2020 (Period 13) Great Britain 6200713.0 43.25 71.50 87.67 93.15 97.46 98.72 99.26 99.70 1.28 0.74 0.30 80764035.0 36.35 64.97 83.95 91.04 96.81 98.45 99.13 99.66 1.55 0.87 0.34
1 2020202101 Apr 2020 to Mar 2021 (Period 01) Great Britain 4233315.0 62.41 88.65 96.71 98.32 99.38 99.70 99.83 99.94 0.30 0.17 0.06 78945509.0 37.43 65.78 84.28 91.19 96.85 98.47 99.14 99.67 1.53 0.86 0.33
1 2020202102 Apr 2020 to Mar 2021 (Period 02) Great Britain 4103393.0 59.88 86.31 95.56 97.64 99.11 99.54 99.72 99.89 0.46 0.28 0.11 76754711.0 38.43 66.55 84.59 91.34 96.89 98.49 99.15 99.67 1.51 0.85 0.33
1 2020202103 Apr 2020 to Mar 2021 (Period 03) Great Britain 4720908.0 57.28 85.06 95.29 97.53 99.06 99.52 99.72 99.88 0.48 0.28 0.12 75147642.0 39.58 67.53 85.07 91.58 96.96 98.52 99.17 99.68 1.48 0.83 0.32
1 2020202104 Apr 2020 to Mar 2021 (Period 04) Great Britain 5143905.0 54.34 83.37 94.83 97.41 99.08 99.54 99.73 99.89 0.46 0.27 0.11 73916477.0 40.81 68.73 85.73 91.95 97.09 98.58 99.20 99.69 1.42 0.80 0.31
1 2020202105 Apr 2020 to Mar 2021 (Period 05) Great Britain 5334934.0 48.79 78.33 92.04 95.73 98.41 99.19 99.53 99.81 0.81 0.47 0.19 72983821.0 41.82 69.82 86.42 92.37 97.27 98.68 99.26 99.72 1.32 0.74 0.28
1 2020202106 Apr 2020 to Mar 2021 (Period 06) Great Britain 5540202.0 48.27 78.41 92.46 96.06 98.54 99.25 99.56 99.81 0.75 0.44 0.19 72181909.0 42.71 70.78 86.97 92.67 97.36 98.71 99.28 99.72 1.29 0.72 0.28
1 2020202107 Apr 2020 to Mar 2021 (Period 07) Great Britain 5860943.0 45.77 76.04 91.51 95.67 98.47 99.23 99.56 99.83 0.77 0.44 0.17 71700821.0 43.70 71.91 87.71 93.12 97.51 98.78 99.31 99.73 1.22 0.69 0.27
1 2020202108 Apr 2020 to Mar 2021 (Period 08) Great Britain 5799576.0 42.25 71.76 88.93 94.24 98.08 99.09 99.51 99.82 0.91 0.49 0.18 71183144.0 44.60 73.00 88.52 93.64 97.71 98.88 99.37 99.76 1.12 0.63 0.24
1 2020202109 Apr 2020 to Mar 2021 (Period 09) Great Britain 5721017.0 44.91 75.08 91.07 95.59 98.58 99.34 99.64 99.85 0.66 0.36 0.15 70676525.0 45.98 74.70 89.77 94.46 98.03 99.03 99.45 99.78 0.97 0.55 0.22
1 2020202110 Apr 2020 to Mar 2021 (Period 10) Great Britain 5103690.0 48.13 77.92 92.10 95.82 98.45 99.22 99.55 99.80 0.78 0.45 0.20 70393350.0 47.04 75.88 90.55 94.95 98.21 99.12 99.50 99.80 0.88 0.50 0.20
1 2020202111 Apr 2020 to Mar 2021 (Period 11) Great Britain 5268909.0 50.20 79.38 92.44 95.88 98.37 99.16 99.51 99.80 0.84 0.49 0.20 69316722.0 48.40 77.30 91.38 95.41 98.34 99.17 99.53 99.81 0.83 0.47 0.19
1 2020202112 Apr 2020 to Mar 2021 (Period 12) Great Britain 5090957.0 51.59 80.60 92.97 96.16 98.55 99.26 99.57 99.83 0.74 0.43 0.17 68122462.0 49.89 78.87 92.33 95.96 98.54 99.27 99.58 99.83 0.73 0.42 0.17
1 2020202113 Apr 2020 to Mar 2021 (Period 13) Great Britain 4611779.0 52.91 82.45 94.43 97.20 99.01 99.50 99.71 99.89 0.50 0.29 0.11 66533528.0 50.72 79.81 92.91 96.31 98.67 99.33 99.62 99.85 0.67 0.38 0.15
1 2021202201 Apr 2021 to Mar 2022 (Period 01) Great Britain 5901281.0 51.29 81.40 94.07 96.99 98.92 99.45 99.67 99.86 0.55 0.33 0.14 68201494.0 50.04 79.40 92.77 96.24 98.65 99.32 99.61 99.84 0.68 0.39 0.16
1 2021202202 Apr 2021 to Mar 2022 (Period 02) Great Britain 5541565.0 48.03 78.40 92.57 96.18 98.60 99.28 99.58 99.82 0.72 0.42 0.18 69639666.0 49.30 78.91 92.59 96.15 98.61 99.31 99.60 99.84 0.69 0.40 0.16
1 2021202203 Apr 2021 to Mar 2022 (Period 03) Great Britain 5780472.0 45.16 74.90 90.34 94.78 98.04 99.00 99.42 99.76 1.00 0.58 0.24 70699230.0 48.43 78.17 92.23 95.95 98.54 99.27 99.58 99.83 0.73 0.42 0.17
1 2021202204 Apr 2021 to Mar 2022 (Period 04) Great Britain 5745113.0 45.38 74.97 89.95 94.36 97.77 98.83 99.31 99.70 1.17 0.69 0.30 71300438.0 47.76 77.54 91.86 95.71 98.44 99.21 99.55 99.81 0.79 0.45 0.19
1 2021202205 Apr 2021 to Mar 2022 (Period 05) Great Britain 5654513.0 45.40 75.48 90.80 95.08 98.18 99.06 99.44 99.76 0.94 0.56 0.24 71620017.0 47.50 77.32 91.76 95.66 98.42 99.20 99.54 99.81 0.80 0.46 0.19
1 2021202206 Apr 2021 to Mar 2022 (Period 06) Great Britain 5714968.0 44.04 74.21 90.03 94.63 97.99 98.99 99.42 99.77 1.01 0.58 0.23 71794783.0 47.16 76.99 91.57 95.55 98.38 99.18 99.53 99.80 0.82 0.47 0.20
1 2021202207 Apr 2021 to Mar 2022 (Period 07) Great Britain 5888593.0 41.44 71.65 89.00 94.31 98.07 99.07 99.47 99.79 0.93 0.53 0.21 71822433.0 46.81 76.63 91.36 95.44 98.34 99.17 99.52 99.80 0.83 0.48 0.20
1 2021202208 Apr 2021 to Mar 2022 (Period 08) Great Britain 5800023.0 36.92 65.90 84.68 91.41 96.87 98.46 99.13 99.65 1.54 0.87 0.35 71822880.0 46.38 76.15 91.02 95.21 98.25 99.12 99.49 99.79 0.88 0.51 0.21
1 2021202209 Apr 2021 to Mar 2022 (Period 09) Great Britain 5854900.0 35.31 63.86 83.27 90.50 96.41 98.19 98.97 99.58 1.81 1.03 0.42 71956763.0 45.59 75.24 90.38 94.80 98.07 99.02 99.44 99.77 0.98 0.56 0.23
1 2021202210 Apr 2021 to Mar 2022 (Period 10) Great Britain 5127762.0 43.34 72.92 89.02 94.05 97.85 98.96 99.41 99.77 1.04 0.59 0.23 71980835.0 45.25 74.88 90.17 94.67 98.03 99.00 99.43 99.76 1.00 0.57 0.24
1 2021202211 Apr 2021 to Mar 2022 (Period 11) Great Britain 5548020.0 43.05 73.14 89.67 94.68 98.20 99.14 99.52 99.81 0.86 0.48 0.19 72259946.0 44.72 74.42 89.96 94.58 98.01 99.00 99.43 99.76 1.00 0.57 0.24
1 2021202212 Apr 2021 to Mar 2022 (Period 12) Great Britain 5454046.0 41.18 70.76 87.64 92.97 97.15 98.43 99.03 99.55 1.57 0.97 0.45 72623035.0 43.97 73.71 89.58 94.35 97.91 98.94 99.39 99.74 1.06 0.61 0.26
1 2021202213 Apr 2021 to Mar 2022 (Period 13) Great Britain 5298576.0 43.35 73.48 89.67 94.49 98.02 99.03 99.46 99.79 0.97 0.54 0.21 73309832.0 43.37 73.15 89.28 94.18 97.85 98.91 99.37 99.74 1.09 0.63 0.26
1 2022202301 Apr 2022 to Mar 2023 (Period 01) Great Britain 6129910.0 44.24 74.08 89.69 94.33 97.83 98.87 99.34 99.73 1.13 0.66 0.27 73538461.0 42.80 72.56 88.93 93.97 97.76 98.87 99.34 99.73 1.13 0.66 0.27
1 2022202302 Apr 2022 to Mar 2023 (Period 02) Great Britain 5888788.0 42.93 72.78 89.21 94.27 97.99 99.00 99.43 99.77 1.00 0.57 0.23 73885684.0 42.42 72.14 88.68 93.83 97.72 98.85 99.33 99.72 1.15 0.67 0.28
1 2022202303 Apr 2022 to Mar 2023 (Period 03) Great Britain 5201221.0 42.52 71.45 87.80 93.12 97.35 98.64 99.18 99.65 1.36 0.82 0.35 73306433.0 42.21 71.88 88.48 93.70 97.67 98.82 99.32 99.72 1.18 0.68 0.28
1 2022202304 Apr 2022 to Mar 2023 (Period 04) Great Britain 5745578.0 39.71 68.31 85.40 91.32 96.32 97.99 98.76 99.45 2.01 1.24 0.55 73306898.0 41.77 71.35 88.13 93.46 97.55 98.75 99.27 99.70 1.25 0.73 0.30
1 2022202305 Apr 2022 to Mar 2023 (Period 05) Great Britain 5219565.0 38.42 66.51 84.07 90.51 96.04 97.86 98.70 99.44 2.14 1.30 0.56 72871950.0 41.25 70.69 87.63 93.13 97.40 98.67 99.22 99.67 1.33 0.78 0.33
1 2022202306 Apr 2022 to Mar 2023 (Period 06) Great Britain 6096185.0 38.99 68.16 86.08 92.21 97.06 98.52 99.16 99.66 1.48 0.84 0.34 73253167.0 40.84 70.20 87.31 92.93 97.32 98.63 99.20 99.66 1.37 0.80 0.34
1 2022202307 Apr 2022 to Mar 2023 (Period 07) Great Britain 5543220.0 38.80 68.13 86.42 92.58 97.36 98.72 99.29 99.72 1.28 0.71 0.28 72907794.0 40.64 69.93 87.11 92.79 97.26 98.60 99.18 99.66 1.40 0.82 0.34
1 2022202308 Apr 2022 to Mar 2023 (Period 08) Great Britain 5642141.0 33.35 60.74 80.55 88.55 95.66 97.89 98.82 99.56 2.11 1.18 0.44 72749912.0 40.37 69.54 86.79 92.58 97.17 98.56 99.16 99.65 1.44 0.84 0.35
1 2022202309 Apr 2022 to Mar 2023 (Period 09) Great Britain 5969288.0 32.68 60.06 80.28 88.47 95.67 97.85 98.79 99.53 2.15 1.21 0.47 72864300.0 40.15 69.21 86.54 92.41 97.11 98.53 99.14 99.65 1.47 0.86 0.35
1 2022202310 Apr 2022 to Mar 2023 (Period 10) Great Britain 3161590.0 37.21 64.21 81.38 88.04 94.55 96.95 98.15 99.23 3.05 1.85 0.77 70898128.0 39.78 68.72 86.13 92.09 96.94 98.43 99.08 99.62 1.57 0.92 0.38
1 2022202311 Apr 2022 to Mar 2023 (Period 11) Great Britain 5873704.0 36.97 65.30 83.73 90.58 96.38 98.15 98.92 99.57 1.85 1.08 0.43 71223812.0 39.30 68.10 85.66 91.77 96.80 98.35 99.03 99.60 1.65 0.97 0.40
1 2022202312 Apr 2022 to Mar 2023 (Period 12) Great Britain 6132696.0 39.84 69.08 86.62 92.56 97.19 98.56 99.17 99.66 1.44 0.83 0.34 71902462.0 39.20 67.98 85.59 91.74 96.80 98.36 99.05 99.61 1.64 0.95 0.39
1 2022202313 Apr 2022 to Mar 2023 (Period 13) Great Britain 5687342.0 41.23 70.79 87.59 93.10 97.44 98.69 99.25 99.70 1.31 0.75 0.30 72291228.0 39.06 67.80 85.45 91.65 96.76 98.34 99.03 99.60 1.66 0.97 0.40
1 2023202401 Apr 2023 to Mar 2024 (Period 01) Great Britain 6374920.0 42.83 72.38 88.44 93.57 97.55 98.73 99.26 99.70 1.27 0.74 0.30 72536238.0 38.95 67.67 85.35 91.59 96.74 98.33 99.03 99.60 1.67 0.97 0.40
1 2023202402 Apr 2023 to Mar 2024 (Period 02) Great Britain 5921045.0 42.35 71.71 87.91 93.16 97.35 98.61 99.19 99.67 1.39 0.81 0.33 72568495.0 38.91 67.58 85.25 91.50 96.69 98.29 99.01 99.59 1.71 0.99 0.41
1 2023202403 Apr 2023 to Mar 2024 (Period 03) Great Britain 5859423.0 39.89 68.13 84.98 91.01 96.20 97.90 98.70 99.43 2.10 1.30 0.57 73226697.0 38.73 67.35 85.05 91.35 96.61 98.24 98.97 99.58 1.76 1.03 0.42
1 2023202404 Apr 2023 to Mar 2024 (Period 04) Great Britain 5908226.0 40.90 69.79 86.65 92.38 97.03 98.44 99.08 99.61 1.56 0.92 0.39 73389345.0 38.83 67.47 85.15 91.43 96.66 98.27 98.99 99.59 1.73 1.01 0.41
1 2023202405 Apr 2023 to Mar 2024 (Period 05) Great Britain 5900672.0 41.13 70.47 87.12 92.68 97.17 98.53 99.14 99.66 1.47 0.86 0.34 74070452.0 39.04 67.78 85.38 91.60 96.75 98.32 99.03 99.61 1.68 0.97 0.39
1 2023202406 Apr 2023 to Mar 2024 (Period 06) Great Britain 5920815.0 39.67 69.02 86.31 92.19 96.96 98.41 99.07 99.62 1.59 0.93 0.38 73895082.0 39.09 67.85 85.40 91.59 96.74 98.31 99.02 99.60 1.69 0.98 0.40
1 2023202407 Apr 2023 to Mar 2024 (Period 07) Great Britain 5908944.0 37.43 66.22 84.45 91.09 96.63 98.30 99.04 99.63 1.70 0.96 0.37 74260806.0 38.98 67.70 85.25 91.48 96.68 98.28 99.00 99.60 1.72 1.00 0.40
1 2023202408 Apr 2023 to Mar 2024 (Period 08) Great Britain 6221518.0 34.43 62.15 81.28 88.80 95.47 97.58 98.54 99.39 2.42 1.46 0.61 74840183.0 39.03 67.76 85.27 91.48 96.66 98.25 98.98 99.58 1.75 1.02 0.42
1 2023202409 Apr 2023 to Mar 2024 (Period 09) Great Britain 5948995.0 31.31 58.31 78.28 86.76 94.59 97.16 98.35 99.34 2.84 1.65 0.66 74819890.0 38.92 67.63 85.11 91.34 96.57 98.20 98.94 99.57 1.80 1.06 0.43
1 2023202410 Apr 2023 to Mar 2024 (Period 10) Great Britain 5596413.0 36.65 64.62 82.65 89.54 95.62 97.63 98.55 99.37 2.37 1.45 0.63 77254713.0 38.83 67.55 85.09 91.35 96.59 98.21 98.95 99.57 1.79 1.05 0.43
1 2023202411 Apr 2023 to Mar 2024 (Period 11) Great Britain 6034038.0 38.17 66.68 84.68 91.25 96.68 98.29 99.01 99.59 1.71 0.99 0.41 77415047.0 38.92 67.65 85.16 91.40 96.61 98.22 98.95 99.57 1.78 1.05 0.43
1 2023202412 Apr 2023 to Mar 2024 (Period 12) Great Britain 6202197.0 39.31 68.30 86.16 92.36 97.21 98.60 99.18 99.67 1.40 0.82 0.33 77484548.0 38.87 67.59 85.12 91.38 96.61 98.22 98.95 99.57 1.78 1.05 0.43
1 2023202413 Apr 2023 to Mar 2024 (Period 13) Great Britain 6485385.0 41.02 70.38 87.44 93.07 97.39 98.66 99.22 99.68 1.34 0.78 0.32 78282591.0 38.88 67.59 85.14 91.40 96.62 98.23 98.95 99.57 1.77 1.05 0.43
1 2024202501 Apr 2024 to Mar 2025 (Period 01) Great Britain 6018306.0 41.54 70.96 87.67 93.08 97.34 98.61 99.18 99.65 1.39 0.82 0.35 77925977.0 38.76 67.46 85.06 91.35 96.60 98.21 98.95 99.56 1.79 1.05 0.44
1 2024202502 Apr 2024 to Mar 2025 (Period 02) Great Britain 6206990.0 41.18 70.32 87.11 92.72 97.25 98.59 99.19 99.68 1.41 0.81 0.32 78211922.0 38.68 67.36 85.01 91.32 96.59 98.21 98.95 99.57 1.79 1.05 0.43
1 2024202503 Apr 2024 to Mar 2025 (Period 03) Great Britain 6463165.0 40.94 69.70 86.49 92.29 97.03 98.47 99.12 99.65 1.53 0.88 0.35 78815664.0 38.78 67.50 85.13 91.42 96.66 98.26 98.98 99.58 1.74 1.02 0.42
1 2024202504 Apr 2024 to Mar 2025 (Period 04) Great Britain 6415398.0 39.36 68.00 85.24 91.41 96.61 98.25 98.99 99.59 1.75 1.01 0.41 79322836.0 38.67 67.37 85.03 91.35 96.63 98.24 98.97 99.58 1.76 1.03 0.42
1 2024202505 Apr 2024 to Mar 2025 (Period 05) Great Britain 6353550.0 39.25 67.80 85.24 91.45 96.66 98.27 99.00 99.61 1.73 1.00 0.39 79775714.0 38.53 67.17 84.89 91.26 96.59 98.22 98.96 99.58 1.78 1.04 0.42
1 2024202506 Apr 2024 to Mar 2025 (Period 06) Great Britain 6318206.0 39.72 68.60 85.74 91.76 96.73 98.28 98.99 99.58 1.72 1.01 0.42 80173105.0 38.54 67.15 84.85 91.23 96.57 98.22 98.96 99.57 1.78 1.04 0.43
1 2024202507 Apr 2024 to Mar 2025 (Period 07) Great Britain 6308039.0 36.96 65.35 83.56 90.36 96.21 98.03 98.85 99.52 1.97 1.15 0.48 80572200.0 38.50 67.07 84.78 91.17 96.54 98.19 98.94 99.57 1.81 1.06 0.43
1 2024202508 Apr 2024 to Mar 2025 (Period 08) Great Britain 6420009.0 34.74 62.49 81.65 89.30 96.01 98.02 98.89 99.58 1.98 1.11 0.42 80770691.0 38.51 67.09 84.80 91.21 96.58 98.23 98.97 99.58 1.77 1.03 0.42
1 2024202509 Apr 2024 to Mar 2025 (Period 09) Great Britain 6373156.0 31.07 57.67 77.38 86.00 94.31 97.05 98.29 99.30 2.95 1.71 0.70 81194852.0 38.46 66.99 84.70 91.13 96.55 98.21 98.96 99.58 1.79 1.04 0.42
1 2024202510 Apr 2024 to Mar 2025 (Period 10) Great Britain 5686408.0 37.02 65.64 83.78 90.57 96.38 98.17 98.95 99.59 1.83 1.05 0.41 81284847.0 38.48 67.06 84.77 91.20 96.60 98.25 98.99 99.59 1.75 1.01 0.41
1 2024202511 Apr 2024 to Mar 2025 (Period 11) Great Britain 6403936.0 37.42 65.78 83.95 90.75 96.44 98.16 98.93 99.56 1.84 1.07 0.44 81654745.0 38.42 66.99 84.72 91.16 96.58 98.24 98.98 99.59 1.76 1.02 0.41
1 2024202512 Apr 2024 to Mar 2025 (Period 12) Great Britain 6569875.0 38.54 68.08 86.23 92.51 97.33 98.70 99.28 99.72 1.30 0.72 0.28 82022423.0 38.36 66.98 84.73 91.17 96.59 98.25 98.99 99.59 1.75 1.01 0.41
1 2024202513 Apr 2024 to Mar 2025 (Period 13) Great Britain 7012797.0 40.67 70.49 87.76 93.36 97.58 98.78 99.30 99.73 1.22 0.70 0.27 82549835.0 38.35 67.01 84.77 91.21 96.61 98.26 99.00 99.60 1.74 1.00 0.40
1 2025202601 Apr 2025 to Mar 2026 (Period 01) Great Britain 6170731.0 40.96 70.67 87.59 93.16 97.50 98.76 99.30 99.73 1.24 0.70 0.27 82702260.0 38.31 66.99 84.77 91.22 96.63 98.28 99.01 99.60 1.72 0.99 0.40
1 2025202602 Apr 2025 to Mar 2026 (Period 02) Great Britain 6610473.0 39.39 68.46 85.98 92.03 96.96 98.45 99.11 99.65 1.55 0.89 0.35 83105743.0 38.19 66.86 84.69 91.17 96.61 98.27 99.00 99.60 1.73 1.00 0.40
1 2025202603 Apr 2025 to Mar 2026 (Period 03) Great Britain 6633799.0 39.94 68.88 86.09 92.04 96.86 98.33 99.00 99.58 1.67 1.00 0.42 83276377.0 38.11 66.80 84.67 91.16 96.59 98.25 98.99 99.60 1.75 1.01 0.40
1 2025202604 Apr 2025 to Mar 2026 (Period 04) Great Britain 6692021.0 37.66 66.12 83.90 90.49 96.20 97.98 98.80 99.49 2.02 1.20 0.51 83553000.0 37.98 66.66 84.56 91.08 96.56 98.23 98.98 99.59 1.77 1.02 0.41
1 2025202605 Apr 2025 to Mar 2026 (Period 05) Great Britain 6595549.0 39.16 68.09 85.42 91.57 96.69 98.27 98.97 99.57 1.73 1.03 0.43 83794999.0 37.98 66.68 84.58 91.09 96.56 98.23 98.98 99.59 1.77 1.02 0.41
1 2025202606 Apr 2025 to Mar 2026 (Period 06) Great Britain 6637853.0 38.02 66.94 85.14 91.61 96.87 98.42 99.11 99.66 1.58 0.89 0.34 84114646.0 37.85 66.56 84.53 91.08 96.57 98.24 98.99 99.59 1.76 1.01 0.41
1 2025202607 Apr 2025 to Mar 2026 (Period 07) Great Britain 6605237.0 36.45 65.16 84.05 90.92 96.57 98.25 98.99 99.59 1.75 1.01 0.41 84411844.0 37.81 66.54 84.57 91.13 96.60 98.26 99.00 99.60 1.74 1.00 0.40
1 2025202608 Apr 2025 to Mar 2026 (Period 08) Great Britain 6644158.0 33.74 61.61 81.36 89.20 96.00 98.03 98.88 99.55 1.97 1.12 0.45 84635993.0 37.72 66.46 84.54 91.11 96.60 98.26 98.99 99.59 1.74 1.01 0.41
1 2025202609 Apr 2025 to Mar 2026 (Period 09) Great Britain 6596812.0 31.80 58.96 78.94 87.34 95.07 97.52 98.60 99.46 2.48 1.40 0.54 84859649.0 37.76 66.54 84.64 91.20 96.65 98.29 99.02 99.61 1.71 0.98 0.39
1 2025202610 Apr 2025 to Mar 2026 (Period 10) Great Britain 5888144.0 36.81 65.44 83.81 90.64 96.39 98.12 98.91 99.56 1.88 1.09 0.44 85061385.0 37.74 66.52 84.64 91.21 96.65 98.29 99.01 99.60 1.71 0.99 0.40
1 2025202611 Apr 2025 to Mar 2026 (Period 11) Great Britain 6658834.0 38.51 67.61 85.75 92.04 97.04 98.48 99.10 99.62 1.52 0.90 0.38 85316283.0 37.82 66.66 84.78 91.31 96.70 98.32 99.03 99.61 1.68 0.97 0.39
1 2025202612 Apr 2025 to Mar 2026 (Period 12) Great Britain 6689540.0 39.57 68.76 86.45 92.54 97.31 98.64 99.21 99.69 1.36 0.79 0.31 85435948.0 37.91 66.72 84.80 91.31 96.70 98.31 99.02 99.61 1.69 0.98 0.39
1 2025202613 Apr 2025 to Mar 2026 (Period 13) Great Britain 7293225.0 41.23 70.20 87.19 92.90 97.34 98.62 99.18 99.66 1.38 0.82 0.34 85716376.0 37.96 66.70 84.76 91.28 96.68 98.30 99.01 99.60 1.70 0.99 0.40
1 2026202701 Apr 2026 to Mar 2027 (Period 01) Great Britain 7713123.0 41.26 70.16 86.95 92.67 97.22 98.55 99.16 99.66 1.45 0.84 0.34 87258768.0 38.04 66.73 84.75 91.27 96.67 98.29 99.01 99.60 1.71 0.99 0.40
1 2026202702 Apr 2026 to Mar 2027 (Period 02) Great Britain 6610868.0 39.54 67.61 84.35 90.40 95.74 97.56 98.47 99.30 2.44 1.53 0.70 87259163.0 38.05 66.66 84.63 91.14 96.58 98.22 98.96 99.57 1.78 1.04 0.43
2 2014201501 Apr 2014 to Mar 2015 (Period 01) England and Wales 4305016.0 36.06 68.58 88.07 94.11 98.12 99.11 99.52 99.81 0.89 0.48 0.19 4305016.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201502 Apr 2014 to Mar 2015 (Period 02) England and Wales 4600338.0 35.42 67.49 87.06 93.35 97.76 98.90 99.37 99.75 1.10 0.63 0.25 8905354.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201503 Apr 2014 to Mar 2015 (Period 03) England and Wales 4623174.0 35.38 67.56 87.10 93.40 97.77 98.93 99.41 99.78 1.07 0.59 0.22 13528528.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201504 Apr 2014 to Mar 2015 (Period 04) England and Wales 4664354.0 34.46 66.07 86.14 92.83 97.54 98.80 99.33 99.74 1.20 0.67 0.26 18192882.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201505 Apr 2014 to Mar 2015 (Period 05) England and Wales 4641560.0 33.79 65.01 85.04 91.91 97.07 98.53 99.17 99.67 1.47 0.83 0.33 22834442.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201506 Apr 2014 to Mar 2015 (Period 06) England and Wales 4627925.0 36.11 67.94 87.52 93.75 97.97 99.01 99.44 99.77 0.99 0.56 0.23 27462367.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201507 Apr 2014 to Mar 2015 (Period 07) England and Wales 4638116.0 33.07 64.10 84.72 92.10 97.49 98.81 99.32 99.72 1.19 0.68 0.28 32100483.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201508 Apr 2014 to Mar 2015 (Period 08) England and Wales 4621041.0 27.41 55.79 77.81 87.33 95.68 98.05 98.98 99.65 1.95 1.02 0.35 36721524.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201509 Apr 2014 to Mar 2015 (Period 09) England and Wales 4621119.0 28.23 56.86 78.96 88.31 96.12 98.24 99.06 99.65 1.76 0.94 0.35 41342643.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201510 Apr 2014 to Mar 2015 (Period 10) England and Wales 4098229.0 32.31 62.67 83.17 90.78 96.79 98.41 99.08 99.63 1.59 0.92 0.37 45440872.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201511 Apr 2014 to Mar 2015 (Period 11) England and Wales 4607376.0 33.36 63.71 83.72 91.09 96.92 98.51 99.17 99.69 1.49 0.83 0.31 50048248.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201512 Apr 2014 to Mar 2015 (Period 12) England and Wales 4646928.0 34.83 65.99 85.94 92.74 97.66 98.93 99.43 99.79 1.07 0.57 0.21 54695176.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
2 2014201513 Apr 2014 to Mar 2015 (Period 13) England and Wales 5091568.0 36.80 68.11 87.07 93.31 97.74 98.89 99.37 99.75 1.11 0.63 0.25 59786744.0 33.66 64.63 84.81 91.93 97.28 98.70 99.28 99.72 1.30 0.72 0.28
2 2015201601 Apr 2015 to Mar 2016 (Period 01) England and Wales 5294787.0 36.36 67.76 86.99 93.21 97.65 98.80 99.30 99.70 1.20 0.70 0.30 60776515.0 33.72 64.62 84.77 91.89 97.26 98.68 99.27 99.72 1.32 0.73 0.28
2 2015201602 Apr 2015 to Mar 2016 (Period 02) England and Wales 4632254.0 36.25 67.78 87.19 93.44 97.85 98.97 99.43 99.79 1.03 0.57 0.21 60808431.0 33.79 64.65 84.78 91.90 97.26 98.69 99.27 99.72 1.31 0.73 0.28
2 2015201603 Apr 2015 to Mar 2016 (Period 03) England and Wales 4714118.0 35.65 67.22 86.83 93.21 97.78 98.96 99.43 99.79 1.04 0.57 0.21 60899375.0 33.81 64.62 84.76 91.89 97.26 98.69 99.27 99.72 1.31 0.73 0.28
2 2015201604 Apr 2015 to Mar 2016 (Period 04) England and Wales 4683333.0 33.46 64.07 84.44 91.59 97.00 98.51 99.15 99.67 1.49 0.85 0.33 60918354.0 33.73 64.47 84.63 91.79 97.22 98.67 99.26 99.71 1.33 0.74 0.29
2 2015201605 Apr 2015 to Mar 2016 (Period 05) England and Wales 4690282.0 34.62 65.75 85.83 92.57 97.43 98.73 99.27 99.70 1.27 0.73 0.30 60967076.0 33.80 64.53 84.69 91.84 97.25 98.68 99.27 99.72 1.32 0.73 0.28
2 2015201606 Apr 2015 to Mar 2016 (Period 06) England and Wales 4658766.0 35.40 66.43 86.63 93.27 97.83 98.96 99.43 99.77 1.04 0.57 0.23 60997917.0 33.74 64.41 84.63 91.81 97.24 98.68 99.27 99.72 1.32 0.73 0.28
2 2015201607 Apr 2015 to Mar 2016 (Period 07) England and Wales 4708621.0 32.58 63.14 84.26 91.89 97.49 98.84 99.35 99.74 1.16 0.65 0.26 61068422.0 33.71 64.34 84.59 91.79 97.24 98.68 99.27 99.72 1.32 0.73 0.28
2 2015201608 Apr 2015 to Mar 2016 (Period 08) England and Wales 4750379.0 26.97 55.13 77.74 87.43 95.77 98.10 99.03 99.68 1.90 0.97 0.32 61197760.0 33.66 64.27 84.57 91.79 97.24 98.69 99.27 99.72 1.31 0.73 0.28
2 2015201609 Apr 2015 to Mar 2016 (Period 09) England and Wales 4771474.0 26.03 53.38 76.04 86.15 95.17 97.75 98.78 99.54 2.25 1.22 0.46 61348115.0 33.47 63.98 84.33 91.61 97.17 98.65 99.25 99.71 1.35 0.75 0.29
2 2015201610 Apr 2015 to Mar 2016 (Period 10) England and Wales 4265155.0 31.82 61.69 82.54 90.33 96.49 98.21 98.98 99.59 1.79 1.02 0.41 61515041.0 33.44 63.91 84.28 91.58 97.14 98.63 99.24 99.71 1.37 0.76 0.29
2 2015201611 Apr 2015 to Mar 2016 (Period 11) England and Wales 4812817.0 31.72 61.83 82.99 90.87 96.99 98.56 99.21 99.70 1.44 0.79 0.30 61720482.0 33.31 63.76 84.22 91.56 97.15 98.64 99.24 99.71 1.36 0.76 0.29
2 2015201612 Apr 2015 to Mar 2016 (Period 12) England and Wales 4789994.0 32.53 62.93 83.95 91.44 97.05 98.53 99.16 99.65 1.47 0.84 0.35 61863548.0 33.13 63.53 84.07 91.46 97.10 98.61 99.22 99.70 1.39 0.78 0.30
2 2015201613 Apr 2015 to Mar 2016 (Period 13) England and Wales 4353956.0 34.43 65.63 85.90 92.77 97.66 98.89 99.38 99.75 1.11 0.62 0.25 61125936.0 32.92 63.30 83.96 91.40 97.09 98.60 99.22 99.70 1.40 0.78 0.30
2 2016201701 Apr 2016 to Mar 2017 (Period 01) England and Wales 5229128.0 35.35 67.06 87.12 93.56 97.94 99.00 99.43 99.78 1.00 0.57 0.22 61060277.0 32.83 63.23 83.96 91.43 97.11 98.62 99.23 99.71 1.38 0.77 0.29
2 2016201702 Apr 2016 to Mar 2017 (Period 02) England and Wales 4840401.0 34.21 65.38 85.62 92.48 97.52 98.82 99.36 99.76 1.18 0.64 0.24 61268424.0 32.68 63.06 83.85 91.36 97.09 98.61 99.23 99.70 1.39 0.77 0.30
2 2016201703 Apr 2016 to Mar 2017 (Period 03) England and Wales 4758198.0 33.25 63.62 83.78 90.89 96.43 98.07 98.83 99.49 1.93 1.17 0.51 61312504.0 32.50 62.78 83.62 91.18 96.99 98.54 99.18 99.68 1.46 0.82 0.32
2 2016201704 Apr 2016 to Mar 2017 (Period 04) England and Wales 4856786.0 32.41 62.75 83.45 90.80 96.50 98.16 98.91 99.53 1.84 1.09 0.47 61485957.0 32.42 62.68 83.54 91.12 96.95 98.51 99.16 99.67 1.49 0.84 0.33
2 2016201705 Apr 2016 to Mar 2017 (Period 05) England and Wales 4832364.0 33.02 63.56 84.38 91.70 97.13 98.59 99.21 99.70 1.41 0.79 0.30 61628039.0 32.30 62.52 83.43 91.05 96.93 98.50 99.16 99.67 1.50 0.84 0.33
2 2016201706 Apr 2016 to Mar 2017 (Period 06) England and Wales 4872046.0 31.62 61.44 82.54 90.26 96.34 98.10 98.90 99.55 1.90 1.10 0.45 61841319.0 32.01 62.14 83.12 90.83 96.81 98.44 99.12 99.65 1.56 0.88 0.35
2 2016201707 Apr 2016 to Mar 2017 (Period 07) England and Wales 4922005.0 31.70 61.64 83.32 91.29 97.26 98.77 99.35 99.77 1.23 0.65 0.23 62054703.0 31.94 62.03 83.05 90.78 96.80 98.43 99.12 99.65 1.57 0.88 0.35
2 2016201708 Apr 2016 to Mar 2017 (Period 08) England and Wales 4898242.0 27.88 56.27 78.82 88.15 95.98 98.16 99.02 99.65 1.84 0.98 0.35 62202566.0 32.00 62.10 83.12 90.83 96.81 98.43 99.12 99.65 1.57 0.88 0.35
2 2016201709 Apr 2016 to Mar 2017 (Period 09) England and Wales 4912295.0 23.60 49.45 72.11 82.85 93.41 96.79 98.23 99.33 3.21 1.77 0.67 62343387.0 31.80 61.77 82.80 90.56 96.67 98.36 99.08 99.64 1.64 0.92 0.36
2 2016201710 Apr 2016 to Mar 2017 (Period 10) England and Wales 4423001.0 31.90 61.69 82.81 90.58 96.80 98.48 99.18 99.71 1.52 0.82 0.29 62501233.0 31.80 61.77 82.82 90.58 96.69 98.38 99.09 99.64 1.62 0.91 0.36
2 2016201711 Apr 2016 to Mar 2017 (Period 11) England and Wales 4893675.0 32.24 61.84 82.56 90.31 96.54 98.29 99.03 99.60 1.71 0.97 0.40 62582091.0 31.84 61.77 82.78 90.53 96.65 98.36 99.08 99.64 1.64 0.92 0.36
2 2016201712 Apr 2016 to Mar 2017 (Period 12) England and Wales 5013322.0 33.99 64.11 84.38 91.51 96.97 98.43 99.07 99.60 1.57 0.93 0.40 62805419.0 31.96 61.87 82.82 90.54 96.65 98.35 99.07 99.63 1.65 0.93 0.37
2 2016201713 Apr 2016 to Mar 2017 (Period 13) England and Wales 4877358.0 36.18 66.97 86.83 93.30 97.81 98.94 99.40 99.74 1.06 0.60 0.26 63328821.0 32.12 62.00 82.92 90.60 96.67 98.36 99.07 99.63 1.64 0.93 0.37
2 2017201801 Apr 2017 to Mar 2018 (Period 01) England and Wales 5191574.0 38.09 69.45 88.35 94.14 98.11 99.10 99.50 99.80 0.90 0.50 0.20 63291267.0 32.34 62.20 83.02 90.65 96.68 98.36 99.08 99.64 1.64 0.92 0.36
2 2017201802 Apr 2017 to Mar 2018 (Period 02) England and Wales 5138203.0 36.50 67.54 87.13 93.45 97.89 99.02 99.46 99.80 0.98 0.54 0.20 63589069.0 32.53 62.39 83.15 90.73 96.72 98.38 99.09 99.64 1.62 0.91 0.36
2 2017201803 Apr 2017 to Mar 2018 (Period 03) England and Wales 5123292.0 34.78 64.67 84.66 91.55 96.91 98.40 99.06 99.61 1.60 0.94 0.39 63954163.0 32.66 62.48 83.22 90.79 96.75 98.41 99.10 99.65 1.59 0.90 0.35
2 2017201804 Apr 2017 to Mar 2018 (Period 04) England and Wales 5095798.0 34.12 64.22 84.99 92.20 97.48 98.81 99.35 99.76 1.19 0.65 0.24 64193175.0 32.80 62.60 83.35 90.90 96.83 98.46 99.14 99.66 1.54 0.86 0.34
2 2017201805 Apr 2017 to Mar 2018 (Period 05) England and Wales 5214704.0 35.10 65.28 85.62 92.51 97.45 98.75 99.31 99.73 1.25 0.69 0.27 64575515.0 32.96 62.74 83.45 90.97 96.86 98.47 99.15 99.67 1.53 0.85 0.33
2 2017201806 Apr 2017 to Mar 2018 (Period 06) England and Wales 5103180.0 34.73 64.82 85.01 91.96 97.25 98.69 99.29 99.75 1.31 0.71 0.25 64806649.0 33.20 63.00 83.65 91.10 96.93 98.52 99.18 99.68 1.48 0.82 0.32
2 2017201807 Apr 2017 to Mar 2018 (Period 07) England and Wales 5153157.0 32.06 61.29 82.61 90.75 97.10 98.70 99.32 99.75 1.30 0.68 0.25 65037801.0 33.23 62.97 83.59 91.06 96.91 98.51 99.17 99.68 1.49 0.83 0.32
2 2017201808 Apr 2017 to Mar 2018 (Period 08) England and Wales 5150614.0 28.48 55.91 78.04 87.45 95.65 97.93 98.86 99.56 2.07 1.14 0.44 65290173.0 33.25 62.91 83.51 90.99 96.89 98.49 99.16 99.67 1.51 0.84 0.33
2 2017201809 Apr 2017 to Mar 2018 (Period 09) England and Wales 5195317.0 28.55 56.02 78.19 87.66 95.80 98.06 98.95 99.61 1.94 1.05 0.39 65573195.0 33.60 63.38 83.94 91.34 97.06 98.59 99.21 99.69 1.41 0.79 0.31
2 2017201810 Apr 2017 to Mar 2018 (Period 10) England and Wales 4528648.0 31.15 59.38 80.21 88.50 95.69 97.85 98.77 99.51 2.15 1.23 0.49 65678842.0 33.55 63.21 83.76 91.19 96.98 98.54 99.19 99.68 1.46 0.81 0.32
2 2017201811 Apr 2017 to Mar 2018 (Period 11) England and Wales 5163116.0 33.67 63.17 83.93 91.63 97.42 98.88 99.41 99.77 1.12 0.59 0.23 65948283.0 33.66 63.31 83.86 91.29 97.05 98.59 99.22 99.69 1.41 0.78 0.31
2 2017201812 Apr 2017 to Mar 2018 (Period 12) England and Wales 4982843.0 32.65 61.20 81.44 89.25 95.71 97.63 98.50 99.30 2.37 1.50 0.70 65917804.0 33.56 63.09 83.64 91.12 96.96 98.53 99.17 99.67 1.47 0.83 0.33
2 2017201813 Apr 2017 to Mar 2018 (Period 13) England and Wales 5149658.0 33.91 62.91 83.32 90.97 96.95 98.56 99.20 99.70 1.44 0.80 0.30 66190104.0 33.39 62.79 83.38 90.95 96.89 98.50 99.16 99.67 1.50 0.84 0.33
2 2018201901 Apr 2018 to Mar 2019 (Period 01) England and Wales 5264536.0 35.96 65.43 85.13 92.02 97.15 98.54 99.14 99.65 1.46 0.86 0.35 66263066.0 33.23 62.48 83.13 90.79 96.82 98.46 99.13 99.66 1.54 0.87 0.34
2 2018201902 Apr 2018 to Mar 2019 (Period 02) England and Wales 5248173.0 35.26 64.22 83.88 91.14 96.83 98.43 99.14 99.68 1.57 0.86 0.32 66373036.0 33.13 62.23 82.88 90.61 96.74 98.41 99.11 99.65 1.59 0.89 0.35
2 2018201903 Apr 2018 to Mar 2019 (Period 03) England and Wales 5233634.0 37.32 65.60 83.76 90.50 96.20 98.03 98.87 99.55 1.97 1.13 0.45 66483378.0 33.34 62.30 82.81 90.53 96.68 98.38 99.09 99.64 1.62 0.91 0.36
2 2018201904 Apr 2018 to Mar 2019 (Period 04) England and Wales 5295071.0 33.78 61.09 80.25 87.90 94.86 97.19 98.31 99.31 2.81 1.69 0.69 66682651.0 33.31 62.06 82.44 90.19 96.47 98.25 99.01 99.61 1.75 0.99 0.39
2 2018201905 Apr 2018 to Mar 2019 (Period 05) England and Wales 5354375.0 34.75 62.53 81.98 89.47 95.99 98.02 98.89 99.58 1.98 1.11 0.42 66822322.0 33.29 61.85 82.15 89.95 96.36 98.20 98.98 99.60 1.80 1.02 0.40
2 2018201906 Apr 2018 to Mar 2019 (Period 06) England and Wales 5317405.0 37.37 66.36 85.36 92.14 97.36 98.75 99.31 99.74 1.25 0.69 0.26 67036547.0 33.50 61.98 82.19 89.97 96.37 98.20 98.98 99.60 1.80 1.02 0.40
2 2018201907 Apr 2018 to Mar 2019 (Period 07) England and Wales 5329362.0 33.69 61.59 81.71 89.71 96.34 98.21 99.00 99.62 1.79 1.00 0.38 67212752.0 33.63 62.00 82.12 89.89 96.31 98.17 98.95 99.58 1.83 1.05 0.42
2 2018201908 Apr 2018 to Mar 2019 (Period 08) England and Wales 5264935.0 31.17 58.22 78.87 87.70 95.60 97.96 98.90 99.61 2.04 1.10 0.39 67327073.0 33.83 62.17 82.18 89.91 96.31 98.17 98.96 99.59 1.83 1.04 0.41
2 2018201909 Apr 2018 to Mar 2019 (Period 09) England and Wales 5313412.0 28.89 55.08 76.16 85.65 94.63 97.47 98.66 99.53 2.53 1.34 0.47 67445168.0 33.84 62.09 82.01 89.74 96.21 98.12 98.93 99.58 1.88 1.07 0.42
2 2018201910 Apr 2018 to Mar 2019 (Period 10) England and Wales 4723987.0 36.44 65.37 84.37 91.40 97.07 98.64 99.27 99.74 1.36 0.73 0.26 67640507.0 34.21 62.50 82.30 89.94 96.31 98.17 98.97 99.60 1.83 1.03 0.40
2 2018201911 Apr 2018 to Mar 2019 (Period 11) England and Wales 5486722.0 37.18 66.28 85.32 92.24 97.45 98.77 99.30 99.73 1.23 0.70 0.27 67964113.0 34.49 62.75 82.42 90.00 96.32 98.17 98.96 99.60 1.83 1.04 0.40
2 2018201912 Apr 2018 to Mar 2019 (Period 12) England and Wales 5507850.0 37.66 67.05 85.80 92.38 97.35 98.70 99.27 99.72 1.30 0.73 0.28 68489120.0 34.88 63.21 82.76 90.25 96.44 98.25 99.02 99.63 1.75 0.98 0.37
2 2018201913 Apr 2018 to Mar 2019 (Period 13) England and Wales 5631135.0 38.56 68.01 86.38 92.65 97.33 98.64 99.20 99.68 1.36 0.80 0.32 68970597.0 35.25 63.62 83.02 90.39 96.48 98.26 99.02 99.63 1.74 0.98 0.37
2 2019202001 Apr 2019 to Mar 2020 (Period 01) England and Wales 5381893.0 41.07 70.83 88.36 93.98 97.96 98.99 99.42 99.77 1.01 0.58 0.23 69087954.0 35.65 64.05 83.27 90.54 96.54 98.29 99.04 99.63 1.71 0.96 0.37
2 2019202002 Apr 2019 to Mar 2020 (Period 02) England and Wales 5599727.0 40.28 69.79 87.53 93.41 97.75 98.91 99.39 99.76 1.09 0.61 0.24 69439508.0 36.05 64.50 83.57 90.73 96.62 98.33 99.06 99.64 1.67 0.94 0.36
2 2019202003 Apr 2019 to Mar 2020 (Period 03) England and Wales 5631367.0 39.53 68.72 86.60 92.79 97.48 98.77 99.31 99.73 1.23 0.69 0.27 69837241.0 36.24 64.75 83.80 90.91 96.72 98.39 99.10 99.66 1.61 0.90 0.34
2 2019202004 Apr 2019 to Mar 2020 (Period 04) England and Wales 5690590.0 37.33 65.79 84.63 91.53 96.95 98.49 99.13 99.64 1.51 0.87 0.36 70232760.0 36.51 65.11 84.13 91.19 96.88 98.49 99.16 99.68 1.51 0.84 0.32
2 2019202005 Apr 2019 to Mar 2020 (Period 05) England and Wales 5578462.0 36.18 63.84 82.54 89.77 95.88 97.85 98.74 99.48 2.15 1.26 0.52 70456847.0 36.62 65.21 84.17 91.21 96.87 98.48 99.15 99.67 1.52 0.85 0.33
2 2019202006 Apr 2019 to Mar 2020 (Period 06) England and Wales 5640461.0 37.79 66.31 85.07 91.88 97.20 98.67 99.26 99.72 1.33 0.74 0.28 70779903.0 36.65 65.21 84.15 91.19 96.86 98.47 99.14 99.67 1.53 0.86 0.33
2 2019202007 Apr 2019 to Mar 2020 (Period 07) England and Wales 5649724.0 34.67 62.47 82.10 89.89 96.42 98.28 99.05 99.63 1.72 0.95 0.37 71100265.0 36.72 65.27 84.17 91.20 96.86 98.47 99.15 99.67 1.53 0.85 0.33
2 2019202008 Apr 2019 to Mar 2020 (Period 08) England and Wales 5624215.0 32.69 59.42 79.39 87.87 95.47 97.75 98.72 99.49 2.25 1.28 0.51 71459545.0 36.81 65.32 84.19 91.20 96.84 98.45 99.13 99.66 1.55 0.87 0.34
2 2019202009 Apr 2019 to Mar 2020 (Period 09) England and Wales 5533977.0 29.67 55.54 76.08 85.45 94.48 97.38 98.60 99.51 2.62 1.40 0.49 71680110.0 36.85 65.33 84.16 91.16 96.82 98.44 99.13 99.66 1.56 0.87 0.34
2 2019202010 Apr 2019 to Mar 2020 (Period 10) England and Wales 4782986.0 34.60 62.32 81.43 89.02 95.81 97.93 98.84 99.55 2.07 1.16 0.45 71739109.0 36.72 65.13 83.96 91.01 96.74 98.40 99.10 99.65 1.60 0.90 0.35
2 2019202011 Apr 2019 to Mar 2020 (Period 11) England and Wales 5647831.0 35.19 63.02 82.51 90.25 96.66 98.42 99.13 99.68 1.58 0.87 0.32 71900218.0 36.57 64.87 83.74 90.85 96.68 98.37 99.08 99.64 1.63 0.92 0.36
2 2019202012 Apr 2019 to Mar 2020 (Period 12) England and Wales 5595262.0 35.16 62.76 81.95 89.63 96.16 98.08 98.89 99.57 1.92 1.11 0.43 71987630.0 36.38 64.54 83.45 90.64 96.59 98.32 99.05 99.63 1.68 0.95 0.37
2 2019202013 Apr 2019 to Mar 2020 (Period 13) England and Wales 5531185.0 43.78 71.37 87.23 92.78 97.26 98.61 99.19 99.68 1.39 0.81 0.32 71887680.0 36.77 64.80 83.51 90.65 96.58 98.32 99.05 99.63 1.68 0.95 0.37
2 2020202101 Apr 2020 to Mar 2021 (Period 01) England and Wales 3829649.0 63.13 88.75 96.65 98.26 99.36 99.68 99.82 99.93 0.32 0.18 0.07 70335436.0 37.88 65.64 83.85 90.81 96.63 98.34 99.07 99.64 1.66 0.93 0.36
2 2020202102 Apr 2020 to Mar 2021 (Period 02) England and Wales 3760061.0 60.64 86.54 95.57 97.63 99.08 99.52 99.71 99.88 0.48 0.29 0.12 68495770.0 38.93 66.45 84.19 90.97 96.67 98.36 99.08 99.64 1.64 0.92 0.36
2 2020202103 Apr 2020 to Mar 2021 (Period 03) England and Wales 4291227.0 58.16 85.36 95.28 97.48 99.02 99.49 99.70 99.87 0.51 0.30 0.13 67155630.0 40.11 67.46 84.70 91.23 96.75 98.40 99.10 99.65 1.60 0.90 0.35
2 2020202104 Apr 2020 to Mar 2021 (Period 04) England and Wales 4657238.0 55.33 83.73 94.83 97.36 99.03 99.51 99.71 99.88 0.49 0.29 0.12 66122278.0 41.42 68.75 85.42 91.64 96.89 98.47 99.14 99.67 1.53 0.86 0.33
2 2020202105 Apr 2020 to Mar 2021 (Period 05) England and Wales 4755377.0 49.59 78.52 91.96 95.64 98.35 99.16 99.51 99.81 0.84 0.49 0.19 65299193.0 42.47 69.88 86.14 92.09 97.09 98.57 99.20 99.69 1.43 0.80 0.31
2 2020202106 Apr 2020 to Mar 2021 (Period 06) England and Wales 4931653.0 49.08 78.54 92.36 95.98 98.47 99.21 99.53 99.80 0.79 0.47 0.20 64590385.0 43.38 70.86 86.71 92.40 97.18 98.61 99.22 99.70 1.39 0.78 0.30
2 2020202107 Apr 2020 to Mar 2021 (Period 07) England and Wales 5221497.0 46.58 76.25 91.43 95.59 98.40 99.19 99.54 99.82 0.81 0.46 0.18 64162158.0 44.41 72.03 87.50 92.88 97.35 98.69 99.26 99.71 1.31 0.74 0.29
2 2020202108 Apr 2020 to Mar 2021 (Period 08) England and Wales 5152715.0 43.33 72.33 89.06 94.28 98.04 99.05 99.48 99.80 0.95 0.52 0.20 63690658.0 45.36 73.17 88.34 93.44 97.57 98.80 99.32 99.74 1.20 0.68 0.26
2 2020202109 Apr 2020 to Mar 2021 (Period 09) England and Wales 5070112.0 45.64 75.23 90.98 95.50 98.53 99.32 99.62 99.85 0.68 0.38 0.15 63226793.0 46.75 74.88 89.63 94.30 97.92 98.97 99.41 99.77 1.03 0.59 0.23
2 2020202110 Apr 2020 to Mar 2021 (Period 10) England and Wales 4575526.0 48.72 78.06 92.02 95.73 98.38 99.17 99.52 99.79 0.83 0.48 0.21 63019333.0 47.82 76.06 90.42 94.81 98.11 99.06 99.46 99.79 0.94 0.54 0.21
2 2020202111 Apr 2020 to Mar 2021 (Period 11) England and Wales 4688051.0 50.75 79.27 92.15 95.65 98.25 99.09 99.47 99.79 0.91 0.53 0.21 62059553.0 49.19 77.49 91.27 95.29 98.26 99.12 99.49 99.80 0.88 0.51 0.20
2 2020202112 Apr 2020 to Mar 2021 (Period 12) England and Wales 4592472.0 52.40 80.95 93.10 96.25 98.59 99.28 99.58 99.83 0.72 0.42 0.17 61056763.0 50.71 79.10 92.27 95.88 98.47 99.23 99.56 99.82 0.77 0.44 0.18
2 2020202113 Apr 2020 to Mar 2021 (Period 13) England and Wales 4153188.0 53.51 82.42 94.27 97.08 98.95 99.47 99.69 99.88 0.53 0.31 0.12 59678766.0 51.55 80.05 92.87 96.25 98.62 99.30 99.60 99.84 0.70 0.40 0.16
2 2021202201 Apr 2021 to Mar 2022 (Period 01) England and Wales 5333108.0 51.97 81.55 94.00 96.91 98.87 99.42 99.65 99.85 0.58 0.35 0.15 61182225.0 50.86 79.64 92.73 96.18 98.59 99.29 99.59 99.83 0.71 0.41 0.17
2 2021202202 Apr 2021 to Mar 2022 (Period 02) England and Wales 5016070.0 48.73 78.65 92.55 96.12 98.56 99.26 99.57 99.81 0.74 0.43 0.19 62438234.0 50.10 79.14 92.55 96.09 98.56 99.27 99.58 99.83 0.73 0.42 0.17
2 2021202203 Apr 2021 to Mar 2022 (Period 03) England and Wales 5212549.0 45.55 74.78 90.08 94.56 97.92 98.93 99.37 99.74 1.07 0.63 0.26 63359556.0 49.18 78.36 92.16 95.87 98.48 99.23 99.56 99.82 0.77 0.44 0.18
2 2021202204 Apr 2021 to Mar 2022 (Period 04) England and Wales 5185874.0 45.99 75.15 89.86 94.24 97.66 98.76 99.27 99.68 1.24 0.73 0.32 63888192.0 48.48 77.71 91.78 95.63 98.37 99.17 99.52 99.80 0.83 0.48 0.20
2 2021202205 Apr 2021 to Mar 2022 (Period 05) England and Wales 5090184.0 46.11 75.76 90.78 95.03 98.13 99.02 99.42 99.75 0.98 0.58 0.25 64222999.0 48.21 77.50 91.69 95.58 98.36 99.16 99.51 99.80 0.84 0.49 0.20
2 2021202206 Apr 2021 to Mar 2022 (Period 06) England and Wales 5148372.0 44.59 74.28 89.83 94.43 97.87 98.91 99.38 99.75 1.09 0.62 0.25 64439718.0 47.85 77.16 91.49 95.46 98.31 99.14 99.50 99.79 0.86 0.50 0.21
2 2021202207 Apr 2021 to Mar 2022 (Period 07) England and Wales 5328203.0 42.02 71.79 88.85 94.17 97.99 99.02 99.44 99.77 0.98 0.56 0.23 64546424.0 47.47 76.79 91.27 95.34 98.27 99.12 99.49 99.79 0.88 0.51 0.21
2 2021202208 Apr 2021 to Mar 2022 (Period 08) England and Wales 5211947.0 37.90 66.73 84.99 91.51 96.84 98.41 99.09 99.63 1.59 0.91 0.37 64605656.0 47.03 76.33 90.94 95.12 98.18 99.07 99.46 99.78 0.93 0.54 0.22
2 2021202209 Apr 2021 to Mar 2022 (Period 09) England and Wales 5260071.0 36.01 64.28 83.21 90.33 96.26 98.08 98.89 99.55 1.92 1.11 0.45 64795615.0 46.24 75.44 90.31 94.70 97.99 98.97 99.40 99.75 1.03 0.60 0.25
2 2021202210 Apr 2021 to Mar 2022 (Period 10) England and Wales 4623576.0 44.14 73.37 89.03 93.97 97.76 98.89 99.38 99.76 1.11 0.62 0.24 64843665.0 45.92 75.11 90.10 94.57 97.95 98.95 99.39 99.75 1.05 0.61 0.25
2 2021202211 Apr 2021 to Mar 2022 (Period 11) England and Wales 4978674.0 43.66 73.40 89.64 94.63 98.16 99.11 99.50 99.80 0.89 0.50 0.20 65134288.0 45.40 74.68 89.92 94.50 97.94 98.96 99.40 99.75 1.04 0.60 0.25
2 2021202212 Apr 2021 to Mar 2022 (Period 12) England and Wales 4878563.0 41.66 70.79 87.43 92.75 96.98 98.31 98.95 99.51 1.69 1.05 0.49 65420379.0 44.63 73.95 89.51 94.25 97.83 98.88 99.35 99.73 1.12 0.65 0.27
2 2021202213 Apr 2021 to Mar 2022 (Period 13) England and Wales 4780591.0 43.59 73.20 89.34 94.25 97.91 98.97 99.42 99.78 1.03 0.58 0.22 66047782.0 43.99 73.36 89.20 94.07 97.76 98.85 99.33 99.72 1.15 0.67 0.28
2 2022202301 Apr 2022 to Mar 2023 (Period 01) England and Wales 5540830.0 44.62 73.87 89.38 94.10 97.70 98.80 99.30 99.71 1.20 0.70 0.29 66255504.0 43.41 72.74 88.83 93.84 97.67 98.80 99.30 99.71 1.20 0.70 0.29
2 2022202302 Apr 2022 to Mar 2023 (Period 02) England and Wales 5363633.0 43.32 72.72 89.04 94.14 97.91 98.95 99.39 99.76 1.05 0.61 0.24 66603067.0 43.00 72.30 88.56 93.69 97.62 98.78 99.29 99.71 1.22 0.71 0.29
2 2022202303 Apr 2022 to Mar 2023 (Period 03) England and Wales 4809707.0 42.87 71.35 87.54 92.91 97.23 98.56 99.14 99.63 1.44 0.86 0.37 66200225.0 42.79 72.03 88.37 93.57 97.57 98.75 99.27 99.70 1.25 0.73 0.30
2 2022202304 Apr 2022 to Mar 2023 (Period 04) England and Wales 5272695.0 39.98 68.11 85.02 90.98 96.11 97.86 98.68 99.41 2.14 1.32 0.59 66287046.0 42.31 71.48 87.98 93.31 97.44 98.68 99.23 99.68 1.32 0.77 0.32
2 2022202305 Apr 2022 to Mar 2023 (Period 05) England and Wales 4672264.0 38.54 65.99 83.47 90.04 95.79 97.71 98.60 99.40 2.29 1.40 0.60 65869126.0 41.75 70.76 87.45 92.95 97.27 98.59 99.17 99.65 1.41 0.83 0.35
2 2022202306 Apr 2022 to Mar 2023 (Period 06) England and Wales 5470408.0 39.20 67.80 85.58 91.81 96.86 98.41 99.09 99.63 1.59 0.91 0.37 66191162.0 41.32 70.24 87.11 92.74 97.19 98.55 99.15 99.64 1.45 0.85 0.36
2 2022202307 Apr 2022 to Mar 2023 (Period 07) England and Wales 4982695.0 39.29 68.18 86.28 92.44 97.27 98.66 99.25 99.71 1.34 0.75 0.29 65845654.0 41.11 69.96 86.91 92.60 97.13 98.52 99.13 99.64 1.48 0.87 0.36
2 2022202308 Apr 2022 to Mar 2023 (Period 08) England and Wales 5098211.0 33.92 60.97 80.43 88.36 95.50 97.77 98.75 99.53 2.23 1.25 0.47 65731918.0 40.81 69.52 86.56 92.36 97.03 98.47 99.10 99.63 1.53 0.90 0.37
2 2022202309 Apr 2022 to Mar 2023 (Period 09) England and Wales 5351925.0 32.92 59.71 79.68 87.94 95.41 97.70 98.71 99.50 2.30 1.29 0.50 65823772.0 40.55 69.14 86.26 92.16 96.96 98.43 99.09 99.62 1.57 0.91 0.38
2 2022202310 Apr 2022 to Mar 2023 (Period 10) England and Wales 2831517.0 37.90 64.38 81.08 87.68 94.27 96.75 98.03 99.18 3.25 1.97 0.82 64031713.0 40.17 68.62 85.84 91.83 96.78 98.33 99.02 99.60 1.67 0.98 0.40
2 2022202311 Apr 2022 to Mar 2023 (Period 11) England and Wales 5249289.0 37.25 64.97 83.13 90.06 96.10 97.99 98.83 99.53 2.01 1.17 0.47 64302328.0 39.66 67.95 85.32 91.47 96.62 98.24 98.97 99.57 1.76 1.03 0.43
2 2022202312 Apr 2022 to Mar 2023 (Period 12) England and Wales 5505304.0 40.22 68.86 86.16 92.18 96.99 98.44 99.11 99.64 1.56 0.89 0.36 64929069.0 39.56 67.82 85.23 91.43 96.63 98.25 98.98 99.58 1.75 1.02 0.42
2 2022202313 Apr 2022 to Mar 2023 (Period 13) England and Wales 5083433.0 41.60 70.56 87.20 92.77 97.27 98.59 99.19 99.67 1.41 0.81 0.33 65231911.0 39.42 67.64 85.08 91.33 96.58 98.23 98.96 99.58 1.77 1.04 0.42
2 2023202401 Apr 2023 to Mar 2024 (Period 01) England and Wales 5726136.0 43.17 72.15 88.06 93.27 97.38 98.63 99.20 99.67 1.37 0.80 0.33 65417217.0 39.31 67.50 84.98 91.27 96.56 98.21 98.96 99.57 1.79 1.04 0.43
2 2023202402 Apr 2023 to Mar 2024 (Period 02) England and Wales 5297590.0 42.56 71.31 87.41 92.78 97.16 98.50 99.13 99.64 1.50 0.87 0.36 65351174.0 39.25 67.38 84.85 91.15 96.50 98.18 98.93 99.56 1.82 1.07 0.44
2 2023202403 Apr 2023 to Mar 2024 (Period 03) England and Wales 5236039.0 40.06 67.72 84.40 90.54 95.92 97.73 98.59 99.38 2.27 1.41 0.62 65777506.0 39.04 67.12 84.61 90.98 96.40 98.11 98.89 99.54 1.89 1.11 0.46
2 2023202404 Apr 2023 to Mar 2024 (Period 04) England and Wales 5288913.0 41.01 69.28 86.05 91.93 96.80 98.31 99.00 99.58 1.69 1.00 0.42 65793724.0 39.13 67.22 84.70 91.05 96.45 98.15 98.92 99.56 1.85 1.08 0.44
2 2023202405 Apr 2023 to Mar 2024 (Period 05) England and Wales 5275704.0 41.49 70.27 86.71 92.32 96.97 98.41 99.07 99.63 1.59 0.93 0.37 66397164.0 39.36 67.54 84.94 91.23 96.54 98.20 98.95 99.57 1.80 1.05 0.43
2 2023202406 Apr 2023 to Mar 2024 (Period 06) England and Wales 5295608.0 39.83 68.58 85.76 91.77 96.74 98.28 98.99 99.58 1.72 1.01 0.42 66222364.0 39.41 67.61 84.95 91.22 96.53 98.19 98.94 99.57 1.81 1.06 0.43
2 2023202407 Apr 2023 to Mar 2024 (Period 07) England and Wales 5316303.0 37.76 66.13 84.15 90.86 96.52 98.24 99.01 99.62 1.76 0.99 0.38 66555972.0 39.29 67.45 84.79 91.10 96.47 98.16 98.92 99.56 1.84 1.08 0.44
2 2023202408 Apr 2023 to Mar 2024 (Period 08) England and Wales 5623689.0 34.95 62.36 81.10 88.56 95.27 97.44 98.45 99.35 2.56 1.55 0.65 67081450.0 39.33 67.51 84.81 91.10 96.45 98.13 98.90 99.55 1.87 1.10 0.45
2 2023202409 Apr 2023 to Mar 2024 (Period 09) England and Wales 5327359.0 31.44 57.88 77.50 86.03 94.17 96.90 98.19 99.28 3.10 1.81 0.72 67056884.0 39.21 67.37 84.64 90.95 96.35 98.06 98.86 99.53 1.94 1.14 0.47
2 2023202410 Apr 2023 to Mar 2024 (Period 10) England and Wales 5051651.0 37.00 64.55 82.29 89.18 95.39 97.48 98.46 99.33 2.52 1.54 0.67 69277018.0 39.11 67.29 84.62 90.95 96.36 98.07 98.86 99.53 1.93 1.14 0.47
2 2023202411 Apr 2023 to Mar 2024 (Period 11) England and Wales 5472328.0 38.51 66.56 84.31 90.95 96.52 98.20 98.95 99.57 1.80 1.05 0.43 69500057.0 39.20 67.40 84.70 91.02 96.39 98.09 98.87 99.53 1.91 1.13 0.47
2 2023202412 Apr 2023 to Mar 2024 (Period 12) England and Wales 5565768.0 39.57 68.06 85.73 92.00 97.02 98.48 99.11 99.64 1.52 0.89 0.36 69560521.0 39.15 67.34 84.67 91.00 96.40 98.09 98.87 99.53 1.91 1.13 0.47
2 2023202413 Apr 2023 to Mar 2024 (Period 13) England and Wales 5831883.0 41.27 70.11 87.02 92.74 97.21 98.55 99.15 99.65 1.45 0.85 0.35 70308971.0 39.15 67.34 84.68 91.02 96.40 98.10 98.87 99.53 1.90 1.13 0.47
2 2024202501 Apr 2024 to Mar 2025 (Period 01) England and Wales 5405730.0 41.87 70.78 87.34 92.81 97.18 98.50 99.12 99.62 1.50 0.88 0.38 69988565.0 39.03 67.21 84.61 90.97 96.38 98.08 98.86 99.53 1.92 1.14 0.47
2 2024202502 Apr 2024 to Mar 2025 (Period 02) England and Wales 5568001.0 41.51 70.13 86.70 92.37 97.05 98.48 99.12 99.65 1.52 0.88 0.35 70258976.0 38.96 67.13 84.57 90.95 96.38 98.08 98.87 99.53 1.92 1.13 0.47
2 2024202503 Apr 2024 to Mar 2025 (Period 03) England and Wales 5813508.0 41.22 69.39 86.01 91.90 96.82 98.35 99.05 99.63 1.65 0.95 0.37 70836445.0 39.06 67.27 84.70 91.06 96.45 98.13 98.90 99.55 1.87 1.10 0.45
2 2024202504 Apr 2024 to Mar 2025 (Period 04) England and Wales 5850013.0 39.51 67.63 84.77 91.05 96.42 98.13 98.91 99.56 1.87 1.09 0.44 71397545.0 38.96 67.15 84.60 90.99 96.42 98.12 98.89 99.55 1.88 1.11 0.45
2 2024202505 Apr 2024 to Mar 2025 (Period 05) England and Wales 5860573.0 39.60 67.73 84.97 91.21 96.50 98.17 98.93 99.58 1.83 1.07 0.42 71982414.0 38.82 66.97 84.48 90.91 96.38 98.10 98.89 99.55 1.90 1.11 0.45
2 2024202506 Apr 2024 to Mar 2025 (Period 06) England and Wales 5815869.0 39.93 68.37 85.33 91.42 96.54 98.17 98.92 99.55 1.83 1.08 0.45 72502675.0 38.84 66.97 84.45 90.89 96.37 98.09 98.88 99.54 1.91 1.12 0.46
2 2024202507 Apr 2024 to Mar 2025 (Period 07) England and Wales 5770203.0 37.11 65.00 83.01 89.92 95.97 97.89 98.77 99.49 2.11 1.23 0.51 72956575.0 38.78 66.87 84.36 90.81 96.33 98.07 98.86 99.53 1.93 1.14 0.47
2 2024202508 Apr 2024 to Mar 2025 (Period 08) England and Wales 5771248.0 35.50 62.92 81.65 89.19 95.87 97.92 98.82 99.55 2.08 1.18 0.45 73104134.0 38.82 66.91 84.40 90.86 96.37 98.10 98.89 99.55 1.90 1.11 0.45
2 2024202509 Apr 2024 to Mar 2025 (Period 09) England and Wales 5719293.0 31.23 57.22 76.58 85.29 93.90 96.82 98.15 99.24 3.18 1.85 0.76 73496068.0 38.76 66.81 84.29 90.78 96.34 98.09 98.88 99.54 1.91 1.12 0.46
2 2024202510 Apr 2024 to Mar 2025 (Period 10) England and Wales 5109515.0 37.46 65.62 83.47 90.26 96.20 98.05 98.88 99.56 1.95 1.12 0.44 73553932.0 38.79 66.88 84.37 90.85 96.40 98.13 98.91 99.56 1.87 1.09 0.44
2 2024202511 Apr 2024 to Mar 2025 (Period 11) England and Wales 5811728.0 37.55 65.41 83.44 90.37 96.24 98.04 98.85 99.52 1.96 1.15 0.48 73893332.0 38.72 66.79 84.30 90.80 96.38 98.12 98.90 99.56 1.88 1.10 0.44
2 2024202512 Apr 2024 to Mar 2025 (Period 12) England and Wales 5901783.0 38.65 67.68 85.71 92.12 97.13 98.59 99.21 99.69 1.41 0.79 0.31 74229347.0 38.65 66.77 84.31 90.82 96.39 98.13 98.91 99.56 1.87 1.09 0.44
2 2024202513 Apr 2024 to Mar 2025 (Period 13) England and Wales 6313721.0 40.71 70.03 87.28 93.02 97.41 98.69 99.25 99.71 1.31 0.75 0.29 74711185.0 38.62 66.78 84.35 90.86 96.41 98.14 98.92 99.57 1.86 1.08 0.43
2 2025202601 Apr 2025 to Mar 2026 (Period 01) England and Wales 5543577.0 41.10 70.29 87.15 92.84 97.35 98.67 99.25 99.71 1.33 0.75 0.29 74849032.0 38.57 66.75 84.34 90.86 96.42 98.15 98.93 99.57 1.85 1.07 0.43
2 2025202602 Apr 2025 to Mar 2026 (Period 02) England and Wales 5945760.0 39.45 67.97 85.44 91.63 96.75 98.33 99.04 99.63 1.67 0.96 0.37 75226791.0 38.42 66.60 84.25 90.81 96.40 98.14 98.93 99.57 1.86 1.07 0.43
2 2025202603 Apr 2025 to Mar 2026 (Period 03) England and Wales 5952111.0 39.98 68.38 85.55 91.63 96.64 98.20 98.91 99.55 1.80 1.09 0.45 75365394.0 38.32 66.52 84.22 90.79 96.39 98.13 98.92 99.57 1.87 1.08 0.43
2 2025202604 Apr 2025 to Mar 2026 (Period 04) England and Wales 6012685.0 37.55 65.52 83.29 90.03 95.97 97.84 98.71 99.45 2.16 1.29 0.55 75528066.0 38.17 66.36 84.10 90.71 96.35 98.11 98.90 99.56 1.89 1.10 0.44
2 2025202605 Apr 2025 to Mar 2026 (Period 05) England and Wales 5941696.0 39.38 67.88 85.10 91.33 96.57 98.19 98.92 99.54 1.81 1.08 0.46 75609189.0 38.16 66.37 84.11 90.72 96.36 98.11 98.90 99.55 1.89 1.10 0.45
2 2025202606 Apr 2025 to Mar 2026 (Period 06) England and Wales 5958207.0 38.09 66.52 84.62 91.23 96.68 98.31 99.05 99.63 1.69 0.95 0.37 75751527.0 38.01 66.23 84.06 90.71 96.37 98.12 98.91 99.56 1.88 1.09 0.44
2 2025202607 Apr 2025 to Mar 2026 (Period 07) England and Wales 5958037.0 36.72 65.04 83.72 90.65 96.42 98.16 98.93 99.57 1.84 1.07 0.43 75939361.0 37.98 66.23 84.11 90.76 96.40 98.14 98.92 99.57 1.86 1.08 0.43
2 2025202608 Apr 2025 to Mar 2026 (Period 08) England and Wales 5959413.0 34.09 61.56 81.03 88.88 95.80 97.90 98.80 99.51 2.10 1.20 0.49 76127526.0 37.86 66.11 84.06 90.73 96.40 98.14 98.92 99.56 1.86 1.08 0.44
2 2025202609 Apr 2025 to Mar 2026 (Period 09) England and Wales 5917145.0 32.04 58.78 78.43 86.87 94.79 97.35 98.50 99.42 2.65 1.50 0.58 76325378.0 37.91 66.21 84.18 90.84 96.46 98.18 98.95 99.58 1.82 1.05 0.42
2 2025202610 Apr 2025 to Mar 2026 (Period 10) England and Wales 5293751.0 37.23 65.45 83.52 90.35 96.20 98.00 98.82 99.52 2.00 1.18 0.48 76509614.0 37.89 66.20 84.18 90.85 96.46 98.17 98.94 99.57 1.83 1.06 0.43
2 2025202611 Apr 2025 to Mar 2026 (Period 11) England and Wales 5976824.0 38.86 67.50 85.43 91.76 96.88 98.39 99.04 99.60 1.61 0.96 0.40 76674710.0 37.99 66.36 84.34 90.95 96.51 98.20 98.96 99.58 1.80 1.04 0.42
2 2025202612 Apr 2025 to Mar 2026 (Period 12) England and Wales 6006461.0 39.96 68.61 86.08 92.25 97.14 98.54 99.15 99.66 1.46 0.85 0.34 76779388.0 38.10 66.43 84.37 90.97 96.51 98.20 98.95 99.58 1.80 1.05 0.42
2 2025202613 Apr 2025 to Mar 2026 (Period 13) England and Wales 6628329.0 41.60 70.14 86.95 92.67 97.19 98.53 99.13 99.64 1.47 0.87 0.36 77093996.0 38.18 66.46 84.35 90.94 96.49 98.19 98.94 99.57 1.81 1.06 0.43
2 2026202701 Apr 2026 to Mar 2027 (Period 01) England and Wales 6915217.0 41.69 70.07 86.64 92.36 97.04 98.44 99.09 99.63 1.56 0.91 0.37 78465636.0 38.29 66.51 84.35 90.94 96.48 98.17 98.93 99.57 1.83 1.07 0.43
2 2026202702 Apr 2026 to Mar 2027 (Period 02) England and Wales 5917071.0 39.87 67.35 83.79 89.86 95.39 97.33 98.32 99.23 2.67 1.68 0.77 78436947.0 38.32 66.46 84.23 90.80 96.38 98.10 98.88 99.54 1.90 1.12 0.46
3 2014201501 Apr 2014 to Mar 2015 (Period 01) Scotland 431681.0 31.42 69.86 92.08 97.01 99.33 99.74 99.86 99.95 0.26 0.14 0.05 431681.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201502 Apr 2014 to Mar 2015 (Period 02) Scotland 460808.0 31.38 69.82 91.90 96.99 99.40 99.79 99.90 99.97 0.21 0.10 0.03 892489.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201503 Apr 2014 to Mar 2015 (Period 03) Scotland 461029.0 31.18 68.78 90.83 96.10 99.03 99.61 99.80 99.93 0.39 0.20 0.07 1353518.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201504 Apr 2014 to Mar 2015 (Period 04) Scotland 459538.0 30.38 67.02 89.50 95.58 98.94 99.60 99.81 99.93 0.40 0.19 0.07 1813056.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201505 Apr 2014 to Mar 2015 (Period 05) Scotland 490120.0 23.29 53.87 78.07 88.11 96.68 98.83 99.49 99.84 1.17 0.51 0.16 2303176.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201506 Apr 2014 to Mar 2015 (Period 06) Scotland 463181.0 30.66 67.91 90.23 95.93 98.98 99.59 99.80 99.91 0.41 0.20 0.09 2766357.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201507 Apr 2014 to Mar 2015 (Period 07) Scotland 458155.0 27.10 62.38 86.43 93.88 98.48 99.37 99.67 99.88 0.63 0.33 0.12 3224512.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201508 Apr 2014 to Mar 2015 (Period 08) Scotland 459131.0 21.60 53.15 79.76 90.06 97.60 99.24 99.66 99.88 0.76 0.34 0.12 3683643.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201509 Apr 2014 to Mar 2015 (Period 09) Scotland 460962.0 24.20 57.95 84.23 93.08 98.50 99.45 99.71 99.86 0.55 0.29 0.14 4144605.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201510 Apr 2014 to Mar 2015 (Period 10) Scotland 405408.0 23.63 56.10 82.28 91.77 97.98 99.16 99.58 99.85 0.84 0.42 0.15 4550013.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201511 Apr 2014 to Mar 2015 (Period 11) Scotland 452498.0 26.60 60.06 84.26 92.61 98.06 99.20 99.57 99.82 0.80 0.43 0.18 5002511.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201512 Apr 2014 to Mar 2015 (Period 12) Scotland 471314.0 28.33 64.34 88.49 95.42 99.07 99.63 99.80 99.90 0.37 0.20 0.10 5473825.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
3 2014201513 Apr 2014 to Mar 2015 (Period 13) Scotland 511556.0 28.71 64.66 88.35 95.21 98.92 99.57 99.76 99.90 0.43 0.24 0.10 5985381.0 27.59 62.77 86.64 93.97 98.53 99.44 99.72 99.89 0.56 0.28 0.11
3 2015201601 Apr 2015 to Mar 2016 (Period 01) Scotland 540955.0 30.60 67.76 90.69 96.47 99.29 99.74 99.85 99.94 0.26 0.15 0.06 6094655.0 27.58 62.71 86.62 93.98 98.54 99.45 99.73 99.89 0.55 0.27 0.11
3 2015201602 Apr 2015 to Mar 2016 (Period 02) Scotland 464386.0 30.94 68.59 91.26 96.66 99.24 99.69 99.84 99.95 0.31 0.16 0.05 6098233.0 27.55 62.62 86.57 93.96 98.53 99.44 99.72 99.89 0.56 0.28 0.11
3 2015201603 Apr 2015 to Mar 2016 (Period 03) Scotland 462075.0 31.01 67.37 90.63 96.44 99.19 99.66 99.82 99.94 0.34 0.18 0.06 6099279.0 27.54 62.52 86.56 93.98 98.54 99.44 99.72 99.89 0.56 0.28 0.11
3 2015201604 Apr 2015 to Mar 2016 (Period 04) Scotland 451285.0 30.82 66.82 89.79 95.77 98.94 99.55 99.75 99.92 0.45 0.25 0.08 6091026.0 27.57 62.50 86.57 93.99 98.54 99.44 99.72 99.89 0.56 0.28 0.11
3 2015201605 Apr 2015 to Mar 2016 (Period 05) Scotland 472483.0 28.28 64.14 88.40 95.32 98.98 99.61 99.81 99.93 0.39 0.19 0.07 6073389.0 27.97 63.32 87.40 94.57 98.73 99.50 99.74 99.90 0.50 0.26 0.10
3 2015201606 Apr 2015 to Mar 2016 (Period 06) Scotland 473579.0 29.72 64.98 89.08 95.73 99.11 99.67 99.83 99.95 0.33 0.17 0.05 6083787.0 27.90 63.10 87.32 94.56 98.74 99.51 99.75 99.90 0.49 0.25 0.10
3 2015201607 Apr 2015 to Mar 2016 (Period 07) Scotland 473065.0 26.68 60.81 86.29 94.34 98.86 99.56 99.79 99.92 0.44 0.21 0.08 6098697.0 27.86 62.98 87.30 94.59 98.77 99.52 99.76 99.91 0.48 0.24 0.09
3 2015201608 Apr 2015 to Mar 2016 (Period 08) Scotland 459262.0 20.70 50.37 77.46 88.87 97.47 99.08 99.54 99.84 0.92 0.46 0.16 6098828.0 27.80 62.77 87.13 94.50 98.76 99.51 99.75 99.90 0.49 0.25 0.10
3 2015201609 Apr 2015 to Mar 2016 (Period 09) Scotland 471717.0 21.54 51.54 78.25 89.25 97.24 98.88 99.44 99.80 1.12 0.56 0.20 6109583.0 27.59 62.26 86.66 94.21 98.66 99.47 99.73 99.90 0.53 0.27 0.10
3 2015201610 Apr 2015 to Mar 2016 (Period 10) Scotland 413960.0 25.87 58.11 82.87 91.97 98.00 99.20 99.57 99.81 0.80 0.43 0.19 6118135.0 27.73 62.39 86.70 94.22 98.66 99.47 99.73 99.89 0.53 0.27 0.11
3 2015201611 Apr 2015 to Mar 2016 (Period 11) Scotland 479421.0 28.05 62.45 86.51 93.93 98.47 99.37 99.66 99.87 0.63 0.34 0.13 6145058.0 27.84 62.57 86.86 94.31 98.69 99.48 99.73 99.90 0.52 0.27 0.10
3 2015201612 Apr 2015 to Mar 2016 (Period 12) Scotland 481942.0 27.80 63.40 88.13 95.33 99.07 99.65 99.81 99.91 0.35 0.19 0.09 6155686.0 27.80 62.50 86.84 94.31 98.69 99.48 99.73 99.90 0.52 0.27 0.10
3 2015201613 Apr 2015 to Mar 2016 (Period 13) Scotland 442211.0 29.64 65.52 88.98 95.75 99.16 99.70 99.85 99.94 0.30 0.15 0.06 6086341.0 27.86 62.53 86.87 94.34 98.71 99.49 99.74 99.90 0.51 0.26 0.10
3 2016201701 Apr 2016 to Mar 2017 (Period 01) Scotland 502588.0 31.58 67.73 89.34 95.65 99.04 99.61 99.81 99.93 0.39 0.19 0.07 6047974.0 27.92 62.50 86.73 94.25 98.68 99.48 99.73 99.90 0.52 0.27 0.10
3 2016201702 Apr 2016 to Mar 2017 (Period 02) Scotland 471003.0 30.78 66.21 88.41 95.17 98.89 99.54 99.75 99.89 0.46 0.25 0.11 6054591.0 27.91 62.32 86.51 94.14 98.66 99.47 99.73 99.90 0.53 0.27 0.10
3 2016201703 Apr 2016 to Mar 2017 (Period 03) Scotland 453609.0 28.61 62.29 85.07 93.12 98.40 99.40 99.69 99.87 0.60 0.31 0.13 6046125.0 27.73 61.93 86.09 93.89 98.60 99.45 99.72 99.89 0.55 0.28 0.11
3 2016201704 Apr 2016 to Mar 2017 (Period 04) Scotland 450907.0 29.11 63.35 86.51 94.19 98.76 99.52 99.76 99.91 0.48 0.24 0.09 6045747.0 27.60 61.67 85.85 93.77 98.58 99.45 99.72 99.89 0.55 0.28 0.11
3 2016201705 Apr 2016 to Mar 2017 (Period 05) Scotland 474426.0 26.97 59.45 83.52 92.44 98.18 99.31 99.65 99.88 0.69 0.35 0.12 6047690.0 27.50 61.31 85.46 93.55 98.52 99.42 99.71 99.89 0.58 0.29 0.11
3 2016201706 Apr 2016 to Mar 2017 (Period 06) Scotland 488373.0 27.35 60.45 84.87 93.81 98.83 99.57 99.78 99.92 0.43 0.22 0.08 6062484.0 27.31 60.95 85.13 93.40 98.50 99.42 99.70 99.88 0.58 0.30 0.12
3 2016201707 Apr 2016 to Mar 2017 (Period 07) Scotland 485273.0 26.67 59.28 84.27 93.56 98.82 99.58 99.77 99.90 0.42 0.23 0.10 6074692.0 27.31 60.83 84.97 93.34 98.50 99.42 99.70 99.88 0.58 0.30 0.12
3 2016201708 Apr 2016 to Mar 2017 (Period 08) Scotland 481358.0 23.63 53.76 79.23 90.33 98.10 99.39 99.73 99.90 0.61 0.27 0.10 6096788.0 27.52 61.06 85.09 93.43 98.54 99.44 99.72 99.89 0.56 0.28 0.11
3 2016201709 Apr 2016 to Mar 2017 (Period 09) Scotland 481861.0 22.29 51.66 76.92 88.45 97.40 99.05 99.54 99.83 0.95 0.46 0.17 6106932.0 27.57 61.05 84.97 93.36 98.55 99.46 99.72 99.89 0.54 0.28 0.11
3 2016201710 Apr 2016 to Mar 2017 (Period 10) Scotland 448008.0 27.14 60.14 84.82 93.61 98.83 99.57 99.76 99.89 0.43 0.24 0.11 6140980.0 27.65 61.18 85.10 93.48 98.61 99.48 99.74 99.89 0.52 0.26 0.11
3 2016201711 Apr 2016 to Mar 2017 (Period 11) Scotland 485343.0 29.83 64.18 87.43 94.90 99.08 99.66 99.81 99.93 0.34 0.19 0.07 6146902.0 27.79 61.32 85.18 93.55 98.66 99.50 99.75 99.90 0.50 0.25 0.10
3 2016201712 Apr 2016 to Mar 2017 (Period 12) Scotland 492178.0 30.42 65.67 88.62 95.74 99.30 99.77 99.89 99.97 0.23 0.11 0.03 6157138.0 28.00 61.51 85.22 93.59 98.68 99.51 99.75 99.90 0.49 0.25 0.10
3 2016201713 Apr 2016 to Mar 2017 (Period 13) Scotland 475642.0 31.21 66.47 89.20 95.96 99.24 99.70 99.84 99.92 0.30 0.16 0.08 6190569.0 28.13 61.60 85.26 93.62 98.69 99.51 99.75 99.90 0.49 0.25 0.10
3 2017201801 Apr 2017 to Mar 2018 (Period 01) Scotland 509273.0 32.97 68.10 89.56 95.81 99.16 99.65 99.80 99.90 0.35 0.20 0.10 6197254.0 28.25 61.64 85.28 93.63 98.70 99.52 99.75 99.90 0.48 0.25 0.10
3 2017201802 Apr 2017 to Mar 2018 (Period 02) Scotland 493484.0 31.65 65.71 87.62 94.78 98.93 99.56 99.78 99.91 0.44 0.22 0.09 6219735.0 28.33 61.61 85.23 93.61 98.70 99.52 99.76 99.90 0.48 0.24 0.10
3 2017201803 Apr 2017 to Mar 2018 (Period 03) Scotland 494893.0 32.70 67.39 88.79 95.48 99.07 99.61 99.79 99.91 0.39 0.21 0.09 6261019.0 28.65 62.02 85.52 93.79 98.75 99.54 99.76 99.90 0.46 0.24 0.10
3 2017201804 Apr 2017 to Mar 2018 (Period 04) Scotland 498293.0 34.27 69.77 90.70 96.41 99.26 99.71 99.86 99.95 0.29 0.14 0.05 6308405.0 29.06 62.54 85.86 93.97 98.79 99.55 99.77 99.91 0.45 0.23 0.09
3 2017201805 Apr 2017 to Mar 2018 (Period 05) Scotland 496676.0 32.80 67.18 88.53 95.22 99.06 99.67 99.85 99.94 0.33 0.15 0.06 6330655.0 29.51 63.13 86.24 94.18 98.86 99.58 99.79 99.91 0.42 0.21 0.09
3 2017201806 Apr 2017 to Mar 2018 (Period 06) Scotland 496478.0 33.56 68.86 90.38 96.46 99.41 99.79 99.89 99.96 0.21 0.11 0.04 6338760.0 30.00 63.79 86.67 94.39 98.90 99.59 99.79 99.92 0.41 0.21 0.08
3 2017201807 Apr 2017 to Mar 2018 (Period 07) Scotland 477644.0 28.62 60.93 83.82 92.57 98.50 99.42 99.70 99.89 0.58 0.30 0.11 6331131.0 30.15 63.92 86.64 94.31 98.88 99.58 99.79 99.91 0.42 0.21 0.09
3 2017201808 Apr 2017 to Mar 2018 (Period 08) Scotland 489893.0 22.60 50.92 75.68 87.67 97.37 99.10 99.60 99.85 0.90 0.40 0.15 6339666.0 30.06 63.69 86.36 94.10 98.82 99.56 99.78 99.91 0.44 0.22 0.09
3 2017201809 Apr 2017 to Mar 2018 (Period 09) Scotland 485233.0 23.72 52.72 76.92 88.20 97.44 99.12 99.58 99.85 0.88 0.42 0.15 6343038.0 30.16 63.76 86.35 94.08 98.82 99.57 99.78 99.91 0.43 0.22 0.09
3 2017201810 Apr 2017 to Mar 2018 (Period 10) Scotland 419688.0 26.55 56.47 79.68 89.79 97.59 99.11 99.54 99.82 0.89 0.46 0.18 6314718.0 30.14 63.53 86.02 93.83 98.74 99.53 99.77 99.91 0.47 0.23 0.09
3 2017201811 Apr 2017 to Mar 2018 (Period 11) Scotland 494052.0 30.15 61.65 84.08 92.61 98.50 99.43 99.70 99.89 0.57 0.30 0.11 6323427.0 30.16 63.34 85.76 93.65 98.70 99.52 99.76 99.91 0.48 0.24 0.09
3 2017201812 Apr 2017 to Mar 2018 (Period 12) Scotland 432882.0 31.30 63.82 85.94 93.41 98.05 99.05 99.43 99.77 0.95 0.57 0.23 6264131.0 30.22 63.19 85.55 93.47 98.60 99.46 99.72 99.89 0.54 0.28 0.11
3 2017201813 Apr 2017 to Mar 2018 (Period 13) Scotland 491953.0 31.43 65.14 87.19 94.59 98.87 99.56 99.78 99.92 0.44 0.22 0.08 6280442.0 30.24 63.09 85.40 93.37 98.58 99.45 99.72 99.89 0.55 0.28 0.11
3 2018201901 Apr 2018 to Mar 2019 (Period 01) Scotland 486583.0 33.29 67.00 88.11 94.91 99.02 99.65 99.84 99.93 0.35 0.16 0.07 6257752.0 30.26 62.99 85.27 93.29 98.56 99.45 99.72 99.89 0.55 0.28 0.11
3 2018201902 Apr 2018 to Mar 2019 (Period 02) Scotland 488439.0 33.24 66.58 87.63 94.72 98.90 99.59 99.79 99.92 0.41 0.21 0.08 6252707.0 30.38 63.05 85.27 93.29 98.56 99.46 99.72 99.89 0.54 0.28 0.11
3 2018201903 Apr 2018 to Mar 2019 (Period 03) Scotland 482085.0 32.41 65.08 86.31 93.57 98.32 99.29 99.61 99.84 0.71 0.39 0.16 6239899.0 30.35 62.87 85.07 93.13 98.50 99.43 99.71 99.89 0.57 0.29 0.11
3 2018201904 Apr 2018 to Mar 2019 (Period 04) Scotland 474738.0 30.65 62.30 83.45 91.39 97.39 98.82 99.37 99.75 1.18 0.63 0.25 6216344.0 30.06 62.27 84.50 92.74 98.36 99.36 99.67 99.87 0.64 0.33 0.13
3 2018201905 Apr 2018 to Mar 2019 (Period 05) Scotland 484862.0 31.48 63.55 85.08 93.06 98.40 99.39 99.72 99.90 0.61 0.28 0.10 6204530.0 29.95 61.98 84.22 92.56 98.30 99.34 99.66 99.87 0.66 0.34 0.13
3 2018201906 Apr 2018 to Mar 2019 (Period 06) Scotland 499108.0 33.50 66.34 87.50 94.62 98.90 99.65 99.84 99.95 0.35 0.16 0.05 6207160.0 29.95 61.78 83.99 92.42 98.26 99.33 99.66 99.87 0.67 0.34 0.13
3 2018201907 Apr 2018 to Mar 2019 (Period 07) Scotland 485905.0 26.52 55.36 78.59 88.74 97.16 98.96 99.46 99.77 1.04 0.54 0.23 6215421.0 29.78 61.34 83.58 92.12 98.16 99.29 99.64 99.86 0.71 0.36 0.14
3 2018201908 Apr 2018 to Mar 2019 (Period 08) Scotland 493034.0 23.72 51.46 75.47 86.91 96.68 98.78 99.41 99.80 1.22 0.59 0.20 6218562.0 29.87 61.38 83.56 92.06 98.10 99.27 99.63 99.86 0.73 0.37 0.14
3 2018201909 Apr 2018 to Mar 2019 (Period 09) Scotland 501327.0 25.05 53.40 77.37 88.57 97.45 99.19 99.66 99.90 0.81 0.34 0.10 6234656.0 29.96 61.41 83.58 92.08 98.10 99.27 99.63 99.86 0.73 0.37 0.14
3 2018201910 Apr 2018 to Mar 2019 (Period 10) Scotland 466227.0 29.22 59.93 82.54 91.52 98.24 99.46 99.77 99.92 0.54 0.23 0.08 6281195.0 30.13 61.63 83.76 92.19 98.15 99.30 99.65 99.87 0.70 0.35 0.13
3 2018201911 Apr 2018 to Mar 2019 (Period 11) Scotland 575000.0 31.92 64.47 86.43 93.86 98.62 99.49 99.76 99.92 0.51 0.24 0.08 6362143.0 30.29 61.88 83.98 92.31 98.16 99.30 99.65 99.87 0.70 0.35 0.13
3 2018201912 Apr 2018 to Mar 2019 (Period 12) Scotland 624573.0 33.73 66.94 88.14 94.83 98.97 99.67 99.84 99.95 0.33 0.16 0.05 6553834.0 30.55 62.24 84.24 92.47 98.25 99.36 99.69 99.88 0.64 0.31 0.12
3 2018201913 Apr 2018 to Mar 2019 (Period 13) Scotland 683428.0 34.25 67.82 88.26 94.53 98.71 99.52 99.76 99.91 0.48 0.24 0.09 6745309.0 30.86 62.59 84.44 92.53 98.25 99.36 99.69 99.88 0.64 0.31 0.12
3 2019202001 Apr 2019 to Mar 2020 (Period 01) Scotland 669948.0 36.33 71.12 90.44 95.71 99.05 99.65 99.82 99.92 0.35 0.18 0.08 6928674.0 31.22 63.11 84.76 92.67 98.27 99.36 99.69 99.88 0.64 0.31 0.12
3 2019202002 Apr 2019 to Mar 2020 (Period 02) Scotland 694464.0 35.69 70.27 89.99 95.52 99.00 99.61 99.81 99.93 0.39 0.19 0.07 7134699.0 31.52 63.57 85.07 92.81 98.30 99.37 99.69 99.88 0.63 0.31 0.12
3 2019202003 Apr 2019 to Mar 2020 (Period 03) Scotland 696610.0 34.15 69.06 89.69 95.39 98.95 99.60 99.79 99.92 0.40 0.21 0.08 7349224.0 31.71 63.99 85.43 93.00 98.36 99.40 99.71 99.89 0.60 0.29 0.11
3 2019202004 Apr 2019 to Mar 2020 (Period 04) Scotland 684480.0 36.06 71.13 90.30 95.56 98.89 99.55 99.79 99.92 0.45 0.21 0.08 7558966.0 32.17 64.74 85.99 93.33 98.47 99.45 99.74 99.90 0.55 0.26 0.10
3 2019202005 Apr 2019 to Mar 2020 (Period 05) Scotland 689128.0 33.37 67.17 87.84 94.19 98.52 99.40 99.67 99.87 0.60 0.33 0.13 7763232.0 32.32 65.03 86.21 93.43 98.48 99.45 99.73 99.90 0.55 0.27 0.10
3 2019202006 Apr 2019 to Mar 2020 (Period 06) Scotland 701653.0 32.94 67.28 88.58 94.83 98.75 99.49 99.75 99.91 0.51 0.25 0.09 7965777.0 32.30 65.15 86.34 93.48 98.47 99.44 99.73 99.90 0.56 0.27 0.10
3 2019202007 Apr 2019 to Mar 2020 (Period 07) Scotland 692307.0 32.20 66.02 87.73 94.45 98.74 99.54 99.78 99.93 0.46 0.22 0.07 8172179.0 32.64 65.80 86.92 93.84 98.57 99.48 99.75 99.91 0.52 0.25 0.09
3 2019202008 Apr 2019 to Mar 2020 (Period 08) Scotland 693038.0 27.94 59.47 82.95 91.74 98.06 99.34 99.69 99.89 0.66 0.31 0.11 8372183.0 32.77 66.12 87.27 94.07 98.64 99.51 99.76 99.91 0.49 0.24 0.09
3 2019202009 Apr 2019 to Mar 2020 (Period 09) Scotland 693659.0 26.08 56.73 81.23 91.08 98.22 99.44 99.74 99.90 0.56 0.26 0.10 8564515.0 32.68 66.11 87.36 94.15 98.68 99.52 99.77 99.91 0.48 0.23 0.09
3 2019202010 Apr 2019 to Mar 2020 (Period 10) Scotland 603879.0 30.43 62.28 84.80 92.63 98.20 99.33 99.68 99.88 0.67 0.32 0.12 8702167.0 32.71 66.17 87.44 94.19 98.67 99.51 99.76 99.91 0.49 0.24 0.09
3 2019202011 Apr 2019 to Mar 2020 (Period 11) Scotland 697706.0 32.05 65.01 87.13 94.33 98.83 99.53 99.76 99.91 0.47 0.24 0.09 8824873.0 32.71 66.19 87.48 94.22 98.69 99.51 99.76 99.91 0.49 0.24 0.09
3 2019202012 Apr 2019 to Mar 2020 (Period 12) Scotland 689955.0 31.92 64.19 85.98 93.40 98.47 99.45 99.72 99.91 0.55 0.28 0.09 8890255.0 32.58 65.98 87.32 94.12 98.65 99.50 99.75 99.91 0.50 0.25 0.09
3 2019202013 Apr 2019 to Mar 2020 (Period 13) Scotland 669528.0 38.85 72.64 91.29 96.20 99.18 99.64 99.82 99.93 0.36 0.18 0.07 8876355.0 32.92 66.34 87.54 94.24 98.68 99.51 99.76 99.91 0.49 0.24 0.09
3 2020202101 Apr 2020 to Mar 2021 (Period 01) Scotland 403666.0 55.57 87.78 97.32 98.85 99.64 99.83 99.90 99.95 0.17 0.10 0.05 8610073.0 33.72 66.98 87.78 94.34 98.70 99.51 99.76 99.91 0.49 0.24 0.09
3 2020202102 Apr 2020 to Mar 2021 (Period 02) Scotland 343332.0 51.47 83.87 95.54 97.82 99.40 99.74 99.85 99.92 0.26 0.15 0.08 8258941.0 34.29 67.40 87.91 94.39 98.70 99.51 99.76 99.91 0.49 0.24 0.09
3 2020202103 Apr 2020 to Mar 2021 (Period 03) Scotland 429681.0 48.40 82.00 95.42 97.98 99.50 99.79 99.88 99.95 0.21 0.12 0.05 7992012.0 35.06 68.04 88.16 94.49 98.73 99.52 99.76 99.91 0.48 0.24 0.09
3 2020202104 Apr 2020 to Mar 2021 (Period 04) Scotland 486667.0 44.89 79.90 94.91 97.90 99.56 99.82 99.91 99.97 0.18 0.09 0.03 7794199.0 35.59 68.51 88.40 94.61 98.76 99.53 99.77 99.91 0.47 0.23 0.09
3 2020202105 Apr 2020 to Mar 2021 (Period 05) Scotland 579557.0 42.25 76.77 92.64 96.44 98.93 99.49 99.70 99.85 0.51 0.30 0.15 7684628.0 36.29 69.26 88.77 94.79 98.80 99.54 99.77 99.91 0.46 0.23 0.09
3 2020202106 Apr 2020 to Mar 2021 (Period 06) Scotland 608549.0 41.70 77.33 93.24 96.76 99.12 99.60 99.78 99.92 0.40 0.22 0.08 7591524.0 37.03 70.09 89.14 94.94 98.83 99.55 99.77 99.91 0.45 0.23 0.09
3 2020202107 Apr 2020 to Mar 2021 (Period 07) Scotland 639446.0 39.16 74.29 92.13 96.35 98.99 99.55 99.74 99.88 0.45 0.26 0.12 7538663.0 37.65 70.82 89.53 95.11 98.85 99.55 99.77 99.91 0.45 0.23 0.09
3 2020202108 Apr 2020 to Mar 2021 (Period 08) Scotland 646861.0 33.68 67.15 87.86 93.98 98.40 99.38 99.70 99.91 0.62 0.30 0.09 7492486.0 38.21 71.55 89.99 95.32 98.88 99.56 99.77 99.91 0.44 0.23 0.09
3 2020202109 Apr 2020 to Mar 2021 (Period 09) Scotland 650905.0 39.16 73.86 91.73 96.26 98.99 99.54 99.74 99.88 0.46 0.26 0.12 7449732.0 39.42 73.13 90.96 95.80 98.95 99.57 99.77 99.91 0.43 0.23 0.09
3 2020202110 Apr 2020 to Mar 2021 (Period 10) Scotland 528164.0 42.99 76.72 92.79 96.62 99.09 99.61 99.78 99.92 0.39 0.22 0.08 7374017.0 40.41 74.28 91.59 96.12 99.03 99.59 99.78 99.91 0.41 0.22 0.09
3 2020202111 Apr 2020 to Mar 2021 (Period 11) Scotland 580858.0 45.81 80.30 94.79 97.66 99.34 99.70 99.82 99.91 0.30 0.18 0.09 7257169.0 41.65 75.65 92.28 96.41 99.07 99.61 99.79 99.91 0.39 0.21 0.09
3 2020202112 Apr 2020 to Mar 2021 (Period 12) Scotland 498485.0 44.06 77.38 91.81 95.37 98.18 99.03 99.47 99.80 0.97 0.53 0.20 7065699.0 42.77 76.89 92.86 96.63 99.07 99.58 99.77 99.91 0.42 0.23 0.09
3 2020202113 Apr 2020 to Mar 2021 (Period 13) Scotland 458591.0 47.49 82.71 95.96 98.27 99.57 99.84 99.92 99.97 0.16 0.08 0.03 6854762.0 43.47 77.70 93.22 96.78 99.09 99.59 99.77 99.91 0.41 0.23 0.09
3 2021202201 Apr 2021 to Mar 2022 (Period 01) Scotland 568173.0 44.91 79.99 94.72 97.73 99.43 99.80 99.88 99.95 0.20 0.12 0.05 7019269.0 42.89 77.30 93.11 96.74 99.09 99.59 99.78 99.91 0.41 0.22 0.09
3 2021202202 Apr 2021 to Mar 2022 (Period 02) Scotland 525495.0 41.31 75.96 92.79 96.69 99.00 99.50 99.70 99.87 0.50 0.30 0.13 7201432.0 42.37 76.89 92.97 96.69 99.06 99.58 99.77 99.91 0.42 0.23 0.09
3 2021202203 Apr 2021 to Mar 2022 (Period 03) Scotland 567923.0 41.57 76.00 92.73 96.79 99.17 99.65 99.82 99.93 0.35 0.18 0.07 7339674.0 41.95 76.52 92.81 96.62 99.05 99.57 99.76 99.90 0.43 0.24 0.10
3 2021202204 Apr 2021 to Mar 2022 (Period 04) Scotland 559239.0 39.67 73.32 90.83 95.50 98.75 99.50 99.74 99.89 0.50 0.26 0.11 7412246.0 41.59 76.06 92.52 96.45 98.99 99.55 99.75 99.90 0.45 0.25 0.10
3 2021202205 Apr 2021 to Mar 2022 (Period 05) Scotland 564329.0 38.99 72.97 90.97 95.53 98.61 99.35 99.63 99.82 0.65 0.37 0.18 7397018.0 41.34 75.77 92.39 96.38 98.97 99.54 99.75 99.90 0.46 0.25 0.10
3 2021202206 Apr 2021 to Mar 2022 (Period 06) Scotland 566596.0 39.06 73.57 91.90 96.46 99.16 99.69 99.86 99.94 0.31 0.14 0.06 7355065.0 41.13 75.47 92.28 96.35 98.97 99.55 99.75 99.90 0.45 0.25 0.10
3 2021202207 Apr 2021 to Mar 2022 (Period 07) Scotland 560390.0 35.97 70.27 90.42 95.69 98.90 99.58 99.78 99.92 0.42 0.22 0.08 7276009.0 40.91 75.17 92.15 96.30 98.96 99.55 99.75 99.90 0.45 0.25 0.10
3 2021202208 Apr 2021 to Mar 2022 (Period 08) Scotland 588076.0 28.27 58.58 81.91 90.49 97.18 98.89 99.48 99.81 1.11 0.52 0.19 7217224.0 40.52 74.54 91.70 96.04 98.87 99.51 99.74 99.89 0.49 0.26 0.11
3 2021202209 Apr 2021 to Mar 2022 (Period 09) Scotland 594829.0 29.05 60.10 83.82 92.02 97.76 99.18 99.60 99.86 0.82 0.40 0.14 7161148.0 39.69 73.40 91.04 95.69 98.76 99.48 99.73 99.89 0.52 0.27 0.11
3 2021202210 Apr 2021 to Mar 2022 (Period 10) Scotland 504186.0 35.95 68.87 88.92 94.81 98.67 99.53 99.76 99.91 0.47 0.24 0.09 7137170.0 39.19 72.84 90.76 95.55 98.73 99.48 99.72 99.89 0.52 0.28 0.11
3 2021202211 Apr 2021 to Mar 2022 (Period 11) Scotland 569346.0 37.75 70.91 89.92 95.10 98.56 99.36 99.67 99.86 0.64 0.33 0.14 7125658.0 38.53 72.07 90.37 95.35 98.67 99.45 99.71 99.89 0.55 0.29 0.11
3 2021202212 Apr 2021 to Mar 2022 (Period 12) Scotland 575483.0 37.12 70.51 89.41 94.80 98.61 99.44 99.72 99.90 0.56 0.28 0.10 7202656.0 38.04 71.58 90.19 95.30 98.70 99.48 99.73 99.89 0.52 0.27 0.11
3 2021202213 Apr 2021 to Mar 2022 (Period 13) Scotland 517985.0 41.13 76.09 92.77 96.68 99.09 99.62 99.80 99.92 0.38 0.20 0.08 7262050.0 37.66 71.20 90.01 95.21 98.67 99.46 99.72 99.89 0.54 0.28 0.11
3 2022202301 Apr 2022 to Mar 2023 (Period 01) Scotland 589080.0 40.62 76.02 92.60 96.53 99.00 99.53 99.72 99.86 0.47 0.28 0.14 7282957.0 37.33 70.90 89.85 95.12 98.64 99.44 99.71 99.88 0.56 0.29 0.12
3 2022202302 Apr 2022 to Mar 2023 (Period 02) Scotland 525155.0 39.00 73.35 91.00 95.68 98.83 99.55 99.78 99.90 0.45 0.22 0.10 7282617.0 37.17 70.71 89.72 95.05 98.63 99.45 99.72 99.89 0.55 0.28 0.11
3 2022202303 Apr 2022 to Mar 2023 (Period 03) Scotland 391514.0 38.17 72.65 91.02 95.76 98.83 99.53 99.73 99.86 0.47 0.27 0.14 7106208.0 36.87 70.40 89.56 94.95 98.59 99.43 99.71 99.88 0.57 0.29 0.12
3 2022202304 Apr 2022 to Mar 2023 (Period 04) Scotland 472883.0 36.71 70.60 89.65 95.09 98.62 99.45 99.72 99.88 0.55 0.28 0.12 7019852.0 36.64 70.18 89.46 94.92 98.58 99.43 99.71 99.88 0.57 0.29 0.12
3 2022202305 Apr 2022 to Mar 2023 (Period 05) Scotland 547301.0 37.39 70.96 89.22 94.50 98.20 99.16 99.52 99.77 0.84 0.48 0.23 7002824.0 36.51 70.02 89.32 94.83 98.55 99.42 99.70 99.88 0.58 0.30 0.12
3 2022202306 Apr 2022 to Mar 2023 (Period 06) Scotland 625777.0 37.18 71.27 90.40 95.68 98.81 99.52 99.74 99.90 0.48 0.26 0.10 7062005.0 36.36 69.84 89.21 94.78 98.52 99.40 99.69 99.87 0.60 0.31 0.13
3 2022202307 Apr 2022 to Mar 2023 (Period 07) Scotland 560525.0 34.54 67.69 87.65 93.81 98.23 99.26 99.62 99.83 0.74 0.38 0.17 7062140.0 36.25 69.64 88.99 94.63 98.47 99.38 99.68 99.87 0.62 0.32 0.13
3 2022202308 Apr 2022 to Mar 2023 (Period 08) Scotland 543930.0 28.01 58.59 81.66 90.34 97.12 98.97 99.53 99.84 1.03 0.47 0.16 7017994.0 36.28 69.71 89.02 94.64 98.47 99.39 99.68 99.87 0.61 0.32 0.13
3 2022202309 Apr 2022 to Mar 2023 (Period 09) Scotland 617363.0 30.55 63.04 85.49 92.99 97.93 99.15 99.50 99.80 0.85 0.50 0.20 7040528.0 36.39 69.93 89.15 94.72 98.49 99.38 99.67 99.86 0.62 0.33 0.14
3 2022202310 Apr 2022 to Mar 2023 (Period 10) Scotland 330073.0 31.35 62.76 83.97 91.15 96.93 98.64 99.22 99.65 1.36 0.78 0.35 6866415.0 36.18 69.67 88.91 94.54 98.40 99.34 99.65 99.85 0.66 0.35 0.15
3 2022202311 Apr 2022 to Mar 2023 (Period 11) Scotland 624415.0 34.61 68.11 88.78 94.94 98.71 99.47 99.73 99.88 0.53 0.27 0.12 6921484.0 35.91 69.42 88.82 94.53 98.41 99.35 99.65 99.85 0.65 0.35 0.15
3 2022202312 Apr 2022 to Mar 2023 (Period 12) Scotland 627392.0 36.53 71.01 90.59 95.87 98.93 99.58 99.79 99.92 0.42 0.21 0.08 6973393.0 35.86 69.48 88.93 94.63 98.44 99.36 99.66 99.85 0.64 0.34 0.15
3 2022202313 Apr 2022 to Mar 2023 (Period 13) Scotland 603909.0 38.17 72.79 90.89 95.81 98.89 99.55 99.76 99.91 0.45 0.24 0.09 7059317.0 35.67 69.28 88.81 94.58 98.44 99.36 99.66 99.85 0.64 0.34 0.15
3 2023202401 Apr 2023 to Mar 2024 (Period 01) Scotland 648784.0 39.84 74.40 91.81 96.19 99.02 99.60 99.78 99.91 0.40 0.22 0.09 7119021.0 35.64 69.19 88.77 94.57 98.44 99.37 99.66 99.86 0.63 0.34 0.14
3 2023202402 Apr 2023 to Mar 2024 (Period 02) Scotland 623455.0 40.59 75.04 92.20 96.39 98.98 99.53 99.72 99.88 0.47 0.28 0.12 7217321.0 35.83 69.39 88.91 94.64 98.46 99.37 99.66 99.86 0.63 0.34 0.14
3 2023202403 Apr 2023 to Mar 2024 (Period 03) Scotland 623384.0 38.49 71.60 89.86 94.97 98.51 99.35 99.65 99.87 0.65 0.35 0.13 7449191.0 35.93 69.40 88.88 94.61 98.44 99.36 99.65 99.86 0.64 0.35 0.14
3 2023202404 Apr 2023 to Mar 2024 (Period 04) Scotland 619313.0 39.96 74.13 91.79 96.23 98.99 99.62 99.80 99.92 0.38 0.20 0.08 7595621.0 36.21 69.71 89.07 94.71 98.48 99.37 99.66 99.86 0.63 0.34 0.14
3 2023202405 Apr 2023 to Mar 2024 (Period 05) Scotland 624968.0 38.14 72.21 90.63 95.66 98.89 99.57 99.77 99.92 0.43 0.23 0.08 7673288.0 36.28 69.83 89.18 94.81 98.53 99.40 99.68 99.87 0.60 0.32 0.13
3 2023202406 Apr 2023 to Mar 2024 (Period 06) Scotland 625207.0 38.34 72.72 90.96 95.69 98.83 99.53 99.78 99.92 0.47 0.22 0.08 7672718.0 36.37 69.95 89.23 94.81 98.53 99.40 99.68 99.87 0.60 0.32 0.13
3 2023202407 Apr 2023 to Mar 2024 (Period 07) Scotland 592641.0 34.46 67.01 87.07 93.14 97.67 98.82 99.31 99.71 1.18 0.69 0.29 7704834.0 36.36 69.88 89.18 94.75 98.49 99.37 99.66 99.87 0.63 0.34 0.13
3 2023202408 Apr 2023 to Mar 2024 (Period 08) Scotland 597829.0 29.50 60.22 82.88 91.09 97.36 98.90 99.39 99.75 1.10 0.61 0.25 7758733.0 36.42 69.93 89.22 94.78 98.50 99.36 99.65 99.86 0.64 0.35 0.14
3 2023202409 Apr 2023 to Mar 2024 (Period 09) Scotland 621636.0 30.22 62.00 85.01 92.97 98.25 99.35 99.67 99.88 0.65 0.33 0.12 7763006.0 36.39 69.84 89.18 94.78 98.52 99.38 99.66 99.86 0.62 0.34 0.14
3 2023202410 Apr 2023 to Mar 2024 (Period 10) Scotland 544762.0 33.43 65.28 86.02 92.85 97.77 98.97 99.43 99.74 1.03 0.57 0.26 7977695.0 36.39 69.83 89.18 94.79 98.54 99.38 99.66 99.87 0.62 0.34 0.13
3 2023202411 Apr 2023 to Mar 2024 (Period 11) Scotland 561710.0 34.93 67.87 88.24 94.25 98.27 99.23 99.58 99.84 0.77 0.42 0.16 7914990.0 36.43 69.82 89.14 94.74 98.51 99.36 99.65 99.86 0.64 0.35 0.14
3 2023202412 Apr 2023 to Mar 2024 (Period 12) Scotland 636429.0 37.04 70.40 89.93 95.45 98.93 99.62 99.83 99.94 0.38 0.17 0.06 7924027.0 36.47 69.77 89.09 94.71 98.51 99.36 99.66 99.86 0.64 0.34 0.14
3 2023202413 Apr 2023 to Mar 2024 (Period 13) Scotland 653502.0 38.77 72.76 91.21 96.05 99.04 99.64 99.83 99.95 0.36 0.17 0.05 7973620.0 36.53 69.79 89.13 94.74 98.52 99.37 99.66 99.87 0.63 0.34 0.13
3 2024202501 Apr 2024 to Mar 2025 (Period 01) Scotland 612576.0 38.65 72.50 90.58 95.43 98.75 99.49 99.75 99.91 0.51 0.25 0.09 7937412.0 36.42 69.62 89.02 94.67 98.50 99.36 99.66 99.87 0.64 0.34 0.13
3 2024202502 Apr 2024 to Mar 2025 (Period 02) Scotland 638989.0 38.26 71.93 90.66 95.81 98.99 99.61 99.82 99.93 0.39 0.18 0.07 7952946.0 36.24 69.38 88.91 94.63 98.50 99.37 99.67 99.87 0.63 0.33 0.13
3 2024202503 Apr 2024 to Mar 2025 (Period 03) Scotland 649657.0 38.45 72.54 90.72 95.71 98.88 99.53 99.76 99.88 0.47 0.24 0.12 7979219.0 36.25 69.47 88.98 94.69 98.53 99.39 99.68 99.87 0.61 0.32 0.13
3 2024202504 Apr 2024 to Mar 2025 (Period 04) Scotland 565385.0 37.79 71.79 90.15 95.15 98.63 99.51 99.77 99.93 0.49 0.23 0.07 7925291.0 36.07 69.27 88.84 94.60 98.50 99.38 99.67 99.87 0.62 0.33 0.13
3 2024202505 Apr 2024 to Mar 2025 (Period 05) Scotland 492977.0 35.09 68.57 88.41 94.28 98.46 99.45 99.77 99.94 0.55 0.23 0.06 7793300.0 35.84 68.99 88.67 94.50 98.47 99.37 99.67 99.87 0.63 0.33 0.13
3 2024202506 Apr 2024 to Mar 2025 (Period 06) Scotland 502337.0 37.29 71.25 90.52 95.69 98.91 99.59 99.80 99.93 0.41 0.20 0.07 7670430.0 35.73 68.83 88.61 94.48 98.47 99.37 99.67 99.87 0.63 0.33 0.13
3 2024202507 Apr 2024 to Mar 2025 (Period 07) Scotland 537836.0 35.37 69.10 89.39 95.03 98.71 99.51 99.74 99.90 0.49 0.26 0.10 7615625.0 35.81 68.99 88.78 94.62 98.55 99.42 99.71 99.89 0.58 0.29 0.11
3 2024202508 Apr 2024 to Mar 2025 (Period 08) Scotland 648761.0 28.00 58.64 81.66 90.29 97.21 98.91 99.51 99.85 1.09 0.49 0.15 7666557.0 35.64 68.80 88.64 94.53 98.53 99.42 99.71 99.89 0.58 0.29 0.11
3 2024202509 Apr 2024 to Mar 2025 (Period 09) Scotland 653863.0 29.73 61.58 84.43 92.28 97.85 99.07 99.52 99.82 0.93 0.48 0.18 7698784.0 35.57 68.74 88.57 94.47 98.49 99.39 99.70 99.89 0.61 0.30 0.11
3 2024202510 Apr 2024 to Mar 2025 (Period 10) Scotland 576893.0 33.09 65.76 86.53 93.29 98.02 99.19 99.59 99.83 0.81 0.41 0.17 7730915.0 35.54 68.76 88.60 94.49 98.51 99.41 99.71 99.89 0.59 0.29 0.11
3 2024202511 Apr 2024 to Mar 2025 (Period 11) Scotland 592208.0 36.20 69.40 88.94 94.54 98.42 99.39 99.69 99.89 0.61 0.31 0.11 7761413.0 35.63 68.87 88.65 94.51 98.52 99.42 99.72 99.90 0.58 0.28 0.10
3 2024202512 Apr 2024 to Mar 2025 (Period 12) Scotland 668092.0 37.57 71.62 90.81 96.00 99.08 99.67 99.84 99.92 0.33 0.16 0.08 7793076.0 35.68 68.98 88.73 94.56 98.53 99.42 99.72 99.90 0.58 0.28 0.10
3 2024202513 Apr 2024 to Mar 2025 (Period 13) Scotland 699076.0 40.25 74.65 92.09 96.45 99.07 99.62 99.82 99.94 0.38 0.18 0.06 7838650.0 35.83 69.17 88.83 94.61 98.54 99.42 99.72 99.90 0.58 0.28 0.10
3 2025202601 Apr 2025 to Mar 2026 (Period 01) Scotland 627154.0 39.71 73.98 91.49 96.01 98.87 99.53 99.74 99.89 0.47 0.26 0.11 7853228.0 35.92 69.30 88.90 94.65 98.55 99.43 99.72 99.90 0.57 0.28 0.10
3 2025202602 Apr 2025 to Mar 2026 (Period 02) Scotland 664713.0 38.85 72.88 90.79 95.59 98.79 99.50 99.74 99.88 0.50 0.26 0.12 7878952.0 35.98 69.39 88.92 94.64 98.53 99.42 99.71 99.89 0.58 0.29 0.11
3 2025202603 Apr 2025 to Mar 2026 (Period 03) Scotland 681688.0 39.52 73.20 90.86 95.65 98.78 99.52 99.75 99.89 0.48 0.25 0.11 7910983.0 36.08 69.46 88.94 94.64 98.52 99.42 99.71 99.89 0.58 0.29 0.11
3 2025202604 Apr 2025 to Mar 2026 (Period 04) Scotland 679336.0 38.61 71.43 89.31 94.58 98.26 99.25 99.61 99.86 0.75 0.39 0.14 8024934.0 36.18 69.46 88.88 94.60 98.49 99.40 99.70 99.89 0.60 0.30 0.11
3 2025202605 Apr 2025 to Mar 2026 (Period 05) Scotland 653853.0 37.15 69.94 88.38 93.74 97.80 98.98 99.41 99.76 1.02 0.59 0.24 8185810.0 36.32 69.55 88.87 94.55 98.44 99.36 99.67 99.87 0.64 0.33 0.13
3 2025202606 Apr 2025 to Mar 2026 (Period 06) Scotland 679646.0 37.38 70.62 89.69 94.99 98.52 99.36 99.67 99.90 0.64 0.33 0.10 8363119.0 36.35 69.54 88.84 94.52 98.42 99.35 99.66 99.87 0.65 0.34 0.13
3 2025202607 Apr 2025 to Mar 2026 (Period 07) Scotland 647200.0 33.97 66.26 87.00 93.41 97.94 99.09 99.51 99.81 0.91 0.49 0.19 8472483.0 36.23 69.31 88.66 94.40 98.36 99.32 99.65 99.87 0.68 0.35 0.13
3 2025202608 Apr 2025 to Mar 2026 (Period 08) Scotland 684745.0 30.70 62.01 84.21 92.02 97.82 99.17 99.59 99.86 0.83 0.41 0.14 8508467.0 36.41 69.54 88.84 94.52 98.41 99.34 99.65 99.87 0.66 0.35 0.13
3 2025202609 Apr 2025 to Mar 2026 (Period 09) Scotland 679667.0 29.72 60.53 83.33 91.40 97.51 99.02 99.47 99.77 0.98 0.53 0.23 8534271.0 36.39 69.43 88.74 94.44 98.38 99.33 99.65 99.86 0.67 0.35 0.14
3 2025202610 Apr 2025 to Mar 2026 (Period 10) Scotland 594393.0 33.01 65.31 86.38 93.18 98.12 99.24 99.63 99.86 0.76 0.37 0.14 8551771.0 36.38 69.39 88.72 94.43 98.39 99.34 99.65 99.86 0.66 0.35 0.14
3 2025202611 Apr 2025 to Mar 2026 (Period 11) Scotland 682010.0 35.39 68.56 88.61 94.51 98.42 99.30 99.62 99.83 0.70 0.38 0.17 8641573.0 36.31 69.33 88.70 94.43 98.39 99.33 99.65 99.86 0.67 0.35 0.14
3 2025202612 Apr 2025 to Mar 2026 (Period 12) Scotland 683079.0 36.20 70.02 89.65 95.14 98.72 99.52 99.78 99.92 0.48 0.22 0.08 8656560.0 36.21 69.20 88.61 94.37 98.36 99.32 99.64 99.86 0.68 0.36 0.14
3 2025202613 Apr 2025 to Mar 2026 (Period 13) Scotland 664896.0 37.55 70.80 89.63 95.19 98.79 99.52 99.73 99.88 0.48 0.27 0.12 8622380.0 35.98 68.89 88.41 94.26 98.34 99.31 99.63 99.86 0.69 0.37 0.14
3 2026202701 Apr 2026 to Mar 2027 (Period 01) Scotland 797906.0 37.47 70.95 89.67 95.32 98.82 99.51 99.75 99.90 0.49 0.25 0.10 8793132.0 35.85 68.71 88.30 94.23 98.34 99.31 99.64 99.86 0.69 0.36 0.14
3 2026202702 Apr 2026 to Mar 2027 (Period 02) Scotland 693797.0 36.68 69.79 89.05 94.96 98.73 99.51 99.75 99.91 0.49 0.25 0.09 8822216.0 35.69 68.48 88.18 94.19 98.34 99.31 99.64 99.86 0.69 0.36 0.14
4 2014201501 Apr 2014 to Mar 2015 (Period 01) Avanti West Coast 48987.0 30.46 54.31 76.20 85.66 94.32 96.94 97.94 98.92 3.06 2.06 1.08 48987.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201502 Apr 2014 to Mar 2015 (Period 02) Avanti West Coast 51186.0 21.39 40.98 61.02 72.68 85.11 90.59 93.59 96.79 9.41 6.41 3.21 100173.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201503 Apr 2014 to Mar 2015 (Period 03) Avanti West Coast 52831.0 25.91 47.50 70.23 81.91 92.28 95.78 97.56 98.85 4.22 2.44 1.15 153004.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201504 Apr 2014 to Mar 2015 (Period 04) Avanti West Coast 53748.0 26.11 48.36 71.03 81.42 91.26 95.04 97.00 98.71 4.96 3.00 1.29 206752.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201505 Apr 2014 to Mar 2015 (Period 05) Avanti West Coast 52971.0 24.01 45.18 66.63 77.61 88.83 93.25 95.47 97.63 6.75 4.53 2.37 259723.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201506 Apr 2014 to Mar 2015 (Period 06) Avanti West Coast 51330.0 26.90 49.27 70.68 80.81 90.43 94.00 95.89 97.75 6.00 4.11 2.25 311053.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201507 Apr 2014 to Mar 2015 (Period 07) Avanti West Coast 53291.0 25.32 46.75 69.05 80.22 91.46 95.14 96.89 98.39 4.86 3.11 1.61 364344.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201508 Apr 2014 to Mar 2015 (Period 08) Avanti West Coast 53153.0 21.53 40.36 60.98 73.18 86.65 91.80 94.62 97.34 8.20 5.38 2.66 417497.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201509 Apr 2014 to Mar 2015 (Period 09) Avanti West Coast 53481.0 21.78 41.05 63.15 75.86 88.63 93.34 95.69 97.69 6.66 4.31 2.31 470978.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201510 Apr 2014 to Mar 2015 (Period 10) Avanti West Coast 47382.0 23.92 43.24 63.86 75.33 87.28 92.24 94.78 97.18 7.76 5.22 2.82 518360.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201511 Apr 2014 to Mar 2015 (Period 11) Avanti West Coast 53258.0 25.45 45.35 64.60 74.65 86.17 91.15 94.02 97.10 8.85 5.98 2.90 571618.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201512 Apr 2014 to Mar 2015 (Period 12) Avanti West Coast 53572.0 30.82 53.09 74.42 83.80 92.73 95.69 97.00 98.28 4.31 3.00 1.72 625190.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2014201513 Apr 2014 to Mar 2015 (Period 13) Avanti West Coast 59348.0 28.70 50.23 70.59 80.85 91.02 94.49 96.54 98.28 5.51 3.46 1.72 684538.0 25.58 46.62 67.90 78.79 89.72 93.81 95.93 97.93 6.19 4.07 2.07
4 2015201601 Apr 2015 to Mar 2016 (Period 01) Avanti West Coast 58253.0 29.16 50.42 70.30 80.14 90.09 93.69 95.49 97.51 6.31 4.51 2.49 693804.0 25.54 46.39 67.52 78.42 89.43 93.58 95.75 97.82 6.42 4.25 2.18
4 2015201602 Apr 2015 to Mar 2016 (Period 02) Avanti West Coast 50941.0 27.81 49.32 71.91 83.03 93.01 96.07 97.65 98.95 3.93 2.35 1.05 693559.0 26.01 47.01 68.32 79.18 90.01 93.99 96.05 97.98 6.01 3.95 2.02
4 2015201603 Apr 2015 to Mar 2016 (Period 03) Avanti West Coast 53672.0 29.95 51.63 72.34 82.40 91.79 94.96 96.48 98.05 5.04 3.52 1.95 694400.0 26.33 47.33 68.49 79.22 89.97 93.92 95.97 97.92 6.08 4.03 2.08
4 2015201604 Apr 2015 to Mar 2016 (Period 04) Avanti West Coast 53744.0 29.47 50.96 70.79 80.46 90.27 94.13 96.13 98.06 5.87 3.87 1.94 694396.0 26.59 47.53 68.47 79.15 89.90 93.85 95.90 97.87 6.15 4.10 2.13
4 2015201605 Apr 2015 to Mar 2016 (Period 05) Avanti West Coast 53958.0 31.30 52.92 73.84 83.57 92.88 95.97 97.37 98.76 4.03 2.63 1.24 695383.0 27.15 48.13 69.02 79.61 90.21 94.06 96.05 97.96 5.94 3.95 2.04
4 2015201606 Apr 2015 to Mar 2016 (Period 06) Avanti West Coast 53159.0 29.48 50.82 71.27 81.10 91.03 94.63 96.48 98.30 5.37 3.52 1.70 697212.0 27.34 48.25 69.07 79.63 90.26 94.11 96.10 98.00 5.89 3.90 2.00
4 2015201607 Apr 2015 to Mar 2016 (Period 07) Avanti West Coast 54296.0 30.14 52.71 74.39 84.99 94.42 97.03 98.27 99.24 2.97 1.73 0.76 698217.0 27.72 48.71 69.49 80.00 90.49 94.26 96.21 98.06 5.74 3.79 1.94
4 2015201608 Apr 2015 to Mar 2016 (Period 08) Avanti West Coast 54237.0 22.15 41.72 63.41 76.02 90.12 94.82 97.02 98.68 5.18 2.98 1.32 699301.0 27.75 48.80 69.66 80.21 90.75 94.49 96.39 98.17 5.51 3.61 1.83
4 2015201609 Apr 2015 to Mar 2016 (Period 09) Avanti West Coast 52278.0 19.11 35.97 54.51 65.77 79.76 86.11 90.00 94.24 13.89 10.00 5.76 698098.0 27.56 48.43 69.03 79.46 90.09 93.95 95.96 97.91 6.05 4.04 2.09
4 2015201610 Apr 2015 to Mar 2016 (Period 10) Avanti West Coast 46915.0 25.01 44.93 64.08 74.33 85.65 90.75 93.92 97.17 9.25 6.08 2.83 697631.0 27.64 48.55 69.05 79.40 89.98 93.85 95.91 97.91 6.15 4.09 2.09
4 2015201611 Apr 2015 to Mar 2016 (Period 11) Avanti West Coast 52034.0 28.29 50.24 71.10 81.72 92.66 96.31 98.04 99.20 3.69 1.96 0.80 696407.0 27.86 48.92 69.54 79.94 90.48 94.24 96.21 98.07 5.76 3.79 1.93
4 2015201612 Apr 2015 to Mar 2016 (Period 12) Avanti West Coast 52804.0 28.08 49.21 69.30 79.94 91.14 95.11 96.97 98.50 4.89 3.03 1.50 695639.0 27.64 48.62 69.15 79.64 90.35 94.20 96.21 98.08 5.80 3.79 1.92
4 2015201613 Apr 2015 to Mar 2016 (Period 13) Avanti West Coast 47527.0 29.67 51.17 70.62 80.31 89.88 93.29 95.39 97.21 6.71 4.61 2.79 683818.0 27.69 48.66 69.12 79.58 90.26 94.11 96.12 98.00 5.89 3.88 2.00
4 2016201701 Apr 2016 to Mar 2017 (Period 01) Avanti West Coast 56828.0 31.30 53.41 73.83 83.19 91.72 94.94 96.79 98.58 5.06 3.21 1.42 682393.0 27.87 48.90 69.42 79.83 90.40 94.21 96.23 98.10 5.79 3.77 1.90
4 2016201702 Apr 2016 to Mar 2017 (Period 02) Avanti West Coast 51541.0 32.84 55.71 75.00 84.47 93.02 95.96 97.45 98.63 4.04 2.55 1.37 682993.0 28.25 49.39 69.65 79.95 90.40 94.21 96.22 98.07 5.79 3.78 1.93
4 2016201703 Apr 2016 to Mar 2017 (Period 03) Avanti West Coast 53428.0 30.30 52.13 72.60 82.48 91.98 95.42 97.08 98.60 4.58 2.92 1.40 682749.0 28.28 49.43 69.67 79.95 90.42 94.24 96.26 98.11 5.76 3.74 1.89
4 2016201704 Apr 2016 to Mar 2017 (Period 04) Avanti West Coast 54503.0 31.81 53.96 74.45 83.89 92.50 95.53 96.92 98.33 4.47 3.08 1.67 683508.0 28.46 49.67 69.96 80.22 90.59 94.36 96.33 98.14 5.64 3.67 1.86
4 2016201705 Apr 2016 to Mar 2017 (Period 05) Avanti West Coast 54847.0 32.22 54.56 74.86 84.70 94.07 96.81 98.15 99.28 3.19 1.85 0.72 684397.0 28.54 49.80 70.05 80.32 90.69 94.43 96.39 98.18 5.57 3.61 1.82
4 2016201706 Apr 2016 to Mar 2017 (Period 06) Avanti West Coast 53462.0 29.35 50.99 71.46 81.23 90.49 94.04 95.90 97.75 5.96 4.10 2.25 684700.0 28.53 49.82 70.07 80.33 90.65 94.38 96.35 98.14 5.62 3.65 1.86
4 2016201707 Apr 2016 to Mar 2017 (Period 07) Avanti West Coast 54607.0 31.28 54.25 75.63 85.53 94.06 96.79 98.00 99.21 3.21 2.00 0.79 685011.0 28.62 49.94 70.17 80.37 90.62 94.36 96.32 98.13 5.64 3.68 1.87
4 2016201708 Apr 2016 to Mar 2017 (Period 08) Avanti West Coast 54549.0 27.82 48.86 71.24 82.97 93.33 96.44 97.87 98.92 3.56 2.13 1.08 685323.0 29.07 50.51 70.79 80.93 90.88 94.49 96.39 98.15 5.51 3.61 1.85
4 2016201709 Apr 2016 to Mar 2017 (Period 09) Avanti West Coast 53912.0 22.12 39.89 60.84 72.88 86.11 91.26 93.94 96.37 8.74 6.06 3.63 686957.0 29.28 50.78 71.25 81.45 91.35 94.87 96.69 98.31 5.13 3.31 1.69
4 2016201710 Apr 2016 to Mar 2017 (Period 10) Avanti West Coast 49794.0 29.32 50.71 72.02 82.54 91.96 95.15 96.67 98.08 4.85 3.33 1.92 689836.0 29.58 51.17 71.79 82.01 91.78 95.17 96.87 98.37 4.83 3.13 1.63
4 2016201711 Apr 2016 to Mar 2017 (Period 11) Avanti West Coast 54461.0 33.82 56.02 78.08 87.12 94.74 97.12 98.17 99.12 2.88 1.83 0.88 692263.0 30.01 51.62 72.34 82.44 91.95 95.24 96.89 98.37 4.76 3.11 1.63
4 2016201712 Apr 2016 to Mar 2017 (Period 12) Avanti West Coast 52563.0 31.02 52.90 74.20 83.71 91.92 94.46 95.96 97.69 5.54 4.04 2.31 692022.0 30.23 51.90 72.71 82.72 92.01 95.19 96.81 98.31 4.81 3.19 1.69
4 2016201713 Apr 2016 to Mar 2017 (Period 13) Avanti West Coast 52263.0 33.39 56.90 77.90 86.93 94.36 96.61 97.77 98.81 3.39 2.23 1.19 696758.0 30.51 52.33 73.24 83.20 92.33 95.43 96.98 98.42 4.57 3.02 1.58
4 2017201801 Apr 2017 to Mar 2018 (Period 01) Avanti West Coast 53694.0 36.07 59.82 80.44 89.04 95.52 97.44 98.26 99.05 2.56 1.74 0.95 693624.0 30.87 52.82 73.75 83.65 92.63 95.63 97.09 98.45 4.37 2.91 1.55
4 2017201802 Apr 2017 to Mar 2018 (Period 02) Avanti West Coast 52954.0 33.10 55.80 75.63 84.94 93.36 95.96 97.38 98.96 4.04 2.62 1.04 695037.0 30.90 52.83 73.80 83.69 92.65 95.63 97.09 98.48 4.37 2.91 1.52
4 2017201803 Apr 2017 to Mar 2018 (Period 03) Avanti West Coast 53284.0 30.05 52.45 72.92 82.50 91.57 95.00 96.91 98.73 5.00 3.09 1.27 694893.0 30.88 52.86 73.82 83.69 92.62 95.59 97.08 98.49 4.41 2.92 1.51
4 2017201804 Apr 2017 to Mar 2018 (Period 04) Avanti West Coast 52797.0 29.99 53.10 74.62 84.07 92.05 94.71 96.15 97.69 5.29 3.85 2.31 693187.0 30.74 52.79 73.84 83.71 92.59 95.53 97.02 98.44 4.47 2.98 1.56
4 2017201805 Apr 2017 to Mar 2018 (Period 05) Avanti West Coast 54400.0 32.26 56.00 77.89 87.06 94.60 96.88 97.95 98.88 3.13 2.05 1.12 692740.0 30.74 52.90 74.07 83.89 92.63 95.54 97.00 98.41 4.46 3.00 1.59
4 2017201806 Apr 2017 to Mar 2018 (Period 06) Avanti West Coast 52941.0 30.10 54.10 76.06 85.80 93.91 96.56 97.85 98.98 3.44 2.15 1.02 692219.0 30.80 53.14 74.43 84.24 92.89 95.73 97.15 98.50 4.27 2.85 1.50
4 2017201807 Apr 2017 to Mar 2018 (Period 07) Avanti West Coast 54224.0 27.04 48.54 69.98 80.47 90.74 94.01 95.67 97.50 5.99 4.33 2.50 691836.0 30.46 52.69 73.98 83.85 92.63 95.51 96.97 98.37 4.49 3.03 1.63
4 2017201808 Apr 2017 to Mar 2018 (Period 08) Avanti West Coast 53301.0 21.55 40.61 62.35 74.84 87.65 92.09 94.37 96.34 7.91 5.63 3.66 690588.0 29.98 52.06 73.30 83.22 92.19 95.17 96.70 98.17 4.83 3.30 1.83
4 2017201809 Apr 2017 to Mar 2018 (Period 09) Avanti West Coast 53501.0 21.34 41.20 61.90 73.34 86.04 90.95 93.57 96.32 9.05 6.43 3.68 690177.0 29.93 52.17 73.39 83.26 92.19 95.15 96.67 98.17 4.85 3.33 1.83
4 2017201810 Apr 2017 to Mar 2018 (Period 10) Avanti West Coast 46608.0 19.81 37.55 57.20 68.48 81.86 88.15 91.43 95.19 11.85 8.57 4.81 686991.0 29.29 51.28 72.39 82.31 91.51 94.68 96.31 97.97 5.32 3.69 2.03
4 2017201811 Apr 2017 to Mar 2018 (Period 11) Avanti West Coast 53671.0 29.45 52.04 73.42 83.21 91.93 95.10 96.56 98.07 4.90 3.44 1.93 686201.0 28.94 50.97 72.02 82.00 91.28 94.52 96.19 97.89 5.48 3.81 2.11
4 2017201812 Apr 2017 to Mar 2018 (Period 12) Avanti West Coast 52352.0 26.08 47.49 68.33 78.08 87.96 91.76 94.06 96.68 8.24 5.94 3.32 685990.0 28.56 50.55 71.57 81.57 90.98 94.31 96.04 97.81 5.69 3.96 2.19
4 2017201813 Apr 2017 to Mar 2018 (Period 13) Avanti West Coast 52983.0 23.64 44.22 65.50 77.00 88.89 93.26 95.80 98.21 6.74 4.20 1.79 686710.0 27.81 49.58 70.62 80.81 90.56 94.05 95.89 97.76 5.95 4.11 2.24
4 2018201901 Apr 2018 to Mar 2019 (Period 01) Avanti West Coast 52424.0 26.88 48.78 69.63 79.98 90.35 94.23 96.25 98.13 5.77 3.75 1.87 685440.0 27.10 48.72 69.78 80.10 90.16 93.80 95.73 97.69 6.20 4.27 2.31
4 2018201902 Apr 2018 to Mar 2019 (Period 02) Avanti West Coast 52581.0 28.53 50.71 72.14 82.69 92.64 95.82 97.51 98.99 4.18 2.49 1.01 685067.0 26.74 48.33 69.51 79.93 90.10 93.79 95.74 97.69 6.21 4.26 2.31
4 2018201903 Apr 2018 to Mar 2019 (Period 03) Avanti West Coast 53712.0 28.55 50.04 70.99 81.63 91.96 95.46 97.10 98.49 4.54 2.90 1.51 685495.0 26.63 48.14 69.36 79.86 90.13 93.83 95.76 97.68 6.17 4.24 2.32
4 2018201904 Apr 2018 to Mar 2019 (Period 04) Avanti West Coast 54114.0 19.73 38.13 57.22 68.07 81.20 87.45 91.06 95.08 12.55 8.94 4.92 686812.0 25.82 46.97 68.00 78.61 89.28 93.26 95.36 97.47 6.74 4.64 2.53
4 2018201905 Apr 2018 to Mar 2019 (Period 05) Avanti West Coast 54879.0 23.69 44.30 65.36 76.54 88.85 93.36 95.64 97.96 6.64 4.36 2.04 687291.0 25.14 46.04 67.00 77.77 88.82 92.98 95.17 97.40 7.02 4.83 2.60
4 2018201906 Apr 2018 to Mar 2019 (Period 06) Avanti West Coast 52131.0 26.25 48.32 70.50 81.70 92.21 95.41 96.97 98.56 4.59 3.03 1.44 686481.0 24.85 45.59 66.57 77.45 88.69 92.89 95.10 97.36 7.11 4.90 2.64
4 2018201907 Apr 2018 to Mar 2019 (Period 07) Avanti West Coast 54747.0 23.79 44.25 64.85 76.03 87.80 92.13 94.34 96.76 7.87 5.66 3.24 687004.0 24.59 45.25 66.16 77.10 88.46 92.74 95.00 97.30 7.26 5.00 2.70
4 2018201908 Apr 2018 to Mar 2019 (Period 08) Avanti West Coast 55502.0 23.50 44.24 65.80 78.22 91.21 95.34 96.98 98.63 4.66 3.02 1.37 689205.0 24.74 45.53 66.43 77.37 88.74 93.00 95.21 97.49 7.00 4.79 2.51
4 2018201909 Apr 2018 to Mar 2019 (Period 09) Avanti West Coast 55395.0 21.42 40.94 62.19 74.59 88.34 93.15 95.41 97.60 6.85 4.59 2.40 691099.0 24.73 45.50 66.44 77.46 88.92 93.17 95.35 97.59 6.83 4.65 2.41
4 2018201910 Apr 2018 to Mar 2019 (Period 10) Avanti West Coast 49336.0 24.55 45.86 67.71 79.00 90.68 94.98 96.95 98.69 5.02 3.05 1.31 693827.0 25.05 46.06 67.15 78.17 89.52 93.63 95.73 97.82 6.37 4.27 2.18
4 2018201911 Apr 2018 to Mar 2019 (Period 11) Avanti West Coast 55570.0 29.87 53.26 74.14 83.62 91.95 94.91 96.36 97.89 5.09 3.64 2.11 695726.0 25.10 46.17 67.22 78.21 89.52 93.62 95.71 97.81 6.38 4.29 2.19
4 2018201912 Apr 2018 to Mar 2019 (Period 12) Avanti West Coast 54906.0 26.11 48.67 70.01 80.37 90.23 93.84 95.90 98.10 6.16 4.10 1.90 698280.0 25.10 46.27 67.36 78.39 89.70 93.78 95.85 97.92 6.22 4.15 2.08
4 2018201913 Apr 2018 to Mar 2019 (Period 13) Avanti West Coast 56725.0 26.76 49.19 71.40 81.98 91.88 94.91 96.40 98.09 5.09 3.60 1.91 702022.0 25.35 46.66 67.83 78.79 89.93 93.91 95.90 97.91 6.09 4.10 2.09
4 2019202001 Apr 2019 to Mar 2020 (Period 01) Avanti West Coast 50726.0 26.11 48.53 70.36 81.34 91.77 95.21 96.83 98.58 4.79 3.17 1.42 50726.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202002 Apr 2019 to Mar 2020 (Period 02) Avanti West Coast 52366.0 23.69 45.73 67.64 78.75 90.05 94.06 96.05 97.72 5.94 3.95 2.28 103092.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202003 Apr 2019 to Mar 2020 (Period 03) Avanti West Coast 53698.0 19.57 40.03 61.70 73.84 87.17 92.59 95.37 97.99 7.41 4.63 2.01 156790.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202004 Apr 2019 to Mar 2020 (Period 04) Avanti West Coast 55050.0 20.64 41.32 63.37 75.58 88.83 93.76 96.11 98.27 6.24 3.89 1.73 211840.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202005 Apr 2019 to Mar 2020 (Period 05) Avanti West Coast 51156.0 16.47 34.18 54.06 65.75 79.85 85.84 89.37 93.17 14.16 10.63 6.83 262996.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202006 Apr 2019 to Mar 2020 (Period 06) Avanti West Coast 54801.0 21.92 42.68 65.00 76.68 89.42 94.25 96.39 98.47 5.75 3.61 1.53 317797.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202007 Apr 2019 to Mar 2020 (Period 07) Avanti West Coast 55112.0 18.07 37.06 58.83 71.93 86.91 92.58 95.38 97.86 7.42 4.62 2.14 372909.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202008 Apr 2019 to Mar 2020 (Period 08) Avanti West Coast 53592.0 14.80 31.76 51.64 64.50 80.61 87.30 91.10 95.48 12.70 8.90 4.52 426501.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202009 Apr 2019 to Mar 2020 (Period 09) Avanti West Coast 54955.0 15.90 32.86 52.87 66.11 83.48 90.84 94.62 97.89 9.16 5.38 2.11 481456.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202010 Apr 2019 to Mar 2020 (Period 10) Avanti West Coast 50525.0 19.63 39.20 60.69 73.74 87.58 93.03 95.58 97.98 6.97 4.42 2.02 531981.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202011 Apr 2019 to Mar 2020 (Period 11) Avanti West Coast 55159.0 21.92 42.69 64.51 76.78 90.15 94.68 96.91 98.75 5.32 3.09 1.25 587140.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202012 Apr 2019 to Mar 2020 (Period 12) Avanti West Coast 54153.0 16.13 34.58 56.44 69.76 85.33 91.63 94.64 97.42 8.37 5.36 2.58 641293.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
4 2019202013 Apr 2019 to Mar 2020 (Period 13) Avanti West Coast 50035.0 24.71 44.41 63.19 73.71 86.19 91.10 93.65 96.35 8.90 6.35 3.65 691328.0 19.92 39.56 60.75 72.94 86.72 92.08 94.79 97.40 7.92 5.21 2.60
4 2020202101 Apr 2020 to Mar 2021 (Period 01) Avanti West Coast 33857.0 47.77 71.70 87.33 92.80 96.94 98.28 98.83 99.34 1.72 1.17 0.66 674459.0 20.85 40.50 61.36 73.30 86.86 92.16 94.84 97.41 7.84 5.16 2.59
4 2020202102 Apr 2020 to Mar 2021 (Period 02) Avanti West Coast 33870.0 43.11 66.89 84.04 90.52 95.80 97.74 98.68 99.24 2.26 1.32 0.76 655963.0 21.77 41.44 62.03 73.75 87.07 92.30 94.94 97.48 7.70 5.06 2.52
4 2020202103 Apr 2020 to Mar 2021 (Period 03) Avanti West Coast 40616.0 47.08 70.75 87.31 92.47 96.71 98.05 98.65 99.33 1.95 1.35 0.67 642881.0 23.55 43.41 63.66 74.93 87.67 92.64 95.14 97.55 7.36 4.86 2.45
4 2020202104 Apr 2020 to Mar 2021 (Period 04) Avanti West Coast 46507.0 41.18 66.07 84.80 91.13 96.40 97.96 98.83 99.49 2.04 1.17 0.51 634338.0 25.10 45.25 65.23 76.06 88.21 92.93 95.33 97.63 7.07 4.67 2.37
4 2020202105 Apr 2020 to Mar 2021 (Period 05) Avanti West Coast 48696.0 34.89 59.32 78.82 86.65 93.59 96.18 97.50 98.77 3.82 2.50 1.23 631878.0 26.55 47.23 67.18 77.71 89.30 93.75 95.98 98.08 6.25 4.02 1.92
4 2020202106 Apr 2020 to Mar 2021 (Period 06) Avanti West Coast 48710.0 35.63 60.07 79.40 86.92 93.64 95.85 97.11 98.41 4.15 2.89 1.59 625787.0 27.66 48.63 68.32 78.52 89.62 93.87 96.03 98.07 6.13 3.97 1.93
4 2020202107 Apr 2020 to Mar 2021 (Period 07) Avanti West Coast 50303.0 31.99 55.69 76.12 84.69 92.41 95.20 96.68 98.22 4.80 3.32 1.78 620978.0 28.87 50.23 69.80 79.60 90.09 94.10 96.14 98.10 5.90 3.86 1.90
4 2020202108 Apr 2020 to Mar 2021 (Period 08) Avanti West Coast 50813.0 32.15 56.11 77.55 86.53 94.10 96.49 97.57 98.67 3.51 2.43 1.33 618199.0 30.36 52.32 72.01 81.48 91.24 94.88 96.69 98.38 5.12 3.31 1.62
4 2020202109 Apr 2020 to Mar 2021 (Period 09) Avanti West Coast 44818.0 36.74 60.86 80.58 88.02 94.20 96.47 97.67 98.84 3.53 2.33 1.16 608062.0 32.13 54.70 74.37 83.35 92.16 95.36 96.95 98.45 4.64 3.05 1.55
4 2020202110 Apr 2020 to Mar 2021 (Period 10) Avanti West Coast 42290.0 35.46 58.44 77.54 85.23 92.52 95.17 96.81 98.40 4.83 3.19 1.60 599827.0 33.42 56.27 75.75 84.29 92.57 95.55 97.06 98.49 4.45 2.94 1.51
4 2020202111 Apr 2020 to Mar 2021 (Period 11) Avanti West Coast 38348.0 35.44 55.63 71.54 79.03 87.79 92.48 95.12 97.57 7.52 4.88 2.43 583016.0 34.64 57.52 76.53 84.66 92.49 95.43 96.95 98.41 4.57 3.05 1.59
4 2020202112 Apr 2020 to Mar 2021 (Period 12) Avanti West Coast 37403.0 39.09 62.29 79.83 86.67 93.69 96.33 97.71 98.86 3.67 2.29 1.14 566266.0 36.71 60.03 78.67 86.22 93.25 95.85 97.22 98.53 4.15 2.78 1.47
4 2020202113 Apr 2020 to Mar 2021 (Period 13) Avanti West Coast 33444.0 41.80 65.60 83.08 90.12 95.70 97.52 98.41 99.27 2.48 1.59 0.73 549675.0 38.11 61.79 80.35 87.59 94.04 96.38 97.61 98.77 3.62 2.39 1.23
4 2021202201 Apr 2021 to Mar 2022 (Period 01) Avanti West Coast 42400.0 40.25 64.58 82.20 88.82 94.71 96.76 97.73 98.79 3.24 2.27 1.21 558218.0 37.68 61.40 80.07 87.37 93.92 96.30 97.55 98.74 3.70 2.45 1.26
4 2021202202 Apr 2021 to Mar 2022 (Period 02) Avanti West Coast 40052.0 34.46 57.58 75.12 82.28 89.94 93.38 95.29 97.10 6.62 4.71 2.90 564400.0 37.13 60.80 79.48 86.82 93.52 96.01 97.32 98.59 3.99 2.68 1.41
4 2021202203 Apr 2021 to Mar 2022 (Period 03) Avanti West Coast 45316.0 35.24 58.81 77.87 85.73 92.91 95.24 96.75 98.29 4.76 3.25 1.71 569100.0 36.27 59.93 78.79 86.33 93.25 95.80 97.18 98.52 4.20 2.82 1.48
4 2021202204 Apr 2021 to Mar 2022 (Period 04) Avanti West Coast 44767.0 32.96 55.50 73.82 81.77 90.12 93.48 95.37 97.21 6.52 4.63 2.79 567360.0 35.61 59.08 77.91 85.58 92.74 95.44 96.90 98.34 4.56 3.10 1.66
4 2021202205 Apr 2021 to Mar 2022 (Period 05) Avanti West Coast 40607.0 32.81 54.83 74.82 84.03 93.02 95.91 97.34 98.60 4.09 2.66 1.40 559271.0 35.47 58.75 77.60 85.37 92.69 95.41 96.88 98.32 4.59 3.12 1.68
4 2021202206 Apr 2021 to Mar 2022 (Period 06) Avanti West Coast 45776.0 34.06 57.70 77.90 86.79 94.23 96.68 97.89 99.10 3.32 2.11 0.90 556337.0 35.33 58.54 77.47 85.35 92.73 95.47 96.94 98.37 4.53 3.06 1.63
4 2021202207 Apr 2021 to Mar 2022 (Period 07) Avanti West Coast 45715.0 29.73 53.91 75.54 84.93 93.75 96.46 97.66 98.84 3.54 2.34 1.16 551749.0 35.18 58.42 77.43 85.38 92.84 95.58 97.03 98.43 4.42 2.97 1.57
4 2021202208 Apr 2021 to Mar 2022 (Period 08) Avanti West Coast 44254.0 22.19 43.63 64.89 76.02 87.91 92.54 95.08 97.48 7.46 4.92 2.52 545190.0 34.40 57.44 76.40 84.51 92.33 95.25 96.82 98.33 4.75 3.18 1.67
4 2021202209 Apr 2021 to Mar 2022 (Period 09) Avanti West Coast 44052.0 19.58 39.47 59.62 70.93 84.07 89.19 92.24 95.71 10.81 7.76 4.29 544424.0 33.01 55.70 74.70 83.12 91.50 94.66 96.38 98.07 5.34 3.62 1.93
4 2021202210 Apr 2021 to Mar 2022 (Period 10) Avanti West Coast 40214.0 26.90 48.97 69.07 78.76 89.12 93.29 95.56 97.84 6.71 4.44 2.16 542348.0 32.37 54.99 74.06 82.64 91.25 94.52 96.28 98.03 5.48 3.72 1.97
4 2021202211 Apr 2021 to Mar 2022 (Period 11) Avanti West Coast 41943.0 31.68 55.70 76.90 86.00 94.05 96.66 97.88 99.02 3.34 2.12 0.98 545943.0 32.10 55.00 74.46 83.15 91.71 94.82 96.49 98.14 5.18 3.51 1.86
4 2021202212 Apr 2021 to Mar 2022 (Period 12) Avanti West Coast 39845.0 27.30 48.57 69.26 78.99 88.61 92.32 94.46 96.76 7.68 5.54 3.24 548385.0 31.27 54.03 73.71 82.61 91.35 94.54 96.26 97.99 5.46 3.74 2.01
4 2021202213 Apr 2021 to Mar 2022 (Period 13) Avanti West Coast 40924.0 26.69 49.06 71.61 83.04 93.06 96.28 97.83 99.04 3.72 2.17 0.96 555865.0 30.30 52.97 73.00 82.18 91.21 94.49 96.24 97.99 5.51 3.76 2.01
4 2022202301 Apr 2022 to Mar 2023 (Period 01) Avanti West Coast 43548.0 24.92 47.63 68.70 78.74 89.35 93.13 95.04 97.07 6.87 4.96 2.93 557013.0 29.13 51.67 71.96 81.41 90.80 94.21 96.04 97.86 5.79 3.96 2.14
4 2022202302 Apr 2022 to Mar 2023 (Period 02) Avanti West Coast 43217.0 25.50 48.59 69.51 79.49 89.36 93.12 94.99 97.22 6.88 5.01 2.78 560178.0 28.46 51.01 71.54 81.20 90.75 94.18 96.01 97.86 5.82 3.99 2.14
4 2022202303 Apr 2022 to Mar 2023 (Period 03) Avanti West Coast 39099.0 23.62 44.90 64.94 75.07 86.18 90.76 93.17 96.03 9.24 6.83 3.97 553961.0 27.57 49.94 70.56 80.40 90.25 93.86 95.75 97.70 6.14 4.25 2.30
4 2022202304 Apr 2022 to Mar 2023 (Period 04) Avanti West Coast 40252.0 18.18 36.40 54.73 65.51 78.77 85.22 89.05 93.43 14.78 10.95 6.57 549446.0 26.44 48.50 69.13 79.20 89.42 93.25 95.29 97.43 6.75 4.71 2.57
4 2022202305 Apr 2022 to Mar 2023 (Period 05) Avanti West Coast 34624.0 17.16 34.26 52.02 62.94 77.35 84.17 88.22 93.18 15.83 11.78 6.82 543463.0 25.38 47.12 67.62 77.80 88.38 92.48 94.68 97.07 7.52 5.32 2.93
4 2022202306 Apr 2022 to Mar 2023 (Period 06) Avanti West Coast 38309.0 23.61 44.07 64.37 75.51 87.28 91.91 94.37 96.94 8.09 5.63 3.06 535996.0 24.51 45.99 66.51 76.87 87.80 92.08 94.39 96.88 7.92 5.61 3.12
4 2022202307 Apr 2022 to Mar 2023 (Period 07) Avanti West Coast 35396.0 21.17 40.89 60.95 72.28 85.20 90.37 93.08 96.39 9.63 6.92 3.61 525677.0 23.83 44.96 65.35 75.86 87.11 91.58 94.02 96.68 8.42 5.98 3.32
4 2022202308 Apr 2022 to Mar 2023 (Period 08) Avanti West Coast 35525.0 16.82 33.31 52.00 63.52 78.65 85.48 89.27 93.91 14.52 10.73 6.09 516948.0 23.49 44.28 64.47 74.99 86.46 91.08 93.60 96.42 8.92 6.40 3.58
4 2022202309 Apr 2022 to Mar 2023 (Period 09) Avanti West Coast 37186.0 15.23 31.99 52.41 65.57 82.11 89.31 92.83 96.59 10.69 7.17 3.41 510082.0 23.22 43.79 64.01 74.66 86.35 91.11 93.66 96.49 8.89 6.34 3.51
4 2022202310 Apr 2022 to Mar 2023 (Period 10) Avanti West Coast 24907.0 16.79 32.15 46.64 54.76 67.45 75.36 80.85 87.93 24.64 19.15 12.07 494775.0 22.60 42.79 62.73 73.32 85.17 90.14 92.86 95.95 9.86 7.14 4.05
4 2022202311 Apr 2022 to Mar 2023 (Period 11) Avanti West Coast 44067.0 17.97 35.17 52.20 62.17 75.21 82.30 87.58 93.20 17.70 12.42 6.80 496899.0 21.42 41.02 60.60 71.26 83.54 88.90 91.97 95.45 11.10 8.03 4.55
4 2022202312 Apr 2022 to Mar 2023 (Period 12) Avanti West Coast 50705.0 22.54 43.50 62.95 72.84 84.29 89.29 92.72 96.67 10.71 7.28 3.33 507759.0 21.07 40.68 60.15 70.81 83.22 88.67 91.85 95.47 11.33 8.15 4.53
4 2022202313 Apr 2022 to Mar 2023 (Period 13) Avanti West Coast 43208.0 26.41 49.91 69.94 79.17 88.73 92.85 95.54 97.87 7.15 4.46 2.13 510043.0 21.08 40.79 60.06 70.54 82.90 88.41 91.68 95.39 11.59 8.32 4.61
4 2023202401 Apr 2023 to Mar 2024 (Period 01) Avanti West Coast 47070.0 26.99 51.82 71.93 80.61 90.15 93.81 96.01 98.29 6.19 3.99 1.71 513565.0 21.29 41.22 60.42 70.77 83.01 88.51 91.79 95.51 11.49 8.21 4.49
4 2023202402 Apr 2023 to Mar 2024 (Period 02) Avanti West Coast 46686.0 24.70 46.93 66.59 75.93 86.14 90.68 93.60 96.68 9.32 6.40 3.32 517034.0 21.25 41.12 60.22 70.51 82.77 88.32 91.69 95.47 11.68 8.31 4.53
4 2023202403 Apr 2023 to Mar 2024 (Period 03) Avanti West Coast 44498.0 20.06 39.04 56.66 66.35 78.56 84.38 88.32 93.17 15.62 11.68 6.83 522433.0 20.97 40.66 59.56 69.81 82.15 87.80 91.29 95.24 12.20 8.71 4.76
4 2023202404 Apr 2023 to Mar 2024 (Period 04) Avanti West Coast 46122.0 25.34 46.53 66.12 75.70 86.12 90.63 93.44 96.37 9.37 6.56 3.63 528303.0 21.56 41.49 60.50 70.65 82.75 88.24 91.65 95.47 11.76 8.35 4.53
4 2023202405 Apr 2023 to Mar 2024 (Period 05) Avanti West Coast 47700.0 26.26 48.02 67.09 76.53 87.09 91.63 94.66 97.60 8.37 5.34 2.40 541379.0 22.26 42.53 61.62 71.66 83.48 88.80 92.13 95.81 11.20 7.87 4.19
4 2023202406 Apr 2023 to Mar 2024 (Period 06) Avanti West Coast 44144.0 26.11 47.43 65.99 75.09 86.18 90.69 93.62 96.73 9.31 6.38 3.27 547214.0 22.47 42.82 61.78 71.67 83.43 88.74 92.10 95.80 11.26 7.90 4.20
4 2023202407 Apr 2023 to Mar 2024 (Period 07) Avanti West Coast 45575.0 20.50 39.98 58.99 69.39 81.38 86.99 90.74 95.07 13.01 9.26 4.93 557393.0 22.40 42.71 61.61 71.45 83.15 88.49 91.93 95.70 11.51 8.07 4.30
4 2023202408 Apr 2023 to Mar 2024 (Period 08) Avanti West Coast 48404.0 19.02 37.26 56.44 66.95 79.69 85.55 89.25 93.95 14.45 10.75 6.05 570272.0 22.46 42.83 61.77 71.56 83.14 88.43 91.86 95.67 11.57 8.14 4.33
4 2023202409 Apr 2023 to Mar 2024 (Period 09) Avanti West Coast 46578.0 17.11 34.60 53.12 63.86 77.61 84.55 88.83 93.85 15.45 11.17 6.15 579664.0 22.49 42.87 61.67 71.32 82.76 88.06 91.56 95.46 11.94 8.44 4.54
4 2023202410 Apr 2023 to Mar 2024 (Period 10) Avanti West Coast 39783.0 20.22 38.88 56.27 65.71 77.39 83.66 87.55 92.78 16.34 12.45 7.22 594540.0 22.58 43.05 61.94 71.64 83.04 88.30 91.74 95.60 11.70 8.26 4.40
4 2023202411 Apr 2023 to Mar 2024 (Period 11) Avanti West Coast 46764.0 22.91 43.24 62.15 71.88 83.41 88.83 92.24 96.00 11.17 7.76 4.00 597237.0 22.94 43.64 62.68 72.36 83.65 88.78 92.08 95.81 11.22 7.92 4.19
4 2023202412 Apr 2023 to Mar 2024 (Period 12) Avanti West Coast 49875.0 22.31 43.29 63.64 73.84 85.33 90.32 93.16 96.26 9.68 6.84 3.74 596407.0 22.92 43.63 62.73 72.44 83.74 88.87 92.12 95.77 11.13 7.88 4.23
4 2023202413 Apr 2023 to Mar 2024 (Period 13) Avanti West Coast 49659.0 25.09 47.83 68.51 77.94 88.24 92.85 95.30 97.71 7.15 4.70 2.29 602858.0 22.85 43.52 62.69 72.41 83.75 88.91 92.14 95.78 11.09 7.86 4.22
4 2024202501 Apr 2024 to Mar 2025 (Period 01) Avanti West Coast 45135.0 22.43 44.49 64.23 73.59 84.29 89.47 92.60 95.99 10.53 7.40 4.01 600923.0 22.50 42.95 62.08 71.86 83.29 88.57 91.87 95.60 11.43 8.13 4.40
4 2024202502 Apr 2024 to Mar 2025 (Period 02) Avanti West Coast 44717.0 21.59 42.23 60.91 70.50 82.41 88.11 91.86 95.93 11.89 8.14 4.07 598954.0 22.26 42.58 61.64 71.44 83.00 88.37 91.73 95.54 11.63 8.27 4.46
4 2024202503 Apr 2024 to Mar 2025 (Period 03) Avanti West Coast 48318.0 19.25 37.91 56.62 67.01 80.04 86.99 91.37 95.95 13.01 8.63 4.05 602774.0 22.18 42.47 61.61 71.46 83.09 88.55 91.96 95.75 11.45 8.04 4.25
4 2024202504 Apr 2024 to Mar 2025 (Period 04) Avanti West Coast 51644.0 19.90 38.54 57.15 66.67 78.83 85.72 90.09 95.12 14.28 9.91 4.88 608296.0 21.75 41.83 60.89 70.73 82.50 88.15 91.68 95.65 11.85 8.32 4.35
4 2024202505 Apr 2024 to Mar 2025 (Period 05) Avanti West Coast 51853.0 21.52 41.35 60.78 70.60 82.02 87.76 91.66 96.04 12.24 8.34 3.96 612449.0 21.37 41.30 60.40 70.27 82.10 87.85 91.45 95.53 12.15 8.55 4.47
4 2024202506 Apr 2024 to Mar 2025 (Period 06) Avanti West Coast 50365.0 22.97 42.83 62.01 72.11 83.32 88.81 92.21 96.08 11.19 7.79 3.92 618670.0 21.17 40.99 60.13 70.08 81.91 87.73 91.36 95.49 12.27 8.64 4.51
4 2024202507 Apr 2024 to Mar 2025 (Period 07) Avanti West Coast 49706.0 20.98 40.91 60.64 71.46 84.10 89.46 92.69 96.36 10.54 7.31 3.64 622801.0 21.20 41.06 60.25 70.24 82.12 87.92 91.51 95.59 12.08 8.49 4.41
4 2024202508 Apr 2024 to Mar 2025 (Period 08) Avanti West Coast 52002.0 19.57 39.24 59.77 71.10 84.04 89.57 92.75 96.41 10.43 7.25 3.59 626399.0 21.23 41.20 60.51 70.56 82.47 88.24 91.79 95.78 11.76 8.21 4.22
4 2024202509 Apr 2024 to Mar 2025 (Period 09) Avanti West Coast 50936.0 14.70 30.86 48.94 59.38 73.86 81.41 86.38 92.51 18.59 13.62 7.49 630757.0 21.01 40.85 60.12 70.15 82.13 87.96 91.57 95.66 12.04 8.43 4.34
4 2024202510 Apr 2024 to Mar 2025 (Period 10) Avanti West Coast 39656.0 16.33 33.61 51.42 61.39 74.59 82.63 88.07 94.46 17.37 11.93 5.54 630630.0 20.77 40.52 59.82 69.88 81.96 87.90 91.60 95.77 12.10 8.40 4.23
4 2024202511 Apr 2024 to Mar 2025 (Period 11) Avanti West Coast 49745.0 18.17 36.62 55.33 65.39 78.48 85.29 89.73 94.84 14.71 10.27 5.16 633611.0 20.40 40.02 59.29 69.38 81.58 87.62 91.41 95.68 12.38 8.59 4.32
4 2024202512 Apr 2024 to Mar 2025 (Period 12) Avanti West Coast 52134.0 20.55 42.18 63.42 74.01 85.28 90.64 93.44 96.41 9.36 6.56 3.59 635870.0 20.27 39.94 59.29 69.41 81.59 87.66 91.44 95.69 12.34 8.56 4.31
4 2024202513 Apr 2024 to Mar 2025 (Period 13) Avanti West Coast 57873.0 22.88 46.06 67.41 77.01 87.65 92.31 94.99 97.68 7.69 5.01 2.32 644084.0 20.13 39.88 59.31 69.44 81.62 87.68 91.46 95.71 12.32 8.54 4.29
4 2025202601 Apr 2025 to Mar 2026 (Period 01) Avanti West Coast 47941.0 20.01 41.38 62.04 72.53 84.55 90.38 93.71 97.19 9.62 6.29 2.81 646890.0 19.96 39.67 59.17 69.38 81.65 87.75 91.55 95.80 12.25 8.45 4.20
4 2025202602 Apr 2025 to Mar 2026 (Period 02) Avanti West Coast 51197.0 17.59 37.05 56.13 66.64 79.66 86.40 90.30 95.06 13.60 9.70 4.94 653370.0 19.66 39.29 58.81 69.09 81.44 87.62 91.43 95.74 12.38 8.57 4.26
4 2025202603 Apr 2025 to Mar 2026 (Period 03) Avanti West Coast 50748.0 20.92 40.81 60.07 69.96 81.75 87.24 90.58 94.70 12.76 9.42 5.30 655800.0 19.79 39.51 59.07 69.31 81.57 87.64 91.37 95.64 12.36 8.63 4.36
4 2025202604 Apr 2025 to Mar 2026 (Period 04) Avanti West Coast 55061.0 15.82 33.22 50.91 61.02 74.57 81.68 86.57 92.63 18.32 13.43 7.37 659217.0 19.45 39.06 58.54 68.82 81.20 87.29 91.06 95.43 12.71 8.94 4.57
4 2025202605 Apr 2025 to Mar 2026 (Period 05) Avanti West Coast 52813.0 20.04 39.60 58.87 69.36 82.13 88.20 91.61 95.33 11.80 8.39 4.67 660177.0 19.33 38.92 58.39 68.72 81.21 87.33 91.06 95.37 12.67 8.94 4.63
4 2025202606 Apr 2025 to Mar 2026 (Period 06) Avanti West Coast 54377.0 19.63 38.98 59.00 69.94 83.17 89.35 93.00 96.88 10.65 7.00 3.12 664189.0 19.08 38.63 58.16 68.57 81.21 87.38 91.13 95.44 12.62 8.87 4.56
4 2025202607 Apr 2025 to Mar 2026 (Period 07) Avanti West Coast 56499.0 17.79 36.92 57.39 68.86 82.00 88.08 91.67 95.62 11.92 8.33 4.38 670982.0 18.83 38.32 57.91 68.38 81.06 87.29 91.06 95.39 12.71 8.94 4.61
4 2025202608 Apr 2025 to Mar 2026 (Period 08) Avanti West Coast 55557.0 15.29 32.80 52.57 64.03 78.35 85.72 90.02 94.64 14.28 9.98 5.36 674537.0 18.49 37.79 57.33 67.81 80.61 86.98 90.85 95.25 13.02 9.15 4.75
4 2025202609 Apr 2025 to Mar 2026 (Period 09) Avanti West Coast 55251.0 12.61 28.01 45.23 56.49 72.63 81.05 86.51 92.85 18.95 13.49 7.15 678852.0 18.29 37.51 56.98 67.52 80.47 86.92 90.83 95.26 13.08 9.17 4.74
4 2025202610 Apr 2025 to Mar 2026 (Period 10) Avanti West Coast 45498.0 18.33 37.33 56.53 67.56 81.58 88.39 92.22 96.42 11.61 7.78 3.58 684694.0 18.41 37.73 57.27 67.88 80.88 87.26 91.08 95.38 12.74 8.92 4.62
4 2025202611 Apr 2025 to Mar 2026 (Period 11) Avanti West Coast 53581.0 21.04 41.65 61.22 71.00 82.33 87.74 91.06 95.10 12.26 8.94 4.90 688530.0 18.63 38.11 57.72 68.30 81.17 87.44 91.18 95.40 12.56 8.82 4.60
4 2025202612 Apr 2025 to Mar 2026 (Period 12) Avanti West Coast 57984.0 21.50 41.47 61.33 71.60 83.20 88.70 91.93 95.82 11.30 8.07 4.18 694380.0 18.73 38.09 57.59 68.15 81.03 87.31 91.07 95.36 12.69 8.93 4.64
4 2025202613 Apr 2025 to Mar 2026 (Period 13) Avanti West Coast 64470.0 22.37 43.67 64.78 75.28 86.71 91.80 94.70 97.58 8.20 5.30 2.42 700977.0 18.72 37.94 57.44 68.07 81.01 87.31 91.08 95.37 12.69 8.92 4.63
4 2026202701 Apr 2026 to Mar 2027 (Period 01) Avanti West Coast 58492.0 21.30 42.38 63.27 73.82 85.72 90.97 93.94 97.20 9.03 6.06 2.80 711528.0 18.84 38.08 57.61 68.24 81.15 87.40 91.14 95.40 12.60 8.86 4.60
4 2026202702 Apr 2026 to Mar 2027 (Period 02) Avanti West Coast 54816.0 18.36 36.93 55.39 64.96 77.59 84.09 88.37 93.47 15.91 11.63 6.53 715147.0 18.89 38.06 57.54 68.11 80.99 87.22 90.99 95.28 12.78 9.01 4.72
5 2014201501 Apr 2014 to Mar 2015 (Period 01) c2c 102320.0 52.32 85.66 95.04 97.00 98.54 99.15 99.67 99.93 0.85 0.33 0.07 102320.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201502 Apr 2014 to Mar 2015 (Period 02) c2c 111373.0 52.96 87.17 97.20 98.80 99.66 99.79 99.89 99.95 0.21 0.11 0.05 213693.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201503 Apr 2014 to Mar 2015 (Period 03) c2c 112651.0 52.90 87.84 97.52 98.91 99.63 99.78 99.92 99.99 0.22 0.08 0.01 326344.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201504 Apr 2014 to Mar 2015 (Period 04) c2c 116852.0 49.82 84.93 96.95 98.74 99.69 99.90 99.96 99.97 0.10 0.04 0.03 443196.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201505 Apr 2014 to Mar 2015 (Period 05) c2c 116151.0 52.12 86.14 96.49 98.16 99.26 99.62 99.75 99.87 0.38 0.25 0.13 559347.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201506 Apr 2014 to Mar 2015 (Period 06) c2c 113319.0 54.68 87.64 96.57 97.97 99.02 99.33 99.45 99.73 0.67 0.55 0.27 672666.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201507 Apr 2014 to Mar 2015 (Period 07) c2c 115920.0 53.05 86.49 96.71 98.40 99.30 99.55 99.70 99.95 0.45 0.30 0.05 788586.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201508 Apr 2014 to Mar 2015 (Period 08) c2c 115385.0 50.27 84.69 96.56 98.57 99.56 99.78 99.90 100.00 0.22 0.10 0.00 903971.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201509 Apr 2014 to Mar 2015 (Period 09) c2c 115976.0 50.25 84.16 96.25 98.37 99.62 99.83 99.89 99.98 0.17 0.11 0.02 1019947.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201510 Apr 2014 to Mar 2015 (Period 10) c2c 104271.0 50.34 85.21 97.18 98.92 99.73 99.89 99.95 99.98 0.11 0.05 0.02 1124218.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201511 Apr 2014 to Mar 2015 (Period 11) c2c 115587.0 54.84 87.27 96.91 98.45 99.51 99.83 99.95 99.99 0.17 0.05 0.01 1239805.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201512 Apr 2014 to Mar 2015 (Period 12) c2c 115966.0 53.55 86.77 96.93 98.55 99.47 99.72 99.87 99.98 0.28 0.13 0.02 1355771.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2014201513 Apr 2014 to Mar 2015 (Period 13) c2c 127182.0 57.15 88.90 97.80 98.87 99.52 99.81 99.94 99.99 0.19 0.06 0.01 1482953.0 52.68 86.40 96.80 98.45 99.43 99.70 99.84 99.95 0.30 0.16 0.05
5 2015201601 Apr 2015 to Mar 2016 (Period 01) c2c 128266.0 56.17 88.34 97.87 99.10 99.67 99.85 99.94 99.97 0.15 0.06 0.03 1508899.0 53.00 86.62 97.01 98.61 99.51 99.75 99.86 99.95 0.25 0.14 0.05
5 2015201602 Apr 2015 to Mar 2016 (Period 02) c2c 110698.0 56.20 87.93 97.14 98.56 99.56 99.77 99.89 99.93 0.23 0.11 0.07 1508224.0 53.24 86.67 97.00 98.59 99.50 99.74 99.86 99.95 0.26 0.14 0.05
5 2015201603 Apr 2015 to Mar 2016 (Period 03) c2c 115563.0 55.71 88.11 97.16 98.56 99.55 99.85 99.95 99.99 0.15 0.05 0.01 1511136.0 53.46 86.70 96.98 98.56 99.50 99.75 99.86 99.95 0.25 0.14 0.05
5 2015201604 Apr 2015 to Mar 2016 (Period 04) c2c 116328.0 54.28 86.37 97.02 98.70 99.70 99.87 99.94 99.99 0.13 0.06 0.01 1510612.0 53.80 86.81 96.98 98.56 99.50 99.75 99.86 99.95 0.25 0.14 0.05
5 2015201605 Apr 2015 to Mar 2016 (Period 05) c2c 115105.0 54.87 87.13 97.07 98.63 99.62 99.84 99.90 99.98 0.16 0.10 0.02 1509566.0 54.01 86.88 97.03 98.60 99.53 99.76 99.87 99.96 0.24 0.13 0.04
5 2015201606 Apr 2015 to Mar 2016 (Period 06) c2c 113321.0 53.54 86.99 97.83 99.35 99.89 99.96 99.98 100.00 0.04 0.02 0.00 1509568.0 53.93 86.83 97.12 98.70 99.59 99.81 99.91 99.98 0.19 0.09 0.02
5 2015201607 Apr 2015 to Mar 2016 (Period 07) c2c 115488.0 54.16 86.16 96.49 98.15 99.23 99.52 99.66 99.81 0.48 0.34 0.19 1509136.0 54.01 86.81 97.10 98.68 99.59 99.81 99.91 99.97 0.19 0.09 0.03
5 2015201608 Apr 2015 to Mar 2016 (Period 08) c2c 115611.0 48.94 82.27 95.26 97.97 99.49 99.77 99.86 99.96 0.23 0.14 0.04 1509362.0 53.91 86.62 97.00 98.63 99.58 99.81 99.90 99.97 0.19 0.10 0.03
5 2015201609 Apr 2015 to Mar 2016 (Period 09) c2c 117527.0 48.06 81.99 95.08 97.71 99.34 99.77 99.91 99.99 0.23 0.09 0.01 1510913.0 53.73 86.45 96.91 98.58 99.56 99.80 99.90 99.97 0.20 0.10 0.03
5 2015201610 Apr 2015 to Mar 2016 (Period 10) c2c 116540.0 38.27 77.11 93.42 97.12 99.06 99.50 99.68 99.80 0.50 0.32 0.20 1523182.0 52.78 85.82 96.63 98.45 99.51 99.78 99.88 99.95 0.22 0.12 0.05
5 2015201611 Apr 2015 to Mar 2016 (Period 11) c2c 129891.0 40.06 79.84 95.01 97.95 99.64 99.89 99.97 100.00 0.11 0.03 0.00 1537486.0 51.55 85.21 96.47 98.40 99.52 99.78 99.89 99.95 0.22 0.11 0.05
5 2015201612 Apr 2015 to Mar 2016 (Period 12) c2c 133400.0 42.97 82.61 95.92 98.48 99.73 99.91 99.98 100.00 0.09 0.02 0.00 1554920.0 50.67 84.87 96.39 98.40 99.54 99.80 99.89 99.96 0.20 0.11 0.04
5 2015201613 Apr 2015 to Mar 2016 (Period 13) c2c 117711.0 45.51 82.95 94.83 97.34 98.98 99.54 99.73 99.90 0.46 0.27 0.10 1545449.0 49.74 84.39 96.15 98.28 99.50 99.78 99.88 99.95 0.22 0.12 0.05
5 2016201701 Apr 2016 to Mar 2017 (Period 01) c2c 140251.0 48.14 84.26 95.79 97.96 99.26 99.58 99.65 99.82 0.42 0.35 0.18 1557434.0 49.07 84.05 95.98 98.18 99.47 99.75 99.85 99.94 0.25 0.15 0.06
5 2016201702 Apr 2016 to Mar 2017 (Period 02) c2c 126657.0 46.11 83.62 95.69 98.10 99.37 99.68 99.84 99.97 0.32 0.16 0.03 1573393.0 48.33 83.75 95.87 98.15 99.45 99.75 99.85 99.94 0.25 0.15 0.06
5 2016201703 Apr 2016 to Mar 2017 (Period 03) c2c 126477.0 47.25 83.48 95.23 97.60 99.15 99.61 99.80 99.94 0.39 0.20 0.06 1584307.0 47.70 83.41 95.73 98.08 99.42 99.73 99.84 99.94 0.27 0.16 0.06
5 2016201704 Apr 2016 to Mar 2017 (Period 04) c2c 130851.0 48.69 83.36 95.13 97.71 99.38 99.82 99.87 99.95 0.18 0.13 0.05 1598830.0 47.31 83.19 95.59 98.00 99.40 99.72 99.83 99.93 0.28 0.17 0.07
5 2016201705 Apr 2016 to Mar 2017 (Period 05) c2c 132497.0 47.48 83.56 95.84 98.17 99.39 99.70 99.87 99.96 0.30 0.13 0.04 1616222.0 46.78 82.94 95.50 97.97 99.38 99.71 99.83 99.93 0.29 0.17 0.07
5 2016201706 Apr 2016 to Mar 2017 (Period 06) c2c 128586.0 45.48 81.72 94.68 97.47 99.04 99.48 99.69 99.85 0.52 0.31 0.15 1631487.0 46.21 82.56 95.27 97.83 99.32 99.68 99.81 99.92 0.32 0.19 0.08
5 2016201707 Apr 2016 to Mar 2017 (Period 07) c2c 127893.0 38.34 71.49 88.61 94.25 98.24 99.23 99.63 99.82 0.77 0.37 0.18 1643892.0 45.04 81.44 94.67 97.53 99.24 99.65 99.81 99.92 0.35 0.19 0.08
5 2016201708 Apr 2016 to Mar 2017 (Period 08) c2c 130808.0 36.15 71.05 91.26 96.92 99.48 99.86 99.95 100.00 0.14 0.05 0.00 1659089.0 44.07 80.57 94.36 97.45 99.24 99.66 99.81 99.92 0.34 0.19 0.08
5 2016201709 Apr 2016 to Mar 2017 (Period 09) c2c 129361.0 40.70 75.32 91.39 95.83 98.70 99.34 99.59 99.81 0.66 0.41 0.19 1670923.0 43.53 80.06 94.08 97.31 99.19 99.63 99.79 99.91 0.37 0.21 0.09
5 2016201710 Apr 2016 to Mar 2017 (Period 10) c2c 116689.0 49.48 83.89 95.96 98.36 99.70 99.93 99.97 100.00 0.07 0.03 0.00 1671072.0 44.31 80.53 94.26 97.40 99.24 99.66 99.81 99.92 0.34 0.19 0.08
5 2016201711 Apr 2016 to Mar 2017 (Period 11) c2c 129455.0 49.40 84.67 95.54 98.12 99.60 99.88 99.95 99.99 0.12 0.05 0.01 1670636.0 45.03 80.91 94.30 97.41 99.23 99.66 99.81 99.92 0.34 0.19 0.08
5 2016201712 Apr 2016 to Mar 2017 (Period 12) c2c 127503.0 51.47 84.74 95.31 97.54 98.73 99.13 99.39 99.72 0.87 0.61 0.28 1664739.0 45.69 81.07 94.25 97.34 99.15 99.60 99.76 99.90 0.40 0.24 0.10
5 2016201713 Apr 2016 to Mar 2017 (Period 13) c2c 125517.0 51.00 84.32 95.39 97.67 99.13 99.47 99.60 99.76 0.53 0.40 0.24 1672545.0 46.10 81.18 94.29 97.36 99.16 99.59 99.75 99.89 0.41 0.25 0.11
5 2017201801 Apr 2017 to Mar 2018 (Period 01) c2c 126938.0 46.52 80.75 94.62 97.68 99.40 99.88 99.96 100.00 0.12 0.04 0.00 1659232.0 45.96 80.88 94.19 97.33 99.17 99.62 99.78 99.91 0.38 0.22 0.09
5 2017201802 Apr 2017 to Mar 2018 (Period 02) c2c 123116.0 47.51 81.84 95.44 98.36 99.60 99.85 99.94 99.99 0.15 0.06 0.01 1655691.0 46.07 80.75 94.17 97.35 99.19 99.63 99.79 99.91 0.37 0.21 0.09
5 2017201803 Apr 2017 to Mar 2018 (Period 03) c2c 126359.0 49.10 82.49 95.25 97.98 99.55 99.85 99.94 99.99 0.15 0.06 0.01 1655573.0 46.21 80.67 94.17 97.38 99.22 99.65 99.80 99.91 0.35 0.20 0.09
5 2017201804 Apr 2017 to Mar 2018 (Period 04) c2c 128385.0 50.28 83.31 94.79 97.37 99.01 99.38 99.61 99.81 0.62 0.39 0.19 1653107.0 46.33 80.66 94.14 97.35 99.19 99.61 99.77 99.90 0.39 0.23 0.10
5 2017201805 Apr 2017 to Mar 2018 (Period 05) c2c 127520.0 51.36 84.88 96.20 98.43 99.51 99.86 99.95 99.98 0.14 0.05 0.02 1648130.0 46.62 80.76 94.16 97.37 99.20 99.63 99.78 99.90 0.37 0.22 0.10
5 2017201806 Apr 2017 to Mar 2018 (Period 06) c2c 126215.0 48.95 83.26 95.70 98.33 99.65 99.87 99.95 99.98 0.13 0.05 0.02 1645759.0 46.89 80.87 94.24 97.44 99.25 99.66 99.80 99.91 0.34 0.20 0.09
5 2017201807 Apr 2017 to Mar 2018 (Period 07) c2c 128607.0 51.23 86.06 96.99 98.94 99.74 99.92 99.99 100.00 0.08 0.01 0.00 1646473.0 47.90 82.01 94.89 97.80 99.36 99.71 99.83 99.93 0.29 0.17 0.07
5 2017201808 Apr 2017 to Mar 2018 (Period 08) c2c 128138.0 48.39 83.66 95.74 98.24 99.58 99.88 99.96 100.00 0.12 0.04 0.00 1643803.0 48.87 83.01 95.25 97.91 99.37 99.71 99.83 99.93 0.29 0.17 0.07
5 2017201809 Apr 2017 to Mar 2018 (Period 09) c2c 129553.0 48.56 84.55 97.02 99.00 99.70 99.88 99.96 99.99 0.12 0.04 0.01 1643995.0 49.49 83.73 95.69 98.16 99.45 99.75 99.86 99.94 0.25 0.14 0.06
5 2017201810 Apr 2017 to Mar 2018 (Period 10) c2c 115578.0 50.52 85.57 97.02 99.03 99.83 99.95 99.99 99.99 0.05 0.01 0.01 1642884.0 49.56 83.85 95.76 98.20 99.46 99.75 99.86 99.94 0.25 0.14 0.06
5 2017201811 Apr 2017 to Mar 2018 (Period 11) c2c 128238.0 51.93 86.54 96.97 98.98 99.78 99.92 99.93 99.96 0.08 0.07 0.04 1641667.0 49.76 84.00 95.88 98.27 99.48 99.76 99.86 99.94 0.24 0.14 0.06
5 2017201812 Apr 2017 to Mar 2018 (Period 12) c2c 122643.0 49.02 81.38 92.38 95.19 97.67 98.73 99.35 99.79 1.27 0.65 0.21 1636807.0 49.57 83.74 95.66 98.10 99.40 99.73 99.86 99.94 0.27 0.14 0.06
5 2017201813 Apr 2017 to Mar 2018 (Period 13) c2c 124101.0 48.14 82.47 95.14 97.89 99.41 99.66 99.87 99.96 0.34 0.13 0.04 1635391.0 49.35 83.60 95.64 98.11 99.42 99.74 99.88 99.96 0.26 0.12 0.04
5 2018201901 Apr 2018 to Mar 2019 (Period 01) c2c 123971.0 48.14 82.16 95.09 97.83 99.30 99.78 99.90 99.98 0.22 0.10 0.02 1632424.0 49.48 83.71 95.68 98.12 99.41 99.74 99.87 99.96 0.26 0.13 0.04
5 2018201902 Apr 2018 to Mar 2019 (Period 02) c2c 124146.0 47.89 81.87 94.48 97.20 98.92 99.45 99.69 99.86 0.55 0.31 0.14 1633454.0 49.51 83.71 95.60 98.04 99.36 99.71 99.85 99.95 0.29 0.15 0.05
5 2018201903 Apr 2018 to Mar 2019 (Period 03) c2c 125335.0 52.24 86.07 96.69 98.62 99.57 99.79 99.87 99.90 0.21 0.13 0.10 1632430.0 49.75 83.99 95.71 98.09 99.36 99.70 99.85 99.94 0.30 0.15 0.06
5 2018201904 Apr 2018 to Mar 2019 (Period 04) c2c 123099.0 48.88 81.10 92.99 96.14 98.41 99.15 99.57 99.91 0.85 0.43 0.09 1627144.0 49.64 83.82 95.58 97.99 99.32 99.68 99.85 99.95 0.32 0.15 0.05
5 2018201905 Apr 2018 to Mar 2019 (Period 05) c2c 127932.0 48.40 82.27 94.85 97.54 99.05 99.46 99.66 99.81 0.54 0.34 0.19 1627556.0 49.41 83.62 95.48 97.92 99.28 99.65 99.82 99.93 0.35 0.18 0.07
5 2018201906 Apr 2018 to Mar 2019 (Period 06) c2c 127136.0 43.93 77.37 93.11 97.29 99.35 99.81 99.94 99.99 0.19 0.06 0.01 1628477.0 49.02 83.16 95.27 97.84 99.26 99.65 99.82 99.93 0.35 0.18 0.07
5 2018201907 Apr 2018 to Mar 2019 (Period 07) c2c 127815.0 42.09 76.40 92.79 96.80 99.11 99.61 99.79 99.94 0.39 0.21 0.06 1627685.0 48.30 82.40 94.94 97.67 99.21 99.62 99.81 99.93 0.38 0.19 0.07
5 2018201908 Apr 2018 to Mar 2019 (Period 08) c2c 127408.0 45.69 79.54 94.54 97.87 99.43 99.72 99.80 99.92 0.28 0.20 0.08 1626955.0 48.09 82.08 94.85 97.64 99.20 99.61 99.79 99.92 0.39 0.21 0.08
5 2018201909 Apr 2018 to Mar 2019 (Period 09) c2c 129318.0 46.87 81.56 95.45 98.29 99.55 99.82 99.93 99.98 0.18 0.07 0.02 1626720.0 47.95 81.84 94.72 97.59 99.18 99.61 99.79 99.92 0.39 0.21 0.08
5 2018201910 Apr 2018 to Mar 2019 (Period 10) c2c 113773.0 56.10 88.05 97.63 99.23 99.85 99.94 99.99 100.00 0.06 0.01 0.00 1624915.0 48.34 82.01 94.76 97.60 99.18 99.61 99.79 99.92 0.39 0.21 0.08
5 2018201911 Apr 2018 to Mar 2019 (Period 11) c2c 125272.0 52.18 84.02 94.78 97.32 98.91 99.46 99.72 99.90 0.54 0.28 0.10 1621949.0 48.35 81.81 94.59 97.47 99.12 99.57 99.77 99.92 0.43 0.23 0.08
5 2018201912 Apr 2018 to Mar 2019 (Period 12) c2c 126406.0 53.67 86.51 96.93 99.00 99.79 99.92 99.95 99.97 0.08 0.05 0.03 1625712.0 48.71 82.20 94.94 97.76 99.28 99.66 99.82 99.93 0.34 0.18 0.07
5 2018201913 Apr 2018 to Mar 2019 (Period 13) c2c 129124.0 53.19 86.03 96.61 98.47 99.46 99.72 99.85 99.95 0.28 0.15 0.05 1630735.0 49.11 82.49 95.06 97.81 99.28 99.66 99.82 99.93 0.34 0.18 0.07
5 2019202001 Apr 2019 to Mar 2020 (Period 01) c2c 118708.0 55.27 86.73 96.41 98.54 99.69 99.88 99.94 99.99 0.12 0.06 0.01 118708.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202002 Apr 2019 to Mar 2020 (Period 02) c2c 124937.0 54.51 86.81 96.42 98.22 99.42 99.78 99.94 99.98 0.22 0.06 0.02 243645.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202003 Apr 2019 to Mar 2020 (Period 03) c2c 126108.0 54.27 86.15 96.28 98.36 99.58 99.83 99.95 99.99 0.17 0.05 0.01 369753.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202004 Apr 2019 to Mar 2020 (Period 04) c2c 128158.0 50.31 83.24 95.76 98.36 99.45 99.68 99.78 99.87 0.32 0.22 0.13 497911.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202005 Apr 2019 to Mar 2020 (Period 05) c2c 121874.0 51.63 82.95 94.25 97.00 98.89 99.48 99.75 99.95 0.52 0.25 0.05 619785.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202006 Apr 2019 to Mar 2020 (Period 06) c2c 122325.0 50.89 84.38 96.19 98.45 99.59 99.76 99.88 99.96 0.24 0.12 0.04 742110.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202007 Apr 2019 to Mar 2020 (Period 07) c2c 126947.0 44.28 78.45 93.75 97.32 99.38 99.72 99.82 99.88 0.28 0.18 0.12 869057.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202008 Apr 2019 to Mar 2020 (Period 08) c2c 127971.0 45.84 80.16 93.98 97.27 99.07 99.54 99.67 99.81 0.46 0.33 0.19 997028.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202009 Apr 2019 to Mar 2020 (Period 09) c2c 127313.0 44.15 78.43 92.98 96.93 99.21 99.70 99.88 99.97 0.30 0.12 0.03 1124341.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202010 Apr 2019 to Mar 2020 (Period 10) c2c 114692.0 50.60 82.99 94.89 97.55 99.36 99.80 99.96 100.00 0.20 0.04 0.00 1239033.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202011 Apr 2019 to Mar 2020 (Period 11) c2c 126599.0 53.94 87.17 97.27 99.00 99.71 99.82 99.88 99.91 0.18 0.12 0.09 1365632.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202012 Apr 2019 to Mar 2020 (Period 12) c2c 128791.0 49.85 82.60 94.78 97.70 99.34 99.68 99.83 99.97 0.32 0.17 0.03 1494423.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
5 2019202013 Apr 2019 to Mar 2020 (Period 13) c2c 126480.0 44.28 73.30 91.74 97.24 99.50 99.83 99.96 99.98 0.17 0.04 0.02 1620903.0 49.94 82.53 94.97 97.84 99.40 99.73 99.86 99.94 0.27 0.14 0.06
5 2020202101 Apr 2020 to Mar 2021 (Period 01) c2c 73519.0 66.87 91.55 98.09 99.13 99.75 99.92 99.96 100.00 0.08 0.04 0.00 1575714.0 50.32 82.63 95.00 97.85 99.39 99.73 99.86 99.94 0.27 0.14 0.06
5 2020202102 Apr 2020 to Mar 2021 (Period 02) c2c 93719.0 62.41 89.23 97.53 98.94 99.78 99.90 99.94 99.97 0.10 0.06 0.03 1544496.0 50.72 82.69 95.04 97.88 99.42 99.73 99.86 99.94 0.27 0.14 0.06
5 2020202103 Apr 2020 to Mar 2021 (Period 03) c2c 125348.0 59.06 87.43 96.81 98.50 99.52 99.78 99.89 99.94 0.22 0.11 0.06 1543736.0 51.11 82.80 95.08 97.89 99.41 99.73 99.86 99.94 0.27 0.14 0.06
5 2020202104 Apr 2020 to Mar 2021 (Period 04) c2c 121715.0 57.17 86.40 96.88 98.57 99.56 99.82 99.92 99.99 0.18 0.08 0.01 1537293.0 51.65 83.04 95.17 97.91 99.42 99.74 99.87 99.95 0.26 0.13 0.05
5 2020202105 Apr 2020 to Mar 2021 (Period 05) c2c 124820.0 49.88 80.25 94.47 97.59 99.30 99.77 99.87 99.95 0.23 0.13 0.05 1540239.0 51.51 82.83 95.19 97.96 99.45 99.76 99.88 99.95 0.24 0.12 0.05
5 2020202106 Apr 2020 to Mar 2021 (Period 06) c2c 118027.0 46.44 80.28 95.50 98.42 99.69 99.89 99.96 100.00 0.11 0.04 0.00 1535941.0 51.17 82.51 95.13 97.95 99.46 99.77 99.88 99.95 0.23 0.12 0.05
5 2020202107 Apr 2020 to Mar 2021 (Period 07) c2c 119241.0 50.41 83.31 96.32 98.53 99.54 99.75 99.84 99.87 0.25 0.16 0.13 1528235.0 51.68 82.91 95.34 98.05 99.47 99.78 99.89 99.95 0.22 0.11 0.05
5 2020202108 Apr 2020 to Mar 2021 (Period 08) c2c 124529.0 48.10 78.24 92.25 96.56 98.94 99.47 99.69 99.86 0.53 0.31 0.14 1524793.0 51.88 82.76 95.20 97.99 99.46 99.77 99.89 99.95 0.23 0.11 0.05
5 2020202109 Apr 2020 to Mar 2021 (Period 09) c2c 97749.0 52.64 83.13 94.78 97.57 99.26 99.68 99.89 99.96 0.32 0.11 0.04 1495229.0 52.59 83.15 95.36 98.06 99.47 99.77 99.89 99.95 0.23 0.11 0.05
5 2020202110 Apr 2020 to Mar 2021 (Period 10) c2c 96838.0 60.57 89.47 97.44 98.93 99.70 99.88 99.95 99.99 0.12 0.05 0.01 1477375.0 53.27 83.58 95.54 98.15 99.49 99.78 99.89 99.95 0.22 0.11 0.05
5 2020202111 Apr 2020 to Mar 2021 (Period 11) c2c 101515.0 57.85 84.75 94.13 96.60 98.63 99.29 99.63 99.85 0.71 0.37 0.15 1452291.0 53.53 83.34 95.29 97.97 99.41 99.74 99.87 99.95 0.26 0.13 0.05
5 2020202112 Apr 2020 to Mar 2021 (Period 12) c2c 91894.0 57.77 87.27 96.22 98.27 99.43 99.72 99.84 99.86 0.28 0.16 0.14 1415394.0 54.14 83.67 95.39 98.01 99.42 99.74 99.87 99.94 0.26 0.13 0.06
5 2020202113 Apr 2020 to Mar 2021 (Period 13) c2c 83284.0 61.15 88.21 96.38 98.44 99.56 99.79 99.86 99.92 0.21 0.14 0.08 1372198.0 55.47 84.90 95.79 98.11 99.42 99.74 99.86 99.93 0.26 0.14 0.07
5 2021202201 Apr 2021 to Mar 2022 (Period 01) c2c 117922.0 61.42 88.35 96.82 98.45 99.35 99.58 99.68 99.78 0.42 0.32 0.22 1416601.0 55.38 84.84 95.76 98.09 99.40 99.71 99.84 99.92 0.29 0.16 0.08
5 2021202202 Apr 2021 to Mar 2022 (Period 02) c2c 105433.0 59.70 88.17 96.95 98.74 99.61 99.82 99.95 100.00 0.18 0.05 0.00 1428315.0 55.23 84.80 95.73 98.08 99.39 99.71 99.84 99.92 0.29 0.16 0.08
5 2021202203 Apr 2021 to Mar 2022 (Period 03) c2c 106615.0 54.28 82.76 94.74 97.54 99.09 99.47 99.62 99.84 0.53 0.38 0.16 1409582.0 54.82 84.41 95.56 98.00 99.36 99.69 99.82 99.91 0.31 0.18 0.09
5 2021202204 Apr 2021 to Mar 2022 (Period 04) c2c 108266.0 53.58 82.87 95.37 97.97 99.33 99.65 99.85 99.94 0.35 0.15 0.06 1396133.0 54.52 84.12 95.43 97.95 99.34 99.67 99.82 99.91 0.33 0.18 0.09
5 2021202205 Apr 2021 to Mar 2022 (Period 05) c2c 114376.0 57.16 85.62 95.57 97.78 99.30 99.69 99.82 99.89 0.31 0.18 0.11 1385689.0 55.16 84.59 95.52 97.97 99.34 99.66 99.81 99.90 0.34 0.19 0.10
5 2021202206 Apr 2021 to Mar 2022 (Period 06) c2c 108346.0 56.64 85.71 96.05 98.29 99.53 99.77 99.88 99.95 0.23 0.12 0.05 1376008.0 56.02 85.05 95.57 97.95 99.32 99.65 99.80 99.90 0.35 0.20 0.10
5 2021202207 Apr 2021 to Mar 2022 (Period 07) c2c 102466.0 45.87 74.94 91.57 96.34 99.09 99.53 99.74 99.92 0.47 0.26 0.08 1359233.0 55.75 84.44 95.20 97.78 99.28 99.63 99.79 99.90 0.37 0.21 0.10
5 2021202208 Apr 2021 to Mar 2022 (Period 08) c2c 99847.0 49.02 81.28 94.95 98.04 99.39 99.82 99.92 99.99 0.18 0.08 0.01 1334551.0 55.96 84.78 95.46 97.91 99.32 99.66 99.81 99.91 0.34 0.19 0.09
5 2021202209 Apr 2021 to Mar 2022 (Period 09) c2c 102455.0 43.46 75.95 94.13 97.91 99.57 99.86 99.99 99.99 0.14 0.01 0.01 1339257.0 55.24 84.22 95.40 97.94 99.35 99.68 99.82 99.91 0.32 0.18 0.09
5 2021202210 Apr 2021 to Mar 2022 (Period 10) c2c 94413.0 51.43 82.32 95.73 98.08 99.54 99.84 99.93 99.97 0.16 0.07 0.03 1336832.0 54.59 83.71 95.28 97.88 99.34 99.68 99.82 99.91 0.32 0.18 0.09
5 2021202211 Apr 2021 to Mar 2022 (Period 11) c2c 103689.0 55.32 85.58 96.58 98.77 99.76 99.90 99.97 99.99 0.10 0.03 0.01 1339006.0 54.40 83.78 95.47 98.04 99.42 99.72 99.85 99.92 0.28 0.15 0.08
5 2021202212 Apr 2021 to Mar 2022 (Period 12) c2c 107250.0 55.51 83.79 93.70 96.34 98.88 99.60 99.84 99.96 0.40 0.16 0.04 1354362.0 54.26 83.54 95.28 97.89 99.38 99.71 99.85 99.93 0.29 0.15 0.07
5 2021202213 Apr 2021 to Mar 2022 (Period 13) c2c 98881.0 57.56 86.63 96.37 98.35 99.64 99.83 99.91 99.98 0.17 0.09 0.02 1369959.0 54.08 83.48 95.29 97.89 99.39 99.72 99.85 99.94 0.28 0.15 0.06
5 2022202301 Apr 2022 to Mar 2023 (Period 01) c2c 113260.0 57.04 85.11 95.29 97.63 99.12 99.52 99.69 99.86 0.48 0.31 0.14 1365297.0 53.69 83.19 95.16 97.82 99.37 99.71 99.85 99.94 0.29 0.15 0.06
5 2022202302 Apr 2022 to Mar 2023 (Period 02) c2c 105522.0 51.01 78.16 93.69 97.80 99.70 99.91 99.95 99.99 0.09 0.05 0.01 1365386.0 53.02 82.42 94.91 97.75 99.37 99.72 99.85 99.94 0.28 0.15 0.06
5 2022202303 Apr 2022 to Mar 2023 (Period 03) c2c 99385.0 52.01 82.08 93.94 96.92 98.79 99.31 99.58 99.75 0.69 0.42 0.25 1358156.0 52.84 82.37 94.85 97.71 99.35 99.71 99.85 99.94 0.29 0.15 0.06
5 2022202304 Apr 2022 to Mar 2023 (Period 04) c2c 109602.0 48.03 78.20 92.19 96.11 98.65 99.35 99.71 99.94 0.65 0.29 0.06 1359492.0 52.40 81.99 94.59 97.56 99.30 99.68 99.84 99.94 0.32 0.16 0.06
5 2022202305 Apr 2022 to Mar 2023 (Period 05) c2c 106032.0 42.32 70.89 87.98 94.24 98.47 99.31 99.61 99.78 0.69 0.39 0.22 1351148.0 51.20 80.81 93.99 97.28 99.23 99.65 99.82 99.93 0.35 0.18 0.07
5 2022202306 Apr 2022 to Mar 2023 (Period 06) c2c 111471.0 42.18 70.32 89.60 95.94 98.94 99.51 99.73 99.92 0.49 0.27 0.08 1354273.0 50.03 79.56 93.46 97.09 99.18 99.63 99.81 99.93 0.37 0.19 0.07
5 2022202307 Apr 2022 to Mar 2023 (Period 07) c2c 100935.0 47.90 78.82 94.38 97.94 99.63 99.82 99.92 100.00 0.18 0.08 0.00 1352742.0 50.18 79.85 93.68 97.21 99.23 99.66 99.82 99.93 0.34 0.18 0.07
5 2022202308 Apr 2022 to Mar 2023 (Period 08) c2c 97870.0 41.97 72.20 90.61 95.83 98.96 99.63 99.84 99.96 0.37 0.16 0.04 1350765.0 49.67 79.19 93.36 97.05 99.19 99.64 99.82 99.93 0.36 0.18 0.07
5 2022202309 Apr 2022 to Mar 2023 (Period 09) c2c 109867.0 41.98 71.97 90.26 95.64 99.02 99.54 99.75 99.90 0.46 0.25 0.10 1358177.0 49.52 78.85 93.05 96.87 99.15 99.62 99.80 99.92 0.38 0.20 0.08
5 2022202310 Apr 2022 to Mar 2023 (Period 10) c2c 69384.0 49.01 77.60 92.22 96.49 98.89 99.49 99.75 99.95 0.51 0.25 0.05 1333148.0 49.36 78.54 92.82 96.76 99.11 99.59 99.79 99.92 0.41 0.21 0.08
5 2022202311 Apr 2022 to Mar 2023 (Period 11) c2c 110415.0 53.59 83.91 95.60 98.06 99.41 99.78 99.90 99.98 0.22 0.10 0.02 1339874.0 49.25 78.44 92.76 96.71 99.09 99.58 99.78 99.92 0.42 0.22 0.08
5 2022202312 Apr 2022 to Mar 2023 (Period 12) c2c 110594.0 50.34 80.77 94.63 97.58 99.07 99.56 99.78 99.93 0.44 0.22 0.07 1343218.0 48.84 78.21 92.83 96.81 99.10 99.58 99.78 99.92 0.42 0.22 0.08
5 2022202313 Apr 2022 to Mar 2023 (Period 13) c2c 108120.0 51.56 81.44 94.66 97.49 99.11 99.47 99.63 99.74 0.53 0.37 0.26 1352457.0 48.42 77.85 92.72 96.76 99.06 99.55 99.76 99.90 0.45 0.24 0.10
5 2023202401 Apr 2023 to Mar 2024 (Period 01) c2c 112261.0 54.85 84.85 95.93 98.36 99.57 99.84 99.93 99.98 0.16 0.07 0.02 1351458.0 48.23 77.82 92.77 96.82 99.10 99.58 99.78 99.91 0.42 0.22 0.09
5 2023202402 Apr 2023 to Mar 2024 (Period 02) c2c 106573.0 51.21 81.04 93.61 96.89 98.89 99.48 99.72 99.89 0.52 0.28 0.11 1352509.0 48.24 78.05 92.77 96.75 99.04 99.55 99.76 99.90 0.45 0.24 0.10
5 2023202403 Apr 2023 to Mar 2024 (Period 03) c2c 109597.0 45.72 74.58 91.00 95.65 98.57 99.33 99.61 99.84 0.67 0.39 0.16 1362721.0 47.77 77.48 92.54 96.65 99.02 99.55 99.76 99.91 0.45 0.24 0.09
5 2023202404 Apr 2023 to Mar 2024 (Period 04) c2c 113811.0 49.90 81.11 94.46 97.56 99.33 99.69 99.87 99.97 0.31 0.13 0.03 1366930.0 47.92 77.72 92.73 96.76 99.07 99.57 99.77 99.91 0.43 0.23 0.09
5 2023202405 Apr 2023 to Mar 2024 (Period 05) c2c 113459.0 51.68 82.56 95.42 98.25 99.65 99.84 99.93 99.99 0.16 0.07 0.01 1374357.0 48.67 78.65 93.32 97.08 99.17 99.62 99.80 99.93 0.38 0.20 0.07
5 2023202406 Apr 2023 to Mar 2024 (Period 06) c2c 105521.0 48.34 79.35 93.03 96.88 99.11 99.62 99.76 99.90 0.38 0.24 0.10 1368407.0 49.17 79.38 93.60 97.16 99.18 99.63 99.80 99.92 0.37 0.20 0.08
5 2023202407 Apr 2023 to Mar 2024 (Period 07) c2c 101276.0 48.50 78.68 92.56 96.34 98.85 99.49 99.68 99.84 0.51 0.32 0.16 1368748.0 49.21 79.37 93.46 97.04 99.12 99.60 99.78 99.91 0.40 0.22 0.09
5 2023202408 Apr 2023 to Mar 2024 (Period 08) c2c 106533.0 43.83 76.25 92.50 96.92 99.20 99.52 99.66 99.78 0.48 0.34 0.22 1377411.0 49.31 79.64 93.59 97.12 99.14 99.59 99.77 99.90 0.41 0.23 0.10
5 2023202409 Apr 2023 to Mar 2024 (Period 09) c2c 101151.0 42.80 75.20 91.90 96.70 99.09 99.59 99.82 99.94 0.41 0.18 0.06 1368695.0 49.42 79.92 93.73 97.21 99.15 99.60 99.78 99.90 0.40 0.22 0.10
5 2023202410 Apr 2023 to Mar 2024 (Period 10) c2c 102554.0 46.68 76.33 90.69 94.85 97.92 98.86 99.32 99.77 1.14 0.68 0.23 1401865.0 49.24 79.78 93.58 97.07 99.07 99.55 99.74 99.89 0.45 0.26 0.11
5 2023202411 Apr 2023 to Mar 2024 (Period 11) c2c 104238.0 48.75 79.46 92.82 96.35 98.66 99.32 99.64 99.81 0.68 0.36 0.19 1395688.0 48.86 79.42 93.37 96.94 99.01 99.51 99.72 99.88 0.49 0.28 0.12
5 2023202412 Apr 2023 to Mar 2024 (Period 12) c2c 112262.0 51.87 82.83 95.01 97.76 99.28 99.72 99.91 99.99 0.28 0.09 0.01 1397356.0 48.98 79.59 93.40 96.95 99.03 99.53 99.73 99.88 0.47 0.27 0.12
5 2023202413 Apr 2023 to Mar 2024 (Period 13) c2c 112584.0 51.67 82.55 94.31 97.24 99.19 99.62 99.78 99.93 0.38 0.22 0.07 1401820.0 49.00 79.69 93.37 96.93 99.04 99.54 99.75 99.90 0.46 0.25 0.10
5 2024202501 Apr 2024 to Mar 2025 (Period 01) c2c 100164.0 50.30 79.99 92.39 95.71 98.02 98.75 99.21 99.62 1.25 0.79 0.38 1389723.0 48.62 79.29 93.10 96.73 98.92 99.46 99.69 99.87 0.54 0.31 0.13
5 2024202502 Apr 2024 to Mar 2025 (Period 02) c2c 102340.0 50.93 81.90 94.57 97.56 99.32 99.79 99.92 99.98 0.21 0.08 0.02 1385490.0 48.59 79.35 93.17 96.78 98.95 99.48 99.71 99.88 0.52 0.29 0.12
5 2024202503 Apr 2024 to Mar 2025 (Period 03) c2c 118707.0 52.30 82.19 94.18 97.15 99.26 99.66 99.85 99.96 0.34 0.15 0.04 1394600.0 49.13 79.97 93.42 96.90 99.01 99.51 99.73 99.89 0.49 0.27 0.11
5 2024202504 Apr 2024 to Mar 2025 (Period 04) c2c 122597.0 51.49 81.33 94.06 97.14 98.86 99.35 99.57 99.75 0.65 0.43 0.25 1403386.0 49.28 79.99 93.39 96.87 98.97 99.48 99.70 99.87 0.52 0.30 0.13
5 2024202505 Apr 2024 to Mar 2025 (Period 05) c2c 124127.0 45.83 76.75 92.71 96.74 99.10 99.59 99.79 99.97 0.41 0.21 0.03 1414054.0 48.78 79.50 93.17 96.74 98.93 99.46 99.69 99.87 0.54 0.31 0.13
5 2024202506 Apr 2024 to Mar 2025 (Period 06) c2c 119945.0 51.03 81.62 94.33 97.36 99.40 99.78 99.87 99.94 0.22 0.13 0.06 1428478.0 49.00 79.69 93.28 96.78 98.95 99.48 99.70 99.87 0.52 0.30 0.13
5 2024202507 Apr 2024 to Mar 2025 (Period 07) c2c 123929.0 49.23 80.56 93.72 97.15 99.09 99.54 99.73 99.91 0.46 0.27 0.09 1451131.0 49.06 79.84 93.37 96.85 98.97 99.48 99.71 99.88 0.52 0.29 0.12
5 2024202508 Apr 2024 to Mar 2025 (Period 08) c2c 121745.0 46.83 76.84 91.79 95.88 98.54 99.31 99.69 99.92 0.69 0.31 0.08 1466343.0 49.25 79.85 93.30 96.76 98.92 99.46 99.71 99.89 0.54 0.29 0.11
5 2024202509 Apr 2024 to Mar 2025 (Period 09) c2c 113216.0 43.98 76.42 93.10 97.26 99.37 99.85 99.94 99.98 0.15 0.06 0.02 1478408.0 49.29 79.91 93.38 96.80 98.94 99.48 99.72 99.89 0.52 0.28 0.11
5 2024202510 Apr 2024 to Mar 2025 (Period 10) c2c 110383.0 49.52 79.88 93.14 96.65 98.84 99.46 99.77 99.94 0.54 0.23 0.06 1486237.0 49.49 80.15 93.55 96.93 99.00 99.53 99.75 99.90 0.47 0.25 0.10
5 2024202511 Apr 2024 to Mar 2025 (Period 11) c2c 124314.0 46.57 77.59 91.71 95.58 98.17 99.00 99.34 99.75 1.00 0.66 0.25 1506313.0 49.30 79.99 93.45 96.85 98.96 99.50 99.72 99.90 0.50 0.28 0.10
5 2024202512 Apr 2024 to Mar 2025 (Period 12) c2c 118801.0 47.36 79.51 93.93 97.30 99.06 99.41 99.61 99.79 0.59 0.39 0.21 1512852.0 48.95 79.74 93.37 96.82 98.94 99.47 99.70 99.88 0.53 0.30 0.12
5 2024202513 Apr 2024 to Mar 2025 (Period 13) c2c 129492.0 49.47 80.02 92.88 96.30 98.50 99.17 99.49 99.77 0.83 0.51 0.23 1529760.0 48.80 79.55 93.26 96.75 98.89 99.44 99.68 99.87 0.56 0.32 0.13
5 2025202601 Apr 2025 to Mar 2026 (Period 01) c2c 113792.0 48.55 79.97 93.37 96.84 99.07 99.56 99.74 99.82 0.44 0.26 0.18 1543388.0 48.68 79.56 93.32 96.82 98.96 99.49 99.71 99.88 0.51 0.29 0.12
5 2025202602 Apr 2025 to Mar 2026 (Period 02) c2c 120076.0 50.15 81.12 93.55 96.67 98.77 99.33 99.62 99.79 0.67 0.38 0.21 1561124.0 48.65 79.52 93.26 96.76 98.92 99.46 99.69 99.87 0.54 0.31 0.13
5 2025202603 Apr 2025 to Mar 2026 (Period 03) c2c 123228.0 50.70 81.84 94.41 97.43 99.28 99.69 99.84 99.96 0.31 0.16 0.04 1565645.0 48.53 79.50 93.28 96.78 98.92 99.46 99.69 99.87 0.54 0.31 0.13
5 2025202604 Apr 2025 to Mar 2026 (Period 04) c2c 124638.0 46.58 78.37 92.52 96.67 99.20 99.74 99.85 99.99 0.26 0.15 0.01 1567686.0 48.15 79.27 93.16 96.75 98.95 99.49 99.71 99.89 0.51 0.29 0.11
5 2025202605 Apr 2025 to Mar 2026 (Period 05) c2c 122201.0 45.42 76.49 91.69 95.90 98.44 99.05 99.41 99.66 0.95 0.59 0.34 1565760.0 48.12 79.25 93.08 96.68 98.90 99.45 99.68 99.86 0.55 0.32 0.14
5 2025202606 Apr 2025 to Mar 2026 (Period 06) c2c 121468.0 37.20 67.55 87.51 94.81 99.08 99.75 99.91 99.98 0.25 0.09 0.02 1567283.0 47.05 78.17 92.55 96.49 98.87 99.45 99.68 99.87 0.55 0.32 0.13
5 2025202607 Apr 2025 to Mar 2026 (Period 07) c2c 120676.0 42.19 73.19 90.44 95.87 99.18 99.72 99.95 100.00 0.28 0.05 0.00 1564030.0 46.50 77.59 92.30 96.39 98.88 99.46 99.70 99.87 0.54 0.30 0.13
5 2025202608 Apr 2025 to Mar 2026 (Period 08) c2c 122436.0 42.03 72.70 90.07 95.53 98.86 99.54 99.84 99.96 0.46 0.16 0.04 1564721.0 46.12 77.27 92.16 96.36 98.90 99.48 99.71 99.87 0.52 0.29 0.13
5 2025202609 Apr 2025 to Mar 2026 (Period 09) c2c 120875.0 40.69 73.07 91.42 96.68 99.32 99.70 99.86 99.96 0.30 0.14 0.04 1572380.0 45.86 77.01 92.04 96.32 98.90 99.47 99.71 99.87 0.53 0.29 0.13
5 2025202610 Apr 2025 to Mar 2026 (Period 10) c2c 108226.0 42.12 71.66 88.62 94.85 98.59 99.36 99.75 99.89 0.64 0.25 0.11 1570223.0 45.35 76.44 91.73 96.19 98.88 99.46 99.71 99.87 0.54 0.29 0.13
5 2025202611 Apr 2025 to Mar 2026 (Period 11) c2c 122320.0 41.74 74.01 92.76 97.17 99.24 99.62 99.82 99.97 0.38 0.18 0.03 1568229.0 44.97 76.15 91.81 96.32 98.97 99.51 99.74 99.89 0.49 0.26 0.11
5 2025202612 Apr 2025 to Mar 2026 (Period 12) c2c 120652.0 48.30 79.08 93.09 96.69 98.96 99.53 99.76 99.94 0.47 0.24 0.06 1570080.0 45.04 76.12 91.75 96.27 98.96 99.52 99.76 99.90 0.48 0.24 0.10
5 2025202613 Apr 2025 to Mar 2026 (Period 13) c2c 137320.0 51.61 82.21 94.10 97.23 99.01 99.49 99.72 99.84 0.51 0.28 0.16 1577908.0 45.25 76.33 91.86 96.35 99.00 99.55 99.77 99.90 0.45 0.23 0.10
5 2026202701 Apr 2026 to Mar 2027 (Period 01) c2c 139157.0 46.35 76.81 91.90 95.96 98.64 99.26 99.52 99.82 0.74 0.48 0.18 1603273.0 45.11 76.12 91.75 96.28 98.97 99.52 99.75 99.90 0.48 0.25 0.10
5 2026202702 Apr 2026 to Mar 2027 (Period 02) c2c 119893.0 48.60 79.36 92.47 95.82 98.24 99.02 99.35 99.73 0.98 0.65 0.27 1603090.0 45.00 75.98 91.67 96.22 98.93 99.50 99.73 99.90 0.50 0.27 0.10
6 2014201513 Apr 2014 to Mar 2015 (Period 13) Caledonian Sleeper 66.0 45.45 68.18 77.27 84.85 92.42 95.45 98.48 100.00 4.55 1.52 0.00 66.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201601 Apr 2015 to Mar 2016 (Period 01) Caledonian Sleeper 1589.0 44.18 60.86 71.93 79.80 88.99 91.50 93.20 94.59 8.50 6.80 5.41 1655.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201602 Apr 2015 to Mar 2016 (Period 02) Caledonian Sleeper 1354.0 47.05 64.62 76.59 83.31 88.63 91.58 92.98 95.64 8.42 7.02 4.36 3009.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201603 Apr 2015 to Mar 2016 (Period 03) Caledonian Sleeper 1283.0 51.05 68.75 80.51 86.44 91.43 94.00 95.40 96.18 6.00 4.60 3.82 4292.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201604 Apr 2015 to Mar 2016 (Period 04) Caledonian Sleeper 1254.0 48.33 65.79 78.71 84.69 92.42 95.06 96.41 98.01 4.94 3.59 1.99 5546.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201605 Apr 2015 to Mar 2016 (Period 05) Caledonian Sleeper 1367.0 45.72 62.62 73.01 77.40 83.76 87.05 89.39 90.49 12.95 10.61 9.51 6913.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201606 Apr 2015 to Mar 2016 (Period 06) Caledonian Sleeper 1394.0 49.43 65.78 80.56 87.16 91.97 93.54 94.55 95.48 6.46 5.45 4.52 8307.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201607 Apr 2015 to Mar 2016 (Period 07) Caledonian Sleeper 1356.0 50.74 68.95 82.23 88.13 93.66 95.94 96.76 97.71 4.06 3.24 2.29 9663.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201608 Apr 2015 to Mar 2016 (Period 08) Caledonian Sleeper 1387.0 43.40 58.33 70.51 77.07 85.94 90.84 92.79 96.32 9.16 7.21 3.68 11050.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201609 Apr 2015 to Mar 2016 (Period 09) Caledonian Sleeper 1314.0 38.13 54.19 67.58 72.91 80.37 83.64 85.24 87.37 16.36 14.76 12.63 12364.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201610 Apr 2015 to Mar 2016 (Period 10) Caledonian Sleeper 821.0 37.64 48.96 59.81 67.72 79.66 83.68 85.87 89.65 16.32 14.13 10.35 13185.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201611 Apr 2015 to Mar 2016 (Period 11) Caledonian Sleeper 1026.0 46.00 61.99 72.90 77.78 83.04 86.06 88.60 91.91 13.94 11.40 8.09 14211.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2015201612 Apr 2015 to Mar 2016 (Period 12) Caledonian Sleeper 1308.0 40.29 56.42 68.65 74.24 83.41 87.39 89.37 92.13 12.61 10.63 7.87 15519.0 45.38 61.85 74.04 80.18 87.31 90.35 92.02 94.00 9.65 7.98 6.00
6 2015201613 Apr 2015 to Mar 2016 (Period 13) Caledonian Sleeper 1336.0 44.69 62.05 78.07 84.81 90.87 93.86 95.51 96.71 6.14 4.49 3.29 16789.0 45.33 61.84 74.35 80.53 87.57 90.61 92.27 94.19 9.39 7.73 5.81
6 2016201701 Apr 2016 to Mar 2017 (Period 01) Caledonian Sleeper 1477.0 49.36 68.45 81.92 86.93 92.82 95.40 95.87 96.95 4.60 4.13 3.05 16677.0 45.79 62.52 75.25 81.17 87.90 90.95 92.50 94.40 9.05 7.50 5.60
6 2016201702 Apr 2016 to Mar 2017 (Period 02) Caledonian Sleeper 1366.0 50.51 65.30 78.48 83.89 91.36 94.73 97.00 97.80 5.27 3.00 2.20 16689.0 46.08 62.58 75.40 81.22 88.12 91.21 92.83 94.58 8.79 7.17 5.42
6 2016201703 Apr 2016 to Mar 2017 (Period 03) Caledonian Sleeper 1327.0 43.86 57.87 70.61 75.73 82.67 86.28 89.30 91.79 13.72 10.70 8.21 16733.0 45.52 61.73 74.63 80.38 87.44 90.61 92.35 94.23 9.39 7.65 5.77
6 2016201704 Apr 2016 to Mar 2017 (Period 04) Caledonian Sleeper 1242.0 49.92 64.33 77.54 83.49 89.61 92.51 94.12 95.57 7.49 5.88 4.43 16721.0 45.64 61.62 74.54 80.29 87.23 90.41 92.18 94.05 9.59 7.82 5.95
6 2016201705 Apr 2016 to Mar 2017 (Period 05) Caledonian Sleeper 1363.0 46.22 61.19 73.15 79.02 85.40 88.26 89.36 92.22 11.74 10.64 7.78 16717.0 45.68 61.51 74.55 80.42 87.36 90.51 92.18 94.19 9.49 7.82 5.81
6 2016201706 Apr 2016 to Mar 2017 (Period 06) Caledonian Sleeper 1350.0 47.63 65.33 79.33 83.85 89.70 91.70 93.04 94.81 8.30 6.96 5.19 16673.0 45.52 61.46 74.44 80.14 87.16 90.36 92.05 94.13 9.64 7.95 5.87
6 2016201707 Apr 2016 to Mar 2017 (Period 07) Caledonian Sleeper 1336.0 44.84 61.23 75.07 81.06 87.57 90.04 90.79 91.47 9.96 9.21 8.53 16653.0 45.04 60.83 73.85 79.56 86.67 89.88 91.56 93.63 10.12 8.44 6.37
6 2016201708 Apr 2016 to Mar 2017 (Period 08) Caledonian Sleeper 1330.0 40.00 55.04 67.52 75.41 85.26 90.30 93.38 95.64 9.70 6.62 4.36 16596.0 44.78 60.57 73.63 79.43 86.62 89.83 91.61 93.56 10.17 8.39 6.44
6 2016201709 Apr 2016 to Mar 2017 (Period 09) Caledonian Sleeper 1324.0 37.76 51.06 62.08 70.09 78.70 84.37 88.22 92.30 15.63 11.78 7.70 16606.0 44.74 60.32 73.18 79.21 86.48 89.88 91.84 93.95 10.12 8.16 6.05
6 2016201710 Apr 2016 to Mar 2017 (Period 10) Caledonian Sleeper 1190.0 45.21 59.58 71.60 78.82 88.66 92.61 95.63 97.65 7.39 4.37 2.35 16975.0 45.12 60.82 73.72 79.73 86.96 90.37 92.39 94.42 9.63 7.61 5.58
6 2016201711 Apr 2016 to Mar 2017 (Period 11) Caledonian Sleeper 1360.0 42.94 59.19 72.13 76.91 84.41 87.79 90.44 93.75 12.21 9.56 6.25 17309.0 44.90 60.62 73.64 79.63 87.00 90.43 92.47 94.52 9.57 7.53 5.48
6 2016201712 Apr 2016 to Mar 2017 (Period 12) Caledonian Sleeper 1368.0 52.92 69.88 84.36 89.62 94.59 96.86 97.37 97.81 3.14 2.63 2.19 17369.0 45.87 61.67 74.86 80.82 87.86 91.16 93.09 94.96 8.84 6.91 5.04
6 2016201713 Apr 2016 to Mar 2017 (Period 13) Caledonian Sleeper 1342.0 50.30 69.82 84.58 90.46 95.38 97.62 97.84 98.06 2.38 2.16 1.94 17375.0 46.31 62.27 75.37 81.26 88.21 91.45 93.27 95.06 8.55 6.73 4.94
6 2017201801 Apr 2017 to Mar 2018 (Period 01) Caledonian Sleeper 1291.0 45.00 59.57 72.04 76.45 80.09 81.80 83.66 85.28 18.20 16.34 14.72 17189.0 45.95 61.53 74.55 80.41 87.21 90.39 92.32 94.16 9.61 7.68 5.84
6 2017201802 Apr 2017 to Mar 2018 (Period 02) Caledonian Sleeper 1301.0 53.04 68.79 81.32 86.70 92.77 94.16 95.23 96.08 5.84 4.77 3.92 17124.0 46.12 61.78 74.75 80.61 87.30 90.33 92.17 94.02 9.67 7.83 5.98
6 2017201803 Apr 2017 to Mar 2018 (Period 03) Caledonian Sleeper 1360.0 58.75 73.97 83.90 88.24 90.88 92.50 93.68 94.56 7.50 6.32 5.44 17157.0 47.30 63.05 75.80 81.59 87.94 90.81 92.51 94.24 9.19 7.49 5.76
6 2017201804 Apr 2017 to Mar 2018 (Period 04) Caledonian Sleeper 1406.0 54.62 69.42 80.16 83.85 90.26 92.89 95.52 96.80 7.11 4.48 3.20 17321.0 47.71 63.48 76.03 81.64 88.01 90.86 92.64 94.35 9.14 7.36 5.65
6 2017201805 Apr 2017 to Mar 2018 (Period 05) Caledonian Sleeper 1412.0 63.60 80.17 92.28 94.48 96.95 98.23 98.37 99.15 1.77 1.63 0.85 17370.0 49.11 65.01 77.58 82.89 88.94 91.66 93.36 94.91 8.34 6.64 5.09
6 2017201806 Apr 2017 to Mar 2018 (Period 06) Caledonian Sleeper 1368.0 56.36 73.54 85.53 89.47 92.18 93.49 93.93 94.74 6.51 6.07 5.26 17388.0 49.80 65.66 78.07 83.33 89.14 91.80 93.43 94.90 8.20 6.57 5.10
6 2017201807 Apr 2017 to Mar 2018 (Period 07) Caledonian Sleeper 1316.0 45.59 60.64 74.47 81.23 88.22 92.10 93.77 95.90 7.90 6.23 4.10 17368.0 49.86 65.62 78.02 83.35 89.19 91.96 93.66 95.24 8.04 6.34 4.76
6 2017201808 Apr 2017 to Mar 2018 (Period 08) Caledonian Sleeper 1271.0 37.06 50.75 63.10 69.39 78.76 83.87 86.31 91.11 16.13 13.69 8.89 17309.0 49.68 65.34 77.73 82.93 88.72 91.50 93.14 94.90 8.50 6.86 5.10
6 2017201809 Apr 2017 to Mar 2018 (Period 09) Caledonian Sleeper 1267.0 47.83 62.12 74.11 78.45 84.37 87.13 88.71 90.29 12.87 11.29 9.71 17252.0 50.46 66.20 78.67 83.59 89.17 91.72 93.19 94.77 8.28 6.81 5.23
6 2017201810 Apr 2017 to Mar 2018 (Period 10) Caledonian Sleeper 1064.0 39.38 50.85 62.97 68.70 77.82 82.99 85.24 88.25 17.01 14.76 11.75 17126.0 50.13 65.71 78.19 83.00 88.50 91.12 92.53 94.16 8.88 7.47 5.84
6 2017201811 Apr 2017 to Mar 2018 (Period 11) Caledonian Sleeper 1354.0 51.55 65.58 79.10 85.97 90.55 92.91 94.02 95.79 7.09 5.98 4.21 17120.0 50.82 66.21 78.74 83.71 88.99 91.52 92.82 94.32 8.48 7.18 5.68
6 2017201812 Apr 2017 to Mar 2018 (Period 12) Caledonian Sleeper 1194.0 45.48 59.88 74.79 80.57 88.02 90.87 92.04 93.38 9.13 7.96 6.62 16946.0 50.27 65.47 78.01 83.02 88.47 91.05 92.39 93.97 8.95 7.61 6.03
6 2017201813 Apr 2017 to Mar 2018 (Period 13) Caledonian Sleeper 1372.0 55.61 69.75 82.29 87.83 92.64 94.31 95.55 97.23 5.69 4.45 2.77 16976.0 50.70 65.47 77.83 82.82 88.26 90.79 92.22 93.91 9.21 7.78 6.09
6 2018201901 Apr 2018 to Mar 2019 (Period 01) Caledonian Sleeper 1314.0 52.66 66.67 79.60 84.32 89.35 91.70 93.38 95.43 8.30 6.62 4.57 16999.0 51.29 66.02 78.41 83.42 88.96 91.55 92.96 94.69 8.45 7.04 5.31
6 2018201902 Apr 2018 to Mar 2019 (Period 02) Caledonian Sleeper 1361.0 59.37 71.86 84.94 90.37 95.08 97.06 97.80 98.24 2.94 2.20 1.76 17059.0 51.80 66.27 78.71 83.72 89.16 91.79 93.17 94.86 8.21 6.83 5.14
6 2018201903 Apr 2018 to Mar 2019 (Period 03) Caledonian Sleeper 1416.0 60.52 74.15 84.39 89.12 93.36 95.20 96.05 97.88 4.80 3.95 2.12 17115.0 51.97 66.31 78.77 83.81 89.37 92.01 93.37 95.14 7.99 6.63 4.86
6 2018201904 Apr 2018 to Mar 2019 (Period 04) Caledonian Sleeper 1418.0 54.44 66.64 78.07 82.72 88.29 91.11 93.51 95.49 8.89 6.49 4.51 17127.0 51.95 66.08 78.60 83.72 89.21 91.87 93.20 95.03 8.13 6.80 4.97
6 2018201905 Apr 2018 to Mar 2019 (Period 05) Caledonian Sleeper 1412.0 53.68 65.16 75.71 81.73 88.10 92.00 93.98 95.33 8.00 6.02 4.67 17127.0 51.14 64.84 77.23 82.66 88.48 91.35 92.84 94.72 8.65 7.16 5.28
6 2018201906 Apr 2018 to Mar 2019 (Period 06) Caledonian Sleeper 1403.0 53.96 67.71 81.04 87.95 94.01 94.94 95.51 97.08 5.06 4.49 2.92 17162.0 50.95 64.39 76.88 82.55 88.64 91.48 92.97 94.91 8.52 7.03 5.09
6 2018201907 Apr 2018 to Mar 2019 (Period 07) Caledonian Sleeper 1331.0 46.28 57.33 71.53 78.36 87.08 91.06 92.94 94.74 8.94 7.06 5.26 17177.0 51.00 64.13 76.65 82.33 88.55 91.40 92.91 94.82 8.60 7.09 5.18
6 2018201908 Apr 2018 to Mar 2019 (Period 08) Caledonian Sleeper 1316.0 47.87 60.26 73.18 79.56 89.21 92.71 93.92 95.44 7.29 6.08 4.56 17222.0 51.79 64.82 77.38 83.07 89.32 92.05 93.47 95.14 7.95 6.53 4.86
6 2018201909 Apr 2018 to Mar 2019 (Period 09) Caledonian Sleeper 1364.0 49.85 65.32 76.76 84.31 90.69 92.89 94.50 95.82 7.11 5.50 4.18 17319.0 51.93 65.06 77.57 83.51 89.79 92.48 93.90 95.55 7.52 6.10 4.45
6 2018201910 Apr 2018 to Mar 2019 (Period 10) Caledonian Sleeper 1102.0 52.90 69.15 81.94 88.29 93.19 94.92 95.64 97.55 5.08 4.36 2.45 17357.0 52.76 66.19 78.75 84.72 90.74 93.21 94.54 96.12 6.79 5.46 3.88
6 2018201911 Apr 2018 to Mar 2019 (Period 11) Caledonian Sleeper 1423.0 56.99 72.59 83.13 89.60 94.87 97.26 98.38 99.02 2.74 1.62 0.98 17426.0 53.20 66.76 79.08 85.02 91.09 93.57 94.90 96.38 6.43 5.10 3.62
6 2018201912 Apr 2018 to Mar 2019 (Period 12) Caledonian Sleeper 1389.0 57.09 71.63 83.30 87.69 91.72 93.02 93.45 94.46 6.98 6.55 5.54 17621.0 54.03 67.61 79.70 85.53 91.35 93.71 94.98 96.44 6.29 5.02 3.56
6 2018201913 Apr 2018 to Mar 2019 (Period 13) Caledonian Sleeper 1378.0 51.67 66.55 77.58 82.22 87.01 89.62 92.02 93.47 10.38 7.98 6.53 17627.0 53.72 67.36 79.33 85.10 90.91 93.34 94.70 96.14 6.66 5.30 3.86
6 2019202001 Apr 2019 to Mar 2020 (Period 01) Caledonian Sleeper 1324.0 55.74 72.13 82.70 86.71 90.33 91.54 92.75 94.18 8.46 7.25 5.82 1324.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202002 Apr 2019 to Mar 2020 (Period 02) Caledonian Sleeper 1387.0 44.63 57.61 69.21 75.20 81.33 84.07 86.23 89.40 15.93 13.77 10.60 2711.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202003 Apr 2019 to Mar 2020 (Period 03) Caledonian Sleeper 1374.0 45.12 57.06 68.70 74.16 82.90 87.19 89.81 93.23 12.81 10.19 6.77 4085.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202004 Apr 2019 to Mar 2020 (Period 04) Caledonian Sleeper 1432.0 57.96 71.65 82.05 86.94 90.50 92.67 93.37 94.55 7.33 6.63 5.45 5517.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202005 Apr 2019 to Mar 2020 (Period 05) Caledonian Sleeper 1411.0 46.35 60.38 68.89 72.64 79.09 82.28 85.68 89.23 17.72 14.32 10.77 6928.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202006 Apr 2019 to Mar 2020 (Period 06) Caledonian Sleeper 1383.0 52.13 65.44 74.98 79.61 86.12 88.29 90.31 92.12 11.71 9.69 7.88 8311.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202007 Apr 2019 to Mar 2020 (Period 07) Caledonian Sleeper 1228.0 47.15 59.28 72.80 79.07 85.67 89.33 90.88 93.00 10.67 9.12 7.00 9539.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202008 Apr 2019 to Mar 2020 (Period 08) Caledonian Sleeper 1387.0 31.00 39.73 49.17 55.37 63.81 69.65 73.76 80.53 30.35 26.24 19.47 10926.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202009 Apr 2019 to Mar 2020 (Period 09) Caledonian Sleeper 1336.0 43.34 55.31 67.66 74.78 82.49 87.35 89.97 92.66 12.65 10.03 7.34 12262.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202010 Apr 2019 to Mar 2020 (Period 10) Caledonian Sleeper 1080.0 50.37 63.61 74.35 79.63 87.22 89.81 92.04 94.07 10.19 7.96 5.93 13342.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202011 Apr 2019 to Mar 2020 (Period 11) Caledonian Sleeper 1404.0 54.27 69.52 80.13 84.76 90.24 91.38 92.45 94.44 8.62 7.55 5.56 14746.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202012 Apr 2019 to Mar 2020 (Period 12) Caledonian Sleeper 1350.0 47.63 60.67 72.59 79.11 86.52 89.11 90.44 92.96 10.89 9.56 7.04 16096.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
6 2019202013 Apr 2019 to Mar 2020 (Period 13) Caledonian Sleeper 1350.0 57.04 69.26 77.70 82.59 88.37 91.41 93.04 94.67 8.59 6.96 5.33 17446.0 48.66 61.65 72.34 77.68 84.12 87.15 89.21 91.87 12.85 10.79 8.13
6 2020202101 Apr 2020 to Mar 2021 (Period 01) Caledonian Sleeper 830.0 65.30 77.11 82.65 85.90 88.92 91.08 92.05 93.98 8.92 7.95 6.02 16952.0 48.92 61.59 72.03 77.38 83.87 87.00 89.07 91.79 13.00 10.93 8.21
6 2020202102 Apr 2020 to Mar 2021 (Period 02) Caledonian Sleeper 779.0 66.11 79.08 86.78 89.60 92.81 95.25 95.89 96.41 4.75 4.11 3.59 16344.0 50.10 62.76 72.97 78.14 84.51 87.65 89.64 92.21 12.35 10.36 7.79
6 2020202103 Apr 2020 to Mar 2021 (Period 03) Caledonian Sleeper 888.0 66.55 79.73 86.37 89.08 92.00 93.81 94.71 97.07 6.19 5.29 2.93 15858.0 51.46 64.21 74.10 79.10 85.07 88.03 89.90 92.40 11.97 10.10 7.60
6 2020202104 Apr 2020 to Mar 2021 (Period 04) Caledonian Sleeper 903.0 66.11 76.74 84.94 88.70 94.46 96.23 97.45 98.34 3.77 2.55 1.66 15329.0 51.71 64.25 73.99 78.94 85.11 88.08 90.03 92.54 11.92 9.97 7.46
6 2020202105 Apr 2020 to Mar 2021 (Period 05) Caledonian Sleeper 963.0 56.18 72.79 82.55 87.02 90.86 93.25 93.87 95.12 6.75 6.13 4.88 14881.0 52.51 65.17 75.03 80.06 86.06 88.97 90.69 93.02 11.03 9.31 6.98
6 2020202106 Apr 2020 to Mar 2021 (Period 06) Caledonian Sleeper 904.0 57.96 72.79 81.75 86.50 91.15 92.15 93.81 95.58 7.85 6.19 4.42 14402.0 52.89 65.62 75.45 80.50 86.37 89.23 90.92 93.27 10.77 9.08 6.73
6 2020202107 Apr 2020 to Mar 2021 (Period 07) Caledonian Sleeper 923.0 55.47 71.61 82.67 87.22 92.42 95.12 97.07 97.72 4.88 2.93 2.28 14097.0 53.56 66.57 76.16 81.07 86.83 89.61 91.32 93.59 10.39 8.68 6.41
6 2020202108 Apr 2020 to Mar 2021 (Period 08) Caledonian Sleeper 1092.0 53.02 67.40 76.65 82.23 90.02 93.50 95.51 97.53 6.50 4.49 2.47 13802.0 55.78 69.33 78.91 83.74 89.39 91.92 93.42 95.21 8.08 6.58 4.79
6 2020202109 Apr 2020 to Mar 2021 (Period 09) Caledonian Sleeper 683.0 62.96 75.70 83.31 86.68 89.60 92.53 93.85 94.58 7.47 6.15 5.42 13149.0 57.42 71.09 80.28 84.80 90.11 92.42 93.79 95.44 7.58 6.21 4.56
6 2020202110 Apr 2020 to Mar 2021 (Period 10) Caledonian Sleeper 699.0 57.94 71.96 80.54 84.41 89.99 92.56 94.13 95.99 7.44 5.87 4.01 12768.0 58.04 71.77 80.80 85.22 90.34 92.65 93.96 95.58 7.35 6.04 4.42
6 2020202111 Apr 2020 to Mar 2021 (Period 11) Caledonian Sleeper 640.0 60.31 72.66 80.78 83.75 88.91 91.72 92.34 94.69 8.28 7.66 5.31 12004.0 58.61 72.08 80.87 85.20 90.28 92.74 94.05 95.67 7.26 5.95 4.33
6 2020202112 Apr 2020 to Mar 2021 (Period 12) Caledonian Sleeper 491.0 66.80 79.23 87.37 92.06 94.70 96.33 97.56 99.19 3.67 2.44 0.81 11145.0 60.30 73.77 82.16 86.24 90.93 93.34 94.64 96.15 6.66 5.36 3.85
6 2020202113 Apr 2020 to Mar 2021 (Period 13) Caledonian Sleeper 601.0 61.40 73.88 83.03 86.19 91.35 93.84 95.34 98.00 6.16 4.66 2.00 10396.0 60.78 74.37 82.79 86.71 91.29 93.62 94.89 96.45 6.38 5.11 3.55
6 2021202201 Apr 2021 to Mar 2022 (Period 01) Caledonian Sleeper 718.0 55.57 66.57 77.58 82.59 87.47 90.25 91.09 92.76 9.75 8.91 7.24 10284.0 60.05 73.60 82.44 86.48 91.21 93.59 94.86 96.39 6.41 5.14 3.61
6 2021202202 Apr 2021 to Mar 2022 (Period 02) Caledonian Sleeper 1322.0 62.03 75.26 83.13 86.69 92.59 94.25 95.76 97.58 5.75 4.24 2.42 10827.0 59.86 73.41 82.21 86.28 91.26 93.55 94.89 96.54 6.45 5.11 3.46
6 2021202203 Apr 2021 to Mar 2022 (Period 03) Caledonian Sleeper 772.0 55.18 66.45 74.35 78.89 82.90 86.14 88.60 91.45 13.86 11.40 8.55 10711.0 58.97 72.38 81.30 85.52 90.60 93.00 94.45 96.13 7.00 5.55 3.87
6 2021202204 Apr 2021 to Mar 2022 (Period 04) Caledonian Sleeper 1277.0 57.01 68.21 78.15 82.62 88.02 90.68 92.40 93.74 9.32 7.60 6.26 11085.0 58.16 71.55 80.64 84.93 89.99 92.47 93.97 95.67 7.53 6.03 4.33
6 2021202205 Apr 2021 to Mar 2022 (Period 05) Caledonian Sleeper 1173.0 53.28 65.56 75.36 80.73 86.10 90.37 93.01 96.68 9.63 6.99 3.32 11295.0 57.82 70.82 79.93 84.31 89.51 92.18 93.88 95.82 7.82 6.12 4.18
6 2021202206 Apr 2021 to Mar 2022 (Period 06) Caledonian Sleeper 1096.0 55.93 69.25 78.74 82.39 87.32 91.24 93.80 95.53 8.76 6.20 4.47 11487.0 57.63 70.51 79.67 83.96 89.17 92.10 93.88 95.81 7.90 6.12 4.19
6 2021202207 Apr 2021 to Mar 2022 (Period 07) Caledonian Sleeper 1350.0 56.89 70.67 79.04 84.30 89.04 93.04 95.11 97.85 6.96 4.89 2.15 11914.0 57.71 70.45 79.37 83.74 88.90 91.97 93.77 95.90 8.03 6.23 4.10
6 2021202208 Apr 2021 to Mar 2022 (Period 08) Caledonian Sleeper 1107.0 39.11 51.76 60.25 63.78 72.45 77.15 80.22 84.73 22.85 19.78 15.27 11929.0 56.42 68.99 77.84 82.03 87.27 90.45 92.35 94.71 9.55 7.65 5.29
6 2021202209 Apr 2021 to Mar 2022 (Period 09) Caledonian Sleeper 1127.0 49.33 61.93 72.76 77.11 81.46 83.58 85.18 87.31 16.42 14.82 12.69 12373.0 55.41 67.98 77.08 81.32 86.62 89.71 91.62 94.04 10.29 8.38 5.96
6 2021202210 Apr 2021 to Mar 2022 (Period 10) Caledonian Sleeper 1154.0 59.97 70.71 81.20 87.09 93.41 96.19 97.14 97.49 3.81 2.86 2.51 12828.0 55.68 68.01 77.26 81.67 87.04 90.14 91.98 94.25 9.86 8.02 5.75
6 2021202211 Apr 2021 to Mar 2022 (Period 11) Caledonian Sleeper 1335.0 64.49 76.93 86.14 89.96 94.08 95.51 96.63 97.60 4.49 3.37 2.40 13523.0 56.33 68.67 77.97 82.39 87.65 90.59 92.42 94.56 9.41 7.58 5.44
6 2021202212 Apr 2021 to Mar 2022 (Period 12) Caledonian Sleeper 1249.0 53.24 65.01 75.02 78.70 83.67 85.91 88.23 91.35 14.09 11.77 8.65 14281.0 55.70 67.99 77.39 81.74 87.06 89.99 91.88 94.12 10.01 8.12 5.88
6 2021202213 Apr 2021 to Mar 2022 (Period 13) Caledonian Sleeper 1287.0 63.33 74.90 85.08 88.73 93.16 95.10 96.27 97.05 4.90 3.73 2.95 14967.0 56.13 68.34 77.82 82.16 87.41 90.27 92.12 94.21 9.73 7.88 5.79
6 2022202301 Apr 2022 to Mar 2023 (Period 01) Caledonian Sleeper 1358.0 62.59 76.07 83.36 87.11 90.06 91.68 92.71 93.45 8.32 7.29 6.55 15607.0 56.72 69.10 78.32 82.57 87.64 90.40 92.22 94.21 9.60 7.78 5.79
6 2022202302 Apr 2022 to Mar 2023 (Period 02) Caledonian Sleeper 1356.0 62.09 73.01 80.60 84.44 89.75 91.74 93.73 94.99 8.26 6.27 5.01 15641.0 56.74 68.92 78.11 82.39 87.40 90.19 92.05 94.00 9.81 7.95 6.00
6 2022202303 Apr 2022 to Mar 2023 (Period 03) Caledonian Sleeper 1068.0 63.11 73.60 81.46 83.43 85.58 87.45 88.76 89.98 12.55 11.24 10.02 15937.0 57.24 69.35 78.52 82.63 87.50 90.20 91.99 93.85 9.80 8.01 6.15
6 2022202304 Apr 2022 to Mar 2023 (Period 04) Caledonian Sleeper 1316.0 57.75 66.95 76.06 79.41 83.74 86.40 87.92 89.67 13.60 12.08 10.33 15976.0 57.30 69.24 78.34 82.36 87.15 89.85 91.62 93.52 10.15 8.38 6.48
6 2022202305 Apr 2022 to Mar 2023 (Period 05) Caledonian Sleeper 1122.0 56.51 67.29 78.79 83.69 89.39 91.35 93.67 97.24 8.65 6.33 2.76 15925.0 57.54 69.38 78.59 82.57 87.38 89.92 91.67 93.54 10.08 8.33 6.46
6 2022202306 Apr 2022 to Mar 2023 (Period 06) Caledonian Sleeper 1375.0 57.31 68.00 77.60 82.84 89.24 92.15 94.11 96.87 7.85 5.89 3.13 16204.0 57.63 69.27 78.50 82.61 87.55 90.01 91.73 93.69 9.99 8.27 6.31
6 2022202307 Apr 2022 to Mar 2023 (Period 07) Caledonian Sleeper 1335.0 56.03 67.64 77.68 83.22 88.99 91.54 93.48 95.51 8.46 6.52 4.49 16189.0 57.56 69.02 78.39 82.52 87.54 89.89 91.59 93.50 10.11 8.41 6.50
6 2022202308 Apr 2022 to Mar 2023 (Period 08) Caledonian Sleeper 1310.0 48.17 58.78 70.31 77.10 86.03 89.62 92.21 95.04 10.38 7.79 4.96 16392.0 58.05 69.36 78.97 83.35 88.44 90.73 92.41 94.21 9.27 7.59 5.79
6 2022202309 Apr 2022 to Mar 2023 (Period 09) Caledonian Sleeper 1388.0 48.92 60.09 71.33 76.80 83.36 87.82 91.35 94.60 12.18 8.65 5.40 16653.0 57.88 69.09 78.75 83.23 88.49 90.97 92.81 94.71 9.03 7.19 5.29
6 2022202310 Apr 2022 to Mar 2023 (Period 10) Caledonian Sleeper 683.0 44.51 56.66 63.40 68.67 74.67 79.06 83.60 89.17 20.94 16.40 10.83 16182.0 57.17 68.45 77.93 82.34 87.55 90.09 92.11 94.28 9.91 7.89 5.72
6 2022202311 Apr 2022 to Mar 2023 (Period 11) Caledonian Sleeper 1362.0 60.28 72.03 80.62 84.65 88.03 89.79 90.97 92.66 10.21 9.03 7.34 16209.0 56.83 68.05 77.48 81.91 87.06 89.62 91.65 93.87 10.38 8.35 6.13
6 2022202312 Apr 2022 to Mar 2023 (Period 12) Caledonian Sleeper 1308.0 63.15 73.24 82.03 86.93 91.97 94.27 95.49 96.48 5.73 4.51 3.52 16268.0 57.61 68.71 78.03 82.55 87.71 90.28 92.22 94.27 9.72 7.78 5.73
6 2022202313 Apr 2022 to Mar 2023 (Period 13) Caledonian Sleeper 1093.0 53.43 66.79 76.85 81.98 89.75 94.78 97.62 98.63 5.22 2.38 1.37 16074.0 56.87 68.08 77.39 82.02 87.41 90.20 92.26 94.34 9.80 7.74 5.66
6 2023202401 Apr 2023 to Mar 2024 (Period 01) Caledonian Sleeper 1149.0 55.87 68.76 75.72 80.07 85.29 87.38 88.08 89.64 12.62 11.92 10.36 15865.0 56.31 67.44 76.75 81.44 87.03 89.87 91.92 94.08 10.13 8.08 5.92
6 2023202402 Apr 2023 to Mar 2024 (Period 02) Caledonian Sleeper 1125.0 57.16 68.00 74.58 77.96 83.91 86.13 89.16 92.44 13.87 10.84 7.56 15634.0 55.87 67.00 76.26 80.93 86.57 89.44 91.56 93.89 10.56 8.44 6.11
6 2023202403 Apr 2023 to Mar 2024 (Period 03) Caledonian Sleeper 1291.0 62.90 72.58 79.86 84.28 88.85 91.09 92.87 95.74 8.91 7.13 4.26 15857.0 55.95 67.01 76.21 81.04 86.83 89.71 91.86 94.30 10.29 8.14 5.70
6 2023202404 Apr 2023 to Mar 2024 (Period 04) Caledonian Sleeper 1396.0 69.84 81.59 89.54 92.19 95.56 96.49 96.78 96.99 3.51 3.22 3.01 15937.0 57.02 68.29 77.39 82.15 87.85 90.58 92.61 94.92 9.42 7.39 5.08
6 2023202405 Apr 2023 to Mar 2024 (Period 05) Caledonian Sleeper 1377.0 66.01 77.12 85.48 87.94 90.56 91.14 92.16 92.74 8.86 7.84 7.26 16192.0 57.82 69.11 77.98 82.53 87.97 90.57 92.50 94.57 9.43 7.50 5.43
6 2023202406 Apr 2023 to Mar 2024 (Period 06) Caledonian Sleeper 1363.0 65.59 78.43 88.70 93.10 96.63 97.43 98.17 98.53 2.57 1.83 1.47 16180.0 58.52 69.99 78.91 83.40 88.59 91.01 92.84 94.71 8.99 7.16 5.29
6 2023202407 Apr 2023 to Mar 2024 (Period 07) Caledonian Sleeper 1254.0 50.88 61.64 71.21 75.92 83.97 87.88 90.35 93.54 12.12 9.65 6.46 16099.0 58.13 69.54 78.41 82.83 88.20 90.73 92.60 94.55 9.27 7.40 5.45
6 2023202408 Apr 2023 to Mar 2024 (Period 08) Caledonian Sleeper 1222.0 42.31 52.45 60.64 66.61 76.35 83.55 87.97 92.80 16.45 12.03 7.20 16011.0 57.74 69.11 77.72 82.06 87.47 90.27 92.27 94.38 9.73 7.73 5.62
6 2023202409 Apr 2023 to Mar 2024 (Period 09) Caledonian Sleeper 1329.0 52.07 60.72 68.10 72.01 79.38 84.88 88.79 93.23 15.12 11.21 6.77 15952.0 58.03 69.20 77.48 81.68 87.16 90.03 92.06 94.26 9.97 7.94 5.74
6 2023202410 Apr 2023 to Mar 2024 (Period 10) Caledonian Sleeper 991.0 56.51 65.49 73.26 77.60 82.04 87.89 92.84 96.37 12.11 7.16 3.63 16260.0 58.51 69.50 77.81 81.98 87.37 90.36 92.47 94.61 9.64 7.53 5.39
6 2023202411 Apr 2023 to Mar 2024 (Period 11) Caledonian Sleeper 1164.0 60.31 70.27 79.04 82.47 86.77 90.64 93.56 96.74 9.36 6.44 3.26 16062.0 58.49 69.34 77.66 81.79 87.27 90.43 92.67 94.93 9.57 7.33 5.07
6 2023202412 Apr 2023 to Mar 2024 (Period 12) Caledonian Sleeper 1247.0 54.05 65.60 76.34 81.32 87.97 90.62 91.34 92.94 9.38 8.66 7.06 16001.0 57.76 68.73 77.20 81.33 86.94 90.13 92.34 94.64 9.87 7.66 5.36
6 2023202413 Apr 2023 to Mar 2024 (Period 13) Caledonian Sleeper 1317.0 61.88 73.04 81.78 86.48 91.34 94.00 94.76 95.90 6.00 5.24 4.10 16225.0 58.39 69.21 77.60 81.71 87.11 90.13 92.18 94.48 9.87 7.82 5.52
6 2024202501 Apr 2024 to Mar 2025 (Period 01) Caledonian Sleeper 1263.0 65.32 75.38 84.09 87.57 91.45 93.43 94.30 95.57 6.57 5.70 4.43 16339.0 59.10 69.72 78.23 82.28 87.57 90.58 92.63 94.90 9.42 7.37 5.10
6 2024202502 Apr 2024 to Mar 2025 (Period 02) Caledonian Sleeper 1230.0 66.91 77.48 85.12 89.02 92.11 93.74 95.45 96.67 6.26 4.55 3.33 16444.0 59.82 70.42 79.00 83.08 88.16 91.12 93.08 95.20 8.88 6.92 4.80
6 2024202503 Apr 2024 to Mar 2025 (Period 03) Caledonian Sleeper 1305.0 61.07 70.50 75.86 78.62 83.14 85.13 86.90 88.12 14.87 13.10 11.88 16458.0 59.67 70.26 78.68 82.63 87.71 90.65 92.61 94.60 9.35 7.39 5.40
6 2024202504 Apr 2024 to Mar 2025 (Period 04) Caledonian Sleeper 1395.0 72.19 82.51 90.18 93.05 96.34 98.42 99.14 99.78 1.58 0.86 0.22 16457.0 59.87 70.33 78.73 82.70 87.77 90.81 92.81 94.84 9.19 7.19 5.16
6 2024202505 Apr 2024 to Mar 2025 (Period 05) Caledonian Sleeper 1384.0 71.24 80.27 86.05 88.58 91.55 93.35 95.01 96.17 6.65 4.99 3.83 16464.0 60.31 70.60 78.78 82.76 87.86 91.00 93.05 95.12 9.00 6.95 4.88
6 2024202506 Apr 2024 to Mar 2025 (Period 06) Caledonian Sleeper 1390.0 67.70 77.91 84.96 88.42 92.16 93.67 94.53 95.54 6.33 5.47 4.46 16491.0 60.50 70.57 78.49 82.38 87.50 90.69 92.75 94.88 9.31 7.25 5.12
6 2024202507 Apr 2024 to Mar 2025 (Period 07) Caledonian Sleeper 1396.0 56.45 66.76 76.07 81.16 88.18 91.69 93.05 94.77 8.31 6.95 5.23 16633.0 60.88 70.93 78.83 82.76 87.82 90.99 92.95 94.97 9.01 7.05 5.03
6 2024202508 Apr 2024 to Mar 2025 (Period 08) Caledonian Sleeper 1317.0 50.72 62.41 73.73 80.03 89.07 93.55 95.90 98.18 6.45 4.10 1.82 16728.0 61.44 71.60 79.76 83.73 88.76 91.73 93.55 95.38 8.27 6.45 4.62
6 2024202509 Apr 2024 to Mar 2025 (Period 09) Caledonian Sleeper 1264.0 49.53 61.16 71.91 76.34 84.10 88.13 91.22 94.22 11.87 8.78 5.78 16663.0 61.29 71.68 80.09 84.10 89.15 92.01 93.75 95.46 7.99 6.25 4.54
6 2024202510 Apr 2024 to Mar 2025 (Period 10) Caledonian Sleeper 1041.0 47.45 57.54 66.86 72.62 81.84 85.21 87.90 90.59 14.79 12.10 9.41 16713.0 60.71 71.17 79.67 83.77 89.12 91.83 93.44 95.11 8.17 6.56 4.89
6 2024202511 Apr 2024 to Mar 2025 (Period 11) Caledonian Sleeper 964.0 49.79 63.59 75.62 83.40 91.29 93.67 94.09 95.02 6.33 5.91 4.98 16513.0 60.10 70.79 79.48 83.84 89.41 92.02 93.47 94.99 7.98 6.53 5.01
6 2024202512 Apr 2024 to Mar 2025 (Period 12) Caledonian Sleeper 1252.0 50.40 62.38 73.88 79.47 88.10 90.42 92.33 93.61 9.58 7.67 6.39 16518.0 59.82 70.54 79.30 83.70 89.42 92.00 93.55 95.04 8.00 6.45 4.96
6 2024202513 Apr 2024 to Mar 2025 (Period 13) Caledonian Sleeper 1394.0 51.79 63.56 74.10 80.34 86.73 90.53 92.97 94.19 9.47 7.03 5.81 16595.0 58.98 69.76 78.66 83.20 89.04 91.72 93.40 94.90 8.28 6.60 5.10
6 2025202601 Apr 2025 to Mar 2026 (Period 01) Caledonian Sleeper 1161.0 50.04 63.22 75.45 81.22 88.03 92.51 94.49 96.55 7.49 5.51 3.45 16493.0 57.87 68.87 78.02 82.73 88.78 91.64 93.41 94.96 8.36 6.59 5.04
6 2025202602 Apr 2025 to Mar 2026 (Period 02) Caledonian Sleeper 1234.0 55.59 66.77 74.72 78.77 85.74 88.90 91.00 93.52 11.10 9.00 6.48 16497.0 57.02 68.07 77.24 81.96 88.31 91.28 93.08 94.73 8.72 6.92 5.27
6 2025202603 Apr 2025 to Mar 2026 (Period 03) Caledonian Sleeper 1178.0 46.94 58.32 70.54 78.35 87.44 90.75 92.95 95.25 9.25 7.05 4.75 16370.0 55.97 67.17 76.87 81.97 88.66 91.73 93.56 95.29 8.27 6.44 4.71
6 2025202604 Apr 2025 to Mar 2026 (Period 04) Caledonian Sleeper 1274.0 51.73 62.17 71.43 76.37 81.63 84.93 87.91 90.42 15.07 12.09 9.58 16249.0 54.25 65.46 75.30 80.58 87.45 90.63 92.64 94.52 9.37 7.36 5.48
6 2025202605 Apr 2025 to Mar 2026 (Period 05) Caledonian Sleeper 1235.0 56.28 65.75 73.68 80.16 88.02 90.53 91.90 93.28 9.47 8.10 6.72 16100.0 52.94 64.21 74.25 79.86 87.14 90.39 92.38 94.29 9.61 7.62 5.71
6 2025202606 Apr 2025 to Mar 2026 (Period 06) Caledonian Sleeper 1240.0 53.95 64.19 73.15 77.10 83.87 85.73 87.34 90.32 14.27 12.66 9.68 15950.0 51.74 63.02 73.24 78.90 86.45 89.74 91.80 93.87 10.26 8.20 6.13
6 2025202607 Apr 2025 to Mar 2026 (Period 07) Caledonian Sleeper 1218.0 44.42 54.93 64.61 69.87 77.01 83.66 89.24 94.58 16.34 10.76 5.42 15772.0 50.75 62.06 72.32 78.00 85.56 89.09 91.49 93.84 10.91 8.51 6.16
6 2025202608 Apr 2025 to Mar 2026 (Period 08) Caledonian Sleeper 1196.0 43.90 53.68 65.89 73.83 83.28 88.13 92.22 95.99 11.87 7.78 4.01 15651.0 50.23 61.39 71.71 77.51 85.09 88.65 91.18 93.64 11.35 8.82 6.36
6 2025202609 Apr 2025 to Mar 2026 (Period 09) Caledonian Sleeper 1246.0 47.51 59.63 70.30 76.89 88.20 92.62 94.62 96.31 7.38 5.38 3.69 15633.0 50.07 61.27 71.58 77.55 85.42 89.00 91.45 93.81 11.00 8.55 6.19
6 2025202610 Apr 2025 to Mar 2026 (Period 10) Caledonian Sleeper 965.0 42.07 53.06 65.18 72.54 80.83 84.25 87.15 90.98 15.75 12.85 9.02 15557.0 49.75 61.01 71.50 77.57 85.38 88.96 91.42 93.85 11.04 8.58 6.15
6 2025202611 Apr 2025 to Mar 2026 (Period 11) Caledonian Sleeper 1013.0 46.30 55.87 67.62 74.04 82.92 86.67 88.55 91.61 13.33 11.45 8.39 15606.0 49.53 60.52 70.99 76.98 84.85 88.52 91.07 93.63 11.48 8.93 6.37
6 2025202612 Apr 2025 to Mar 2026 (Period 12) Caledonian Sleeper 1252.0 49.12 62.22 74.60 82.19 89.06 91.53 92.97 95.21 8.47 7.03 4.79 15606.0 49.42 60.50 71.05 77.20 84.93 88.61 91.12 93.76 11.39 8.88 6.24
6 2025202613 Apr 2025 to Mar 2026 (Period 13) Caledonian Sleeper 1420.0 48.59 60.56 70.07 75.92 83.80 86.90 88.87 91.69 13.10 11.13 8.31 15632.0 49.14 60.24 70.69 76.80 84.67 88.29 90.75 93.53 11.71 9.25 6.47
6 2026202701 Apr 2026 to Mar 2027 (Period 01) Caledonian Sleeper 1303.0 47.58 59.79 70.30 75.90 82.73 85.65 88.95 91.02 14.35 11.05 8.98 15774.0 48.94 59.98 70.31 76.40 84.26 87.76 90.33 93.10 12.24 9.67 6.90
6 2026202702 Apr 2026 to Mar 2027 (Period 02) Caledonian Sleeper 1325.0 49.21 61.43 72.23 76.98 82.26 85.89 88.68 91.70 14.11 11.32 8.30 15865.0 48.45 59.57 70.12 76.27 83.98 87.51 90.14 92.95 12.49 9.86 7.05
7 2014201501 Apr 2014 to Mar 2015 (Period 01) Chiltern Railways 69439.0 47.40 80.10 92.93 96.66 99.03 99.55 99.78 99.95 0.45 0.22 0.05 69439.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201502 Apr 2014 to Mar 2015 (Period 02) Chiltern Railways 74933.0 48.06 81.41 93.75 97.23 99.31 99.63 99.80 99.95 0.37 0.20 0.05 144372.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201503 Apr 2014 to Mar 2015 (Period 03) Chiltern Railways 71847.0 42.54 75.92 90.60 95.13 98.14 98.88 99.28 99.72 1.12 0.72 0.28 216219.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201504 Apr 2014 to Mar 2015 (Period 04) Chiltern Railways 75161.0 40.94 74.72 90.10 95.15 98.63 99.42 99.73 99.92 0.58 0.27 0.08 291380.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201505 Apr 2014 to Mar 2015 (Period 05) Chiltern Railways 75062.0 41.07 74.84 90.45 95.72 98.85 99.37 99.62 99.80 0.63 0.38 0.20 366442.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201506 Apr 2014 to Mar 2015 (Period 06) Chiltern Railways 73374.0 45.09 78.72 92.40 96.46 98.93 99.44 99.65 99.81 0.56 0.35 0.19 439816.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201507 Apr 2014 to Mar 2015 (Period 07) Chiltern Railways 74601.0 40.25 73.78 88.86 94.04 98.07 99.01 99.55 99.89 0.99 0.45 0.11 514417.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201508 Apr 2014 to Mar 2015 (Period 08) Chiltern Railways 74964.0 35.26 66.49 84.14 91.39 97.19 98.65 99.21 99.69 1.35 0.79 0.31 589381.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201509 Apr 2014 to Mar 2015 (Period 09) Chiltern Railways 74638.0 36.69 68.70 86.10 93.11 98.25 99.23 99.61 99.80 0.77 0.39 0.20 664019.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201510 Apr 2014 to Mar 2015 (Period 10) Chiltern Railways 65615.0 39.23 72.14 88.10 93.96 98.40 99.21 99.54 99.83 0.79 0.46 0.17 729634.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201511 Apr 2014 to Mar 2015 (Period 11) Chiltern Railways 75069.0 42.47 76.34 90.56 95.22 98.61 99.32 99.66 99.91 0.68 0.34 0.09 804703.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201512 Apr 2014 to Mar 2015 (Period 12) Chiltern Railways 71981.0 42.10 77.26 91.52 95.86 98.80 99.47 99.78 99.91 0.53 0.22 0.09 876684.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2014201513 Apr 2014 to Mar 2015 (Period 13) Chiltern Railways 80112.0 43.52 79.23 92.77 96.33 98.51 99.02 99.31 99.67 0.98 0.69 0.33 956796.0 41.89 75.37 90.19 95.10 98.52 99.24 99.58 99.83 0.76 0.42 0.17
7 2015201601 Apr 2015 to Mar 2016 (Period 01) Chiltern Railways 82851.0 41.84 75.44 90.09 94.98 98.49 99.22 99.52 99.73 0.78 0.48 0.27 970208.0 41.49 75.04 89.98 94.98 98.48 99.22 99.56 99.82 0.78 0.44 0.18
7 2015201602 Apr 2015 to Mar 2016 (Period 02) Chiltern Railways 73214.0 41.24 76.11 90.56 95.01 98.30 99.13 99.44 99.76 0.87 0.56 0.24 968489.0 40.96 74.63 89.73 94.81 98.40 99.18 99.53 99.80 0.82 0.47 0.20
7 2015201603 Apr 2015 to Mar 2016 (Period 03) Chiltern Railways 73488.0 38.56 73.32 89.92 95.03 98.73 99.46 99.71 99.90 0.54 0.29 0.10 970130.0 40.66 74.43 89.68 94.80 98.44 99.23 99.56 99.81 0.77 0.44 0.19
7 2015201604 Apr 2015 to Mar 2016 (Period 04) Chiltern Railways 75537.0 36.77 71.23 87.63 93.37 97.75 99.01 99.55 99.90 0.99 0.45 0.10 970506.0 40.34 74.16 89.49 94.66 98.37 99.19 99.55 99.81 0.81 0.45 0.19
7 2015201605 Apr 2015 to Mar 2016 (Period 05) Chiltern Railways 75868.0 40.30 75.03 90.37 94.91 98.10 98.95 99.31 99.65 1.05 0.69 0.35 971312.0 40.28 74.18 89.49 94.60 98.32 99.16 99.52 99.80 0.84 0.48 0.20
7 2015201606 Apr 2015 to Mar 2016 (Period 06) Chiltern Railways 74187.0 44.29 77.77 91.52 95.71 98.78 99.40 99.64 99.85 0.60 0.36 0.15 972125.0 40.22 74.11 89.42 94.55 98.31 99.16 99.52 99.80 0.84 0.48 0.20
7 2015201607 Apr 2015 to Mar 2016 (Period 07) Chiltern Railways 75815.0 40.33 74.12 89.95 95.44 98.89 99.55 99.79 99.92 0.45 0.21 0.08 973339.0 40.23 74.13 89.51 94.65 98.37 99.20 99.54 99.81 0.80 0.46 0.19
7 2015201608 Apr 2015 to Mar 2016 (Period 08) Chiltern Railways 78959.0 31.68 62.20 81.91 90.05 97.20 98.79 99.34 99.73 1.21 0.66 0.27 977334.0 39.92 73.76 89.30 94.53 98.37 99.21 99.55 99.81 0.79 0.45 0.19
7 2015201609 Apr 2015 to Mar 2016 (Period 09) Chiltern Railways 78794.0 28.97 58.98 78.90 87.62 96.00 98.12 98.97 99.64 1.88 1.03 0.36 981490.0 39.29 72.95 88.71 94.08 98.18 99.12 99.50 99.80 0.88 0.50 0.20
7 2015201610 Apr 2015 to Mar 2016 (Period 10) Chiltern Railways 70822.0 34.11 66.70 85.56 92.65 97.83 98.99 99.46 99.81 1.01 0.54 0.19 986697.0 38.92 72.56 88.53 93.99 98.14 99.11 99.49 99.80 0.89 0.51 0.20
7 2015201611 Apr 2015 to Mar 2016 (Period 11) Chiltern Railways 80237.0 35.80 71.09 87.81 93.96 98.28 99.12 99.48 99.79 0.88 0.52 0.21 991865.0 38.40 72.15 88.32 93.89 98.12 99.09 99.48 99.79 0.91 0.52 0.21
7 2015201612 Apr 2015 to Mar 2016 (Period 12) Chiltern Railways 80570.0 39.27 74.67 90.21 95.39 98.80 99.49 99.75 99.90 0.51 0.25 0.10 1000454.0 38.20 71.99 88.24 93.87 98.13 99.10 99.48 99.79 0.90 0.52 0.21
7 2015201613 Apr 2015 to Mar 2016 (Period 13) Chiltern Railways 72790.0 41.34 75.97 91.24 95.96 98.65 99.22 99.57 99.84 0.78 0.43 0.16 993132.0 38.00 71.70 88.09 93.83 98.13 99.11 99.50 99.80 0.89 0.50 0.20
7 2016201701 Apr 2016 to Mar 2017 (Period 01) Chiltern Railways 86803.0 42.64 77.53 91.79 96.16 99.09 99.68 99.85 99.98 0.32 0.15 0.02 997084.0 38.09 71.89 88.25 93.93 98.19 99.15 99.53 99.82 0.85 0.47 0.18
7 2016201702 Apr 2016 to Mar 2017 (Period 02) Chiltern Railways 79899.0 36.41 69.74 86.60 93.07 97.94 98.99 99.45 99.81 1.01 0.55 0.19 1003769.0 37.72 71.42 87.95 93.79 98.16 99.14 99.53 99.83 0.86 0.47 0.17
7 2016201703 Apr 2016 to Mar 2017 (Period 03) Chiltern Railways 79927.0 34.14 66.72 85.63 92.71 97.61 98.61 99.09 99.59 1.39 0.91 0.41 1010208.0 37.38 70.91 87.62 93.61 98.07 99.07 99.48 99.80 0.93 0.52 0.20
7 2016201704 Apr 2016 to Mar 2017 (Period 04) Chiltern Railways 79110.0 30.92 63.66 84.18 91.45 96.93 98.42 99.04 99.60 1.58 0.96 0.40 1013781.0 36.92 70.32 87.35 93.46 98.01 99.03 99.44 99.78 0.97 0.56 0.22
7 2016201705 Apr 2016 to Mar 2017 (Period 05) Chiltern Railways 76892.0 32.19 65.54 86.28 93.16 97.93 98.92 99.24 99.63 1.08 0.76 0.37 1014805.0 36.31 69.60 87.04 93.33 98.00 99.03 99.44 99.78 0.97 0.56 0.22
7 2016201706 Apr 2016 to Mar 2017 (Period 06) Chiltern Railways 79154.0 31.28 64.45 84.47 91.40 96.88 98.34 99.00 99.57 1.66 1.00 0.43 1019772.0 35.34 68.61 86.52 93.01 97.85 98.95 99.39 99.76 1.05 0.61 0.24
7 2016201707 Apr 2016 to Mar 2017 (Period 07) Chiltern Railways 79012.0 38.50 73.61 89.94 95.09 98.61 99.34 99.60 99.83 0.66 0.40 0.17 1022969.0 35.21 68.59 86.53 92.99 97.83 98.93 99.37 99.75 1.07 0.63 0.25
7 2016201708 Apr 2016 to Mar 2017 (Period 08) Chiltern Railways 80166.0 35.00 67.13 85.03 91.75 97.41 98.86 99.37 99.84 1.14 0.63 0.16 1024176.0 35.47 68.96 86.77 93.12 97.85 98.94 99.38 99.76 1.06 0.62 0.24
7 2016201709 Apr 2016 to Mar 2017 (Period 09) Chiltern Railways 79466.0 31.54 61.98 81.56 89.74 97.04 98.84 99.39 99.82 1.16 0.61 0.18 1024848.0 35.67 69.19 86.97 93.28 97.93 98.99 99.41 99.77 1.01 0.59 0.23
7 2016201710 Apr 2016 to Mar 2017 (Period 10) Chiltern Railways 73995.0 33.61 66.31 86.27 93.70 98.55 99.48 99.71 99.93 0.52 0.29 0.07 1028021.0 35.62 69.15 87.02 93.35 97.98 99.03 99.43 99.78 0.97 0.57 0.22
7 2016201711 Apr 2016 to Mar 2017 (Period 11) Chiltern Railways 82078.0 36.24 69.96 88.13 94.66 98.69 99.35 99.62 99.82 0.65 0.38 0.18 1029862.0 35.66 69.07 87.04 93.41 98.01 99.04 99.44 99.78 0.96 0.56 0.22
7 2016201712 Apr 2016 to Mar 2017 (Period 12) Chiltern Railways 81616.0 36.33 70.21 87.40 93.30 97.58 98.58 99.06 99.56 1.42 0.94 0.44 1030908.0 35.43 68.72 86.82 93.25 97.92 98.97 99.39 99.76 1.03 0.61 0.24
7 2016201713 Apr 2016 to Mar 2017 (Period 13) Chiltern Railways 79152.0 38.96 74.61 91.34 96.06 98.84 99.41 99.68 99.90 0.59 0.32 0.10 1037270.0 35.29 68.66 86.86 93.27 97.94 98.99 99.39 99.76 1.01 0.61 0.24
7 2017201801 Apr 2017 to Mar 2018 (Period 01) Chiltern Railways 83370.0 38.43 72.84 89.23 94.33 98.11 99.07 99.54 99.83 0.93 0.46 0.17 1033837.0 34.92 68.25 86.63 93.11 97.85 98.94 99.37 99.75 1.06 0.63 0.25
7 2017201802 Apr 2017 to Mar 2018 (Period 02) Chiltern Railways 81894.0 36.55 71.07 88.64 94.40 98.60 99.42 99.74 99.95 0.58 0.26 0.05 1035832.0 34.94 68.36 86.80 93.22 97.91 98.97 99.39 99.76 1.03 0.61 0.24
7 2017201803 Apr 2017 to Mar 2018 (Period 03) Chiltern Railways 81249.0 33.42 66.33 84.91 91.47 96.67 98.30 99.03 99.64 1.70 0.97 0.36 1037154.0 34.88 68.33 86.74 93.12 97.83 98.95 99.39 99.76 1.05 0.61 0.24
7 2017201804 Apr 2017 to Mar 2018 (Period 04) Chiltern Railways 81966.0 34.08 67.23 86.35 93.36 98.10 99.17 99.56 99.82 0.83 0.44 0.18 1040010.0 35.12 68.60 86.90 93.27 97.92 99.00 99.43 99.78 1.00 0.57 0.22
7 2017201805 Apr 2017 to Mar 2018 (Period 05) Chiltern Railways 81789.0 38.99 74.19 90.82 95.84 99.04 99.62 99.78 99.93 0.38 0.22 0.07 1044907.0 35.63 69.26 87.25 93.48 98.01 99.06 99.47 99.80 0.94 0.53 0.20
7 2017201806 Apr 2017 to Mar 2018 (Period 06) Chiltern Railways 80146.0 36.10 69.36 86.74 92.90 97.42 98.61 99.18 99.67 1.39 0.82 0.33 1045899.0 36.00 69.63 87.43 93.59 98.05 99.08 99.48 99.81 0.92 0.52 0.19
7 2017201807 Apr 2017 to Mar 2018 (Period 07) Chiltern Railways 81932.0 35.55 68.32 86.66 93.21 97.96 98.92 99.39 99.78 1.08 0.61 0.22 1048819.0 35.78 69.23 87.18 93.44 98.00 99.05 99.46 99.81 0.95 0.54 0.19
7 2017201808 Apr 2017 to Mar 2018 (Period 08) Chiltern Railways 82207.0 33.30 64.14 83.57 91.06 97.08 98.48 99.10 99.72 1.52 0.90 0.28 1050860.0 35.64 68.99 87.06 93.39 97.97 99.02 99.44 99.80 0.98 0.56 0.20
7 2017201809 Apr 2017 to Mar 2018 (Period 09) Chiltern Railways 81945.0 33.36 64.76 83.81 91.52 97.54 98.83 99.38 99.80 1.17 0.62 0.20 1053339.0 35.77 69.19 87.22 93.52 98.01 99.02 99.44 99.80 0.98 0.56 0.20
7 2017201810 Apr 2017 to Mar 2018 (Period 10) Chiltern Railways 71914.0 32.84 65.31 84.23 91.47 97.23 98.64 99.22 99.72 1.36 0.78 0.28 1051258.0 35.73 69.13 87.08 93.36 97.92 98.96 99.41 99.78 1.04 0.59 0.22
7 2017201811 Apr 2017 to Mar 2018 (Period 11) Chiltern Railways 82498.0 38.12 72.97 89.58 94.99 98.43 99.29 99.55 99.73 0.71 0.45 0.27 1051678.0 35.87 69.36 87.20 93.39 97.90 98.95 99.40 99.77 1.05 0.60 0.23
7 2017201812 Apr 2017 to Mar 2018 (Period 12) Chiltern Railways 81687.0 35.77 69.09 85.93 92.18 97.27 98.63 99.09 99.56 1.37 0.91 0.44 1051749.0 35.83 69.28 87.08 93.30 97.87 98.96 99.40 99.77 1.04 0.60 0.23
7 2017201813 Apr 2017 to Mar 2018 (Period 13) Chiltern Railways 81684.0 37.94 72.82 89.32 94.76 98.57 99.45 99.74 99.89 0.55 0.26 0.11 1054281.0 35.76 69.15 86.94 93.21 97.86 98.96 99.41 99.77 1.04 0.59 0.23
7 2018201901 Apr 2018 to Mar 2019 (Period 01) Chiltern Railways 82074.0 39.45 75.48 91.53 96.11 99.13 99.65 99.83 99.97 0.35 0.17 0.03 1052985.0 35.83 69.35 87.11 93.35 97.93 99.01 99.43 99.78 0.99 0.57 0.22
7 2018201902 Apr 2018 to Mar 2019 (Period 02) Chiltern Railways 81512.0 36.71 71.26 88.71 94.36 98.31 99.20 99.53 99.83 0.80 0.47 0.17 1052603.0 35.85 69.37 87.12 93.34 97.91 98.99 99.42 99.78 1.01 0.58 0.22
7 2018201903 Apr 2018 to Mar 2019 (Period 03) Chiltern Railways 82080.0 35.07 69.33 87.64 93.69 97.93 98.98 99.44 99.77 1.02 0.56 0.23 1053434.0 35.97 69.60 87.33 93.52 98.01 99.04 99.45 99.79 0.96 0.55 0.21
7 2018201904 Apr 2018 to Mar 2019 (Period 04) Chiltern Railways 81105.0 30.79 63.93 84.37 91.80 97.49 98.82 99.35 99.69 1.18 0.65 0.31 1052573.0 35.72 69.35 87.18 93.39 97.96 99.01 99.43 99.78 0.99 0.57 0.22
7 2018201905 Apr 2018 to Mar 2019 (Period 05) Chiltern Railways 80161.0 29.99 61.61 82.87 90.80 97.19 98.79 99.32 99.74 1.21 0.68 0.26 1050945.0 35.03 68.38 86.57 93.01 97.82 98.95 99.40 99.76 1.05 0.60 0.24
7 2018201906 Apr 2018 to Mar 2019 (Period 06) Chiltern Railways 79513.0 30.62 62.22 82.45 90.46 96.63 98.24 98.94 99.46 1.76 1.06 0.54 1050312.0 34.62 67.84 86.24 92.82 97.76 98.92 99.38 99.74 1.08 0.62 0.26
7 2018201907 Apr 2018 to Mar 2019 (Period 07) Chiltern Railways 82163.0 30.40 61.34 82.47 91.31 98.14 99.40 99.80 99.96 0.60 0.20 0.04 1050543.0 34.21 67.29 85.91 92.67 97.77 98.96 99.41 99.76 1.04 0.59 0.24
7 2018201908 Apr 2018 to Mar 2019 (Period 08) Chiltern Railways 81707.0 36.12 68.63 86.98 93.72 98.37 99.27 99.55 99.78 0.73 0.45 0.22 1050043.0 34.43 67.64 86.18 92.88 97.87 99.02 99.45 99.76 0.98 0.55 0.24
7 2018201909 Apr 2018 to Mar 2019 (Period 09) Chiltern Railways 82311.0 32.32 62.91 82.66 90.62 96.88 98.36 98.99 99.57 1.64 1.01 0.43 1050409.0 34.35 67.50 86.09 92.81 97.82 98.98 99.42 99.75 1.02 0.58 0.25
7 2018201910 Apr 2018 to Mar 2019 (Period 10) Chiltern Railways 72344.0 37.05 71.03 88.52 94.38 98.26 99.15 99.49 99.74 0.85 0.51 0.26 1050839.0 34.64 67.89 86.38 93.01 97.89 99.02 99.43 99.75 0.98 0.57 0.25
7 2018201911 Apr 2018 to Mar 2019 (Period 11) Chiltern Railways 82669.0 38.27 73.02 89.30 94.83 98.42 99.23 99.52 99.79 0.77 0.48 0.21 1051010.0 34.65 67.89 86.36 93.00 97.89 99.01 99.43 99.75 0.99 0.57 0.25
7 2018201912 Apr 2018 to Mar 2019 (Period 12) Chiltern Railways 81177.0 38.28 72.81 89.35 94.86 98.49 99.28 99.57 99.80 0.72 0.43 0.20 1050500.0 34.85 68.18 86.63 93.21 97.99 99.06 99.47 99.77 0.94 0.53 0.23
7 2018201913 Apr 2018 to Mar 2019 (Period 13) Chiltern Railways 84248.0 40.05 74.76 90.23 95.03 98.24 99.11 99.47 99.78 0.89 0.53 0.22 1053064.0 35.02 68.35 86.71 93.23 97.96 99.04 99.45 99.76 0.96 0.55 0.24
7 2019202001 Apr 2019 to Mar 2020 (Period 01) Chiltern Railways 78473.0 41.57 76.91 92.22 96.48 98.95 99.48 99.68 99.82 0.52 0.32 0.18 78473.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202002 Apr 2019 to Mar 2020 (Period 02) Chiltern Railways 80123.0 39.21 72.77 89.08 94.43 98.20 99.09 99.44 99.79 0.91 0.56 0.21 158596.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202003 Apr 2019 to Mar 2020 (Period 03) Chiltern Railways 81344.0 36.79 69.16 86.88 93.18 97.94 99.09 99.49 99.77 0.91 0.51 0.23 239940.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202004 Apr 2019 to Mar 2020 (Period 04) Chiltern Railways 81782.0 31.92 64.80 85.48 92.98 97.95 98.99 99.42 99.74 1.01 0.58 0.26 321722.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202005 Apr 2019 to Mar 2020 (Period 05) Chiltern Railways 81847.0 32.20 65.08 84.52 91.71 97.48 98.94 99.40 99.82 1.06 0.60 0.18 403569.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202006 Apr 2019 to Mar 2020 (Period 06) Chiltern Railways 81580.0 34.66 68.43 87.53 94.03 98.50 99.37 99.67 99.87 0.63 0.33 0.13 485149.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202007 Apr 2019 to Mar 2020 (Period 07) Chiltern Railways 82370.0 31.52 62.67 82.96 91.42 97.27 98.72 99.24 99.67 1.28 0.76 0.33 567519.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202008 Apr 2019 to Mar 2020 (Period 08) Chiltern Railways 86545.0 33.28 64.66 84.55 92.41 98.16 99.30 99.69 99.90 0.70 0.31 0.10 654064.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202009 Apr 2019 to Mar 2020 (Period 09) Chiltern Railways 88202.0 28.81 58.23 78.29 87.46 95.84 98.11 98.95 99.60 1.89 1.05 0.40 742266.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202010 Apr 2019 to Mar 2020 (Period 10) Chiltern Railways 79375.0 32.44 64.19 84.09 91.89 97.67 98.91 99.32 99.73 1.09 0.68 0.27 821641.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202011 Apr 2019 to Mar 2020 (Period 11) Chiltern Railways 86712.0 34.50 67.05 85.03 91.93 97.37 98.63 99.20 99.71 1.37 0.80 0.29 908353.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202012 Apr 2019 to Mar 2020 (Period 12) Chiltern Railways 87280.0 33.48 65.89 84.63 92.07 97.26 98.52 99.08 99.62 1.48 0.92 0.38 995633.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
7 2019202013 Apr 2019 to Mar 2020 (Period 13) Chiltern Railways 84816.0 40.81 74.42 90.47 95.36 98.74 99.50 99.75 99.89 0.50 0.25 0.11 1080449.0 34.65 67.16 85.76 92.67 97.78 98.97 99.41 99.76 1.03 0.59 0.24
7 2020202101 Apr 2020 to Mar 2021 (Period 01) Chiltern Railways 55399.0 55.14 87.48 95.94 97.64 99.05 99.49 99.69 99.83 0.51 0.31 0.17 1057375.0 35.21 67.50 85.81 92.65 97.76 98.96 99.40 99.76 1.04 0.60 0.24
7 2020202102 Apr 2020 to Mar 2021 (Period 02) Chiltern Railways 60070.0 49.86 81.42 93.94 97.15 99.25 99.70 99.83 99.95 0.30 0.17 0.05 1037322.0 35.75 67.90 86.03 92.77 97.81 98.99 99.42 99.77 1.01 0.58 0.23
7 2020202103 Apr 2020 to Mar 2021 (Period 03) Chiltern Railways 73564.0 49.73 81.30 93.97 96.89 98.69 99.31 99.59 99.73 0.69 0.41 0.27 1029542.0 36.67 68.76 86.53 93.04 97.86 99.00 99.43 99.77 1.00 0.57 0.23
7 2020202104 Apr 2020 to Mar 2021 (Period 04) Chiltern Railways 77363.0 51.21 83.67 95.06 97.44 99.02 99.43 99.63 99.75 0.57 0.37 0.25 1025123.0 38.14 70.20 87.26 93.37 97.94 99.04 99.44 99.77 0.96 0.56 0.23
7 2020202105 Apr 2020 to Mar 2021 (Period 05) Chiltern Railways 77424.0 43.05 75.24 90.04 94.44 98.04 99.19 99.64 99.88 0.81 0.36 0.12 1020700.0 38.99 71.00 87.69 93.59 97.99 99.05 99.46 99.77 0.95 0.54 0.23
7 2020202106 Apr 2020 to Mar 2021 (Period 06) Chiltern Railways 79704.0 45.97 78.81 91.95 95.42 98.14 98.98 99.42 99.72 1.02 0.58 0.28 1018824.0 39.88 71.81 88.03 93.70 97.96 99.02 99.44 99.76 0.98 0.56 0.24
7 2020202107 Apr 2020 to Mar 2021 (Period 07) Chiltern Railways 81568.0 45.07 76.97 90.54 94.41 97.61 98.76 99.29 99.75 1.24 0.71 0.25 1018022.0 40.98 72.97 88.64 93.94 97.99 99.03 99.45 99.77 0.97 0.55 0.23
7 2020202108 Apr 2020 to Mar 2021 (Period 08) Chiltern Railways 82665.0 44.14 75.27 90.39 95.07 98.38 99.10 99.47 99.82 0.90 0.53 0.18 1014142.0 41.89 73.86 89.14 94.16 98.00 99.01 99.43 99.76 0.99 0.57 0.24
7 2020202109 Apr 2020 to Mar 2021 (Period 09) Chiltern Railways 80974.0 45.69 77.96 92.46 96.47 98.90 99.45 99.68 99.85 0.55 0.32 0.15 1006914.0 43.34 75.56 90.35 94.93 98.26 99.12 99.49 99.78 0.88 0.51 0.22
7 2020202110 Apr 2020 to Mar 2021 (Period 10) Chiltern Railways 70184.0 46.75 78.69 92.17 95.62 98.24 98.98 99.31 99.55 1.02 0.69 0.45 997723.0 44.45 76.69 90.98 95.22 98.31 99.13 99.49 99.77 0.87 0.51 0.23
7 2020202111 Apr 2020 to Mar 2021 (Period 11) Chiltern Railways 67637.0 49.53 81.04 92.71 95.93 98.31 98.95 99.29 99.69 1.05 0.71 0.31 978648.0 45.68 77.84 91.63 95.56 98.39 99.16 99.50 99.77 0.84 0.50 0.23
7 2020202112 Apr 2020 to Mar 2021 (Period 12) Chiltern Railways 61040.0 54.71 85.72 95.57 97.88 99.31 99.70 99.89 99.97 0.30 0.11 0.03 952408.0 47.38 79.44 92.52 96.03 98.56 99.26 99.57 99.80 0.74 0.43 0.20
7 2020202113 Apr 2020 to Mar 2021 (Period 13) Chiltern Railways 51298.0 51.39 84.29 95.28 97.65 99.15 99.68 99.86 99.95 0.32 0.14 0.05 918890.0 48.21 80.17 92.86 96.18 98.57 99.26 99.57 99.80 0.74 0.43 0.20
7 2021202201 Apr 2021 to Mar 2022 (Period 01) Chiltern Railways 81154.0 49.53 81.24 93.01 96.10 98.55 99.35 99.68 99.85 0.65 0.32 0.15 944645.0 47.92 79.84 92.69 96.09 98.54 99.25 99.57 99.80 0.75 0.43 0.20
7 2021202202 Apr 2021 to Mar 2022 (Period 02) Chiltern Railways 76035.0 45.64 78.52 92.44 96.12 98.75 99.51 99.79 99.95 0.49 0.21 0.05 960610.0 47.61 79.63 92.60 96.03 98.51 99.24 99.57 99.80 0.76 0.43 0.20
7 2021202203 Apr 2021 to Mar 2022 (Period 03) Chiltern Railways 76379.0 40.96 74.17 89.95 95.00 98.48 99.30 99.68 99.91 0.70 0.32 0.09 963425.0 46.93 79.07 92.28 95.88 98.50 99.24 99.58 99.82 0.76 0.42 0.18
7 2021202204 Apr 2021 to Mar 2022 (Period 04) Chiltern Railways 75357.0 38.34 70.45 86.94 92.90 97.65 98.80 99.33 99.67 1.20 0.67 0.33 961419.0 45.91 78.03 91.64 95.52 98.39 99.19 99.55 99.81 0.81 0.45 0.19
7 2021202205 Apr 2021 to Mar 2022 (Period 05) Chiltern Railways 75494.0 40.88 73.52 89.91 95.06 98.53 99.27 99.49 99.73 0.73 0.51 0.27 959489.0 45.74 77.90 91.63 95.57 98.43 99.20 99.54 99.80 0.80 0.46 0.20
7 2021202206 Apr 2021 to Mar 2022 (Period 06) Chiltern Railways 75448.0 37.49 71.13 88.58 94.17 97.86 98.92 99.32 99.74 1.08 0.68 0.26 955233.0 45.07 77.29 91.36 95.48 98.41 99.20 99.54 99.80 0.80 0.46 0.20
7 2021202207 Apr 2021 to Mar 2022 (Period 07) Chiltern Railways 74601.0 37.54 70.14 88.26 94.10 97.95 98.92 99.35 99.66 1.08 0.65 0.34 948266.0 44.48 76.75 91.19 95.46 98.44 99.21 99.54 99.79 0.79 0.46 0.21
7 2021202208 Apr 2021 to Mar 2022 (Period 08) Chiltern Railways 74247.0 35.42 66.49 85.27 91.91 97.53 98.79 99.22 99.62 1.21 0.78 0.38 939848.0 43.79 76.07 90.79 95.21 98.38 99.19 99.52 99.78 0.81 0.48 0.22
7 2021202209 Apr 2021 to Mar 2022 (Period 09) Chiltern Railways 75009.0 34.83 65.76 84.52 91.45 97.30 98.73 99.35 99.75 1.27 0.65 0.25 933883.0 42.91 75.08 90.14 94.80 98.24 99.13 99.50 99.77 0.87 0.50 0.23
7 2021202210 Apr 2021 to Mar 2022 (Period 10) Chiltern Railways 66088.0 42.51 77.02 91.93 96.29 98.88 99.42 99.64 99.82 0.58 0.36 0.18 929787.0 42.59 74.95 90.12 94.84 98.29 99.16 99.52 99.79 0.84 0.48 0.21
7 2021202211 Apr 2021 to Mar 2022 (Period 11) Chiltern Railways 76073.0 44.21 79.40 92.52 96.10 98.73 99.36 99.55 99.71 0.64 0.45 0.29 938223.0 42.22 74.87 90.13 94.87 98.32 99.19 99.54 99.79 0.81 0.46 0.21
7 2021202212 Apr 2021 to Mar 2022 (Period 12) Chiltern Railways 72901.0 42.78 76.79 90.45 94.67 97.99 98.96 99.41 99.71 1.04 0.59 0.29 950084.0 41.46 74.32 89.80 94.66 98.23 99.14 99.51 99.77 0.86 0.49 0.23
7 2021202213 Apr 2021 to Mar 2022 (Period 13) Chiltern Railways 70192.0 44.77 80.48 93.68 97.02 99.18 99.65 99.84 99.97 0.35 0.16 0.03 968978.0 41.18 74.24 89.79 94.67 98.25 99.15 99.51 99.78 0.85 0.49 0.22
7 2022202301 Apr 2022 to Mar 2023 (Period 01) Chiltern Railways 79668.0 44.32 78.45 91.77 96.00 98.71 99.43 99.74 99.90 0.57 0.26 0.10 967492.0 40.73 74.00 89.69 94.66 98.27 99.16 99.52 99.78 0.84 0.48 0.22
7 2022202302 Apr 2022 to Mar 2023 (Period 02) Chiltern Railways 76110.0 42.04 77.15 91.24 95.06 98.05 98.91 99.27 99.65 1.09 0.73 0.35 967567.0 40.45 73.89 89.59 94.58 98.21 99.11 99.47 99.76 0.89 0.53 0.24
7 2022202303 Apr 2022 to Mar 2023 (Period 03) Chiltern Railways 63935.0 40.21 74.56 89.87 94.39 97.86 98.84 99.26 99.74 1.16 0.74 0.26 955123.0 40.39 73.91 89.58 94.53 98.17 99.08 99.44 99.74 0.92 0.56 0.26
7 2022202304 Apr 2022 to Mar 2023 (Period 04) Chiltern Railways 74215.0 35.92 68.20 85.51 91.91 97.24 98.78 99.34 99.78 1.22 0.66 0.22 953981.0 40.21 73.74 89.47 94.46 98.13 99.07 99.44 99.75 0.93 0.56 0.25
7 2022202305 Apr 2022 to Mar 2023 (Period 05) Chiltern Railways 68008.0 32.67 64.79 82.91 89.79 95.95 97.73 98.69 99.55 2.27 1.31 0.45 946495.0 39.61 73.11 88.97 94.07 97.95 98.96 99.39 99.74 1.04 0.61 0.26
7 2022202306 Apr 2022 to Mar 2023 (Period 06) Chiltern Railways 73221.0 34.80 68.30 85.11 91.18 96.27 97.69 98.43 99.22 2.31 1.57 0.78 944268.0 39.41 72.90 88.70 93.84 97.82 98.87 99.32 99.70 1.13 0.68 0.30
7 2022202307 Apr 2022 to Mar 2023 (Period 07) Chiltern Railways 67939.0 36.62 69.69 86.38 92.69 97.85 98.90 99.35 99.77 1.10 0.65 0.23 937606.0 39.36 72.89 88.57 93.74 97.82 98.87 99.32 99.71 1.13 0.68 0.29
7 2022202308 Apr 2022 to Mar 2023 (Period 08) Chiltern Railways 69735.0 33.21 64.91 83.28 90.70 96.96 98.60 99.28 99.83 1.40 0.72 0.17 933094.0 39.21 72.80 88.43 93.65 97.77 98.85 99.32 99.72 1.15 0.68 0.28
7 2022202309 Apr 2022 to Mar 2023 (Period 09) Chiltern Railways 74131.0 33.86 66.41 84.94 91.77 97.27 98.63 99.30 99.80 1.37 0.70 0.20 932216.0 39.14 72.86 88.47 93.68 97.77 98.84 99.32 99.73 1.16 0.68 0.27
7 2022202310 Apr 2022 to Mar 2023 (Period 10) Chiltern Railways 20863.0 60.33 83.78 90.96 93.88 97.29 98.64 99.15 99.65 1.36 0.85 0.35 886991.0 39.38 72.80 88.27 93.49 97.68 98.80 99.29 99.72 1.20 0.71 0.28
7 2022202311 Apr 2022 to Mar 2023 (Period 11) Chiltern Railways 67276.0 38.93 70.04 85.79 92.00 97.06 98.46 99.02 99.52 1.54 0.98 0.48 878194.0 38.93 72.02 87.71 93.15 97.54 98.72 99.25 99.71 1.28 0.75 0.29
7 2022202312 Apr 2022 to Mar 2023 (Period 12) Chiltern Railways 74008.0 44.33 76.27 89.78 94.42 98.08 98.96 99.36 99.71 1.04 0.64 0.29 879301.0 39.07 71.98 87.66 93.13 97.55 98.72 99.24 99.70 1.28 0.76 0.30
7 2022202313 Apr 2022 to Mar 2023 (Period 13) Chiltern Railways 66198.0 44.37 75.65 89.28 94.11 97.88 98.89 99.28 99.65 1.11 0.72 0.35 875307.0 39.01 71.58 87.30 92.90 97.44 98.66 99.20 99.68 1.34 0.80 0.32
7 2023202401 Apr 2023 to Mar 2024 (Period 01) Chiltern Railways 74405.0 39.10 67.83 82.99 89.55 95.85 97.52 98.56 99.38 2.48 1.44 0.62 870044.0 38.53 70.63 86.52 92.33 97.19 98.49 99.10 99.63 1.51 0.90 0.37
7 2023202402 Apr 2023 to Mar 2024 (Period 02) Chiltern Railways 61263.0 43.85 75.79 88.91 93.87 98.05 99.19 99.61 99.90 0.81 0.39 0.10 855197.0 38.60 70.42 86.27 92.19 97.18 98.50 99.12 99.65 1.50 0.88 0.35
7 2023202403 Apr 2023 to Mar 2024 (Period 03) Chiltern Railways 67481.0 46.05 78.54 90.35 94.38 97.80 98.77 99.22 99.63 1.23 0.78 0.37 858743.0 39.07 70.75 86.33 92.20 97.17 98.50 99.11 99.64 1.50 0.89 0.36
7 2023202404 Apr 2023 to Mar 2024 (Period 04) Chiltern Railways 62563.0 49.99 82.14 92.60 96.01 98.55 99.31 99.57 99.87 0.69 0.43 0.13 847091.0 40.15 71.81 86.86 92.51 97.27 98.54 99.13 99.65 1.46 0.87 0.35
7 2023202405 Apr 2023 to Mar 2024 (Period 05) Chiltern Railways 55267.0 52.57 83.90 93.03 95.78 98.16 98.93 99.28 99.65 1.07 0.72 0.35 834350.0 41.58 73.19 87.59 92.95 97.44 98.63 99.17 99.66 1.37 0.83 0.34
7 2023202406 Apr 2023 to Mar 2024 (Period 06) Chiltern Railways 65433.0 48.09 80.66 91.66 95.18 98.10 98.94 99.35 99.81 1.06 0.65 0.19 826562.0 42.70 74.21 88.13 93.28 97.59 98.74 99.25 99.71 1.26 0.75 0.29
7 2023202407 Apr 2023 to Mar 2024 (Period 07) Chiltern Railways 61959.0 48.64 79.64 90.32 94.21 97.79 98.77 99.30 99.74 1.23 0.70 0.26 820582.0 43.65 75.00 88.44 93.40 97.59 98.72 99.25 99.70 1.28 0.75 0.30
7 2023202408 Apr 2023 to Mar 2024 (Period 08) Chiltern Railways 72677.0 45.85 77.51 90.19 94.66 98.18 99.03 99.40 99.84 0.97 0.60 0.16 823524.0 44.73 76.07 89.03 93.74 97.69 98.76 99.26 99.70 1.24 0.74 0.30
7 2023202409 Apr 2023 to Mar 2024 (Period 09) Chiltern Railways 65718.0 39.95 71.09 86.91 92.80 97.38 98.62 99.09 99.67 1.38 0.91 0.33 815111.0 45.33 76.55 89.24 93.84 97.70 98.76 99.24 99.69 1.24 0.76 0.31
7 2023202410 Apr 2023 to Mar 2024 (Period 10) Chiltern Railways 65351.0 49.14 79.50 90.02 94.01 97.41 98.45 98.96 99.43 1.55 1.04 0.57 859599.0 45.26 76.60 89.25 93.85 97.69 98.74 99.22 99.67 1.26 0.78 0.33
7 2023202411 Apr 2023 to Mar 2024 (Period 11) Chiltern Railways 65124.0 46.35 77.38 88.42 92.13 95.89 97.19 97.86 98.81 2.81 2.14 1.19 857447.0 45.84 77.17 89.46 93.87 97.61 98.65 99.14 99.62 1.35 0.86 0.38
7 2023202412 Apr 2023 to Mar 2024 (Period 12) Chiltern Railways 67199.0 46.74 78.51 89.96 93.64 96.95 98.11 98.76 99.50 1.89 1.24 0.50 850638.0 46.04 77.36 89.47 93.80 97.51 98.58 99.09 99.60 1.42 0.91 0.40
7 2023202413 Apr 2023 to Mar 2024 (Period 13) Chiltern Railways 74236.0 49.75 81.91 93.07 96.13 98.38 99.11 99.40 99.68 0.89 0.60 0.32 858676.0 46.49 77.88 89.80 93.98 97.56 98.60 99.10 99.61 1.40 0.90 0.39
7 2024202501 Apr 2024 to Mar 2025 (Period 01) Chiltern Railways 65189.0 51.06 84.53 94.13 96.69 98.66 99.29 99.51 99.82 0.71 0.49 0.18 849460.0 47.49 79.27 90.73 94.57 97.79 98.75 99.18 99.64 1.25 0.82 0.36
7 2024202502 Apr 2024 to Mar 2025 (Period 02) Chiltern Railways 66219.0 48.77 82.26 92.43 95.51 98.28 99.22 99.53 99.77 0.78 0.47 0.23 854416.0 47.85 79.75 90.99 94.70 97.81 98.75 99.17 99.63 1.25 0.83 0.37
7 2024202503 Apr 2024 to Mar 2025 (Period 03) Chiltern Railways 74073.0 49.03 81.78 92.04 95.33 97.90 98.63 98.99 99.42 1.37 1.01 0.58 861008.0 48.09 80.02 91.13 94.78 97.82 98.74 99.15 99.61 1.26 0.85 0.39
7 2024202504 Apr 2024 to Mar 2025 (Period 04) Chiltern Railways 74828.0 41.74 74.01 89.16 94.29 98.32 99.33 99.66 99.86 0.67 0.34 0.14 873273.0 47.41 79.36 90.86 94.65 97.81 98.75 99.17 99.62 1.25 0.83 0.38
7 2024202505 Apr 2024 to Mar 2025 (Period 05) Chiltern Railways 71378.0 41.84 76.00 89.19 93.70 97.74 98.84 99.36 99.77 1.16 0.64 0.23 889384.0 46.64 78.80 90.59 94.50 97.78 98.75 99.18 99.63 1.25 0.82 0.37
7 2024202506 Apr 2024 to Mar 2025 (Period 06) Chiltern Railways 73790.0 47.38 80.07 91.52 95.13 98.14 98.98 99.51 99.78 1.02 0.49 0.22 897741.0 46.60 78.77 90.59 94.50 97.79 98.75 99.19 99.63 1.25 0.81 0.37
7 2024202507 Apr 2024 to Mar 2025 (Period 07) Chiltern Railways 69638.0 42.86 72.90 85.56 90.31 95.01 96.89 97.79 98.65 3.11 2.21 1.35 905420.0 46.17 78.26 90.22 94.20 97.58 98.61 99.08 99.54 1.39 0.92 0.46
7 2024202508 Apr 2024 to Mar 2025 (Period 08) Chiltern Railways 72350.0 43.75 75.35 88.49 93.27 97.34 98.40 99.05 99.58 1.60 0.95 0.42 905093.0 46.00 78.09 90.08 94.09 97.51 98.55 99.05 99.52 1.45 0.95 0.48
7 2024202509 Apr 2024 to Mar 2025 (Period 09) Chiltern Railways 74110.0 39.12 71.21 85.77 91.33 96.09 97.66 98.41 99.29 2.34 1.59 0.71 913485.0 45.88 78.03 89.96 93.96 97.40 98.48 98.99 99.49 1.52 1.01 0.51
7 2024202510 Apr 2024 to Mar 2025 (Period 10) Chiltern Railways 62216.0 48.00 79.11 90.59 94.63 98.10 98.97 99.45 99.82 1.03 0.55 0.18 910350.0 45.79 78.00 90.00 94.00 97.45 98.51 99.03 99.52 1.49 0.97 0.48
7 2024202511 Apr 2024 to Mar 2025 (Period 11) Chiltern Railways 74304.0 50.38 82.15 91.90 95.23 98.00 98.83 99.20 99.59 1.17 0.80 0.41 919530.0 46.12 78.38 90.27 94.23 97.61 98.63 99.12 99.58 1.37 0.88 0.42
7 2024202512 Apr 2024 to Mar 2025 (Period 12) Chiltern Railways 72466.0 51.01 83.49 93.08 95.88 98.14 98.97 99.41 99.75 1.03 0.59 0.25 924797.0 46.46 78.77 90.51 94.40 97.69 98.70 99.17 99.60 1.30 0.83 0.40
7 2024202513 Apr 2024 to Mar 2025 (Period 13) Chiltern Railways 76887.0 51.03 83.04 93.28 96.40 98.69 99.34 99.63 99.89 0.66 0.37 0.11 927448.0 46.57 78.87 90.53 94.43 97.72 98.72 99.19 99.61 1.28 0.81 0.39
7 2025202601 Apr 2025 to Mar 2026 (Period 01) Chiltern Railways 66698.0 50.35 82.86 92.68 95.58 98.17 98.97 99.34 99.72 1.03 0.66 0.28 928957.0 46.53 78.76 90.44 94.36 97.69 98.70 99.18 99.61 1.30 0.82 0.39
7 2025202602 Apr 2025 to Mar 2026 (Period 02) Chiltern Railways 73449.0 45.90 78.08 89.91 93.83 97.46 98.69 99.10 99.58 1.31 0.90 0.42 936187.0 46.32 78.46 90.25 94.23 97.63 98.66 99.15 99.59 1.34 0.85 0.41
7 2025202603 Apr 2025 to Mar 2026 (Period 03) Chiltern Railways 75092.0 43.70 75.34 87.72 92.34 96.34 97.89 98.69 99.45 2.11 1.31 0.55 937206.0 45.90 77.95 89.91 93.99 97.50 98.60 99.12 99.60 1.40 0.88 0.40
7 2025202604 Apr 2025 to Mar 2026 (Period 04) Chiltern Railways 74183.0 40.52 73.11 87.36 92.69 97.12 98.48 99.11 99.66 1.52 0.89 0.34 936561.0 45.80 77.88 89.77 93.87 97.41 98.53 99.08 99.58 1.47 0.92 0.42
7 2025202605 Apr 2025 to Mar 2026 (Period 05) Chiltern Railways 75532.0 43.69 74.37 88.01 93.19 97.51 98.76 99.22 99.66 1.24 0.78 0.34 940715.0 45.94 77.74 89.67 93.83 97.39 98.53 99.07 99.57 1.47 0.93 0.43
7 2025202606 Apr 2025 to Mar 2026 (Period 06) Chiltern Railways 73643.0 44.30 75.36 89.04 93.56 97.39 98.61 99.14 99.50 1.39 0.86 0.50 940568.0 45.69 77.37 89.47 93.70 97.33 98.50 99.04 99.55 1.50 0.96 0.45
7 2025202607 Apr 2025 to Mar 2026 (Period 07) Chiltern Railways 73619.0 47.14 78.55 90.17 94.15 97.71 98.79 99.31 99.72 1.21 0.69 0.28 944549.0 46.02 77.80 89.82 93.99 97.53 98.64 99.15 99.63 1.36 0.85 0.37
7 2025202608 Apr 2025 to Mar 2026 (Period 08) Chiltern Railways 74637.0 43.06 73.34 86.93 92.24 96.84 98.14 98.89 99.48 1.86 1.11 0.52 946836.0 45.96 77.63 89.69 93.91 97.49 98.62 99.14 99.62 1.38 0.86 0.38
7 2025202609 Apr 2025 to Mar 2026 (Period 09) Chiltern Railways 74449.0 41.37 72.23 86.31 91.92 96.84 98.39 99.08 99.73 1.61 0.92 0.27 947175.0 46.13 77.71 89.73 93.95 97.55 98.67 99.19 99.65 1.33 0.81 0.35
7 2025202610 Apr 2025 to Mar 2026 (Period 10) Chiltern Railways 66393.0 45.78 76.10 88.91 93.32 97.42 98.53 99.08 99.60 1.47 0.92 0.40 951352.0 45.98 77.51 89.62 93.86 97.51 98.65 99.17 99.64 1.35 0.83 0.36
7 2025202611 Apr 2025 to Mar 2026 (Period 11) Chiltern Railways 74599.0 48.30 78.98 90.40 94.34 97.79 98.92 99.32 99.70 1.08 0.68 0.30 951647.0 45.82 77.26 89.50 93.79 97.49 98.65 99.18 99.65 1.35 0.82 0.35
7 2025202612 Apr 2025 to Mar 2026 (Period 12) Chiltern Railways 75976.0 50.35 81.00 91.75 95.46 98.40 99.36 99.67 99.85 0.64 0.33 0.15 955157.0 45.79 77.08 89.41 93.77 97.51 98.68 99.20 99.66 1.32 0.80 0.34
7 2025202613 Apr 2025 to Mar 2026 (Period 13) Chiltern Railways 82421.0 50.65 81.44 91.61 95.06 97.96 98.86 99.28 99.70 1.14 0.72 0.30 960691.0 45.79 76.98 89.29 93.67 97.46 98.65 99.17 99.64 1.35 0.83 0.36
7 2026202701 Apr 2026 to Mar 2027 (Period 01) Chiltern Railways 81653.0 52.24 82.00 91.54 94.85 97.81 98.80 99.31 99.74 1.20 0.69 0.26 975646.0 46.01 77.00 89.24 93.64 97.44 98.64 99.17 99.64 1.36 0.83 0.36
7 2026202702 Apr 2026 to Mar 2027 (Period 02) Chiltern Railways 75402.0 46.77 76.09 87.57 92.25 96.68 98.17 98.94 99.63 1.83 1.06 0.37 977599.0 46.08 76.85 89.06 93.51 97.38 98.60 99.16 99.65 1.40 0.84 0.35
8 2014201501 Apr 2014 to Mar 2015 (Period 01) CrossCountry 86827.0 27.34 51.93 76.71 87.13 95.17 97.34 98.47 99.48 2.66 1.53 0.52 86827.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201502 Apr 2014 to Mar 2015 (Period 02) CrossCountry 94217.0 26.20 51.19 76.47 86.81 95.22 97.37 98.40 99.39 2.63 1.60 0.61 181044.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201503 Apr 2014 to Mar 2015 (Period 03) CrossCountry 94355.0 25.45 50.03 75.22 85.92 94.54 97.04 98.12 99.18 2.96 1.88 0.82 275399.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201504 Apr 2014 to Mar 2015 (Period 04) CrossCountry 93985.0 24.80 49.68 74.90 85.47 94.14 96.74 98.05 99.21 3.26 1.95 0.79 369384.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201505 Apr 2014 to Mar 2015 (Period 05) CrossCountry 93051.0 22.90 46.06 71.31 82.78 92.82 95.88 97.41 98.81 4.12 2.59 1.19 462435.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201506 Apr 2014 to Mar 2015 (Period 06) CrossCountry 92457.0 25.66 50.22 75.76 86.33 94.69 97.12 98.11 99.15 2.88 1.89 0.85 554892.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201507 Apr 2014 to Mar 2015 (Period 07) CrossCountry 92852.0 23.02 46.48 71.96 83.60 93.58 96.51 97.83 99.11 3.49 2.17 0.89 647744.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201508 Apr 2014 to Mar 2015 (Period 08) CrossCountry 91867.0 16.13 34.99 58.55 72.40 87.16 92.47 94.93 97.56 7.53 5.07 2.44 739611.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201509 Apr 2014 to Mar 2015 (Period 09) CrossCountry 92345.0 18.54 39.61 64.80 77.98 90.81 94.94 96.72 98.44 5.06 3.28 1.56 831956.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201510 Apr 2014 to Mar 2015 (Period 10) CrossCountry 83466.0 22.05 44.29 68.67 80.81 91.98 95.36 97.09 98.56 4.64 2.91 1.44 915422.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201511 Apr 2014 to Mar 2015 (Period 11) CrossCountry 93421.0 23.99 48.43 73.34 84.42 94.10 96.69 97.91 99.02 3.31 2.09 0.98 1008843.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201512 Apr 2014 to Mar 2015 (Period 12) CrossCountry 89464.0 26.42 54.13 78.88 88.67 96.42 98.23 98.94 99.52 1.77 1.06 0.48 1098307.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2014201513 Apr 2014 to Mar 2015 (Period 13) CrossCountry 99744.0 26.61 52.81 76.52 86.10 94.06 96.45 97.60 98.81 3.55 2.40 1.19 1198051.0 23.80 47.72 72.58 83.75 93.45 96.32 97.66 98.94 3.68 2.34 1.06
8 2015201601 Apr 2015 to Mar 2016 (Period 01) CrossCountry 107041.0 27.41 53.58 77.43 86.79 94.99 97.41 98.47 99.36 2.59 1.53 0.64 1218265.0 23.86 47.93 72.72 83.78 93.46 96.35 97.67 98.94 3.65 2.33 1.06
8 2015201602 Apr 2015 to Mar 2016 (Period 02) CrossCountry 93818.0 26.57 52.21 76.52 86.74 94.98 97.39 98.40 99.32 2.61 1.60 0.68 1217866.0 23.89 48.01 72.72 83.77 93.44 96.35 97.67 98.93 3.65 2.33 1.07
8 2015201603 Apr 2015 to Mar 2016 (Period 03) CrossCountry 94940.0 26.42 52.59 76.25 86.33 95.01 97.47 98.49 99.33 2.53 1.51 0.67 1218451.0 23.96 48.21 72.80 83.80 93.48 96.38 97.70 98.95 3.62 2.30 1.05
8 2015201604 Apr 2015 to Mar 2016 (Period 04) CrossCountry 94720.0 25.03 49.31 72.72 83.39 93.27 96.16 97.63 98.91 3.84 2.37 1.09 1219186.0 23.98 48.18 72.63 83.64 93.41 96.33 97.67 98.92 3.67 2.33 1.08
8 2015201605 Apr 2015 to Mar 2016 (Period 05) CrossCountry 94713.0 25.36 50.43 74.74 85.24 94.33 96.90 98.17 99.16 3.10 1.83 0.84 1220848.0 24.17 48.52 72.90 83.83 93.53 96.41 97.73 98.95 3.59 2.27 1.05
8 2015201606 Apr 2015 to Mar 2016 (Period 06) CrossCountry 93680.0 26.02 51.66 76.18 86.09 94.63 96.91 98.00 99.14 3.09 2.00 0.86 1222071.0 24.20 48.63 72.93 83.82 93.52 96.40 97.72 98.95 3.60 2.28 1.05
8 2015201607 Apr 2015 to Mar 2016 (Period 07) CrossCountry 94413.0 23.12 47.10 71.78 83.46 93.49 96.39 97.65 98.91 3.61 2.35 1.09 1223632.0 24.21 48.68 72.92 83.80 93.52 96.39 97.71 98.93 3.61 2.29 1.07
8 2015201608 Apr 2015 to Mar 2016 (Period 08) CrossCountry 94328.0 17.70 38.22 63.26 76.71 90.20 94.51 96.56 98.41 5.49 3.44 1.59 1226093.0 24.31 48.90 73.25 84.11 93.74 96.54 97.83 99.00 3.46 2.17 1.00
8 2015201609 Apr 2015 to Mar 2016 (Period 09) CrossCountry 93420.0 16.81 37.00 61.28 75.03 89.03 93.82 95.98 98.08 6.18 4.02 1.92 1227168.0 24.18 48.69 72.97 83.88 93.60 96.45 97.77 98.97 3.55 2.23 1.03
8 2015201610 Apr 2015 to Mar 2016 (Period 10) CrossCountry 84296.0 23.35 46.65 71.08 82.61 92.78 96.02 97.48 98.84 3.98 2.52 1.16 1227998.0 24.26 48.85 73.14 84.00 93.65 96.49 97.80 98.99 3.51 2.20 1.01
8 2015201611 Apr 2015 to Mar 2016 (Period 11) CrossCountry 93440.0 24.82 49.84 74.55 85.29 94.38 96.93 98.03 99.15 3.07 1.97 0.85 1228017.0 24.33 48.96 73.23 84.07 93.67 96.51 97.81 99.00 3.49 2.19 1.00
8 2015201612 Apr 2015 to Mar 2016 (Period 12) CrossCountry 92980.0 25.40 51.18 75.46 85.60 94.28 96.62 97.76 98.87 3.38 2.24 1.13 1231533.0 24.26 48.75 72.99 83.85 93.52 96.40 97.72 98.95 3.60 2.28 1.05
8 2015201613 Apr 2015 to Mar 2016 (Period 13) CrossCountry 86021.0 27.16 53.83 77.68 87.30 94.97 97.14 98.21 99.18 2.86 1.79 0.82 1217810.0 24.27 48.78 73.03 83.91 93.58 96.45 97.77 98.98 3.55 2.23 1.02
8 2016201701 Apr 2016 to Mar 2017 (Period 01) CrossCountry 101121.0 29.21 56.71 80.61 89.06 95.68 97.40 98.31 99.19 2.60 1.69 0.81 1211890.0 24.40 49.01 73.27 84.09 93.63 96.44 97.75 98.96 3.56 2.25 1.04
8 2016201702 Apr 2016 to Mar 2017 (Period 02) CrossCountry 94075.0 26.72 54.02 78.33 87.70 95.35 97.42 98.37 99.25 2.58 1.63 0.75 1212147.0 24.41 49.15 73.41 84.16 93.66 96.44 97.75 98.96 3.56 2.25 1.04
8 2016201703 Apr 2016 to Mar 2017 (Period 03) CrossCountry 94519.0 25.19 50.79 75.07 85.45 94.08 96.65 97.84 99.00 3.35 2.16 1.00 1211726.0 24.32 49.01 73.32 84.09 93.58 96.38 97.70 98.93 3.62 2.30 1.07
8 2016201704 Apr 2016 to Mar 2017 (Period 04) CrossCountry 94680.0 24.09 49.44 73.82 84.22 92.95 95.64 97.04 98.54 4.36 2.96 1.46 1211686.0 24.25 49.02 73.41 84.16 93.56 96.34 97.65 98.90 3.66 2.35 1.10
8 2016201705 Apr 2016 to Mar 2017 (Period 05) CrossCountry 93192.0 24.55 49.75 74.38 85.44 94.37 96.95 98.01 98.98 3.05 1.99 1.02 1210165.0 24.18 48.97 73.38 84.17 93.56 96.34 97.64 98.89 3.66 2.36 1.11
8 2016201706 Apr 2016 to Mar 2017 (Period 06) CrossCountry 94423.0 23.65 48.29 72.85 83.80 93.81 96.58 97.86 99.13 3.42 2.14 0.87 1210908.0 24.00 48.71 73.12 83.99 93.50 96.32 97.63 98.89 3.68 2.37 1.11
8 2016201707 Apr 2016 to Mar 2017 (Period 07) CrossCountry 94145.0 23.41 48.46 73.88 85.21 94.51 97.27 98.33 99.28 2.73 1.67 0.72 1210640.0 24.02 48.81 73.28 84.13 93.58 96.38 97.68 98.92 3.62 2.32 1.08
8 2016201708 Apr 2016 to Mar 2017 (Period 08) CrossCountry 92762.0 19.01 41.15 66.35 79.24 91.69 95.62 97.34 98.93 4.38 2.66 1.07 1209074.0 24.13 49.05 73.53 84.33 93.70 96.47 97.74 98.96 3.53 2.26 1.04
8 2016201709 Apr 2016 to Mar 2017 (Period 09) CrossCountry 93234.0 16.40 36.34 60.10 73.80 88.24 93.26 95.57 98.00 6.74 4.43 2.00 1208888.0 24.10 49.00 73.44 84.24 93.64 96.43 97.71 98.95 3.57 2.29 1.05
8 2016201710 Apr 2016 to Mar 2017 (Period 10) CrossCountry 86030.0 23.58 48.22 73.66 84.50 93.99 96.89 98.11 99.16 3.11 1.89 0.84 1210622.0 24.11 49.11 73.62 84.37 93.72 96.49 97.75 98.97 3.51 2.25 1.03
8 2016201711 Apr 2016 to Mar 2017 (Period 11) CrossCountry 93986.0 25.21 51.13 76.89 87.50 95.55 97.70 98.51 99.35 2.30 1.49 0.65 1211168.0 24.14 49.21 73.80 84.54 93.81 96.55 97.79 98.99 3.45 2.21 1.01
8 2016201712 Apr 2016 to Mar 2017 (Period 12) CrossCountry 92621.0 25.44 51.42 76.59 86.84 94.85 96.81 97.77 98.76 3.19 2.23 1.24 1210809.0 24.15 49.23 73.89 84.64 93.85 96.56 97.79 98.98 3.44 2.21 1.02
8 2016201713 Apr 2016 to Mar 2017 (Period 13) CrossCountry 91292.0 27.03 53.98 78.62 88.30 95.82 97.68 98.55 99.25 2.32 1.45 0.75 1216080.0 24.15 49.26 73.98 84.73 93.92 96.61 97.82 98.99 3.39 2.18 1.01
8 2017201801 Apr 2017 to Mar 2018 (Period 01) CrossCountry 98574.0 28.84 56.57 80.39 89.20 95.98 97.70 98.49 99.26 2.30 1.51 0.74 1213533.0 24.11 49.23 73.95 84.73 93.94 96.63 97.83 98.99 3.37 2.17 1.01
8 2017201802 Apr 2017 to Mar 2018 (Period 02) CrossCountry 95427.0 26.76 52.89 77.42 87.12 95.10 97.27 98.24 99.24 2.73 1.76 0.76 1214885.0 24.11 49.15 73.88 84.69 93.93 96.62 97.82 98.99 3.38 2.18 1.01
8 2017201803 Apr 2017 to Mar 2018 (Period 03) CrossCountry 95466.0 22.43 46.40 70.73 81.96 91.91 95.21 96.89 98.51 4.79 3.11 1.49 1215832.0 23.90 48.81 73.54 84.41 93.76 96.51 97.75 98.95 3.49 2.25 1.05
8 2017201804 Apr 2017 to Mar 2018 (Period 04) CrossCountry 95695.0 22.89 47.94 73.16 84.46 94.03 96.77 97.89 98.91 3.23 2.11 1.09 1216847.0 23.80 48.69 73.49 84.43 93.84 96.59 97.81 98.98 3.41 2.19 1.02
8 2017201805 Apr 2017 to Mar 2018 (Period 05) CrossCountry 95535.0 24.80 51.06 76.22 86.65 95.10 97.46 98.40 99.38 2.54 1.60 0.62 1219190.0 23.82 48.79 73.63 84.53 93.90 96.64 97.85 99.01 3.36 2.15 0.99
8 2017201806 Apr 2017 to Mar 2018 (Period 06) CrossCountry 94702.0 24.15 49.96 74.89 85.89 95.05 97.46 98.53 99.40 2.54 1.47 0.60 1219469.0 23.86 48.92 73.79 84.69 93.99 96.70 97.90 99.03 3.30 2.10 0.97
8 2017201807 Apr 2017 to Mar 2018 (Period 07) CrossCountry 94410.0 19.87 43.35 69.15 82.08 93.51 96.65 97.98 98.99 3.35 2.02 1.01 1219734.0 23.59 48.53 73.43 84.45 93.92 96.66 97.87 99.01 3.34 2.13 0.99
8 2017201808 Apr 2017 to Mar 2018 (Period 08) CrossCountry 94402.0 16.54 37.12 61.58 75.53 89.84 94.50 96.54 98.39 5.50 3.46 1.61 1221374.0 23.39 48.21 73.05 84.15 93.77 96.57 97.81 98.97 3.43 2.19 1.03
8 2017201809 Apr 2017 to Mar 2018 (Period 09) CrossCountry 89245.0 15.73 36.45 60.88 75.08 89.91 94.86 96.91 98.48 5.14 3.09 1.52 1217385.0 23.37 48.25 73.15 84.28 93.91 96.70 97.91 99.01 3.30 2.09 0.99
8 2017201810 Apr 2017 to Mar 2018 (Period 10) CrossCountry 75132.0 19.18 41.28 65.57 77.64 90.02 94.31 96.30 98.32 5.69 3.70 1.68 1206487.0 23.09 47.82 72.64 83.85 93.66 96.53 97.80 98.95 3.47 2.20 1.05
8 2017201811 Apr 2017 to Mar 2018 (Period 11) CrossCountry 93841.0 23.89 49.29 74.07 85.10 94.60 97.13 98.14 99.23 2.87 1.86 0.77 1206342.0 22.99 47.68 72.42 83.66 93.59 96.49 97.77 98.94 3.51 2.23 1.06
8 2017201812 Apr 2017 to Mar 2018 (Period 12) CrossCountry 90018.0 22.77 47.41 71.30 82.22 92.45 95.57 97.02 98.43 4.43 2.98 1.57 1203739.0 22.78 47.37 72.01 83.31 93.41 96.39 97.71 98.92 3.61 2.29 1.08
8 2017201813 Apr 2017 to Mar 2018 (Period 13) CrossCountry 94049.0 21.27 45.25 69.19 80.92 91.81 95.42 97.03 98.58 4.58 2.97 1.42 1206496.0 22.34 46.71 71.29 82.75 93.10 96.22 97.60 98.87 3.78 2.40 1.13
8 2018201901 Apr 2018 to Mar 2019 (Period 01) CrossCountry 94840.0 23.65 48.80 73.04 83.62 93.13 96.25 97.53 98.87 3.75 2.47 1.13 1202762.0 21.91 46.06 70.69 82.29 92.87 96.10 97.52 98.84 3.90 2.48 1.16
8 2018201902 Apr 2018 to Mar 2019 (Period 02) CrossCountry 94593.0 22.37 46.55 69.74 81.37 92.17 95.78 97.24 98.66 4.22 2.76 1.34 1201928.0 21.57 45.56 70.08 81.83 92.64 95.98 97.44 98.79 4.02 2.56 1.21
8 2018201903 Apr 2018 to Mar 2019 (Period 03) CrossCountry 94458.0 21.00 43.79 66.57 78.20 89.95 94.07 96.11 98.16 5.93 3.89 1.84 1200920.0 21.45 45.35 69.75 81.54 92.48 95.89 97.38 98.76 4.11 2.62 1.24
8 2018201904 Apr 2018 to Mar 2019 (Period 04) CrossCountry 93563.0 18.02 39.16 61.25 73.27 86.70 92.07 94.66 97.30 7.93 5.34 2.70 1198788.0 21.07 44.66 68.81 80.66 91.91 95.53 97.12 98.64 4.47 2.88 1.36
8 2018201905 Apr 2018 to Mar 2019 (Period 05) CrossCountry 91691.0 20.30 40.98 62.24 74.39 88.24 93.23 95.51 97.83 6.77 4.49 2.17 1194944.0 20.71 43.87 67.72 79.70 91.37 95.20 96.90 98.52 4.80 3.10 1.48
8 2018201906 Apr 2018 to Mar 2019 (Period 06) CrossCountry 93700.0 23.66 46.34 69.61 80.95 91.91 95.37 96.90 98.48 4.63 3.10 1.52 1193942.0 20.67 43.58 67.30 79.31 91.12 95.03 96.77 98.44 4.97 3.23 1.56
8 2018201907 Apr 2018 to Mar 2019 (Period 07) CrossCountry 93737.0 21.59 43.04 66.23 78.09 90.40 94.80 96.70 98.59 5.20 3.30 1.41 1193269.0 20.81 43.56 67.07 78.99 90.88 94.88 96.67 98.41 5.12 3.33 1.59
8 2018201908 Apr 2018 to Mar 2019 (Period 08) CrossCountry 94467.0 18.63 39.59 63.59 76.55 90.00 94.53 96.51 98.47 5.47 3.49 1.53 1193334.0 20.97 43.75 67.23 79.07 90.89 94.89 96.66 98.42 5.11 3.34 1.58
8 2018201909 Apr 2018 to Mar 2019 (Period 09) CrossCountry 93951.0 17.17 36.93 60.26 73.41 87.64 92.70 95.14 97.60 7.30 4.86 2.40 1198040.0 21.06 43.76 67.15 78.93 90.71 94.72 96.53 98.35 5.28 3.47 1.65
8 2018201910 Apr 2018 to Mar 2019 (Period 10) CrossCountry 85476.0 24.22 47.80 70.87 82.11 92.65 95.96 97.55 99.08 4.04 2.45 0.92 1208384.0 21.40 44.20 67.51 79.23 90.89 94.83 96.61 98.40 5.17 3.39 1.60
8 2018201911 Apr 2018 to Mar 2019 (Period 11) CrossCountry 95955.0 27.27 52.89 76.23 86.32 94.71 97.05 97.98 99.02 2.95 2.02 0.98 1210498.0 21.68 44.49 67.70 79.34 90.90 94.83 96.60 98.39 5.17 3.40 1.61
8 2018201912 Apr 2018 to Mar 2019 (Period 12) CrossCountry 93813.0 28.19 54.50 77.52 87.15 95.34 97.53 98.52 99.38 2.47 1.48 0.62 1214293.0 22.10 45.05 68.19 79.73 91.13 94.98 96.72 98.46 5.02 3.28 1.54
8 2018201913 Apr 2018 to Mar 2019 (Period 13) CrossCountry 96598.0 26.84 52.31 74.78 84.97 93.79 96.63 97.80 99.01 3.37 2.20 0.99 1216842.0 22.54 45.61 68.63 80.05 91.29 95.08 96.78 98.50 4.92 3.22 1.50
8 2019202001 Apr 2019 to Mar 2020 (Period 01) CrossCountry 92647.0 27.02 52.65 75.45 85.30 93.98 96.57 97.66 98.87 3.43 2.34 1.13 92647.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202002 Apr 2019 to Mar 2020 (Period 02) CrossCountry 95842.0 27.24 53.19 75.89 85.77 94.16 96.74 97.90 98.97 3.26 2.10 1.03 188489.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202003 Apr 2019 to Mar 2020 (Period 03) CrossCountry 97016.0 24.54 50.22 72.22 82.39 92.41 95.63 97.02 98.52 4.37 2.98 1.48 285505.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202004 Apr 2019 to Mar 2020 (Period 04) CrossCountry 96495.0 22.87 47.60 70.38 81.40 91.74 95.22 96.81 98.30 4.78 3.19 1.70 382000.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202005 Apr 2019 to Mar 2020 (Period 05) CrossCountry 93652.0 21.02 44.06 65.30 76.13 88.08 92.52 94.70 97.24 7.48 5.30 2.76 475652.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202006 Apr 2019 to Mar 2020 (Period 06) CrossCountry 94002.0 23.98 49.41 71.94 82.42 92.17 95.38 97.00 98.57 4.62 3.00 1.43 569654.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202007 Apr 2019 to Mar 2020 (Period 07) CrossCountry 94845.0 20.79 44.73 67.44 79.10 91.18 94.95 96.60 98.25 5.05 3.40 1.75 664499.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202008 Apr 2019 to Mar 2020 (Period 08) CrossCountry 93997.0 17.65 39.40 61.30 73.52 86.98 92.12 94.57 97.11 7.88 5.43 2.89 758496.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202009 Apr 2019 to Mar 2020 (Period 09) CrossCountry 94647.0 15.72 36.10 57.87 70.69 85.88 91.91 94.86 97.64 8.09 5.14 2.36 853143.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202010 Apr 2019 to Mar 2020 (Period 10) CrossCountry 84881.0 21.93 45.16 66.44 77.26 89.38 93.66 95.79 98.06 6.34 4.21 1.94 938024.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202011 Apr 2019 to Mar 2020 (Period 11) CrossCountry 93870.0 23.91 48.71 70.64 81.41 92.04 95.28 96.77 98.54 4.72 3.23 1.46 1031894.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202012 Apr 2019 to Mar 2020 (Period 12) CrossCountry 92784.0 22.19 45.79 67.34 78.16 89.60 93.82 95.90 98.08 6.18 4.10 1.92 1124678.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
8 2019202013 Apr 2019 to Mar 2020 (Period 13) CrossCountry 94297.0 28.57 53.58 74.40 83.88 93.15 96.22 97.63 98.98 3.78 2.37 1.02 1218975.0 22.89 46.99 69.00 79.83 90.85 94.63 96.41 98.24 5.37 3.59 1.76
8 2020202101 Apr 2020 to Mar 2021 (Period 01) CrossCountry 67089.0 53.38 81.01 93.19 96.17 98.33 98.99 99.31 99.75 1.01 0.69 0.25 1193417.0 24.28 48.46 69.86 80.33 91.02 94.72 96.47 98.28 5.28 3.53 1.72
8 2020202102 Apr 2020 to Mar 2021 (Period 02) CrossCountry 54842.0 52.30 79.57 91.76 95.10 97.85 98.70 99.17 99.59 1.30 0.83 0.41 1152417.0 25.37 49.55 70.40 80.58 91.09 94.75 96.48 98.28 5.25 3.52 1.72
8 2020202103 Apr 2020 to Mar 2021 (Period 03) CrossCountry 55214.0 48.98 77.47 90.75 94.85 97.77 98.81 99.30 99.71 1.19 0.70 0.29 1110615.0 26.62 50.88 71.25 81.13 91.30 94.87 96.58 98.33 5.13 3.42 1.67
8 2020202104 Apr 2020 to Mar 2021 (Period 04) CrossCountry 56688.0 45.71 74.59 90.74 95.00 97.80 98.59 99.05 99.62 1.41 0.95 0.38 1070808.0 27.96 52.43 72.36 81.84 91.61 95.04 96.69 98.41 4.96 3.31 1.59
8 2020202105 Apr 2020 to Mar 2021 (Period 05) CrossCountry 57651.0 37.26 65.16 83.82 90.83 96.09 97.65 98.44 99.24 2.35 1.56 0.76 1034807.0 29.11 53.90 73.64 82.85 92.18 95.41 96.97 98.56 4.59 3.03 1.44
8 2020202106 Apr 2020 to Mar 2021 (Period 06) CrossCountry 57314.0 38.52 66.07 84.77 91.19 95.94 97.37 98.01 98.79 2.63 1.99 1.21 998119.0 30.14 55.02 74.44 83.37 92.39 95.52 97.02 98.57 4.48 2.98 1.43
8 2020202107 Apr 2020 to Mar 2021 (Period 07) CrossCountry 56753.0 33.79 60.69 81.46 89.49 95.59 97.42 98.33 99.24 2.58 1.67 0.76 960027.0 31.27 56.37 75.55 84.16 92.70 95.69 97.14 98.64 4.31 2.86 1.36
8 2020202108 Apr 2020 to Mar 2021 (Period 08) CrossCountry 58218.0 31.85 58.25 79.27 88.30 95.54 97.66 98.53 99.25 2.34 1.47 0.75 924248.0 32.70 58.22 77.23 85.50 93.46 96.18 97.49 98.84 3.82 2.51 1.16
8 2020202109 Apr 2020 to Mar 2021 (Period 09) CrossCountry 58664.0 35.66 63.25 83.33 90.95 96.99 98.55 99.05 99.49 1.45 0.95 0.51 888265.0 34.70 60.91 79.69 87.44 94.50 96.79 97.87 99.01 3.21 2.13 0.99
8 2020202110 Apr 2020 to Mar 2021 (Period 10) CrossCountry 53347.0 35.66 63.37 82.73 89.91 95.65 97.39 98.13 98.93 2.61 1.87 1.07 856731.0 36.03 62.62 81.20 88.60 95.08 97.14 98.10 99.10 2.86 1.90 0.90
8 2020202111 Apr 2020 to Mar 2021 (Period 11) CrossCountry 57557.0 38.99 66.24 83.88 89.58 94.75 96.66 97.64 98.72 3.34 2.36 1.28 820418.0 37.62 64.47 82.59 89.49 95.41 97.32 98.22 99.13 2.68 1.78 0.87
8 2020202112 Apr 2020 to Mar 2021 (Period 12) CrossCountry 57954.0 41.49 69.21 86.35 91.69 95.98 97.35 98.12 99.05 2.65 1.88 0.95 785588.0 39.73 67.02 84.67 90.99 96.14 97.74 98.48 99.25 2.26 1.52 0.75
8 2020202113 Apr 2020 to Mar 2021 (Period 13) CrossCountry 52161.0 45.15 73.88 89.74 94.27 97.33 98.20 98.72 99.44 1.80 1.28 0.56 743452.0 41.52 69.21 86.33 92.13 96.60 97.96 98.61 99.30 2.04 1.39 0.70
8 2021202201 Apr 2021 to Mar 2022 (Period 01) CrossCountry 66079.0 42.83 71.37 88.53 93.45 97.10 98.26 98.80 99.40 1.74 1.20 0.60 742442.0 40.57 68.33 85.91 91.88 96.49 97.89 98.56 99.27 2.11 1.44 0.73
8 2021202202 Apr 2021 to Mar 2022 (Period 02) CrossCountry 63535.0 39.25 67.61 84.90 90.67 95.34 97.00 97.89 98.87 3.00 2.11 1.13 751135.0 39.60 67.45 85.39 91.54 96.29 97.76 98.46 99.21 2.24 1.54 0.79
8 2021202203 Apr 2021 to Mar 2022 (Period 03) CrossCountry 67864.0 34.52 62.55 81.01 88.06 94.48 96.60 97.65 98.80 3.40 2.35 1.20 763785.0 38.47 66.29 84.62 90.99 96.02 97.58 98.33 99.14 2.42 1.67 0.86
8 2021202204 Apr 2021 to Mar 2022 (Period 04) CrossCountry 67565.0 32.35 59.85 78.92 86.21 93.32 95.95 97.12 98.40 4.05 2.88 1.60 774662.0 37.41 65.12 83.67 90.28 95.66 97.36 98.17 99.04 2.64 1.83 0.96
8 2021202205 Apr 2021 to Mar 2022 (Period 05) CrossCountry 66718.0 33.61 61.56 80.76 87.75 94.01 96.10 97.16 98.39 3.90 2.84 1.61 783729.0 37.10 64.82 83.41 90.03 95.48 97.24 98.06 98.97 2.76 1.94 1.03
8 2021202206 Apr 2021 to Mar 2022 (Period 06) CrossCountry 65569.0 32.61 61.17 80.98 88.63 95.13 97.39 98.33 99.17 2.61 1.67 0.83 791984.0 36.62 64.42 83.11 89.83 95.42 97.24 98.09 99.00 2.76 1.91 1.00
8 2021202207 Apr 2021 to Mar 2022 (Period 07) CrossCountry 68710.0 29.20 57.68 79.08 87.82 95.14 97.32 98.24 99.14 2.68 1.76 0.86 803941.0 36.19 64.11 82.89 89.68 95.38 97.23 98.08 98.99 2.77 1.92 1.01
8 2021202208 Apr 2021 to Mar 2022 (Period 08) CrossCountry 68817.0 24.48 50.58 72.85 83.22 92.95 96.10 97.46 98.86 3.90 2.54 1.14 814540.0 35.51 63.39 82.30 89.23 95.17 97.11 98.00 98.96 2.89 2.00 1.04
8 2021202209 Apr 2021 to Mar 2022 (Period 09) CrossCountry 63209.0 22.64 46.71 68.16 78.92 89.79 93.83 95.77 97.86 6.17 4.23 2.14 819085.0 34.50 62.11 81.13 88.31 94.62 96.75 97.75 98.84 3.25 2.25 1.16
8 2021202210 Apr 2021 to Mar 2022 (Period 10) CrossCountry 52023.0 33.78 61.02 79.29 86.81 94.04 96.65 97.92 99.07 3.35 2.08 0.93 817761.0 34.38 61.96 80.91 88.11 94.52 96.70 97.74 98.85 3.30 2.26 1.15
8 2021202211 Apr 2021 to Mar 2022 (Period 11) CrossCountry 58851.0 35.02 64.38 83.40 90.37 95.59 97.48 98.48 99.28 2.52 1.52 0.72 819055.0 34.10 61.83 80.88 88.17 94.58 96.76 97.80 98.89 3.24 2.20 1.11
8 2021202212 Apr 2021 to Mar 2022 (Period 12) CrossCountry 53823.0 28.90 55.68 75.86 84.31 91.72 94.34 95.66 97.66 5.66 4.34 2.34 814924.0 33.23 60.90 80.16 87.66 94.29 96.56 97.63 98.80 3.44 2.37 1.20
8 2021202213 Apr 2021 to Mar 2022 (Period 13) CrossCountry 57257.0 32.38 60.56 80.87 88.71 94.64 96.86 97.89 98.82 3.14 2.11 1.18 820020.0 32.42 60.05 79.60 87.32 94.12 96.48 97.58 98.76 3.52 2.42 1.24
8 2022202301 Apr 2022 to Mar 2023 (Period 01) CrossCountry 64980.0 34.72 61.89 80.22 87.46 94.04 96.38 97.71 99.02 3.62 2.29 0.98 818921.0 31.76 59.28 78.93 86.83 93.88 96.32 97.50 98.73 3.68 2.50 1.27
8 2022202302 Apr 2022 to Mar 2023 (Period 02) CrossCountry 64993.0 33.00 60.80 80.48 88.20 95.21 97.33 98.32 99.25 2.67 1.68 0.75 820379.0 31.28 58.76 78.59 86.65 93.87 96.35 97.53 98.76 3.65 2.47 1.24
8 2022202303 Apr 2022 to Mar 2023 (Period 03) CrossCountry 61793.0 29.61 55.40 74.82 83.36 91.54 94.50 96.03 97.72 5.50 3.97 2.28 814308.0 30.88 58.19 78.10 86.28 93.64 96.19 97.41 98.67 3.81 2.59 1.33
8 2022202304 Apr 2022 to Mar 2023 (Period 04) CrossCountry 63234.0 22.26 44.43 65.58 76.35 87.81 92.03 94.39 97.14 7.97 5.61 2.86 809977.0 30.09 56.98 77.06 85.51 93.21 95.89 97.19 98.58 4.11 2.81 1.42
8 2022202305 Apr 2022 to Mar 2023 (Period 05) CrossCountry 56707.0 20.51 41.61 61.78 73.05 86.17 91.35 93.96 96.91 8.65 6.04 3.09 799966.0 29.11 55.50 75.66 84.44 92.65 95.55 96.97 98.47 4.45 3.03 1.53
8 2022202306 Apr 2022 to Mar 2023 (Period 06) CrossCountry 67929.0 26.08 51.04 71.99 82.21 91.93 95.30 97.01 98.76 4.70 2.99 1.24 802326.0 28.57 54.66 74.92 83.91 92.38 95.37 96.86 98.44 4.63 3.14 1.56
8 2022202307 Apr 2022 to Mar 2023 (Period 07) CrossCountry 62547.0 25.73 50.69 72.07 82.02 91.83 95.16 97.00 98.73 4.84 3.00 1.27 796163.0 28.29 54.09 74.33 83.42 92.10 95.19 96.75 98.40 4.81 3.25 1.60
8 2022202308 Apr 2022 to Mar 2023 (Period 08) CrossCountry 60336.0 19.40 40.75 61.90 73.86 86.19 91.20 93.87 96.94 8.80 6.13 3.06 787682.0 27.95 53.38 73.51 82.71 91.58 94.80 96.47 98.25 5.20 3.53 1.75
8 2022202309 Apr 2022 to Mar 2023 (Period 09) CrossCountry 63056.0 18.19 40.12 62.79 75.39 88.35 92.96 95.35 97.77 7.04 4.65 2.23 787529.0 27.59 52.85 73.08 82.43 91.46 94.73 96.44 98.24 5.27 3.56 1.76
8 2022202310 Apr 2022 to Mar 2023 (Period 10) CrossCountry 35140.0 23.53 47.39 68.25 77.84 88.64 92.57 95.09 97.90 7.43 4.91 2.10 770646.0 26.99 52.05 72.44 81.92 91.16 94.51 96.28 98.17 5.49 3.72 1.83
8 2022202311 Apr 2022 to Mar 2023 (Period 11) CrossCountry 64086.0 24.09 48.91 71.69 82.27 92.19 95.43 96.93 98.77 4.57 3.07 1.23 775881.0 26.14 50.85 71.55 81.31 90.91 94.36 96.16 98.14 5.64 3.84 1.86
8 2022202312 Apr 2022 to Mar 2023 (Period 12) CrossCountry 67208.0 27.73 53.45 75.40 85.21 93.77 96.33 97.56 98.85 3.67 2.44 1.15 789266.0 26.09 50.75 71.58 81.44 91.10 94.53 96.32 98.23 5.47 3.68 1.77
8 2022202313 Apr 2022 to Mar 2023 (Period 13) CrossCountry 61640.0 27.41 53.21 74.74 84.25 92.92 95.86 97.22 98.71 4.14 2.78 1.29 793649.0 25.74 50.23 71.16 81.13 90.98 94.46 96.27 98.23 5.54 3.73 1.77
8 2023202401 Apr 2023 to Mar 2024 (Period 01) CrossCountry 68091.0 26.75 52.61 74.07 83.60 92.01 95.09 96.64 98.49 4.91 3.36 1.51 796760.0 25.09 49.48 70.67 80.82 90.82 94.36 96.19 98.18 5.64 3.81 1.82
8 2023202402 Apr 2023 to Mar 2024 (Period 02) CrossCountry 63520.0 26.67 51.97 72.80 82.47 91.83 95.14 96.81 98.38 4.86 3.19 1.62 795287.0 24.57 48.75 70.04 80.35 90.54 94.18 96.06 98.11 5.82 3.94 1.89
8 2023202403 Apr 2023 to Mar 2024 (Period 03) CrossCountry 64898.0 23.17 44.90 64.40 74.19 85.49 90.47 93.07 96.17 9.53 6.93 3.83 798392.0 24.06 47.93 69.21 79.62 90.05 93.85 95.82 97.98 6.15 4.18 2.02
8 2023202404 Apr 2023 to Mar 2024 (Period 04) CrossCountry 68900.0 24.94 47.80 67.84 78.15 88.88 93.02 95.24 97.81 6.98 4.76 2.19 804058.0 24.28 48.19 69.38 79.75 90.13 93.92 95.88 98.04 6.08 4.12 1.96
8 2023202405 Apr 2023 to Mar 2024 (Period 05) CrossCountry 69188.0 27.20 51.37 71.97 81.88 91.64 94.92 96.59 98.42 5.08 3.41 1.58 816539.0 24.79 48.92 70.12 80.40 90.53 94.19 96.08 98.15 5.81 3.92 1.85
8 2023202406 Apr 2023 to Mar 2024 (Period 06) CrossCountry 69248.0 25.13 48.56 69.46 80.11 90.38 94.49 96.63 98.63 5.51 3.37 1.37 817858.0 24.71 48.71 69.91 80.22 90.40 94.12 96.05 98.14 5.88 3.95 1.86
8 2023202407 Apr 2023 to Mar 2024 (Period 07) CrossCountry 67259.0 23.16 45.46 66.24 77.40 88.89 93.16 95.41 97.96 6.84 4.59 2.04 822570.0 24.51 48.29 69.45 79.86 90.17 93.96 95.92 98.08 6.04 4.08 1.92
8 2023202408 Apr 2023 to Mar 2024 (Period 08) CrossCountry 70657.0 18.38 38.55 59.24 70.98 84.70 90.05 93.06 96.64 9.95 6.94 3.36 832891.0 24.36 48.01 69.13 79.54 89.99 93.83 95.83 98.04 6.17 4.17 1.96
8 2023202409 Apr 2023 to Mar 2024 (Period 09) CrossCountry 67630.0 17.77 37.46 58.11 69.76 83.84 89.87 93.34 97.04 10.13 6.66 2.96 837465.0 24.29 47.76 68.72 79.06 89.62 93.58 95.66 97.98 6.42 4.34 2.02
8 2023202410 Apr 2023 to Mar 2024 (Period 10) CrossCountry 65174.0 20.72 43.16 63.83 74.58 86.21 90.87 93.56 96.69 9.13 6.44 3.31 867499.0 24.05 47.43 68.37 78.77 89.40 93.41 95.53 97.88 6.59 4.47 2.12
8 2023202411 Apr 2023 to Mar 2024 (Period 11) CrossCountry 73360.0 24.92 48.52 70.07 80.25 90.51 94.34 96.42 98.53 5.66 3.58 1.47 876773.0 24.12 47.41 68.27 78.64 89.29 93.34 95.50 97.87 6.66 4.50 2.13
8 2023202412 Apr 2023 to Mar 2024 (Period 12) CrossCountry 71084.0 25.25 50.10 71.00 81.01 90.72 94.62 96.47 98.53 5.38 3.53 1.47 880649.0 23.94 47.16 67.94 78.33 89.07 93.22 95.42 97.85 6.78 4.58 2.15
8 2023202413 Apr 2023 to Mar 2024 (Period 13) CrossCountry 77349.0 27.02 52.55 72.91 82.02 91.23 94.63 96.43 98.49 5.37 3.57 1.51 896358.0 23.96 47.21 67.91 78.24 88.99 93.16 95.38 97.85 6.84 4.62 2.15
8 2024202501 Apr 2024 to Mar 2025 (Period 01) CrossCountry 69619.0 25.48 50.57 72.79 82.59 91.33 94.58 96.31 98.36 5.42 3.69 1.64 897886.0 23.87 47.06 67.82 78.17 88.94 93.12 95.36 97.84 6.88 4.64 2.16
8 2024202502 Apr 2024 to Mar 2025 (Period 02) CrossCountry 72701.0 26.75 52.19 73.08 82.76 91.97 95.32 96.82 98.58 4.68 3.18 1.42 907067.0 23.91 47.13 67.89 78.24 88.98 93.16 95.38 97.86 6.84 4.62 2.14
8 2024202503 Apr 2024 to Mar 2025 (Period 03) CrossCountry 78534.0 26.67 52.15 73.10 82.83 92.05 95.26 97.02 98.76 4.74 2.98 1.24 920703.0 24.19 47.72 68.58 78.92 89.49 93.53 95.68 98.06 6.47 4.32 1.94
8 2024202504 Apr 2024 to Mar 2025 (Period 04) CrossCountry 77044.0 23.86 47.54 68.52 79.00 89.44 93.44 95.60 97.93 6.56 4.40 2.07 928847.0 24.11 47.70 68.63 78.98 89.53 93.56 95.71 98.06 6.44 4.29 1.94
8 2024202505 Apr 2024 to Mar 2025 (Period 05) CrossCountry 73560.0 22.27 46.62 68.84 79.75 90.25 94.05 96.00 98.35 5.95 4.00 1.65 933219.0 23.74 47.34 68.40 78.83 89.43 93.49 95.66 98.06 6.51 4.34 1.94
8 2024202506 Apr 2024 to Mar 2025 (Period 06) CrossCountry 70419.0 23.95 48.03 69.17 79.66 90.13 93.89 95.83 97.87 6.11 4.17 2.13 934390.0 23.65 47.30 68.38 78.79 89.41 93.45 95.60 98.00 6.55 4.40 2.00
8 2024202507 Apr 2024 to Mar 2025 (Period 07) CrossCountry 70418.0 19.38 41.83 63.86 75.98 87.93 92.64 95.03 97.76 7.36 4.97 2.24 937549.0 23.36 47.02 68.19 78.68 89.34 93.41 95.57 97.99 6.59 4.43 2.01
8 2024202508 Apr 2024 to Mar 2025 (Period 08) CrossCountry 70324.0 19.23 41.82 63.81 75.40 87.87 92.70 95.14 97.87 7.30 4.86 2.13 937216.0 23.43 47.27 68.54 79.02 89.58 93.61 95.73 98.08 6.39 4.27 1.92
8 2024202509 Apr 2024 to Mar 2025 (Period 09) CrossCountry 74641.0 16.37 35.79 55.25 67.02 81.26 87.77 91.39 95.55 12.23 8.61 4.45 944227.0 23.28 47.07 68.24 78.73 89.33 93.42 95.56 97.96 6.58 4.44 2.04
8 2024202510 Apr 2024 to Mar 2025 (Period 10) CrossCountry 66142.0 23.63 46.90 67.24 77.29 88.04 92.22 94.59 97.38 7.78 5.41 2.62 945195.0 23.48 47.32 68.47 78.92 89.46 93.51 95.63 98.00 6.49 4.37 2.00
8 2024202511 Apr 2024 to Mar 2025 (Period 11) CrossCountry 78159.0 25.58 50.04 70.10 79.88 89.70 93.50 95.55 97.91 6.50 4.45 2.09 949994.0 23.54 47.46 68.48 78.89 89.40 93.44 95.56 97.95 6.56 4.44 2.05
8 2024202512 Apr 2024 to Mar 2025 (Period 12) CrossCountry 79746.0 28.47 54.83 76.31 85.61 93.72 96.51 97.84 99.13 3.49 2.16 0.87 958656.0 23.82 47.87 68.95 79.30 89.66 93.61 95.68 98.01 6.39 4.32 1.99
8 2024202513 Apr 2024 to Mar 2025 (Period 13) CrossCountry 83886.0 29.07 56.07 77.03 85.84 93.29 95.86 97.29 98.89 4.14 2.71 1.11 965193.0 24.02 48.21 69.33 79.64 89.85 93.73 95.76 98.05 6.27 4.24 1.95
8 2025202601 Apr 2025 to Mar 2026 (Period 01) CrossCountry 73124.0 28.72 55.23 75.94 84.72 92.70 95.56 97.12 98.74 4.44 2.88 1.26 968698.0 24.27 48.57 69.58 79.82 89.96 93.80 95.83 98.08 6.20 4.17 1.92
8 2025202602 Apr 2025 to Mar 2026 (Period 02) CrossCountry 79121.0 25.61 50.62 71.79 81.45 90.76 94.34 96.35 98.55 5.66 3.65 1.45 975118.0 24.20 48.47 69.50 79.73 89.87 93.73 95.79 98.08 6.27 4.21 1.92
8 2025202603 Apr 2025 to Mar 2026 (Period 03) CrossCountry 80227.0 23.08 46.10 66.92 77.02 87.81 92.11 94.45 97.64 7.89 5.55 2.36 976811.0 23.91 47.98 69.00 79.26 89.53 93.48 95.59 97.99 6.52 4.41 2.01
8 2025202604 Apr 2025 to Mar 2026 (Period 04) CrossCountry 78061.0 21.11 43.08 63.86 74.24 85.41 90.09 92.88 96.14 9.91 7.12 3.86 977828.0 23.69 47.62 68.62 78.88 89.20 93.21 95.37 97.84 6.79 4.63 2.16
8 2025202605 Apr 2025 to Mar 2026 (Period 05) CrossCountry 77690.0 22.81 46.20 66.72 76.95 87.16 91.42 94.09 97.20 8.58 5.91 2.80 981958.0 23.72 47.58 68.46 78.66 88.96 93.01 95.22 97.76 6.99 4.78 2.24
8 2025202606 Apr 2025 to Mar 2026 (Period 06) CrossCountry 75256.0 24.71 48.83 69.81 80.18 90.11 94.08 96.07 98.35 5.92 3.93 1.65 986795.0 23.78 47.65 68.51 78.70 88.97 93.02 95.24 97.79 6.98 4.76 2.21
8 2025202607 Apr 2025 to Mar 2026 (Period 07) CrossCountry 78949.0 23.56 47.83 69.85 80.37 90.60 94.41 96.53 98.71 5.59 3.47 1.29 995326.0 24.08 48.07 68.94 79.03 89.17 93.16 95.36 97.87 6.84 4.64 2.13
8 2025202608 Apr 2025 to Mar 2026 (Period 08) CrossCountry 78727.0 19.31 40.88 62.48 74.48 87.12 92.04 94.66 97.50 7.96 5.34 2.50 1003729.0 24.04 47.95 68.80 78.93 89.10 93.11 95.32 97.84 6.89 4.68 2.16
8 2025202609 Apr 2025 to Mar 2026 (Period 09) CrossCountry 78888.0 15.54 34.48 55.41 67.69 81.77 88.05 91.63 96.11 11.95 8.37 3.89 1007976.0 23.94 47.79 68.75 78.93 89.11 93.10 95.32 97.87 6.90 4.68 2.13
8 2025202610 Apr 2025 to Mar 2026 (Period 10) CrossCountry 68553.0 22.41 44.43 65.56 76.09 87.00 91.68 94.34 97.64 8.32 5.66 2.36 1010387.0 23.86 47.62 68.63 78.84 89.04 93.06 95.30 97.89 6.94 4.70 2.11
8 2025202611 Apr 2025 to Mar 2026 (Period 11) CrossCountry 79776.0 27.07 51.48 72.33 81.97 91.31 94.84 96.65 98.56 5.16 3.35 1.44 1012004.0 23.98 47.74 68.81 79.01 89.16 93.17 95.39 97.94 6.83 4.61 2.06
8 2025202612 Apr 2025 to Mar 2026 (Period 12) CrossCountry 80612.0 26.62 52.06 73.21 82.95 91.69 95.10 96.84 98.78 4.90 3.16 1.22 1012870.0 23.84 47.53 68.57 78.80 89.01 93.06 95.31 97.91 6.94 4.69 2.09
8 2025202613 Apr 2025 to Mar 2026 (Period 13) CrossCountry 88727.0 25.68 50.22 70.99 80.44 89.84 93.72 95.81 98.12 6.28 4.19 1.88 1017711.0 23.57 47.06 68.09 78.37 88.73 92.89 95.19 97.85 7.11 4.81 2.15
8 2026202701 Apr 2026 to Mar 2027 (Period 01) CrossCountry 95697.0 24.59 48.15 69.40 79.95 89.87 93.46 95.58 98.36 6.54 4.42 1.64 1040284.0 23.30 46.58 67.66 78.06 88.55 92.75 95.09 97.84 7.25 4.91 2.16
8 2026202702 Apr 2026 to Mar 2027 (Period 02) CrossCountry 80307.0 21.69 42.94 62.17 72.37 83.22 88.33 91.64 95.78 11.67 8.36 4.22 1041470.0 23.00 46.00 66.92 77.37 87.97 92.29 94.73 97.62 7.71 5.27 2.38
9 2014201501 Apr 2014 to Mar 2015 (Period 01) East Midlands Railway 82186.0 36.50 62.89 81.79 89.77 96.24 98.09 98.92 99.53 1.91 1.08 0.47 82186.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201502 Apr 2014 to Mar 2015 (Period 02) East Midlands Railway 88870.0 35.99 62.72 81.69 89.57 95.94 97.64 98.48 99.23 2.36 1.52 0.77 171056.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201503 Apr 2014 to Mar 2015 (Period 03) East Midlands Railway 89047.0 36.62 63.51 82.54 90.27 96.35 98.10 98.83 99.55 1.90 1.17 0.45 260103.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201504 Apr 2014 to Mar 2015 (Period 04) East Midlands Railway 90144.0 35.75 61.74 81.15 89.11 95.94 97.95 98.75 99.49 2.05 1.25 0.51 350247.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201505 Apr 2014 to Mar 2015 (Period 05) East Midlands Railway 83292.0 35.21 61.79 81.83 90.01 96.66 98.43 99.10 99.67 1.57 0.90 0.33 433539.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201506 Apr 2014 to Mar 2015 (Period 06) East Midlands Railway 89914.0 37.36 64.81 83.95 91.30 97.12 98.67 99.33 99.80 1.33 0.67 0.20 523453.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201507 Apr 2014 to Mar 2015 (Period 07) East Midlands Railway 88816.0 35.95 62.66 82.07 89.90 96.25 97.99 98.78 99.49 2.01 1.22 0.51 612269.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201508 Apr 2014 to Mar 2015 (Period 08) East Midlands Railway 88557.0 26.52 49.54 71.18 82.35 93.38 96.53 97.97 99.22 3.47 2.03 0.78 700826.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201509 Apr 2014 to Mar 2015 (Period 09) East Midlands Railway 89117.0 31.24 55.47 76.42 86.40 95.27 97.78 98.75 99.59 2.22 1.25 0.41 789943.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201510 Apr 2014 to Mar 2015 (Period 10) East Midlands Railway 81468.0 35.42 59.90 79.50 88.01 95.57 97.74 98.53 99.49 2.26 1.47 0.51 871411.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201511 Apr 2014 to Mar 2015 (Period 11) East Midlands Railway 88542.0 38.11 63.23 82.23 89.98 96.19 97.83 98.57 99.33 2.17 1.43 0.67 959953.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201512 Apr 2014 to Mar 2015 (Period 12) East Midlands Railway 89552.0 39.72 65.27 84.13 91.35 96.86 98.33 99.02 99.61 1.67 0.98 0.39 1049505.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2014201513 Apr 2014 to Mar 2015 (Period 13) East Midlands Railway 98240.0 40.36 66.58 85.26 92.17 97.36 98.65 99.15 99.67 1.35 0.85 0.33 1147745.0 35.79 61.60 81.10 89.28 96.10 97.99 98.79 99.52 2.01 1.21 0.48
9 2015201601 Apr 2015 to Mar 2016 (Period 01) East Midlands Railway 103680.0 43.41 70.05 87.35 93.39 97.65 98.72 99.17 99.62 1.28 0.83 0.38 1169239.0 36.42 62.26 81.60 89.61 96.23 98.04 98.81 99.52 1.96 1.19 0.48
9 2015201602 Apr 2015 to Mar 2016 (Period 02) East Midlands Railway 90273.0 43.06 69.67 87.20 93.32 97.84 99.01 99.43 99.82 0.99 0.57 0.18 1170642.0 36.96 62.79 82.03 89.89 96.37 98.15 98.88 99.57 1.85 1.12 0.43
9 2015201603 Apr 2015 to Mar 2016 (Period 03) East Midlands Railway 91659.0 41.84 69.08 86.32 92.53 97.40 98.78 99.29 99.72 1.22 0.71 0.28 1173254.0 37.37 63.23 82.33 90.07 96.45 98.20 98.92 99.58 1.80 1.08 0.42
9 2015201604 Apr 2015 to Mar 2016 (Period 04) East Midlands Railway 90597.0 38.25 64.35 82.84 90.20 96.35 98.09 98.82 99.41 1.91 1.18 0.59 1173707.0 37.56 63.43 82.45 90.15 96.49 98.21 98.93 99.58 1.79 1.07 0.42
9 2015201605 Apr 2015 to Mar 2016 (Period 05) East Midlands Railway 90015.0 39.47 65.77 84.21 91.12 96.61 98.17 98.79 99.49 1.83 1.21 0.51 1180430.0 37.87 63.72 82.63 90.24 96.48 98.19 98.90 99.56 1.81 1.10 0.44
9 2015201606 Apr 2015 to Mar 2016 (Period 06) East Midlands Railway 90580.0 41.04 67.58 85.63 92.16 96.94 98.31 98.92 99.49 1.69 1.08 0.51 1181096.0 38.16 63.94 82.76 90.31 96.47 98.17 98.87 99.54 1.83 1.13 0.46
9 2015201607 Apr 2015 to Mar 2016 (Period 07) East Midlands Railway 91446.0 37.18 63.09 82.56 90.23 96.44 98.16 98.92 99.59 1.84 1.08 0.41 1183726.0 38.25 63.97 82.80 90.33 96.48 98.18 98.88 99.55 1.82 1.12 0.45
9 2015201608 Apr 2015 to Mar 2016 (Period 08) East Midlands Railway 90485.0 28.64 52.73 73.43 83.94 94.21 97.34 98.62 99.49 2.66 1.38 0.51 1185654.0 38.39 64.19 82.95 90.44 96.54 98.24 98.93 99.57 1.76 1.07 0.43
9 2015201609 Apr 2015 to Mar 2016 (Period 09) East Midlands Railway 89325.0 28.49 51.47 72.07 83.11 93.95 97.16 98.37 99.36 2.84 1.63 0.64 1185862.0 38.18 63.88 82.62 90.19 96.44 98.19 98.90 99.55 1.81 1.10 0.45
9 2015201610 Apr 2015 to Mar 2016 (Period 10) East Midlands Railway 82877.0 36.46 62.80 82.62 90.87 97.16 98.70 99.36 99.80 1.30 0.64 0.20 1187271.0 38.25 64.08 82.84 90.39 96.55 98.26 98.96 99.57 1.74 1.04 0.43
9 2015201611 Apr 2015 to Mar 2016 (Period 11) East Midlands Railway 90799.0 36.77 63.13 82.39 90.05 96.35 98.07 98.80 99.38 1.93 1.20 0.62 1189528.0 38.15 64.07 82.85 90.39 96.56 98.28 98.97 99.57 1.72 1.03 0.43
9 2015201612 Apr 2015 to Mar 2016 (Period 12) East Midlands Railway 91068.0 39.81 66.97 85.33 92.12 97.35 98.65 99.23 99.76 1.35 0.77 0.24 1191044.0 38.16 64.20 82.94 90.45 96.60 98.30 98.99 99.58 1.70 1.01 0.42
9 2015201613 Apr 2015 to Mar 2016 (Period 13) East Midlands Railway 82944.0 40.65 67.14 85.21 91.63 96.62 98.03 98.74 99.45 1.97 1.26 0.55 1175748.0 38.15 64.21 82.91 90.39 96.54 98.25 98.96 99.57 1.75 1.04 0.43
9 2016201701 Apr 2016 to Mar 2017 (Period 01) East Midlands Railway 97262.0 42.88 70.10 87.59 93.47 97.65 98.71 99.21 99.67 1.29 0.79 0.33 1169330.0 38.08 64.18 82.90 90.38 96.53 98.25 98.96 99.57 1.75 1.04 0.43
9 2016201702 Apr 2016 to Mar 2017 (Period 02) East Midlands Railway 90885.0 40.25 66.40 84.15 91.24 96.81 98.45 99.04 99.60 1.55 0.96 0.40 1169942.0 37.86 63.93 82.67 90.22 96.46 98.20 98.93 99.55 1.80 1.07 0.45
9 2016201703 Apr 2016 to Mar 2017 (Period 03) East Midlands Railway 91170.0 36.61 62.65 81.61 89.19 95.73 97.60 98.47 99.29 2.40 1.53 0.71 1169453.0 37.45 63.43 82.30 89.96 96.32 98.11 98.87 99.52 1.89 1.13 0.48
9 2016201704 Apr 2016 to Mar 2017 (Period 04) East Midlands Railway 91435.0 37.98 65.05 83.38 90.56 96.55 98.23 98.95 99.54 1.77 1.05 0.46 1170291.0 37.43 63.49 82.35 89.99 96.34 98.12 98.88 99.53 1.88 1.12 0.47
9 2016201705 Apr 2016 to Mar 2017 (Period 05) East Midlands Railway 91088.0 36.76 62.90 82.07 89.98 96.62 98.49 99.14 99.66 1.51 0.86 0.34 1171364.0 37.22 63.26 82.18 89.90 96.34 98.15 98.91 99.54 1.85 1.09 0.46
9 2016201706 Apr 2016 to Mar 2017 (Period 06) East Midlands Railway 90672.0 35.63 61.62 81.15 89.32 96.12 97.86 98.67 99.38 2.14 1.33 0.62 1171456.0 36.80 62.80 81.83 89.68 96.28 98.11 98.89 99.54 1.89 1.11 0.46
9 2016201707 Apr 2016 to Mar 2017 (Period 07) East Midlands Railway 89129.0 35.48 61.01 81.10 89.74 96.56 98.27 98.95 99.58 1.73 1.05 0.42 1169139.0 36.67 62.65 81.72 89.64 96.29 98.12 98.89 99.54 1.88 1.11 0.46
9 2016201708 Apr 2016 to Mar 2017 (Period 08) East Midlands Railway 87542.0 28.59 51.46 73.03 84.00 94.01 96.85 98.03 99.13 3.15 1.97 0.87 1166196.0 36.69 62.58 81.71 89.66 96.28 98.09 98.85 99.51 1.91 1.15 0.49
9 2016201709 Apr 2016 to Mar 2017 (Period 09) East Midlands Railway 89631.0 26.41 48.41 69.38 80.96 92.49 95.97 97.49 98.86 4.03 2.51 1.14 1166502.0 36.53 62.34 81.50 89.49 96.16 98.00 98.78 99.47 2.00 1.22 0.53
9 2016201710 Apr 2016 to Mar 2017 (Period 10) East Midlands Railway 84648.0 36.04 62.63 82.46 90.43 96.91 98.53 99.16 99.70 1.47 0.84 0.30 1168273.0 36.50 62.33 81.49 89.46 96.15 97.99 98.76 99.46 2.01 1.24 0.54
9 2016201711 Apr 2016 to Mar 2017 (Period 11) East Midlands Railway 93511.0 38.86 65.82 85.07 92.30 97.72 98.98 99.39 99.79 1.02 0.61 0.21 1170985.0 36.66 62.54 81.71 89.65 96.26 98.06 98.81 99.50 1.94 1.19 0.50
9 2016201712 Apr 2016 to Mar 2017 (Period 12) East Midlands Railway 92794.0 38.05 64.36 83.29 90.53 96.21 97.94 98.70 99.38 2.06 1.30 0.62 1172711.0 36.53 62.34 81.55 89.52 96.17 98.00 98.77 99.47 2.00 1.23 0.53
9 2016201713 Apr 2016 to Mar 2017 (Period 13) East Midlands Railway 93076.0 41.48 68.69 86.88 93.39 98.04 99.05 99.42 99.76 0.95 0.58 0.24 1182843.0 36.63 62.51 81.72 89.68 96.28 98.08 98.82 99.49 1.92 1.18 0.51
9 2017201801 Apr 2017 to Mar 2018 (Period 01) East Midlands Railway 100469.0 41.73 69.05 87.23 93.53 97.77 98.87 99.26 99.66 1.13 0.74 0.34 1186050.0 36.55 62.44 81.70 89.69 96.30 98.10 98.83 99.49 1.90 1.17 0.51
9 2017201802 Apr 2017 to Mar 2018 (Period 02) East Midlands Railway 100209.0 40.30 66.75 84.95 91.92 96.92 98.37 99.02 99.58 1.63 0.98 0.42 1195374.0 36.58 62.50 81.79 89.76 96.31 98.09 98.83 99.49 1.91 1.17 0.51
9 2017201803 Apr 2017 to Mar 2018 (Period 03) East Midlands Railway 100375.0 37.16 62.46 81.66 89.31 95.51 97.46 98.48 99.42 2.54 1.52 0.58 1204579.0 36.63 62.48 81.79 89.77 96.29 98.08 98.83 99.50 1.92 1.17 0.50
9 2017201804 Apr 2017 to Mar 2018 (Period 04) East Midlands Railway 100595.0 38.30 64.55 83.67 91.36 97.15 98.72 99.26 99.72 1.28 0.74 0.28 1213739.0 36.66 62.46 81.83 89.84 96.34 98.12 98.85 99.51 1.88 1.15 0.49
9 2017201805 Apr 2017 to Mar 2018 (Period 05) East Midlands Railway 100535.0 38.26 64.79 84.31 91.98 97.42 98.63 99.18 99.69 1.37 0.82 0.31 1223186.0 36.79 62.62 82.01 90.01 96.41 98.13 98.86 99.52 1.87 1.14 0.48
9 2017201806 Apr 2017 to Mar 2018 (Period 06) East Midlands Railway 101619.0 39.83 66.61 85.33 92.56 97.55 98.80 99.32 99.81 1.20 0.68 0.19 1234133.0 37.12 63.02 82.35 90.27 96.52 98.21 98.91 99.55 1.79 1.09 0.45
9 2017201807 Apr 2017 to Mar 2018 (Period 07) East Midlands Railway 99608.0 33.95 58.86 79.24 88.22 95.76 97.99 98.85 99.55 2.01 1.15 0.45 1244612.0 36.99 62.83 82.19 90.14 96.46 98.19 98.90 99.55 1.81 1.10 0.45
9 2017201808 Apr 2017 to Mar 2018 (Period 08) East Midlands Railway 99523.0 28.74 51.16 72.49 83.49 93.96 97.07 98.30 99.38 2.93 1.70 0.62 1256593.0 36.92 62.70 82.06 90.04 96.43 98.19 98.91 99.56 1.81 1.09 0.44
9 2017201809 Apr 2017 to Mar 2018 (Period 09) East Midlands Railway 99867.0 27.92 50.64 72.55 84.25 94.42 97.21 98.49 99.45 2.79 1.51 0.55 1266829.0 36.95 62.76 82.21 90.23 96.55 98.27 98.98 99.61 1.73 1.02 0.39
9 2017201810 Apr 2017 to Mar 2018 (Period 10) East Midlands Railway 89840.0 31.83 56.27 77.29 86.80 94.95 97.20 98.18 99.11 2.80 1.82 0.89 1272021.0 36.65 62.31 81.84 89.97 96.42 98.18 98.91 99.56 1.82 1.09 0.44
9 2017201811 Apr 2017 to Mar 2018 (Period 11) East Midlands Railway 96858.0 34.93 59.94 80.55 89.27 95.93 97.70 98.59 99.31 2.30 1.41 0.69 1275368.0 36.36 61.87 81.51 89.75 96.28 98.08 98.85 99.53 1.92 1.15 0.47
9 2017201812 Apr 2017 to Mar 2018 (Period 12) East Midlands Railway 94459.0 33.41 57.69 78.13 86.95 94.26 96.39 97.55 98.79 3.61 2.45 1.21 1277033.0 36.02 61.38 81.13 89.49 96.14 97.97 98.77 99.48 2.03 1.23 0.52
9 2017201813 Apr 2017 to Mar 2018 (Period 13) East Midlands Railway 99679.0 34.20 58.99 79.68 88.74 96.25 98.27 99.00 99.61 1.73 1.00 0.39 1283636.0 35.48 60.67 80.60 89.15 96.01 97.91 98.74 99.47 2.09 1.26 0.53
9 2018201901 Apr 2018 to Mar 2019 (Period 01) East Midlands Railway 100045.0 37.26 62.74 82.24 89.99 96.14 97.92 98.69 99.43 2.08 1.31 0.57 1283212.0 35.13 60.17 80.21 88.87 95.88 97.84 98.70 99.46 2.16 1.30 0.54
9 2018201902 Apr 2018 to Mar 2019 (Period 02) East Midlands Railway 100580.0 35.69 60.69 80.66 88.89 95.64 97.69 98.69 99.50 2.31 1.31 0.50 1283583.0 34.77 59.70 79.87 88.63 95.78 97.79 98.67 99.45 2.21 1.33 0.55
9 2018201903 Apr 2018 to Mar 2019 (Period 03) East Midlands Railway 99418.0 36.57 60.61 79.42 87.97 95.43 97.54 98.46 99.38 2.46 1.54 0.62 1282626.0 34.72 59.55 79.70 88.53 95.78 97.79 98.67 99.45 2.21 1.33 0.55
9 2018201904 Apr 2018 to Mar 2019 (Period 04) East Midlands Railway 99483.0 33.52 56.42 75.38 84.71 93.73 96.64 97.86 99.15 3.36 2.14 0.85 1281514.0 34.35 58.92 79.05 88.01 95.51 97.63 98.56 99.40 2.37 1.44 0.60
9 2018201905 Apr 2018 to Mar 2019 (Period 05) East Midlands Railway 94719.0 31.69 54.74 73.74 82.86 92.85 96.34 97.88 99.17 3.66 2.12 0.83 1275698.0 33.84 58.15 78.24 87.31 95.16 97.46 98.46 99.36 2.54 1.54 0.64
9 2018201906 Apr 2018 to Mar 2019 (Period 06) East Midlands Railway 92394.0 36.15 60.49 80.01 88.45 95.35 97.30 98.22 99.18 2.70 1.78 0.82 1266473.0 33.53 57.64 77.80 86.97 94.98 97.34 98.37 99.31 2.66 1.63 0.69
9 2018201907 Apr 2018 to Mar 2019 (Period 07) East Midlands Railway 95616.0 32.89 55.70 75.47 84.82 93.61 96.50 97.78 99.04 3.50 2.22 0.96 1262481.0 33.45 57.39 77.51 86.71 94.82 97.22 98.29 99.27 2.78 1.71 0.73
9 2018201908 Apr 2018 to Mar 2019 (Period 08) East Midlands Railway 99172.0 27.36 48.30 68.98 80.38 92.02 95.61 97.33 99.00 4.39 2.67 1.00 1262130.0 33.34 57.17 77.24 86.47 94.67 97.11 98.22 99.24 2.89 1.78 0.76
9 2018201909 Apr 2018 to Mar 2019 (Period 09) East Midlands Railway 98777.0 26.33 46.36 67.04 78.96 91.41 95.73 97.46 98.95 4.27 2.54 1.05 1261040.0 33.22 56.84 76.81 86.06 94.43 96.99 98.13 99.20 3.01 1.87 0.80
9 2018201910 Apr 2018 to Mar 2019 (Period 10) East Midlands Railway 88805.0 33.50 56.82 77.13 86.65 95.20 97.66 98.63 99.42 2.34 1.37 0.58 1260005.0 33.34 56.88 76.80 86.05 94.45 97.02 98.17 99.23 2.98 1.83 0.77
9 2018201911 Apr 2018 to Mar 2019 (Period 11) East Midlands Railway 99826.0 35.85 60.89 81.13 90.08 96.91 98.46 99.05 99.58 1.54 0.95 0.42 1262973.0 33.42 56.96 76.85 86.12 94.53 97.09 98.20 99.25 2.91 1.80 0.75
9 2018201912 Apr 2018 to Mar 2019 (Period 12) East Midlands Railway 99063.0 35.96 60.72 80.71 89.47 96.47 98.36 99.10 99.67 1.64 0.90 0.33 1267577.0 33.62 57.20 77.06 86.32 94.70 97.24 98.32 99.31 2.76 1.68 0.69
9 2018201913 Apr 2018 to Mar 2019 (Period 13) East Midlands Railway 101106.0 37.88 63.01 81.52 89.51 95.70 97.40 98.26 99.12 2.60 1.74 0.88 1269004.0 33.91 57.52 77.21 86.38 94.66 97.17 98.26 99.28 2.83 1.74 0.72
9 2019202001 Apr 2019 to Mar 2020 (Period 01) East Midlands Railway 97266.0 39.32 64.35 83.64 91.17 96.82 98.41 98.98 99.59 1.59 1.02 0.41 97266.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202002 Apr 2019 to Mar 2020 (Period 02) East Midlands Railway 99929.0 38.22 63.11 82.15 90.05 96.39 98.08 98.83 99.58 1.92 1.17 0.42 197195.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202003 Apr 2019 to Mar 2020 (Period 03) East Midlands Railway 99031.0 36.47 60.60 79.72 88.06 95.31 97.54 98.52 99.36 2.46 1.48 0.64 296226.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202004 Apr 2019 to Mar 2020 (Period 04) East Midlands Railway 99296.0 36.30 60.19 79.49 88.01 95.43 97.68 98.64 99.47 2.32 1.36 0.53 395522.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202005 Apr 2019 to Mar 2020 (Period 05) East Midlands Railway 93061.0 35.24 58.69 77.06 85.42 93.37 96.25 97.52 98.91 3.75 2.48 1.09 488583.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202006 Apr 2019 to Mar 2020 (Period 06) East Midlands Railway 99713.0 37.08 60.89 80.35 88.87 95.76 97.88 98.75 99.47 2.12 1.25 0.53 588296.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202007 Apr 2019 to Mar 2020 (Period 07) East Midlands Railway 100347.0 32.17 55.40 75.11 84.78 93.67 96.60 97.91 99.03 3.40 2.09 0.97 688643.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202008 Apr 2019 to Mar 2020 (Period 08) East Midlands Railway 98562.0 27.19 48.15 68.62 79.98 91.77 95.87 97.55 99.03 4.13 2.45 0.97 787205.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202009 Apr 2019 to Mar 2020 (Period 09) East Midlands Railway 98323.0 25.63 46.15 65.94 77.64 90.76 95.07 96.88 98.68 4.93 3.12 1.32 885528.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202010 Apr 2019 to Mar 2020 (Period 10) East Midlands Railway 87889.0 31.69 53.98 73.05 83.00 93.13 96.44 97.81 99.03 3.56 2.19 0.97 973417.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202011 Apr 2019 to Mar 2020 (Period 11) East Midlands Railway 100587.0 34.23 57.64 77.63 87.27 95.60 97.90 98.82 99.53 2.10 1.18 0.47 1074004.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202012 Apr 2019 to Mar 2020 (Period 12) East Midlands Railway 97434.0 33.19 55.54 74.76 84.48 93.62 96.88 98.17 99.33 3.12 1.83 0.67 1171438.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
9 2019202013 Apr 2019 to Mar 2020 (Period 13) East Midlands Railway 95633.0 44.83 68.80 84.76 91.25 96.67 98.25 98.94 99.57 1.75 1.06 0.43 1267071.0 34.74 57.97 77.12 86.18 94.50 97.15 98.26 99.28 2.85 1.74 0.72
9 2020202101 Apr 2020 to Mar 2021 (Period 01) East Midlands Railway 67975.0 61.62 85.72 95.26 97.61 99.10 99.58 99.72 99.88 0.42 0.28 0.12 1237780.0 35.85 58.99 77.61 86.41 94.57 97.19 98.29 99.29 2.81 1.71 0.71
9 2020202102 Apr 2020 to Mar 2021 (Period 02) East Midlands Railway 67638.0 57.60 81.59 92.70 95.71 98.26 99.11 99.48 99.83 0.89 0.52 0.17 1205489.0 36.88 59.92 78.08 86.63 94.63 97.22 98.31 99.29 2.78 1.69 0.71
9 2020202103 Apr 2020 to Mar 2021 (Period 03) East Midlands Railway 76821.0 56.00 80.38 92.14 95.56 98.16 98.84 99.17 99.56 1.16 0.83 0.44 1183279.0 38.15 61.19 78.85 87.09 94.80 97.30 98.35 99.30 2.70 1.65 0.70
9 2020202104 Apr 2020 to Mar 2021 (Period 04) East Midlands Railway 76633.0 54.73 79.05 91.72 95.56 98.10 98.86 99.17 99.53 1.14 0.83 0.47 1160616.0 39.41 62.46 79.65 87.57 94.96 97.37 98.38 99.31 2.63 1.62 0.69
9 2020202105 Apr 2020 to Mar 2021 (Period 05) East Midlands Railway 78173.0 50.07 74.57 89.21 94.19 97.95 99.01 99.38 99.72 0.99 0.62 0.28 1145728.0 40.47 63.59 80.51 88.20 95.30 97.57 98.51 99.37 2.43 1.49 0.63
9 2020202106 Apr 2020 to Mar 2021 (Period 06) East Midlands Railway 88487.0 48.44 73.72 88.74 93.81 97.68 98.81 99.22 99.60 1.19 0.78 0.40 1134502.0 41.39 64.62 81.16 88.58 95.44 97.64 98.55 99.38 2.36 1.45 0.62
9 2020202107 Apr 2020 to Mar 2021 (Period 07) East Midlands Railway 97126.0 47.28 71.93 87.51 93.11 97.31 98.65 99.25 99.69 1.35 0.75 0.31 1131281.0 42.71 66.06 82.25 89.30 95.76 97.82 98.66 99.43 2.18 1.34 0.57
9 2020202108 Apr 2020 to Mar 2021 (Period 08) East Midlands Railway 90720.0 41.16 64.37 82.01 89.68 96.29 98.10 98.87 99.54 1.90 1.13 0.46 1123439.0 43.95 67.50 83.42 90.15 96.15 98.01 98.78 99.48 1.99 1.22 0.52
9 2020202109 Apr 2020 to Mar 2021 (Period 09) East Midlands Railway 91240.0 46.70 71.12 87.53 93.45 97.58 98.70 99.24 99.69 1.30 0.76 0.31 1116356.0 45.79 69.67 85.30 91.52 96.74 98.33 98.98 99.56 1.67 1.02 0.44
9 2020202110 Apr 2020 to Mar 2021 (Period 10) East Midlands Railway 81612.0 48.41 72.40 87.41 92.83 96.95 98.34 98.99 99.53 1.66 1.01 0.47 1110079.0 47.10 71.12 86.42 92.29 97.04 98.48 99.08 99.60 1.52 0.92 0.40
9 2020202111 Apr 2020 to Mar 2021 (Period 11) East Midlands Railway 82968.0 51.38 74.38 88.40 93.18 97.04 98.32 98.95 99.59 1.68 1.05 0.41 1092460.0 48.61 72.60 87.38 92.82 97.18 98.52 99.09 99.61 1.48 0.91 0.39
9 2020202112 Apr 2020 to Mar 2021 (Period 12) East Midlands Railway 80314.0 51.82 74.83 88.40 93.14 97.43 98.79 99.37 99.74 1.21 0.63 0.26 1075340.0 50.24 74.32 88.60 93.60 97.52 98.69 99.20 99.65 1.31 0.80 0.35
9 2020202113 Apr 2020 to Mar 2021 (Period 13) East Midlands Railway 72814.0 56.53 79.50 91.45 95.26 98.34 99.26 99.59 99.80 0.74 0.41 0.20 1052521.0 51.17 75.18 89.15 93.93 97.65 98.77 99.25 99.66 1.23 0.75 0.34
9 2021202201 Apr 2021 to Mar 2022 (Period 01) East Midlands Railway 99766.0 53.15 77.07 90.59 94.92 98.14 99.02 99.37 99.76 0.98 0.63 0.24 1084312.0 50.70 74.69 88.90 93.79 97.61 98.74 99.23 99.66 1.26 0.77 0.34
9 2021202202 Apr 2021 to Mar 2022 (Period 02) East Midlands Railway 101972.0 40.00 65.03 83.23 90.58 96.38 98.01 98.90 99.59 1.99 1.10 0.41 1118646.0 49.31 73.39 88.15 93.38 97.45 98.65 99.18 99.64 1.35 0.82 0.36
9 2021202203 Apr 2021 to Mar 2022 (Period 03) East Midlands Railway 106119.0 31.40 56.95 78.03 87.06 95.12 97.68 98.72 99.51 2.32 1.28 0.49 1147944.0 47.20 71.40 86.95 92.65 97.19 98.55 99.14 99.64 1.45 0.86 0.36
9 2021202204 Apr 2021 to Mar 2022 (Period 04) East Midlands Railway 96654.0 31.84 57.05 77.78 86.31 94.36 96.90 98.13 99.10 3.10 1.87 0.90 1167965.0 45.44 69.71 85.88 91.94 96.90 98.39 99.06 99.60 1.61 0.94 0.40
9 2021202205 Apr 2021 to Mar 2022 (Period 05) East Midlands Railway 95860.0 33.32 59.39 79.70 88.27 95.63 97.67 98.63 99.45 2.33 1.37 0.55 1185652.0 44.15 68.56 85.16 91.49 96.72 98.29 99.00 99.58 1.71 1.00 0.42
9 2021202206 Apr 2021 to Mar 2022 (Period 06) East Midlands Railway 94691.0 32.10 57.53 78.73 87.75 95.41 97.60 98.64 99.45 2.40 1.36 0.55 1191856.0 42.88 67.30 84.38 91.02 96.55 98.20 98.95 99.57 1.80 1.05 0.43
9 2021202207 Apr 2021 to Mar 2022 (Period 07) East Midlands Railway 95581.0 28.44 51.94 74.08 84.43 93.97 96.75 97.92 99.02 3.25 2.08 0.98 1190311.0 41.36 65.69 83.30 90.32 96.28 98.05 98.85 99.51 1.95 1.15 0.49
9 2021202208 Apr 2021 to Mar 2022 (Period 08) East Midlands Railway 95262.0 26.69 47.95 69.14 80.23 91.97 95.88 97.66 99.19 4.12 2.34 0.81 1194853.0 40.20 64.38 82.27 89.57 95.93 97.87 98.75 99.48 2.13 1.25 0.52
9 2021202209 Apr 2021 to Mar 2022 (Period 09) East Midlands Railway 90295.0 26.11 47.50 68.80 79.98 92.05 95.99 97.75 99.20 4.01 2.25 0.80 1193908.0 38.64 62.58 80.85 88.55 95.52 97.67 98.64 99.45 2.33 1.36 0.55
9 2021202210 Apr 2021 to Mar 2022 (Period 10) East Midlands Railway 89623.0 32.81 57.56 78.16 87.26 95.10 97.55 98.56 99.48 2.45 1.44 0.52 1201919.0 37.54 61.54 80.20 88.16 95.39 97.61 98.61 99.44 2.39 1.39 0.56
9 2021202211 Apr 2021 to Mar 2022 (Period 11) East Midlands Railway 100889.0 36.29 61.80 81.81 89.95 96.53 98.19 98.91 99.57 1.81 1.09 0.43 1219840.0 36.50 60.69 79.78 87.97 95.37 97.61 98.61 99.44 2.39 1.39 0.56
9 2021202212 Apr 2021 to Mar 2022 (Period 12) East Midlands Railway 96876.0 31.99 56.13 76.06 85.38 94.00 96.54 97.76 98.92 3.46 2.24 1.08 1236402.0 35.15 59.41 78.93 87.43 95.13 97.45 98.49 99.38 2.55 1.51 0.62
9 2021202213 Apr 2021 to Mar 2022 (Period 13) East Midlands Railway 93917.0 34.58 59.22 79.43 88.37 95.77 98.02 98.97 99.70 1.98 1.03 0.30 1257505.0 33.87 58.24 78.24 87.04 94.99 97.39 98.47 99.38 2.61 1.53 0.62
9 2022202301 Apr 2022 to Mar 2023 (Period 01) East Midlands Railway 110151.0 34.19 58.51 78.80 88.03 95.63 97.80 98.88 99.60 2.20 1.12 0.40 1267890.0 32.38 56.78 77.32 86.51 94.80 97.30 98.43 99.37 2.70 1.57 0.63
9 2022202302 Apr 2022 to Mar 2023 (Period 02) East Midlands Railway 102431.0 32.77 57.67 78.19 86.89 94.70 97.03 98.26 99.12 2.97 1.74 0.88 1268349.0 31.80 56.19 76.91 86.21 94.66 97.22 98.38 99.34 2.78 1.62 0.66
9 2022202303 Apr 2022 to Mar 2023 (Period 03) East Midlands Railway 94437.0 33.34 58.59 78.87 87.43 95.00 97.56 98.63 99.55 2.44 1.37 0.45 1256667.0 31.95 56.30 76.96 86.24 94.65 97.20 98.37 99.34 2.80 1.63 0.66
9 2022202304 Apr 2022 to Mar 2023 (Period 04) East Midlands Railway 96697.0 29.99 53.41 73.31 82.53 91.59 94.65 96.40 98.18 5.35 3.60 1.82 1256710.0 31.81 56.02 76.62 85.94 94.44 97.03 98.24 99.27 2.97 1.76 0.73
9 2022202305 Apr 2022 to Mar 2023 (Period 05) East Midlands Railway 92013.0 26.52 48.08 67.50 77.82 89.46 94.03 96.33 98.48 5.97 3.67 1.52 1252863.0 31.30 55.18 75.71 85.17 93.98 96.76 98.07 99.20 3.24 1.93 0.80
9 2022202306 Apr 2022 to Mar 2023 (Period 06) East Midlands Railway 105723.0 30.30 53.79 74.92 84.94 94.60 97.48 98.72 99.65 2.52 1.28 0.35 1263895.0 31.16 54.89 75.42 84.96 93.93 96.76 98.08 99.21 3.24 1.92 0.79
9 2022202307 Apr 2022 to Mar 2023 (Period 07) East Midlands Railway 89751.0 30.78 54.14 74.77 84.91 94.37 97.03 98.39 99.40 2.97 1.61 0.60 1258065.0 31.34 55.06 75.48 84.99 93.95 96.78 98.11 99.24 3.22 1.89 0.76
9 2022202308 Apr 2022 to Mar 2023 (Period 08) East Midlands Railway 91811.0 24.21 45.47 66.26 77.79 90.06 94.46 96.67 98.68 5.54 3.33 1.32 1254614.0 31.17 54.90 75.28 84.83 93.82 96.68 98.04 99.20 3.32 1.96 0.80
9 2022202309 Apr 2022 to Mar 2023 (Period 09) East Midlands Railway 94009.0 24.82 46.11 67.57 79.16 91.23 95.25 97.25 98.98 4.75 2.75 1.02 1258328.0 31.06 54.77 75.17 84.75 93.75 96.62 98.00 99.19 3.38 2.00 0.81
9 2022202310 Apr 2022 to Mar 2023 (Period 10) East Midlands Railway 57845.0 26.84 50.25 70.38 79.92 90.31 94.53 96.66 98.55 5.47 3.34 1.45 1226550.0 30.73 54.36 74.73 84.34 93.49 96.45 97.90 99.14 3.55 2.10 0.86
9 2022202311 Apr 2022 to Mar 2023 (Period 11) East Midlands Railway 97416.0 30.30 54.93 76.85 86.44 94.95 97.48 98.64 99.48 2.52 1.36 0.52 1223077.0 30.24 53.79 74.31 84.05 93.36 96.39 97.87 99.13 3.61 2.13 0.87
9 2022202312 Apr 2022 to Mar 2023 (Period 12) East Midlands Railway 107322.0 31.94 57.44 78.32 87.37 95.37 97.73 98.83 99.52 2.27 1.17 0.48 1233523.0 30.25 53.92 74.52 84.23 93.48 96.50 97.97 99.18 3.50 2.03 0.82
9 2022202313 Apr 2022 to Mar 2023 (Period 13) East Midlands Railway 95459.0 32.54 57.64 78.12 86.69 94.72 97.22 98.45 99.48 2.78 1.55 0.52 1235065.0 30.10 53.81 74.43 84.11 93.40 96.44 97.93 99.16 3.56 2.07 0.84
9 2023202401 Apr 2023 to Mar 2024 (Period 01) East Midlands Railway 109518.0 32.82 57.87 78.72 87.34 94.75 97.15 98.32 99.31 2.85 1.68 0.69 1234432.0 29.97 53.75 74.42 84.04 93.32 96.38 97.88 99.13 3.62 2.12 0.87
9 2023202402 Apr 2023 to Mar 2024 (Period 02) East Midlands Railway 101874.0 32.07 56.92 77.89 86.79 94.72 97.21 98.43 99.40 2.79 1.57 0.60 1233875.0 29.91 53.68 74.39 84.03 93.32 96.39 97.89 99.16 3.61 2.11 0.84
9 2023202403 Apr 2023 to Mar 2024 (Period 03) East Midlands Railway 98349.0 27.47 49.28 69.81 80.32 91.21 95.08 97.17 99.00 4.92 2.83 1.00 1237787.0 29.46 52.96 73.69 83.48 93.03 96.20 97.78 99.12 3.80 2.22 0.88
9 2023202404 Apr 2023 to Mar 2024 (Period 04) East Midlands Railway 108121.0 31.07 55.96 77.02 86.06 94.21 96.98 98.27 99.35 3.02 1.73 0.65 1249211.0 29.56 53.18 74.01 83.78 93.24 96.39 97.93 99.21 3.61 2.07 0.79
9 2023202405 Apr 2023 to Mar 2024 (Period 05) East Midlands Railway 111042.0 30.60 55.00 76.30 85.36 94.23 96.99 98.31 99.33 3.01 1.69 0.67 1268240.0 29.87 53.71 74.68 84.35 93.60 96.61 98.08 99.27 3.39 1.92 0.73
9 2023202406 Apr 2023 to Mar 2024 (Period 06) East Midlands Railway 103512.0 28.11 52.64 74.87 84.53 93.36 96.61 98.12 99.40 3.39 1.88 0.60 1266029.0 29.69 53.62 74.67 84.31 93.50 96.54 98.03 99.25 3.46 1.97 0.75
9 2023202407 Apr 2023 to Mar 2024 (Period 07) East Midlands Railway 105708.0 27.60 52.00 74.29 84.52 94.14 97.22 98.51 99.43 2.78 1.49 0.57 1281986.0 29.44 53.45 74.64 84.29 93.49 96.56 98.04 99.26 3.44 1.96 0.74
9 2023202408 Apr 2023 to Mar 2024 (Period 08) East Midlands Railway 108081.0 22.99 44.36 66.12 77.61 89.32 93.84 96.17 98.38 6.16 3.83 1.62 1298256.0 29.27 53.26 74.52 84.19 93.39 96.48 97.98 99.22 3.52 2.02 0.78
9 2023202409 Apr 2023 to Mar 2024 (Period 09) East Midlands Railway 108435.0 20.56 40.82 62.41 74.53 88.31 93.43 95.85 98.29 6.57 4.15 1.71 1312682.0 28.87 52.74 74.02 83.75 93.12 96.32 97.86 99.16 3.68 2.14 0.84
9 2023202410 Apr 2023 to Mar 2024 (Period 10) East Midlands Railway 102102.0 24.55 46.15 66.40 76.78 88.23 92.93 95.54 98.37 7.07 4.46 1.63 1356939.0 28.63 52.35 73.60 83.39 92.87 96.14 97.73 99.13 3.86 2.27 0.87
9 2023202411 Apr 2023 to Mar 2024 (Period 11) East Midlands Railway 110966.0 27.40 51.59 72.99 83.29 93.19 96.33 97.82 99.05 3.68 2.18 0.95 1370489.0 28.42 52.11 73.32 83.17 92.75 96.06 97.68 99.10 3.94 2.32 0.90
9 2023202412 Apr 2023 to Mar 2024 (Period 12) East Midlands Railway 117424.0 28.67 53.63 75.25 84.91 94.12 97.16 98.51 99.48 2.84 1.49 0.52 1380591.0 28.16 51.82 73.09 82.99 92.66 96.02 97.66 99.10 3.98 2.34 0.90
9 2023202413 Apr 2023 to Mar 2024 (Period 13) East Midlands Railway 118216.0 32.14 58.41 78.66 87.32 94.76 97.26 98.38 99.41 2.74 1.62 0.59 1403348.0 28.20 51.98 73.22 83.10 92.70 96.05 97.67 99.10 3.95 2.33 0.90
9 2024202501 Apr 2024 to Mar 2025 (Period 01) East Midlands Railway 111054.0 32.30 58.22 78.83 87.56 95.44 97.67 98.71 99.51 2.33 1.29 0.49 1404884.0 28.16 52.01 73.23 83.12 92.76 96.09 97.70 99.11 3.91 2.30 0.89
9 2024202502 Apr 2024 to Mar 2025 (Period 02) East Midlands Railway 112796.0 31.65 57.52 77.68 86.74 94.66 97.11 98.42 99.47 2.89 1.58 0.53 1415806.0 28.16 52.10 73.25 83.15 92.77 96.09 97.70 99.12 3.91 2.30 0.88
9 2024202503 Apr 2024 to Mar 2025 (Period 03) East Midlands Railway 117706.0 30.35 55.67 76.16 85.35 93.74 96.47 98.01 99.29 3.53 1.99 0.71 1435163.0 28.39 52.59 73.73 83.52 92.96 96.19 97.76 99.14 3.81 2.24 0.86
9 2024202504 Apr 2024 to Mar 2025 (Period 04) East Midlands Railway 117585.0 28.70 52.86 73.50 83.32 92.65 96.12 97.81 99.20 3.88 2.19 0.80 1444627.0 28.21 52.36 73.46 83.31 92.84 96.12 97.73 99.13 3.88 2.27 0.87
9 2024202505 Apr 2024 to Mar 2025 (Period 05) East Midlands Railway 116710.0 27.92 52.22 73.57 83.30 92.81 95.93 97.53 98.89 4.07 2.47 1.11 1450295.0 28.01 52.14 73.25 83.16 92.73 96.04 97.67 99.10 3.96 2.33 0.90
9 2024202506 Apr 2024 to Mar 2025 (Period 06) East Midlands Railway 117077.0 29.70 54.54 74.96 84.07 92.73 95.79 97.29 98.79 4.21 2.71 1.21 1463860.0 28.13 52.30 73.28 83.13 92.68 95.98 97.61 99.05 4.02 2.39 0.95
9 2024202507 Apr 2024 to Mar 2025 (Period 07) East Midlands Railway 115609.0 27.30 51.96 73.53 83.64 93.23 96.39 97.92 99.11 3.61 2.08 0.89 1473761.0 28.11 52.29 73.22 83.07 92.62 95.92 97.57 99.03 4.08 2.43 0.97
9 2024202508 Apr 2024 to Mar 2025 (Period 08) East Midlands Railway 115349.0 25.94 49.59 71.41 81.84 92.41 95.90 97.60 98.95 4.10 2.40 1.05 1481029.0 28.31 52.66 73.60 83.37 92.85 96.07 97.67 99.07 3.93 2.33 0.93
9 2024202509 Apr 2024 to Mar 2025 (Period 09) East Midlands Railway 113533.0 23.63 45.80 66.39 77.57 89.65 94.21 96.40 98.42 5.79 3.60 1.58 1486127.0 28.52 53.00 73.87 83.58 92.93 96.12 97.71 99.08 3.88 2.29 0.92
9 2024202510 Apr 2024 to Mar 2025 (Period 10) East Midlands Railway 102423.0 28.30 53.55 74.43 84.05 93.61 96.65 98.03 99.28 3.35 1.97 0.72 1486448.0 28.78 53.51 74.42 84.08 93.30 96.38 97.88 99.14 3.62 2.12 0.86
9 2024202511 Apr 2024 to Mar 2025 (Period 11) East Midlands Railway 118338.0 30.31 55.19 75.34 84.63 93.14 96.19 97.69 99.06 3.81 2.31 0.94 1493820.0 29.00 53.79 74.60 84.18 93.30 96.37 97.87 99.14 3.63 2.13 0.86
9 2024202512 Apr 2024 to Mar 2025 (Period 12) East Midlands Railway 119098.0 32.16 58.62 78.84 87.47 94.85 97.24 98.44 99.36 2.76 1.56 0.64 1495494.0 29.28 54.18 74.88 84.38 93.36 96.38 97.86 99.13 3.62 2.14 0.87
9 2024202513 Apr 2024 to Mar 2025 (Period 13) East Midlands Railway 123065.0 33.94 60.61 80.44 88.28 94.90 97.32 98.49 99.36 2.68 1.51 0.64 1500343.0 29.44 54.38 75.04 84.47 93.37 96.38 97.87 99.13 3.62 2.13 0.87
9 2025202601 Apr 2025 to Mar 2026 (Period 01) East Midlands Railway 109253.0 32.75 58.55 78.55 87.21 94.75 97.16 98.45 99.44 2.84 1.55 0.56 1498542.0 29.46 54.40 75.02 84.44 93.32 96.34 97.85 99.12 3.66 2.15 0.88
9 2025202602 Apr 2025 to Mar 2026 (Period 02) East Midlands Railway 119055.0 32.48 58.27 78.26 86.78 94.73 97.17 98.26 99.29 2.83 1.74 0.71 1504801.0 29.54 54.47 75.07 84.46 93.33 96.35 97.84 99.11 3.65 2.16 0.89
9 2025202603 Apr 2025 to Mar 2026 (Period 03) East Midlands Railway 115762.0 32.11 57.32 76.57 85.07 93.22 95.99 97.42 98.77 4.01 2.58 1.23 1502857.0 29.67 54.60 75.10 84.43 93.29 96.32 97.80 99.07 3.68 2.20 0.93
9 2025202604 Apr 2025 to Mar 2026 (Period 04) East Midlands Railway 116182.0 30.84 55.75 75.78 84.63 93.19 96.09 97.79 99.07 3.91 2.21 0.93 1501454.0 29.84 54.82 75.28 84.54 93.33 96.31 97.80 99.06 3.69 2.20 0.94
9 2025202605 Apr 2025 to Mar 2026 (Period 05) East Midlands Railway 113872.0 30.21 54.58 74.66 83.83 92.98 96.20 97.82 99.16 3.80 2.18 0.84 1498616.0 30.02 55.00 75.37 84.58 93.35 96.34 97.82 99.08 3.66 2.18 0.92
9 2025202606 Apr 2025 to Mar 2026 (Period 06) East Midlands Railway 117770.0 30.77 55.70 76.18 85.38 94.24 97.03 98.32 99.32 2.97 1.68 0.68 1499309.0 30.10 55.09 75.46 84.68 93.47 96.43 97.90 99.12 3.57 2.10 0.88
9 2025202607 Apr 2025 to Mar 2026 (Period 07) East Midlands Railway 113881.0 29.08 54.02 74.76 84.35 93.56 96.63 97.92 99.09 3.37 2.08 0.91 1497581.0 30.24 55.25 75.56 84.74 93.49 96.45 97.90 99.12 3.55 2.10 0.88
9 2025202608 Apr 2025 to Mar 2026 (Period 08) East Midlands Railway 116989.0 26.52 50.32 71.70 82.39 92.81 96.33 98.00 99.27 3.67 2.00 0.73 1499221.0 30.28 55.31 75.58 84.78 93.52 96.48 97.93 99.15 3.52 2.07 0.85
9 2025202609 Apr 2025 to Mar 2026 (Period 09) East Midlands Railway 116289.0 24.26 46.24 67.22 78.48 90.57 94.89 96.93 98.72 5.11 3.07 1.28 1501977.0 30.32 55.32 75.63 84.83 93.59 96.53 97.97 99.17 3.47 2.03 0.83
9 2025202610 Apr 2025 to Mar 2026 (Period 10) East Midlands Railway 110378.0 33.85 58.67 77.30 85.59 93.50 96.36 97.76 98.97 3.64 2.24 1.03 1509932.0 30.71 55.69 75.83 84.94 93.58 96.51 97.95 99.15 3.49 2.05 0.85
9 2025202611 Apr 2025 to Mar 2026 (Period 11) East Midlands Railway 119087.0 36.16 62.19 80.70 88.30 94.79 97.17 98.22 99.19 2.83 1.78 0.81 1510681.0 31.17 56.24 76.25 85.23 93.71 96.59 97.99 99.16 3.41 2.01 0.84
9 2025202612 Apr 2025 to Mar 2026 (Period 12) East Midlands Railway 120113.0 35.63 60.45 78.80 86.80 94.35 96.92 98.17 99.22 3.08 1.83 0.78 1511696.0 31.45 56.39 76.25 85.18 93.67 96.56 97.97 99.15 3.44 2.03 0.85
9 2025202613 Apr 2025 to Mar 2026 (Period 13) East Midlands Railway 130643.0 35.39 59.73 77.69 85.36 92.86 96.03 97.48 98.88 3.97 2.52 1.12 1519274.0 31.59 56.33 76.03 84.94 93.50 96.46 97.88 99.11 3.54 2.12 0.89
9 2026202701 Apr 2026 to Mar 2027 (Period 01) East Midlands Railway 138880.0 35.31 59.82 78.21 86.37 93.90 96.64 97.91 99.10 3.36 2.09 0.90 1548901.0 31.84 56.49 76.05 84.91 93.45 96.42 97.85 99.08 3.58 2.15 0.92
9 2026202702 Apr 2026 to Mar 2027 (Period 02) East Midlands Railway 119238.0 32.85 56.74 75.10 83.37 91.86 95.16 96.92 98.60 4.84 3.08 1.40 1549084.0 31.87 56.37 75.81 84.65 93.23 96.27 97.74 99.03 3.73 2.26 0.97
10 2014201501 Apr 2014 to Mar 2015 (Period 01) Elizabeth line 81302.0 31.98 71.66 91.47 96.37 99.26 99.77 99.93 99.99 0.23 0.07 0.01 81302.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201502 Apr 2014 to Mar 2015 (Period 02) Elizabeth line 87023.0 33.53 72.83 91.40 96.29 98.92 99.61 99.86 99.97 0.39 0.14 0.03 168325.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201503 Apr 2014 to Mar 2015 (Period 03) Elizabeth line 87332.0 31.84 70.58 90.37 95.78 98.93 99.64 99.84 99.99 0.36 0.16 0.01 255657.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201504 Apr 2014 to Mar 2015 (Period 04) Elizabeth line 90299.0 31.01 68.63 88.85 94.74 98.50 99.40 99.63 99.81 0.60 0.37 0.19 345956.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201505 Apr 2014 to Mar 2015 (Period 05) Elizabeth line 89907.0 30.96 69.11 88.92 94.33 98.51 99.51 99.82 99.96 0.49 0.18 0.04 435863.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201506 Apr 2014 to Mar 2015 (Period 06) Elizabeth line 88292.0 31.10 69.46 90.55 96.29 99.10 99.58 99.80 99.95 0.42 0.20 0.05 524155.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201507 Apr 2014 to Mar 2015 (Period 07) Elizabeth line 89494.0 31.10 68.56 89.66 95.54 98.92 99.50 99.76 99.89 0.50 0.24 0.11 613649.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201508 Apr 2014 to Mar 2015 (Period 08) Elizabeth line 89263.0 28.76 65.16 87.34 94.57 98.87 99.66 99.84 99.95 0.34 0.16 0.05 702912.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201509 Apr 2014 to Mar 2015 (Period 09) Elizabeth line 89687.0 26.14 60.41 83.68 92.36 97.96 99.33 99.71 99.95 0.67 0.29 0.05 792599.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201510 Apr 2014 to Mar 2015 (Period 10) Elizabeth line 77099.0 29.50 66.88 89.46 95.83 99.03 99.67 99.79 99.90 0.33 0.21 0.10 869698.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201511 Apr 2014 to Mar 2015 (Period 11) Elizabeth line 89025.0 30.48 67.38 87.86 94.06 98.36 99.51 99.78 99.98 0.49 0.22 0.02 958723.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201512 Apr 2014 to Mar 2015 (Period 12) Elizabeth line 92778.0 31.91 67.35 87.61 94.54 98.76 99.70 99.92 99.99 0.30 0.08 0.01 1051501.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2014201513 Apr 2014 to Mar 2015 (Period 13) Elizabeth line 101187.0 38.00 76.20 93.33 97.41 99.54 99.88 99.93 99.99 0.12 0.07 0.01 1152688.0 31.33 68.84 89.28 95.24 98.82 99.60 99.82 99.95 0.40 0.18 0.05
10 2015201601 Apr 2015 to Mar 2016 (Period 01) Elizabeth line 99893.0 34.36 72.18 90.38 95.50 98.65 99.38 99.64 99.84 0.62 0.36 0.16 1171279.0 31.55 68.93 89.22 95.18 98.78 99.57 99.79 99.94 0.43 0.21 0.06
10 2015201602 Apr 2015 to Mar 2016 (Period 02) Elizabeth line 85339.0 30.36 66.67 87.26 93.39 97.85 99.10 99.55 99.91 0.90 0.45 0.09 1169595.0 31.31 68.48 88.92 94.97 98.70 99.53 99.77 99.93 0.47 0.23 0.07
10 2015201603 Apr 2015 to Mar 2016 (Period 03) Elizabeth line 94925.0 36.28 73.02 91.24 96.02 99.00 99.69 99.90 99.99 0.31 0.10 0.01 1177188.0 31.67 68.69 89.00 94.99 98.70 99.54 99.78 99.93 0.46 0.22 0.07
10 2015201604 Apr 2015 to Mar 2016 (Period 04) Elizabeth line 94465.0 36.45 73.47 91.89 96.63 99.32 99.74 99.87 99.97 0.26 0.13 0.03 1181354.0 32.11 69.07 89.24 95.14 98.77 99.56 99.79 99.95 0.44 0.21 0.05
10 2015201605 Apr 2015 to Mar 2016 (Period 05) Elizabeth line 94100.0 38.78 76.31 93.45 97.53 99.46 99.82 99.92 99.97 0.18 0.08 0.03 1185547.0 32.72 69.65 89.60 95.40 98.84 99.59 99.80 99.95 0.41 0.20 0.05
10 2015201606 Apr 2015 to Mar 2016 (Period 06) Elizabeth line 92981.0 36.95 73.84 92.21 96.59 99.18 99.76 99.92 99.98 0.24 0.08 0.02 1190236.0 33.17 69.99 89.73 95.42 98.85 99.60 99.81 99.95 0.40 0.19 0.05
10 2015201607 Apr 2015 to Mar 2016 (Period 07) Elizabeth line 94040.0 34.38 71.16 90.97 96.37 99.26 99.80 99.91 99.98 0.20 0.09 0.02 1194782.0 33.42 70.19 89.83 95.49 98.88 99.62 99.82 99.96 0.38 0.18 0.04
10 2015201608 Apr 2015 to Mar 2016 (Period 08) Elizabeth line 94364.0 31.96 67.36 88.26 94.97 99.13 99.77 99.92 99.98 0.23 0.08 0.02 1199883.0 33.66 70.34 89.90 95.52 98.90 99.63 99.83 99.96 0.37 0.17 0.04
10 2015201609 Apr 2015 to Mar 2016 (Period 09) Elizabeth line 93877.0 33.73 69.13 89.79 95.63 99.21 99.76 99.92 99.98 0.24 0.08 0.02 1204073.0 34.22 70.98 90.35 95.76 98.99 99.66 99.85 99.96 0.34 0.15 0.04
10 2015201610 Apr 2015 to Mar 2016 (Period 10) Elizabeth line 75690.0 36.57 73.00 91.87 96.80 99.37 99.86 99.96 99.99 0.14 0.04 0.01 1202664.0 34.67 71.37 90.50 95.82 99.01 99.68 99.86 99.97 0.32 0.14 0.03
10 2015201611 Apr 2015 to Mar 2016 (Period 11) Elizabeth line 88902.0 36.48 72.83 90.84 95.56 98.75 99.50 99.79 99.98 0.50 0.21 0.02 1202541.0 35.12 71.78 90.72 95.93 99.04 99.68 99.86 99.96 0.32 0.14 0.04
10 2015201612 Apr 2015 to Mar 2016 (Period 12) Elizabeth line 75482.0 36.59 73.43 91.49 96.52 99.21 99.72 99.84 99.94 0.28 0.16 0.06 1185245.0 35.46 72.23 91.02 96.08 99.08 99.68 99.85 99.96 0.32 0.15 0.04
10 2015201613 Apr 2015 to Mar 2016 (Period 13) Elizabeth line 70549.0 38.97 75.62 92.01 96.25 98.99 99.67 99.91 100.00 0.33 0.09 0.00 1154607.0 35.45 72.09 90.87 95.97 99.03 99.66 99.85 99.96 0.34 0.15 0.04
10 2016201701 Apr 2016 to Mar 2017 (Period 01) Elizabeth line 102373.0 37.11 74.70 92.56 96.87 99.30 99.75 99.92 99.98 0.25 0.08 0.02 1157087.0 35.69 72.31 91.07 96.09 99.09 99.69 99.87 99.97 0.31 0.13 0.03
10 2016201702 Apr 2016 to Mar 2017 (Period 02) Elizabeth line 92909.0 38.61 75.42 93.23 97.53 99.44 99.79 99.90 99.97 0.21 0.10 0.03 1164657.0 36.32 72.97 91.52 96.41 99.21 99.74 99.90 99.98 0.26 0.10 0.02
10 2016201703 Apr 2016 to Mar 2017 (Period 03) Elizabeth line 86910.0 36.08 73.30 91.56 96.41 98.93 99.60 99.83 99.96 0.40 0.17 0.04 1156642.0 36.30 72.99 91.54 96.44 99.20 99.73 99.89 99.98 0.27 0.11 0.02
10 2016201704 Apr 2016 to Mar 2017 (Period 04) Elizabeth line 96123.0 33.83 72.28 91.35 96.39 99.20 99.70 99.85 99.99 0.30 0.15 0.01 1158300.0 36.09 72.90 91.50 96.42 99.19 99.73 99.89 99.98 0.27 0.11 0.02
10 2016201705 Apr 2016 to Mar 2017 (Period 05) Elizabeth line 99191.0 34.99 74.16 92.87 97.33 99.50 99.82 99.91 99.98 0.18 0.09 0.02 1163391.0 35.77 72.73 91.46 96.41 99.20 99.73 99.89 99.98 0.27 0.11 0.02
10 2016201706 Apr 2016 to Mar 2017 (Period 06) Elizabeth line 93634.0 30.99 69.20 89.45 95.58 99.10 99.70 99.88 99.98 0.30 0.12 0.02 1164044.0 35.29 72.35 91.24 96.32 99.19 99.73 99.89 99.98 0.27 0.11 0.02
10 2016201707 Apr 2016 to Mar 2017 (Period 07) Elizabeth line 84311.0 30.25 68.19 89.42 95.48 99.12 99.63 99.82 99.93 0.37 0.18 0.07 1154315.0 35.00 72.15 91.13 96.26 99.18 99.71 99.88 99.97 0.29 0.12 0.03
10 2016201708 Apr 2016 to Mar 2017 (Period 08) Elizabeth line 86292.0 30.32 66.74 88.17 94.98 98.85 99.67 99.87 99.98 0.33 0.13 0.02 1146243.0 34.90 72.13 91.14 96.27 99.16 99.71 99.88 99.97 0.29 0.12 0.03
10 2016201709 Apr 2016 to Mar 2017 (Period 09) Elizabeth line 95172.0 26.34 60.96 85.07 93.41 98.54 99.46 99.77 99.95 0.54 0.23 0.05 1147538.0 34.28 71.45 90.75 96.08 99.10 99.68 99.86 99.97 0.32 0.14 0.03
10 2016201710 Apr 2016 to Mar 2017 (Period 10) Elizabeth line 72775.0 31.86 69.03 90.06 95.60 98.93 99.64 99.86 99.96 0.36 0.14 0.04 1144623.0 33.98 71.20 90.63 96.00 99.07 99.67 99.86 99.97 0.33 0.14 0.03
10 2016201711 Apr 2016 to Mar 2017 (Period 11) Elizabeth line 90103.0 36.19 71.49 90.25 95.66 98.84 99.49 99.70 99.87 0.51 0.30 0.13 1145824.0 33.96 71.09 90.58 96.01 99.08 99.67 99.85 99.96 0.33 0.15 0.04
10 2016201712 Apr 2016 to Mar 2017 (Period 12) Elizabeth line 77098.0 33.77 70.98 90.47 96.20 99.16 99.67 99.82 99.97 0.33 0.18 0.03 1147440.0 33.77 70.93 90.51 95.99 99.08 99.66 99.85 99.96 0.34 0.15 0.04
10 2016201713 Apr 2016 to Mar 2017 (Period 13) Elizabeth line 76791.0 38.40 76.14 93.20 97.20 99.44 99.72 99.85 99.90 0.28 0.15 0.10 1153682.0 33.76 70.99 90.60 96.06 99.11 99.67 99.84 99.96 0.33 0.16 0.04
10 2017201801 Apr 2017 to Mar 2018 (Period 01) Elizabeth line 78471.0 37.17 74.24 92.08 96.62 99.38 99.82 99.95 99.99 0.18 0.05 0.01 1129780.0 33.70 70.88 90.53 96.02 99.11 99.67 99.85 99.96 0.33 0.15 0.04
10 2017201802 Apr 2017 to Mar 2018 (Period 02) Elizabeth line 91332.0 30.63 69.15 90.19 95.60 98.86 99.56 99.82 99.96 0.44 0.18 0.04 1128203.0 33.04 70.37 90.28 95.86 99.06 99.65 99.84 99.96 0.35 0.16 0.04
10 2017201803 Apr 2017 to Mar 2018 (Period 03) Elizabeth line 94440.0 32.01 70.30 89.64 95.10 98.50 99.42 99.75 99.88 0.58 0.25 0.12 1135733.0 32.72 70.14 90.13 95.76 99.02 99.63 99.83 99.95 0.37 0.17 0.05
10 2017201804 Apr 2017 to Mar 2018 (Period 04) Elizabeth line 102531.0 31.89 69.97 91.01 96.64 99.44 99.81 99.89 99.97 0.19 0.11 0.03 1142141.0 32.56 69.94 90.10 95.78 99.05 99.64 99.84 99.95 0.36 0.16 0.05
10 2017201805 Apr 2017 to Mar 2018 (Period 05) Elizabeth line 103610.0 32.29 71.47 91.90 96.84 99.27 99.69 99.83 99.92 0.31 0.17 0.08 1146560.0 32.32 69.72 90.03 95.75 99.03 99.63 99.83 99.94 0.37 0.17 0.06
10 2017201806 Apr 2017 to Mar 2018 (Period 06) Elizabeth line 96204.0 32.19 70.67 90.73 95.70 98.77 99.47 99.72 99.94 0.53 0.28 0.06 1149130.0 32.42 69.84 90.13 95.76 99.00 99.62 99.82 99.94 0.38 0.18 0.06
10 2017201807 Apr 2017 to Mar 2018 (Period 07) Elizabeth line 98332.0 29.58 64.44 86.71 94.37 98.89 99.58 99.79 99.97 0.42 0.21 0.03 1163151.0 32.34 69.50 89.89 95.66 98.98 99.61 99.81 99.94 0.39 0.19 0.06
10 2017201808 Apr 2017 to Mar 2018 (Period 08) Elizabeth line 90160.0 27.08 61.50 84.72 93.13 98.52 99.53 99.76 99.91 0.47 0.24 0.09 1167019.0 32.08 69.09 89.62 95.52 98.96 99.60 99.81 99.94 0.40 0.19 0.06
10 2017201809 Apr 2017 to Mar 2018 (Period 09) Elizabeth line 92542.0 28.18 60.99 83.86 92.90 98.81 99.68 99.90 99.99 0.32 0.10 0.01 1164389.0 32.24 69.11 89.53 95.48 98.98 99.62 99.82 99.94 0.38 0.18 0.06
10 2017201810 Apr 2017 to Mar 2018 (Period 10) Elizabeth line 64244.0 33.62 66.13 86.40 93.25 98.46 99.41 99.76 99.91 0.59 0.24 0.09 1155858.0 32.34 68.95 89.33 95.35 98.95 99.61 99.81 99.94 0.39 0.19 0.06
10 2017201811 Apr 2017 to Mar 2018 (Period 11) Elizabeth line 92521.0 30.92 65.68 87.19 94.04 98.37 99.48 99.85 99.98 0.52 0.15 0.02 1158276.0 31.93 68.49 89.08 95.22 98.92 99.61 99.82 99.95 0.39 0.18 0.05
10 2017201812 Apr 2017 to Mar 2018 (Period 12) Elizabeth line 81355.0 33.80 68.35 87.67 94.07 98.55 99.55 99.84 99.94 0.45 0.16 0.06 1162533.0 31.94 68.31 88.89 95.07 98.87 99.60 99.82 99.94 0.40 0.18 0.06
10 2017201813 Apr 2017 to Mar 2018 (Period 13) Elizabeth line 78112.0 39.05 74.17 91.94 96.94 99.44 99.83 99.96 100.00 0.17 0.04 0.00 1163854.0 31.99 68.19 88.81 95.06 98.87 99.60 99.83 99.95 0.40 0.17 0.05
10 2018201901 Apr 2018 to Mar 2019 (Period 01) Elizabeth line 96446.0 44.54 78.94 93.15 97.12 99.41 99.83 99.93 99.99 0.17 0.07 0.01 1181829.0 32.67 68.67 88.95 95.12 98.88 99.61 99.83 99.95 0.39 0.17 0.05
10 2018201902 Apr 2018 to Mar 2019 (Period 02) Elizabeth line 100139.0 45.27 80.15 94.29 97.67 99.49 99.82 99.91 99.99 0.18 0.09 0.01 1190636.0 33.88 69.59 89.31 95.30 98.94 99.63 99.84 99.95 0.37 0.16 0.05
10 2018201903 Apr 2018 to Mar 2019 (Period 03) Elizabeth line 107117.0 42.87 76.53 92.21 96.42 99.06 99.67 99.86 99.97 0.33 0.14 0.03 1203313.0 34.83 70.16 89.54 95.42 98.98 99.65 99.85 99.96 0.35 0.15 0.04
10 2018201904 Apr 2018 to Mar 2019 (Period 04) Elizabeth line 111188.0 41.95 74.41 91.06 95.98 98.89 99.62 99.82 99.97 0.38 0.18 0.03 1211970.0 35.73 70.56 89.55 95.36 98.94 99.63 99.84 99.96 0.37 0.16 0.04
10 2018201905 Apr 2018 to Mar 2019 (Period 05) Elizabeth line 110066.0 43.41 75.92 91.93 96.57 99.26 99.65 99.80 99.89 0.35 0.20 0.11 1218426.0 36.72 70.97 89.57 95.35 98.94 99.63 99.84 99.96 0.37 0.16 0.04
10 2018201906 Apr 2018 to Mar 2019 (Period 06) Elizabeth line 112187.0 43.55 77.63 93.38 97.30 99.48 99.82 99.93 100.00 0.18 0.07 0.00 1234409.0 37.69 71.60 89.82 95.50 99.00 99.66 99.86 99.96 0.34 0.14 0.04
10 2018201907 Apr 2018 to Mar 2019 (Period 07) Elizabeth line 112977.0 41.80 74.74 91.19 95.95 99.13 99.65 99.87 99.96 0.35 0.13 0.04 1249054.0 38.70 72.45 90.19 95.63 99.02 99.66 99.86 99.96 0.34 0.14 0.04
10 2018201908 Apr 2018 to Mar 2019 (Period 08) Elizabeth line 106088.0 37.57 71.09 89.92 95.94 99.39 99.81 99.93 99.99 0.19 0.07 0.01 1264982.0 39.44 73.11 90.56 95.83 99.09 99.69 99.88 99.97 0.31 0.12 0.03
10 2018201909 Apr 2018 to Mar 2019 (Period 09) Elizabeth line 105063.0 35.51 69.08 88.06 94.57 98.79 99.62 99.86 99.99 0.38 0.14 0.01 1277503.0 39.93 73.66 90.84 95.94 99.08 99.68 99.87 99.97 0.32 0.13 0.03
10 2018201910 Apr 2018 to Mar 2019 (Period 10) Elizabeth line 82061.0 43.86 78.02 93.63 97.43 99.29 99.67 99.78 99.93 0.33 0.22 0.07 1295320.0 40.49 74.31 91.24 96.17 99.13 99.69 99.87 99.97 0.31 0.13 0.03
10 2018201911 Apr 2018 to Mar 2019 (Period 11) Elizabeth line 108034.0 43.43 77.31 92.96 96.92 99.24 99.67 99.77 99.88 0.33 0.23 0.12 1310833.0 41.41 75.17 91.66 96.38 99.19 99.71 99.86 99.96 0.29 0.14 0.04
10 2018201912 Apr 2018 to Mar 2019 (Period 12) Elizabeth line 101567.0 42.04 76.90 93.17 97.19 99.35 99.75 99.83 99.90 0.25 0.17 0.10 1331045.0 41.92 75.71 92.02 96.58 99.24 99.72 99.86 99.96 0.28 0.14 0.04
10 2018201913 Apr 2018 to Mar 2019 (Period 13) Elizabeth line 97110.0 41.80 76.74 93.49 97.79 99.64 99.91 99.97 100.00 0.09 0.03 0.00 1350043.0 42.08 75.88 92.13 96.65 99.26 99.73 99.87 99.96 0.27 0.13 0.04
10 2019202001 Apr 2019 to Mar 2020 (Period 01) Elizabeth line 110759.0 46.73 80.50 94.44 97.74 99.57 99.87 99.94 99.98 0.13 0.06 0.02 110759.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202002 Apr 2019 to Mar 2020 (Period 02) Elizabeth line 113340.0 47.08 81.86 95.47 98.18 99.63 99.84 99.90 99.95 0.16 0.10 0.05 224099.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202003 Apr 2019 to Mar 2020 (Period 03) Elizabeth line 114833.0 48.34 82.67 95.23 97.96 99.51 99.72 99.86 99.97 0.28 0.14 0.03 338932.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202004 Apr 2019 to Mar 2020 (Period 04) Elizabeth line 115693.0 45.63 78.90 93.19 97.07 99.36 99.76 99.89 99.97 0.24 0.11 0.03 454625.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202005 Apr 2019 to Mar 2020 (Period 05) Elizabeth line 116979.0 48.64 82.31 95.01 97.99 99.63 99.89 99.95 99.97 0.11 0.05 0.03 571604.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202006 Apr 2019 to Mar 2020 (Period 06) Elizabeth line 116748.0 45.44 78.53 93.72 97.55 99.59 99.87 99.96 100.00 0.13 0.04 0.00 688352.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202007 Apr 2019 to Mar 2020 (Period 07) Elizabeth line 117615.0 42.60 76.97 93.08 97.22 99.66 99.96 100.00 100.00 0.04 0.00 0.00 805967.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202008 Apr 2019 to Mar 2020 (Period 08) Elizabeth line 116441.0 43.09 77.09 92.52 96.95 99.42 99.84 99.92 99.98 0.16 0.08 0.02 922408.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202009 Apr 2019 to Mar 2020 (Period 09) Elizabeth line 116685.0 39.95 73.45 91.31 96.70 99.44 99.91 99.97 99.99 0.09 0.03 0.01 1039093.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202010 Apr 2019 to Mar 2020 (Period 10) Elizabeth line 117368.0 46.38 78.17 92.33 96.45 99.15 99.69 99.84 99.94 0.31 0.16 0.06 1156461.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202011 Apr 2019 to Mar 2020 (Period 11) Elizabeth line 145353.0 44.62 74.76 91.03 96.21 99.41 99.84 99.94 99.98 0.16 0.06 0.02 1301814.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202012 Apr 2019 to Mar 2020 (Period 12) Elizabeth line 135489.0 38.54 68.15 89.20 95.76 99.18 99.70 99.85 99.93 0.30 0.15 0.07 1437303.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
10 2019202013 Apr 2019 to Mar 2020 (Period 13) Elizabeth line 136088.0 49.75 79.38 94.06 97.57 99.51 99.85 99.93 99.98 0.15 0.07 0.02 1573391.0 45.09 77.72 93.04 97.14 99.46 99.83 99.92 99.97 0.17 0.08 0.03
10 2020202101 Apr 2020 to Mar 2021 (Period 01) Elizabeth line 136833.0 65.81 92.20 98.16 99.16 99.78 99.93 99.97 99.99 0.07 0.03 0.01 1599465.0 46.75 78.77 93.38 97.28 99.48 99.83 99.92 99.97 0.17 0.08 0.03
10 2020202102 Apr 2020 to Mar 2021 (Period 02) Elizabeth line 134467.0 65.78 90.90 97.65 98.83 99.71 99.90 99.99 100.00 0.10 0.01 0.00 1620592.0 48.31 79.56 93.59 97.34 99.49 99.84 99.93 99.98 0.16 0.07 0.02
10 2020202103 Apr 2020 to Mar 2021 (Period 03) Elizabeth line 142000.0 65.06 89.85 97.08 98.64 99.56 99.82 99.92 99.98 0.18 0.08 0.02 1647759.0 49.75 80.23 93.77 97.41 99.49 99.84 99.93 99.98 0.16 0.07 0.02
10 2020202104 Apr 2020 to Mar 2021 (Period 04) Elizabeth line 151247.0 64.76 90.37 97.76 99.02 99.75 99.89 99.95 99.99 0.11 0.05 0.01 1683313.0 51.38 81.23 94.17 97.58 99.53 99.85 99.94 99.98 0.15 0.06 0.02
10 2020202105 Apr 2020 to Mar 2021 (Period 05) Elizabeth line 151644.0 62.93 87.66 95.70 97.87 99.39 99.79 99.91 99.99 0.21 0.09 0.01 1717978.0 52.59 81.73 94.25 97.58 99.51 99.85 99.93 99.98 0.15 0.07 0.02
10 2020202106 Apr 2020 to Mar 2021 (Period 06) Elizabeth line 150886.0 65.48 89.38 96.69 98.52 99.70 99.92 99.97 100.00 0.08 0.03 0.00 1752116.0 54.17 82.60 94.49 97.66 99.52 99.85 99.94 99.98 0.15 0.06 0.02
10 2020202107 Apr 2020 to Mar 2021 (Period 07) Elizabeth line 150501.0 63.45 88.17 95.88 98.03 99.58 99.88 99.95 100.00 0.12 0.05 0.00 1785002.0 55.72 83.44 94.71 97.72 99.51 99.85 99.93 99.98 0.15 0.07 0.02
10 2020202108 Apr 2020 to Mar 2021 (Period 08) Elizabeth line 144390.0 57.49 83.79 94.26 97.18 99.22 99.73 99.94 99.99 0.27 0.06 0.01 1812951.0 56.67 83.88 94.81 97.73 99.50 99.84 99.93 99.98 0.16 0.07 0.02
10 2020202109 Apr 2020 to Mar 2021 (Period 09) Elizabeth line 145164.0 59.83 86.45 95.52 97.81 99.34 99.74 99.86 99.94 0.26 0.14 0.06 1841430.0 57.98 84.74 95.09 97.80 99.49 99.83 99.93 99.98 0.17 0.07 0.02
10 2020202110 Apr 2020 to Mar 2021 (Period 10) Elizabeth line 139911.0 63.71 88.90 96.33 98.19 99.50 99.86 99.95 99.98 0.14 0.05 0.02 1863973.0 59.14 85.46 95.35 97.91 99.51 99.84 99.93 99.98 0.16 0.07 0.02
10 2020202111 Apr 2020 to Mar 2021 (Period 11) Elizabeth line 146672.0 64.00 87.55 95.53 97.90 99.47 99.81 99.91 99.98 0.19 0.09 0.02 1865292.0 60.65 86.46 95.70 98.04 99.52 99.83 99.93 99.98 0.17 0.07 0.02
10 2020202112 Apr 2020 to Mar 2021 (Period 12) Elizabeth line 164543.0 65.56 88.28 95.53 97.71 99.36 99.77 99.90 99.97 0.23 0.10 0.03 1894346.0 62.66 87.93 96.15 98.18 99.53 99.84 99.93 99.98 0.16 0.07 0.02
10 2020202113 Apr 2020 to Mar 2021 (Period 13) Elizabeth line 143432.0 67.22 89.87 96.29 98.20 99.43 99.81 99.92 99.98 0.19 0.08 0.02 1901690.0 63.93 88.69 96.31 98.22 99.52 99.83 99.93 99.98 0.17 0.07 0.02
10 2021202201 Apr 2021 to Mar 2022 (Period 01) Elizabeth line 161504.0 65.62 89.19 96.13 98.19 99.59 99.85 99.92 99.97 0.15 0.08 0.03 1926361.0 63.94 88.48 96.17 98.15 99.51 99.83 99.93 99.98 0.17 0.07 0.02
10 2021202202 Apr 2021 to Mar 2022 (Period 02) Elizabeth line 160290.0 63.24 88.47 96.26 98.27 99.60 99.89 99.97 99.99 0.11 0.03 0.01 1952184.0 63.75 88.31 96.07 98.12 99.50 99.83 99.93 99.98 0.17 0.07 0.02
10 2021202203 Apr 2021 to Mar 2022 (Period 03) Elizabeth line 174642.0 60.52 86.20 94.50 96.95 98.96 99.65 99.87 99.97 0.35 0.13 0.03 1984826.0 63.37 88.02 95.86 97.98 99.45 99.81 99.92 99.98 0.19 0.08 0.02
10 2021202204 Apr 2021 to Mar 2022 (Period 04) Elizabeth line 176543.0 61.64 87.69 96.02 98.02 99.41 99.80 99.92 99.98 0.20 0.08 0.02 2010122.0 63.12 87.81 95.73 97.90 99.42 99.81 99.92 99.98 0.19 0.08 0.02
10 2021202205 Apr 2021 to Mar 2022 (Period 05) Elizabeth line 176961.0 59.14 86.29 95.49 97.77 99.39 99.77 99.91 99.97 0.23 0.09 0.03 2035439.0 62.78 87.69 95.72 97.89 99.42 99.80 99.92 99.98 0.20 0.08 0.02
10 2021202206 Apr 2021 to Mar 2022 (Period 06) Elizabeth line 172289.0 60.18 86.80 95.55 97.86 99.47 99.86 99.94 99.97 0.14 0.06 0.03 2056842.0 62.37 87.49 95.63 97.84 99.41 99.80 99.92 99.98 0.20 0.08 0.02
10 2021202207 Apr 2021 to Mar 2022 (Period 07) Elizabeth line 175332.0 57.94 85.67 95.20 97.80 99.54 99.85 99.93 99.98 0.15 0.07 0.02 2081673.0 61.92 87.29 95.58 97.83 99.40 99.80 99.92 99.98 0.20 0.08 0.02
10 2021202208 Apr 2021 to Mar 2022 (Period 08) Elizabeth line 175058.0 52.68 80.88 92.63 95.97 98.63 99.45 99.72 99.91 0.55 0.28 0.09 2112341.0 61.45 87.00 95.42 97.72 99.35 99.77 99.90 99.97 0.23 0.10 0.03
10 2021202209 Apr 2021 to Mar 2022 (Period 09) Elizabeth line 174137.0 49.67 77.49 91.06 95.37 98.70 99.58 99.86 99.97 0.42 0.14 0.03 2141314.0 60.61 86.26 95.06 97.52 99.30 99.76 99.90 99.97 0.24 0.10 0.03
10 2021202210 Apr 2021 to Mar 2022 (Period 10) Elizabeth line 159150.0 57.71 83.67 93.50 96.42 98.84 99.57 99.81 99.98 0.43 0.19 0.02 2160553.0 60.19 85.90 94.86 97.40 99.25 99.74 99.89 99.97 0.26 0.11 0.03
10 2021202211 Apr 2021 to Mar 2022 (Period 11) Elizabeth line 175052.0 60.39 85.04 94.26 97.04 99.17 99.71 99.86 99.96 0.29 0.14 0.04 2188933.0 59.95 85.72 94.77 97.33 99.23 99.73 99.89 99.97 0.27 0.11 0.03
10 2021202212 Apr 2021 to Mar 2022 (Period 12) Elizabeth line 156190.0 57.11 83.01 93.53 96.36 98.84 99.44 99.67 99.85 0.56 0.33 0.15 2180580.0 59.33 85.33 94.62 97.24 99.19 99.71 99.87 99.96 0.29 0.13 0.04
10 2021202213 Apr 2021 to Mar 2022 (Period 13) Elizabeth line 144714.0 55.64 80.83 92.18 96.06 98.98 99.68 99.87 99.97 0.32 0.13 0.03 2181862.0 58.56 84.74 94.35 97.09 99.16 99.70 99.87 99.96 0.30 0.13 0.04
10 2022202301 Apr 2022 to Mar 2023 (Period 01) Elizabeth line 190767.0 62.84 87.62 95.40 97.62 99.21 99.67 99.82 99.92 0.33 0.18 0.08 2211125.0 58.42 84.66 94.31 97.06 99.14 99.69 99.86 99.96 0.31 0.14 0.04
10 2022202302 Apr 2022 to Mar 2023 (Period 02) Elizabeth line 198079.0 62.96 87.27 95.08 97.38 99.16 99.63 99.79 99.91 0.37 0.21 0.09 2248914.0 58.47 84.62 94.24 97.00 99.11 99.67 99.84 99.95 0.33 0.16 0.05
10 2022202303 Apr 2022 to Mar 2023 (Period 03) Elizabeth line 244920.0 67.54 89.28 95.45 97.53 99.33 99.76 99.91 99.98 0.24 0.09 0.02 2319192.0 59.28 84.99 94.35 97.06 99.14 99.68 99.85 99.95 0.32 0.15 0.05
10 2022202304 Apr 2022 to Mar 2023 (Period 04) Elizabeth line 264901.0 64.96 87.50 94.47 96.63 98.56 99.32 99.66 99.91 0.68 0.34 0.09 2407550.0 59.73 85.07 94.24 96.94 99.06 99.63 99.82 99.95 0.37 0.18 0.05
10 2022202305 Apr 2022 to Mar 2023 (Period 05) Elizabeth line 243723.0 65.51 87.90 95.23 97.35 99.09 99.60 99.81 99.96 0.40 0.19 0.04 2474312.0 60.34 85.26 94.25 96.93 99.04 99.62 99.82 99.94 0.38 0.18 0.06
10 2022202306 Apr 2022 to Mar 2023 (Period 06) Elizabeth line 269034.0 62.48 86.08 93.78 96.33 98.69 99.42 99.74 99.90 0.58 0.26 0.10 2571057.0 60.58 85.24 94.11 96.80 98.97 99.58 99.80 99.94 0.42 0.20 0.06
10 2022202307 Apr 2022 to Mar 2023 (Period 07) Elizabeth line 256298.0 65.04 88.22 95.55 97.52 99.09 99.56 99.78 99.92 0.44 0.22 0.08 2652023.0 61.18 85.50 94.18 96.80 98.95 99.56 99.79 99.93 0.44 0.21 0.07
10 2022202308 Apr 2022 to Mar 2023 (Period 08) Elizabeth line 272190.0 61.81 84.52 93.05 95.87 98.38 99.18 99.57 99.85 0.82 0.43 0.15 2749155.0 61.78 85.70 94.17 96.76 98.91 99.53 99.77 99.93 0.47 0.23 0.07
10 2022202309 Apr 2022 to Mar 2023 (Period 09) Elizabeth line 296450.0 58.29 80.07 89.76 93.77 97.53 98.80 99.34 99.74 1.20 0.66 0.26 2871468.0 62.16 85.62 93.90 96.54 98.78 99.45 99.72 99.90 0.55 0.28 0.10
10 2022202310 Apr 2022 to Mar 2023 (Period 10) Elizabeth line 197118.0 66.32 86.09 93.38 96.03 98.71 99.62 99.89 99.98 0.38 0.11 0.02 2909436.0 62.68 85.76 93.89 96.51 98.77 99.46 99.73 99.91 0.54 0.27 0.09
10 2022202311 Apr 2022 to Mar 2023 (Period 11) Elizabeth line 297473.0 62.48 84.70 92.83 95.74 98.34 99.16 99.54 99.83 0.84 0.46 0.17 3031857.0 62.80 85.70 93.76 96.40 98.71 99.41 99.70 99.90 0.59 0.30 0.10
10 2022202312 Apr 2022 to Mar 2023 (Period 12) Elizabeth line 279325.0 63.25 84.58 92.67 95.45 98.06 98.99 99.41 99.73 1.01 0.59 0.27 3154992.0 63.12 85.73 93.68 96.32 98.64 99.37 99.68 99.88 0.63 0.32 0.12
10 2022202313 Apr 2022 to Mar 2023 (Period 13) Elizabeth line 279293.0 64.21 86.08 93.60 96.35 98.75 99.43 99.74 99.91 0.57 0.26 0.09 3289571.0 63.54 85.97 93.74 96.34 98.64 99.37 99.68 99.88 0.63 0.32 0.12
10 2023202401 Apr 2023 to Mar 2024 (Period 01) Elizabeth line 299748.0 60.00 81.91 90.29 93.71 97.13 98.40 99.04 99.61 1.60 0.96 0.39 3398552.0 63.27 85.52 93.34 96.03 98.47 99.26 99.61 99.86 0.74 0.39 0.14
10 2023202402 Apr 2023 to Mar 2024 (Period 02) Elizabeth line 313381.0 60.93 82.84 90.79 94.10 97.43 98.74 99.33 99.73 1.26 0.67 0.27 3513854.0 63.07 85.19 93.01 95.78 98.34 99.20 99.58 99.84 0.80 0.42 0.16
10 2023202403 Apr 2023 to Mar 2024 (Period 03) Elizabeth line 323934.0 59.72 82.43 91.04 94.60 97.91 99.02 99.51 99.85 0.98 0.49 0.15 3592868.0 62.47 84.66 92.67 95.56 98.24 99.14 99.55 99.83 0.86 0.45 0.17
10 2023202404 Apr 2023 to Mar 2024 (Period 04) Elizabeth line 329395.0 60.71 83.69 92.01 95.13 98.02 99.05 99.51 99.88 0.95 0.49 0.12 3657362.0 62.13 84.37 92.48 95.44 98.19 99.12 99.54 99.83 0.88 0.46 0.17
10 2023202405 Apr 2023 to Mar 2024 (Period 05) Elizabeth line 310520.0 60.27 83.92 92.22 95.22 97.88 98.91 99.40 99.79 1.09 0.60 0.21 3724159.0 61.75 84.10 92.28 95.30 98.11 99.07 99.51 99.82 0.93 0.49 0.18
10 2023202406 Apr 2023 to Mar 2024 (Period 06) Elizabeth line 324952.0 57.94 81.48 90.35 93.73 97.15 98.41 98.93 99.49 1.59 1.07 0.51 3780077.0 61.37 83.73 92.01 95.09 97.98 98.99 99.44 99.78 1.01 0.56 0.22
10 2023202407 Apr 2023 to Mar 2024 (Period 07) Elizabeth line 327017.0 58.01 81.75 91.16 94.52 97.72 98.93 99.50 99.86 1.07 0.50 0.14 3850796.0 60.84 83.26 91.70 94.88 97.89 98.95 99.42 99.78 1.05 0.58 0.22
10 2023202408 Apr 2023 to Mar 2024 (Period 08) Elizabeth line 325435.0 52.15 75.45 86.42 91.25 96.03 97.77 98.60 99.44 2.23 1.40 0.56 3904041.0 60.05 82.52 91.16 94.51 97.70 98.83 99.34 99.75 1.17 0.66 0.25
10 2023202409 Apr 2023 to Mar 2024 (Period 09) Elizabeth line 313737.0 49.87 73.09 85.24 90.56 95.86 97.88 98.91 99.65 2.12 1.09 0.35 3921328.0 59.37 81.95 90.79 94.25 97.56 98.76 99.31 99.74 1.24 0.69 0.26
10 2023202410 Apr 2023 to Mar 2024 (Period 10) Elizabeth line 295735.0 56.10 78.77 89.15 93.21 97.03 98.43 99.11 99.64 1.57 0.89 0.36 4019945.0 58.79 81.52 90.55 94.09 97.47 98.69 99.27 99.72 1.31 0.73 0.28
10 2023202411 Apr 2023 to Mar 2024 (Period 11) Elizabeth line 315292.0 56.35 79.10 90.06 94.19 97.76 98.91 99.39 99.75 1.09 0.61 0.25 4037764.0 58.33 81.09 90.34 93.97 97.43 98.68 99.26 99.72 1.32 0.74 0.28
10 2023202412 Apr 2023 to Mar 2024 (Period 12) Elizabeth line 306992.0 60.41 83.58 92.88 96.06 98.55 99.36 99.62 99.86 0.64 0.38 0.14 4065431.0 58.14 81.04 90.37 94.03 97.47 98.71 99.27 99.73 1.29 0.73 0.27
10 2023202413 Apr 2023 to Mar 2024 (Period 13) Elizabeth line 316827.0 59.89 83.29 92.55 95.73 98.42 99.27 99.59 99.85 0.73 0.41 0.15 4102965.0 57.87 80.87 90.32 94.00 97.45 98.70 99.27 99.72 1.30 0.73 0.28
10 2024202501 Apr 2024 to Mar 2025 (Period 01) Elizabeth line 316042.0 58.32 82.00 92.14 95.68 98.57 99.44 99.74 99.93 0.56 0.26 0.07 4119259.0 57.75 80.88 90.46 94.15 97.56 98.78 99.32 99.75 1.22 0.68 0.25
10 2024202502 Apr 2024 to Mar 2025 (Period 02) Elizabeth line 330939.0 59.16 83.11 92.65 96.01 98.73 99.55 99.83 99.96 0.45 0.17 0.04 4136817.0 57.62 80.91 90.61 94.30 97.67 98.84 99.36 99.76 1.16 0.64 0.24
10 2024202503 Apr 2024 to Mar 2025 (Period 03) Elizabeth line 317433.0 61.67 84.54 92.76 95.68 98.06 98.97 99.34 99.74 1.03 0.66 0.26 4130316.0 57.77 81.07 90.75 94.39 97.68 98.84 99.35 99.76 1.16 0.65 0.24
10 2024202504 Apr 2024 to Mar 2025 (Period 04) Elizabeth line 329692.0 58.34 81.77 91.53 95.08 97.91 98.98 99.45 99.81 1.02 0.55 0.19 4130613.0 57.58 80.92 90.71 94.38 97.67 98.83 99.34 99.75 1.17 0.66 0.25
10 2024202505 Apr 2024 to Mar 2025 (Period 05) Elizabeth line 325803.0 58.91 81.76 91.03 94.67 97.89 99.01 99.51 99.84 0.99 0.49 0.16 4145896.0 57.48 80.76 90.62 94.34 97.67 98.84 99.35 99.75 1.16 0.65 0.25
10 2024202506 Apr 2024 to Mar 2025 (Period 06) Elizabeth line 327991.0 57.37 81.92 92.26 95.70 98.46 99.33 99.69 99.91 0.67 0.31 0.09 4148935.0 57.44 80.80 90.77 94.50 97.77 98.91 99.41 99.79 1.09 0.59 0.21
10 2024202507 Apr 2024 to Mar 2025 (Period 07) Elizabeth line 326053.0 55.44 78.89 90.48 94.72 98.07 99.02 99.48 99.81 0.98 0.52 0.19 4147971.0 57.23 80.57 90.72 94.51 97.80 98.92 99.41 99.78 1.08 0.59 0.22
10 2024202508 Apr 2024 to Mar 2025 (Period 08) Elizabeth line 332404.0 57.10 81.48 92.96 96.71 99.14 99.65 99.81 99.93 0.35 0.19 0.07 4154940.0 57.62 81.05 91.23 94.94 98.05 99.07 99.50 99.82 0.93 0.50 0.18
10 2024202509 Apr 2024 to Mar 2025 (Period 09) Elizabeth line 307882.0 48.85 72.87 86.59 92.50 97.59 99.02 99.57 99.90 0.98 0.43 0.10 4149085.0 57.56 81.04 91.34 95.09 98.18 99.16 99.55 99.84 0.84 0.45 0.16
10 2024202510 Apr 2024 to Mar 2025 (Period 10) Elizabeth line 294705.0 53.25 79.99 92.18 95.89 98.72 99.48 99.71 99.91 0.52 0.29 0.09 4148055.0 57.35 81.13 91.56 95.29 98.30 99.23 99.60 99.86 0.77 0.40 0.14
10 2024202511 Apr 2024 to Mar 2025 (Period 11) Elizabeth line 300876.0 48.48 73.34 86.77 91.97 96.81 98.43 99.16 99.75 1.57 0.84 0.25 4133639.0 56.78 80.72 91.32 95.13 98.23 99.20 99.58 99.86 0.80 0.42 0.14
10 2024202512 Apr 2024 to Mar 2025 (Period 12) Elizabeth line 295670.0 45.39 71.90 87.20 93.05 97.82 99.17 99.62 99.90 0.83 0.38 0.10 4122317.0 55.70 79.87 90.91 94.91 98.18 99.18 99.58 99.86 0.82 0.42 0.14
10 2024202513 Apr 2024 to Mar 2025 (Period 13) Elizabeth line 352521.0 50.55 77.02 90.40 94.90 98.36 99.33 99.65 99.92 0.67 0.35 0.08 4158011.0 54.94 79.37 90.74 94.84 98.18 99.19 99.58 99.87 0.81 0.42 0.13
10 2025202601 Apr 2025 to Mar 2026 (Period 01) Elizabeth line 303648.0 52.37 78.41 91.18 95.30 98.36 99.23 99.62 99.88 0.77 0.38 0.12 4145617.0 54.50 79.10 90.67 94.81 98.16 99.17 99.58 99.87 0.83 0.42 0.13
10 2025202602 Apr 2025 to Mar 2026 (Period 02) Elizabeth line 327391.0 53.20 78.72 91.21 95.34 98.37 99.26 99.59 99.90 0.74 0.41 0.10 4142069.0 54.02 78.75 90.55 94.76 98.13 99.15 99.56 99.86 0.85 0.44 0.14
10 2025202603 Apr 2025 to Mar 2026 (Period 03) Elizabeth line 331507.0 58.89 84.17 93.68 96.64 98.95 99.52 99.74 99.90 0.48 0.26 0.10 4156143.0 53.83 78.74 90.63 94.84 98.20 99.19 99.59 99.87 0.81 0.41 0.13
10 2025202604 Apr 2025 to Mar 2026 (Period 04) Elizabeth line 333877.0 56.34 81.67 92.03 95.61 98.58 99.43 99.71 99.94 0.57 0.29 0.06 4160328.0 53.67 78.73 90.67 94.88 98.25 99.23 99.61 99.88 0.77 0.39 0.12
10 2025202605 Apr 2025 to Mar 2026 (Period 05) Elizabeth line 333066.0 58.36 83.92 93.32 96.46 98.67 99.37 99.66 99.88 0.63 0.34 0.12 4167591.0 53.63 78.91 90.86 95.02 98.32 99.26 99.62 99.89 0.74 0.38 0.11
10 2025202606 Apr 2025 to Mar 2026 (Period 06) Elizabeth line 329772.0 50.26 76.07 89.18 94.08 98.19 99.23 99.58 99.84 0.77 0.42 0.16 4169372.0 53.07 78.45 90.61 94.90 98.29 99.25 99.61 99.88 0.75 0.39 0.12
10 2025202607 Apr 2025 to Mar 2026 (Period 07) Elizabeth line 322940.0 47.64 72.91 86.77 92.22 97.04 98.55 99.21 99.69 1.45 0.79 0.31 4166259.0 52.47 77.99 90.33 94.70 98.21 99.21 99.59 99.87 0.79 0.41 0.13
10 2025202608 Apr 2025 to Mar 2026 (Period 08) Elizabeth line 326678.0 47.46 73.42 88.00 93.44 97.75 98.96 99.45 99.78 1.04 0.55 0.22 4160533.0 51.70 77.35 89.93 94.44 98.10 99.16 99.56 99.86 0.84 0.44 0.14
10 2025202609 Apr 2025 to Mar 2026 (Period 09) Elizabeth line 318928.0 46.60 73.76 88.21 93.76 98.15 99.23 99.59 99.86 0.77 0.41 0.14 4171579.0 51.52 77.40 90.05 94.53 98.15 99.17 99.56 99.86 0.83 0.44 0.14
10 2025202610 Apr 2025 to Mar 2026 (Period 10) Elizabeth line 300410.0 52.50 79.60 91.59 95.71 98.53 99.30 99.59 99.85 0.70 0.41 0.15 4177284.0 51.47 77.38 90.01 94.52 98.13 99.16 99.55 99.85 0.84 0.45 0.15
10 2025202611 Apr 2025 to Mar 2026 (Period 11) Elizabeth line 331409.0 49.80 77.75 90.52 94.74 97.97 98.99 99.47 99.85 1.01 0.53 0.15 4207817.0 51.55 77.70 90.28 94.72 98.21 99.20 99.58 99.86 0.80 0.42 0.14
10 2025202612 Apr 2025 to Mar 2026 (Period 12) Elizabeth line 336762.0 52.77 80.19 91.70 95.72 98.78 99.56 99.79 99.96 0.44 0.21 0.04 4248909.0 52.08 78.30 90.61 94.92 98.29 99.23 99.59 99.87 0.77 0.41 0.13
10 2025202613 Apr 2025 to Mar 2026 (Period 13) Elizabeth line 340024.0 52.41 77.92 90.30 94.52 98.12 99.17 99.57 99.86 0.83 0.43 0.14 4236412.0 52.23 78.38 90.60 94.89 98.27 99.22 99.58 99.86 0.78 0.42 0.14
10 2026202701 Apr 2026 to Mar 2027 (Period 01) Elizabeth line 377174.0 52.92 78.98 90.89 95.13 98.33 99.15 99.49 99.74 0.85 0.51 0.26 4309938.0 52.28 78.43 90.58 94.88 98.27 99.21 99.57 99.85 0.79 0.43 0.15
10 2026202702 Apr 2026 to Mar 2027 (Period 02) Elizabeth line 329473.0 56.45 80.01 90.88 94.85 98.00 98.98 99.40 99.78 1.02 0.60 0.22 4312020.0 52.53 78.53 90.56 94.84 98.24 99.19 99.56 99.84 0.81 0.44 0.16
11 2014201501 Apr 2014 to Mar 2015 (Period 01) Govia Thameslink Railway 725744.0 37.04 67.03 86.58 93.12 97.56 98.78 99.31 99.71 1.22 0.69 0.29 725744.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201502 Apr 2014 to Mar 2015 (Period 02) Govia Thameslink Railway 775647.0 35.77 65.13 84.88 91.85 97.04 98.56 99.21 99.68 1.44 0.79 0.32 1501391.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201503 Apr 2014 to Mar 2015 (Period 03) Govia Thameslink Railway 777213.0 38.61 68.59 87.26 93.40 97.65 98.86 99.39 99.79 1.14 0.61 0.21 2278604.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201504 Apr 2014 to Mar 2015 (Period 04) Govia Thameslink Railway 789689.0 38.04 67.68 86.79 93.41 97.87 99.04 99.53 99.87 0.96 0.47 0.13 3068293.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201505 Apr 2014 to Mar 2015 (Period 05) Govia Thameslink Railway 784890.0 37.15 66.49 85.88 92.60 97.47 98.88 99.47 99.84 1.12 0.53 0.16 3853183.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201506 Apr 2014 to Mar 2015 (Period 06) Govia Thameslink Railway 769753.0 39.17 69.02 87.65 93.82 98.03 99.15 99.58 99.88 0.85 0.42 0.12 4622936.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201507 Apr 2014 to Mar 2015 (Period 07) Govia Thameslink Railway 779016.0 33.87 62.08 82.52 90.68 97.01 98.72 99.37 99.79 1.28 0.63 0.21 5401952.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201508 Apr 2014 to Mar 2015 (Period 08) Govia Thameslink Railway 775551.0 28.27 54.39 76.17 86.34 95.33 98.02 99.13 99.79 1.98 0.87 0.21 6177503.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201509 Apr 2014 to Mar 2015 (Period 09) Govia Thameslink Railway 775684.0 28.84 55.04 76.34 86.27 95.16 97.83 98.95 99.65 2.17 1.05 0.35 6953187.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201510 Apr 2014 to Mar 2015 (Period 10) Govia Thameslink Railway 665302.0 32.75 60.31 80.13 88.49 95.66 97.97 98.89 99.61 2.03 1.11 0.39 7618489.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201511 Apr 2014 to Mar 2015 (Period 11) Govia Thameslink Railway 788885.0 31.23 57.68 77.01 85.82 94.28 97.13 98.42 99.41 2.87 1.58 0.59 8407374.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201512 Apr 2014 to Mar 2015 (Period 12) Govia Thameslink Railway 802267.0 33.20 60.75 80.54 88.77 95.97 98.23 99.15 99.77 1.77 0.85 0.23 9209641.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2014201513 Apr 2014 to Mar 2015 (Period 13) Govia Thameslink Railway 881570.0 36.08 63.68 82.29 89.78 95.95 97.98 98.87 99.56 2.02 1.13 0.44 10091211.0 34.64 62.92 82.62 90.33 96.53 98.40 99.17 99.72 1.60 0.83 0.28
11 2015201601 Apr 2015 to Mar 2016 (Period 01) Govia Thameslink Railway 916150.0 37.39 66.31 84.97 91.72 96.82 98.40 99.11 99.66 1.60 0.89 0.34 10281617.0 34.71 62.93 82.55 90.26 96.48 98.37 99.16 99.71 1.63 0.84 0.29
11 2015201602 Apr 2015 to Mar 2016 (Period 02) Govia Thameslink Railway 804574.0 37.68 66.96 85.76 92.50 97.39 98.74 99.32 99.75 1.26 0.68 0.25 10310544.0 34.86 63.08 82.62 90.31 96.51 98.38 99.17 99.72 1.62 0.83 0.28
11 2015201603 Apr 2015 to Mar 2016 (Period 03) Govia Thameslink Railway 808677.0 35.79 65.02 84.87 92.10 97.38 98.85 99.44 99.86 1.15 0.56 0.14 10342008.0 34.65 62.82 82.45 90.22 96.50 98.38 99.17 99.73 1.62 0.83 0.27
11 2015201604 Apr 2015 to Mar 2016 (Period 04) Govia Thameslink Railway 808196.0 33.01 60.88 81.23 89.42 96.03 98.07 98.95 99.62 1.93 1.05 0.38 10360515.0 34.27 62.30 82.02 89.91 96.35 98.31 99.13 99.71 1.69 0.87 0.29
11 2015201605 Apr 2015 to Mar 2016 (Period 05) Govia Thameslink Railway 809341.0 34.61 62.97 83.07 90.88 96.70 98.45 99.19 99.72 1.55 0.81 0.28 10384966.0 34.08 62.04 81.81 89.79 96.30 98.28 99.11 99.70 1.72 0.89 0.30
11 2015201606 Apr 2015 to Mar 2016 (Period 06) Govia Thameslink Railway 798604.0 35.19 63.80 84.24 91.91 97.41 98.86 99.45 99.80 1.14 0.55 0.20 10413817.0 33.79 61.65 81.57 89.65 96.26 98.26 99.10 99.69 1.74 0.90 0.31
11 2015201607 Apr 2015 to Mar 2016 (Period 07) Govia Thameslink Railway 811506.0 31.80 59.54 80.97 89.83 96.70 98.54 99.21 99.72 1.46 0.79 0.28 10446307.0 33.63 61.46 81.45 89.59 96.23 98.24 99.09 99.69 1.76 0.91 0.31
11 2015201608 Apr 2015 to Mar 2016 (Period 08) Govia Thameslink Railway 851125.0 25.53 49.85 72.02 83.12 93.74 97.16 98.65 99.65 2.84 1.35 0.35 10521881.0 33.37 61.04 81.08 89.30 96.10 98.17 99.05 99.68 1.83 0.95 0.32
11 2015201609 Apr 2015 to Mar 2016 (Period 09) Govia Thameslink Railway 880467.0 24.48 48.24 70.77 82.62 94.10 97.53 98.88 99.74 2.47 1.12 0.26 10626664.0 32.96 60.42 80.57 88.97 96.00 98.14 99.04 99.68 1.86 0.96 0.32
11 2015201610 Apr 2015 to Mar 2016 (Period 10) Govia Thameslink Railway 760555.0 31.24 57.30 77.03 85.62 93.52 96.47 97.95 99.19 3.53 2.05 0.81 10721917.0 32.85 60.20 80.34 88.76 95.85 98.04 98.97 99.65 1.96 1.03 0.35
11 2015201611 Apr 2015 to Mar 2016 (Period 11) Govia Thameslink Railway 898390.0 30.19 55.98 77.13 86.74 95.21 97.77 98.83 99.63 2.23 1.17 0.37 10831422.0 32.75 60.04 80.32 88.81 95.91 98.08 99.00 99.67 1.92 1.00 0.33
11 2015201612 Apr 2015 to Mar 2016 (Period 12) Govia Thameslink Railway 886767.0 30.52 56.91 78.42 87.66 95.61 98.02 99.02 99.69 1.98 0.98 0.31 10915922.0 32.54 59.73 80.15 88.72 95.88 98.06 98.99 99.66 1.94 1.01 0.34
11 2015201613 Apr 2015 to Mar 2016 (Period 13) Govia Thameslink Railway 791969.0 32.14 59.45 80.56 89.54 96.62 98.58 99.31 99.81 1.42 0.69 0.19 10826321.0 32.22 59.39 80.01 88.69 95.93 98.11 99.02 99.68 1.89 0.98 0.32
11 2016201701 Apr 2016 to Mar 2017 (Period 01) Govia Thameslink Railway 932670.0 32.69 60.90 82.02 90.54 96.89 98.57 99.26 99.72 1.43 0.74 0.28 10842841.0 31.82 58.93 79.76 88.60 95.94 98.12 99.04 99.69 1.88 0.96 0.31
11 2016201702 Apr 2016 to Mar 2017 (Period 02) Govia Thameslink Railway 845991.0 30.90 57.63 78.54 87.79 95.56 97.99 98.99 99.71 2.01 1.01 0.29 10884258.0 31.32 58.24 79.22 88.25 95.80 98.07 99.01 99.68 1.93 0.99 0.32
11 2016201703 Apr 2016 to Mar 2017 (Period 03) Govia Thameslink Railway 801601.0 29.57 54.54 74.06 82.99 91.94 95.48 97.36 98.99 4.52 2.64 1.01 10877182.0 30.86 57.46 78.42 87.57 95.40 97.82 98.86 99.62 2.18 1.14 0.38
11 2016201704 Apr 2016 to Mar 2017 (Period 04) Govia Thameslink Railway 814731.0 28.24 53.15 73.78 83.54 92.83 96.20 97.81 99.13 3.80 2.19 0.87 10883717.0 30.50 56.89 77.86 87.13 95.16 97.68 98.77 99.58 2.32 1.23 0.42
11 2016201705 Apr 2016 to Mar 2017 (Period 05) Govia Thameslink Railway 788740.0 29.56 54.99 75.34 84.78 93.55 96.64 98.10 99.33 3.36 1.90 0.67 10863116.0 30.13 56.29 77.29 86.68 94.93 97.55 98.69 99.56 2.45 1.31 0.44
11 2016201706 Apr 2016 to Mar 2017 (Period 06) Govia Thameslink Railway 841064.0 28.72 53.72 74.78 84.73 93.82 96.91 98.36 99.45 3.09 1.64 0.55 10905576.0 29.65 55.55 76.59 86.15 94.66 97.40 98.61 99.53 2.60 1.39 0.47
11 2016201707 Apr 2016 to Mar 2017 (Period 07) Govia Thameslink Railway 872510.0 28.96 53.77 75.11 85.24 94.69 97.68 98.90 99.72 2.32 1.10 0.28 10966580.0 29.43 55.11 76.15 85.81 94.51 97.34 98.59 99.53 2.66 1.41 0.47
11 2016201708 Apr 2016 to Mar 2017 (Period 08) Govia Thameslink Railway 844760.0 25.05 48.36 69.93 81.08 92.63 96.63 98.35 99.50 3.37 1.65 0.50 10960215.0 29.40 55.00 75.99 85.65 94.43 97.30 98.57 99.52 2.70 1.43 0.48
11 2016201709 Apr 2016 to Mar 2017 (Period 09) Govia Thameslink Railway 845790.0 21.16 41.68 62.16 74.03 88.38 94.41 97.10 99.09 5.59 2.90 0.91 10925538.0 29.16 54.51 75.34 84.99 93.98 97.06 98.43 99.47 2.94 1.57 0.53
11 2016201710 Apr 2016 to Mar 2017 (Period 10) Govia Thameslink Railway 674962.0 31.56 56.73 76.10 84.79 93.54 96.83 98.36 99.51 3.17 1.64 0.49 10839945.0 29.16 54.45 75.27 84.94 93.99 97.08 98.46 99.49 2.92 1.54 0.51
11 2016201711 Apr 2016 to Mar 2017 (Period 11) Govia Thameslink Railway 819039.0 30.24 54.76 75.36 84.93 94.32 97.51 98.80 99.66 2.49 1.20 0.34 10760594.0 29.16 54.35 75.12 84.79 93.91 97.06 98.45 99.49 2.94 1.55 0.51
11 2016201712 Apr 2016 to Mar 2017 (Period 12) Govia Thameslink Railway 918448.0 33.01 58.32 78.23 87.13 95.19 97.73 98.80 99.60 2.27 1.20 0.40 10792275.0 29.37 54.48 75.11 84.75 93.88 97.04 98.44 99.48 2.96 1.56 0.52
11 2016201713 Apr 2016 to Mar 2017 (Period 13) Govia Thameslink Railway 902568.0 36.28 62.25 81.87 90.00 96.47 98.41 99.18 99.71 1.59 0.82 0.29 10902874.0 29.74 54.76 75.28 84.84 93.90 97.04 98.43 99.48 2.96 1.57 0.52
11 2017201801 Apr 2017 to Mar 2018 (Period 01) Govia Thameslink Railway 958742.0 39.27 65.90 84.50 91.66 97.26 98.89 99.49 99.85 1.11 0.51 0.15 10928946.0 30.33 55.21 75.51 84.95 93.94 97.07 98.46 99.49 2.93 1.54 0.51
11 2017201802 Apr 2017 to Mar 2018 (Period 02) Govia Thameslink Railway 927833.0 37.41 63.91 83.64 91.50 97.46 99.03 99.55 99.86 0.97 0.45 0.14 11010788.0 30.88 55.76 75.96 85.28 94.11 97.16 98.51 99.51 2.84 1.49 0.49
11 2017201803 Apr 2017 to Mar 2018 (Period 03) Govia Thameslink Railway 925999.0 37.28 63.50 82.70 90.24 96.43 98.27 99.05 99.63 1.73 0.95 0.37 11135186.0 31.51 56.49 76.66 85.86 94.46 97.38 98.64 99.55 2.62 1.36 0.45
11 2017201804 Apr 2017 to Mar 2018 (Period 04) Govia Thameslink Railway 846052.0 37.64 64.50 84.22 91.85 97.52 98.98 99.52 99.86 1.02 0.48 0.14 11166507.0 32.21 57.34 77.45 86.48 94.81 97.59 98.76 99.61 2.41 1.24 0.39
11 2017201805 Apr 2017 to Mar 2018 (Period 05) Govia Thameslink Railway 946028.0 39.00 64.94 83.63 91.24 97.12 98.72 99.39 99.81 1.28 0.61 0.19 11323795.0 32.96 58.14 78.11 87.00 95.09 97.75 98.86 99.64 2.25 1.14 0.36
11 2017201806 Apr 2017 to Mar 2018 (Period 06) Govia Thameslink Railway 918024.0 37.91 63.51 82.75 90.52 96.89 98.73 99.39 99.82 1.27 0.61 0.18 11400755.0 33.67 58.90 78.73 87.45 95.33 97.89 98.94 99.67 2.11 1.06 0.33
11 2017201807 Apr 2017 to Mar 2018 (Period 07) Govia Thameslink Railway 932258.0 34.17 59.28 79.76 89.02 96.76 98.79 99.48 99.86 1.21 0.52 0.14 11460503.0 34.07 59.32 79.09 87.74 95.49 97.98 98.99 99.68 2.02 1.01 0.32
11 2017201808 Apr 2017 to Mar 2018 (Period 08) Govia Thameslink Railway 921453.0 30.60 54.27 74.59 84.63 94.47 97.58 98.81 99.62 2.42 1.19 0.38 11537196.0 34.46 59.72 79.40 87.98 95.62 98.04 99.02 99.69 1.96 0.98 0.31
11 2017201809 Apr 2017 to Mar 2018 (Period 09) Govia Thameslink Railway 924425.0 30.96 54.73 75.07 85.04 94.57 97.52 98.69 99.52 2.48 1.31 0.48 11615831.0 35.15 60.64 80.31 88.77 96.06 98.27 99.13 99.72 1.73 0.87 0.28
11 2017201810 Apr 2017 to Mar 2018 (Period 10) Govia Thameslink Railway 813222.0 34.48 59.44 78.33 86.65 94.82 97.64 98.85 99.69 2.36 1.15 0.31 11754091.0 35.30 60.78 80.41 88.85 96.12 98.30 99.16 99.73 1.70 0.84 0.27
11 2017201811 Apr 2017 to Mar 2018 (Period 11) Govia Thameslink Railway 940051.0 36.26 61.91 81.64 90.03 96.97 98.82 99.47 99.83 1.18 0.53 0.17 11875103.0 35.73 61.28 80.86 89.21 96.31 98.40 99.21 99.74 1.60 0.79 0.26
11 2017201812 Apr 2017 to Mar 2018 (Period 12) Govia Thameslink Railway 897684.0 34.86 59.77 79.52 88.15 95.69 97.91 98.84 99.61 2.09 1.16 0.39 11854339.0 35.87 61.40 80.96 89.29 96.35 98.41 99.21 99.74 1.59 0.79 0.26
11 2017201813 Apr 2017 to Mar 2018 (Period 13) Govia Thameslink Railway 912563.0 37.58 62.43 81.31 89.49 96.47 98.46 99.23 99.75 1.54 0.77 0.25 11864334.0 35.97 61.41 80.92 89.25 96.35 98.42 99.22 99.75 1.58 0.78 0.25
11 2018201901 Apr 2018 to Mar 2019 (Period 01) Govia Thameslink Railway 925107.0 40.53 66.15 84.63 91.81 97.29 98.70 99.25 99.68 1.30 0.75 0.32 11830699.0 36.06 61.42 80.92 89.26 96.35 98.40 99.20 99.73 1.60 0.80 0.27
11 2018201902 Apr 2018 to Mar 2019 (Period 02) Govia Thameslink Railway 936749.0 41.01 65.86 83.74 91.10 96.96 98.60 99.28 99.76 1.40 0.72 0.24 11839615.0 36.35 61.58 80.93 89.23 96.32 98.37 99.17 99.73 1.63 0.83 0.27
11 2018201903 Apr 2018 to Mar 2019 (Period 03) Govia Thameslink Railway 897453.0 47.37 71.22 85.19 90.63 95.77 97.89 98.85 99.59 2.11 1.15 0.41 11811069.0 37.11 62.16 81.11 89.26 96.26 98.34 99.16 99.72 1.66 0.84 0.28
11 2018201904 Apr 2018 to Mar 2019 (Period 04) Govia Thameslink Railway 903242.0 42.42 65.86 81.22 87.65 94.13 96.79 98.14 99.29 3.21 1.86 0.71 11868259.0 37.48 62.27 80.90 88.95 96.01 98.17 99.06 99.68 1.83 0.94 0.32
11 2018201905 Apr 2018 to Mar 2019 (Period 05) Govia Thameslink Railway 981977.0 45.41 70.41 85.69 91.35 96.33 98.16 98.99 99.64 1.84 1.01 0.36 11904208.0 38.01 62.73 81.08 88.96 95.95 98.13 99.02 99.67 1.87 0.98 0.33
11 2018201906 Apr 2018 to Mar 2019 (Period 06) Govia Thameslink Railway 981354.0 48.76 74.73 89.36 94.24 97.87 98.98 99.44 99.79 1.02 0.56 0.21 11967538.0 38.90 63.65 81.63 89.28 96.04 98.15 99.03 99.67 1.85 0.97 0.33
11 2018201907 Apr 2018 to Mar 2019 (Period 07) Govia Thameslink Railway 992678.0 43.95 69.49 86.08 92.34 97.21 98.74 99.40 99.81 1.26 0.60 0.19 12027958.0 39.69 64.48 82.14 89.55 96.08 98.15 99.03 99.66 1.85 0.97 0.34
11 2018201908 Apr 2018 to Mar 2019 (Period 08) Govia Thameslink Railway 980241.0 40.47 65.78 83.41 90.71 96.80 98.68 99.31 99.74 1.32 0.69 0.26 12086746.0 40.44 65.36 82.82 90.02 96.26 98.24 99.07 99.67 1.76 0.93 0.33
11 2018201909 Apr 2018 to Mar 2019 (Period 09) Govia Thameslink Railway 983878.0 37.42 62.32 80.97 89.07 96.01 98.32 99.19 99.72 1.68 0.81 0.28 12146199.0 40.92 65.92 83.26 90.32 96.37 98.30 99.11 99.69 1.70 0.89 0.31
11 2018201910 Apr 2018 to Mar 2019 (Period 10) Govia Thameslink Railway 885286.0 44.63 70.55 86.63 92.56 97.35 98.85 99.46 99.84 1.15 0.54 0.16 12218263.0 41.62 66.69 83.83 90.73 96.54 98.38 99.15 99.70 1.62 0.85 0.30
11 2018201911 Apr 2018 to Mar 2019 (Period 11) Govia Thameslink Railway 1064788.0 43.89 69.69 86.10 92.15 97.02 98.57 99.19 99.70 1.43 0.81 0.30 12343000.0 42.22 67.31 84.20 90.90 96.55 98.37 99.13 99.69 1.63 0.87 0.31
11 2018201912 Apr 2018 to Mar 2019 (Period 12) Govia Thameslink Railway 1064527.0 46.28 72.69 88.46 93.76 97.76 99.04 99.54 99.87 0.96 0.46 0.13 12509843.0 43.09 68.31 84.89 91.34 96.71 98.46 99.18 99.71 1.54 0.82 0.29
11 2018201913 Apr 2018 to Mar 2019 (Period 13) Govia Thameslink Railway 1075760.0 46.63 72.56 87.76 92.91 97.07 98.51 99.15 99.68 1.49 0.85 0.32 12673040.0 43.79 69.10 85.40 91.61 96.76 98.46 99.18 99.70 1.54 0.82 0.30
11 2019202001 Apr 2019 to Mar 2020 (Period 01) Govia Thameslink Railway 1015555.0 50.53 76.96 90.81 95.05 98.13 99.07 99.45 99.75 0.93 0.55 0.25 1015555.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202002 Apr 2019 to Mar 2020 (Period 02) Govia Thameslink Railway 1074185.0 48.61 75.02 89.70 94.40 98.00 99.17 99.60 99.88 0.83 0.40 0.12 2089740.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202003 Apr 2019 to Mar 2020 (Period 03) Govia Thameslink Railway 1088619.0 48.64 75.26 89.81 94.40 97.78 98.91 99.39 99.79 1.09 0.61 0.21 3178359.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202004 Apr 2019 to Mar 2020 (Period 04) Govia Thameslink Railway 1103705.0 46.94 73.39 88.84 93.88 97.76 98.92 99.38 99.74 1.08 0.62 0.26 4282064.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202005 Apr 2019 to Mar 2020 (Period 05) Govia Thameslink Railway 1066038.0 44.66 69.84 85.82 91.74 96.62 98.37 99.10 99.68 1.63 0.90 0.32 5348102.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202006 Apr 2019 to Mar 2020 (Period 06) Govia Thameslink Railway 1085570.0 47.99 73.67 88.69 93.86 97.74 98.98 99.49 99.83 1.02 0.51 0.17 6433672.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202007 Apr 2019 to Mar 2020 (Period 07) Govia Thameslink Railway 1082528.0 43.41 68.48 85.29 91.62 96.67 98.38 99.11 99.64 1.62 0.89 0.36 7516200.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202008 Apr 2019 to Mar 2020 (Period 08) Govia Thameslink Railway 1087966.0 41.07 66.15 84.33 91.49 97.13 98.77 99.39 99.80 1.23 0.61 0.20 8604166.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202009 Apr 2019 to Mar 2020 (Period 09) Govia Thameslink Railway 1088377.0 37.33 62.20 81.35 89.53 96.23 98.35 99.19 99.74 1.65 0.81 0.26 9692543.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202010 Apr 2019 to Mar 2020 (Period 10) Govia Thameslink Railway 950278.0 43.51 68.24 85.31 91.83 97.03 98.63 99.28 99.74 1.37 0.72 0.26 10642821.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202011 Apr 2019 to Mar 2020 (Period 11) Govia Thameslink Railway 1083186.0 42.96 67.95 85.29 91.82 97.05 98.76 99.40 99.83 1.24 0.60 0.17 11726007.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202012 Apr 2019 to Mar 2020 (Period 12) Govia Thameslink Railway 1062430.0 44.17 69.30 85.76 91.82 96.72 98.44 99.16 99.70 1.56 0.84 0.30 12788437.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
11 2019202013 Apr 2019 to Mar 2020 (Period 13) Govia Thameslink Railway 1073025.0 50.93 75.04 88.75 93.53 97.46 98.78 99.33 99.78 1.22 0.67 0.22 13861462.0 45.43 70.88 86.90 92.69 97.25 98.73 99.33 99.76 1.27 0.67 0.24
11 2020202101 Apr 2020 to Mar 2021 (Period 01) Govia Thameslink Railway 849614.0 68.68 90.03 96.88 98.40 99.47 99.76 99.88 99.96 0.24 0.12 0.04 13695521.0 46.50 71.62 87.23 92.87 97.33 98.77 99.35 99.78 1.23 0.65 0.22
11 2020202102 Apr 2020 to Mar 2021 (Period 02) Govia Thameslink Railway 829411.0 65.40 87.58 95.91 97.91 99.30 99.70 99.84 99.96 0.30 0.16 0.04 13450747.0 47.49 72.33 87.57 93.06 97.39 98.80 99.36 99.78 1.20 0.64 0.22
11 2020202103 Apr 2020 to Mar 2021 (Period 03) Govia Thameslink Railway 919983.0 62.71 86.27 95.21 97.37 98.97 99.48 99.69 99.87 0.52 0.31 0.13 13282111.0 48.45 73.05 87.91 93.24 97.47 98.84 99.38 99.78 1.16 0.62 0.22
11 2020202104 Apr 2020 to Mar 2021 (Period 04) Govia Thameslink Railway 976431.0 59.72 84.37 94.37 96.97 98.79 99.38 99.64 99.85 0.62 0.36 0.15 13154837.0 49.42 73.86 88.32 93.47 97.55 98.87 99.40 99.79 1.13 0.60 0.21
11 2020202105 Apr 2020 to Mar 2021 (Period 05) Govia Thameslink Railway 979424.0 54.28 79.61 91.59 95.25 98.11 99.10 99.50 99.81 0.90 0.50 0.19 13068223.0 50.17 74.62 88.77 93.74 97.66 98.93 99.44 99.80 1.07 0.56 0.20
11 2020202106 Apr 2020 to Mar 2021 (Period 06) Govia Thameslink Railway 949237.0 52.59 78.47 91.36 95.16 98.09 99.04 99.45 99.79 0.96 0.55 0.21 12931890.0 50.53 74.99 88.96 93.84 97.69 98.93 99.43 99.80 1.07 0.57 0.20
11 2020202107 Apr 2020 to Mar 2021 (Period 07) Govia Thameslink Railway 976420.0 49.46 76.19 90.83 95.08 98.04 99.03 99.48 99.84 0.97 0.52 0.16 12825782.0 51.05 75.63 89.41 94.12 97.80 98.98 99.46 99.82 1.02 0.54 0.18
11 2020202108 Apr 2020 to Mar 2021 (Period 08) Govia Thameslink Railway 975166.0 46.29 72.56 88.50 93.86 97.81 98.96 99.45 99.80 1.04 0.55 0.20 12712982.0 51.54 76.20 89.78 94.32 97.86 99.00 99.47 99.82 1.00 0.53 0.18
11 2020202109 Apr 2020 to Mar 2021 (Period 09) Govia Thameslink Railway 985301.0 49.14 75.78 90.71 95.38 98.58 99.43 99.74 99.91 0.57 0.26 0.09 12609906.0 52.58 77.38 90.58 94.82 98.06 99.09 99.51 99.83 0.91 0.49 0.17
11 2020202110 Apr 2020 to Mar 2021 (Period 10) Govia Thameslink Railway 888397.0 50.96 77.11 90.78 94.98 98.20 99.17 99.57 99.82 0.83 0.43 0.18 12548025.0 53.15 78.05 90.99 95.06 98.14 99.13 99.54 99.84 0.87 0.46 0.16
11 2020202111 Apr 2020 to Mar 2021 (Period 11) Govia Thameslink Railway 962106.0 51.88 77.48 90.64 94.86 98.08 99.20 99.62 99.90 0.80 0.38 0.10 12426945.0 53.94 78.89 91.46 95.33 98.23 99.17 99.55 99.84 0.83 0.45 0.16
11 2020202112 Apr 2020 to Mar 2021 (Period 12) Govia Thameslink Railway 894054.0 51.89 77.55 90.45 94.71 98.15 99.17 99.57 99.84 0.83 0.43 0.16 12258569.0 54.64 79.62 91.88 95.58 98.36 99.23 99.59 99.85 0.77 0.41 0.15
11 2020202113 Apr 2020 to Mar 2021 (Period 13) Govia Thameslink Railway 789163.0 53.98 80.39 92.85 96.35 98.76 99.42 99.70 99.89 0.58 0.30 0.11 11974707.0 54.93 80.08 92.23 95.82 98.47 99.29 99.62 99.86 0.71 0.38 0.14
11 2021202201 Apr 2021 to Mar 2022 (Period 01) Govia Thameslink Railway 993089.0 55.07 81.96 93.47 96.51 98.70 99.37 99.62 99.86 0.63 0.38 0.14 12118182.0 53.97 79.54 92.00 95.70 98.42 99.26 99.60 99.86 0.74 0.40 0.14
11 2021202202 Apr 2021 to Mar 2022 (Period 02) Govia Thameslink Railway 905415.0 52.16 79.75 92.68 96.15 98.60 99.37 99.66 99.88 0.63 0.34 0.12 12194186.0 53.06 79.01 91.79 95.58 98.37 99.24 99.59 99.85 0.76 0.41 0.15
11 2021202203 Apr 2021 to Mar 2022 (Period 03) Govia Thameslink Railway 937532.0 49.65 76.83 90.79 95.11 98.30 99.25 99.63 99.90 0.75 0.37 0.10 12211735.0 52.07 78.29 91.45 95.41 98.32 99.22 99.58 99.85 0.78 0.42 0.15
11 2021202204 Apr 2021 to Mar 2022 (Period 04) Govia Thameslink Railway 918797.0 50.09 76.78 89.99 94.15 97.42 98.69 99.26 99.70 1.31 0.74 0.30 12154101.0 51.31 77.69 91.11 95.19 98.21 99.17 99.56 99.84 0.83 0.44 0.16
11 2021202205 Apr 2021 to Mar 2022 (Period 05) Govia Thameslink Railway 846281.0 49.64 76.26 90.15 94.43 97.77 98.86 99.34 99.76 1.14 0.66 0.24 12020958.0 50.95 77.43 91.00 95.13 98.19 99.15 99.55 99.84 0.85 0.45 0.16
11 2021202206 Apr 2021 to Mar 2022 (Period 06) Govia Thameslink Railway 851653.0 48.47 75.04 89.21 93.78 97.42 98.77 99.36 99.77 1.23 0.64 0.23 11923374.0 50.64 77.18 90.84 95.03 98.14 99.13 99.54 99.84 0.87 0.46 0.16
11 2021202207 Apr 2021 to Mar 2022 (Period 07) Govia Thameslink Railway 904460.0 45.52 72.56 88.44 93.85 97.75 98.98 99.47 99.81 1.02 0.53 0.19 11851414.0 50.35 76.91 90.66 94.94 98.12 99.13 99.54 99.83 0.87 0.46 0.17
11 2021202208 Apr 2021 to Mar 2022 (Period 08) Govia Thameslink Railway 912494.0 43.88 70.73 87.15 92.93 97.30 98.67 99.30 99.75 1.33 0.70 0.25 11788742.0 50.18 76.79 90.57 94.87 98.08 99.11 99.53 99.83 0.89 0.47 0.17
11 2021202209 Apr 2021 to Mar 2022 (Period 09) Govia Thameslink Railway 904714.0 42.56 69.32 86.43 92.66 97.43 98.92 99.52 99.89 1.08 0.48 0.11 11708155.0 49.68 76.30 90.24 94.66 97.99 99.07 99.51 99.83 0.93 0.49 0.17
11 2021202210 Apr 2021 to Mar 2022 (Period 10) Govia Thameslink Railway 741105.0 48.97 75.74 90.10 94.64 98.08 99.13 99.57 99.87 0.87 0.43 0.13 11560863.0 49.54 76.20 90.19 94.63 97.98 99.06 99.51 99.83 0.94 0.49 0.17
11 2021202211 Apr 2021 to Mar 2022 (Period 11) Govia Thameslink Railway 859563.0 45.68 71.87 87.63 93.36 97.67 98.97 99.47 99.82 1.03 0.53 0.18 11458320.0 49.05 75.77 89.96 94.51 97.95 99.04 99.50 99.83 0.96 0.50 0.17
11 2021202212 Apr 2021 to Mar 2022 (Period 12) Govia Thameslink Railway 822633.0 45.07 70.98 86.55 92.05 96.65 98.28 99.06 99.64 1.72 0.94 0.36 11386899.0 48.54 75.28 89.67 94.32 97.84 98.98 99.46 99.81 1.02 0.54 0.19
11 2021202213 Apr 2021 to Mar 2022 (Period 13) Govia Thameslink Railway 777989.0 47.86 75.19 89.69 94.30 97.84 99.00 99.50 99.85 1.00 0.50 0.15 11375725.0 48.12 74.92 89.45 94.18 97.78 98.95 99.45 99.81 1.05 0.55 0.19
11 2022202301 Apr 2022 to Mar 2023 (Period 01) Govia Thameslink Railway 907054.0 48.07 74.65 88.57 93.25 97.16 98.54 99.16 99.68 1.46 0.84 0.32 11289690.0 47.50 74.28 89.03 93.90 97.65 98.88 99.41 99.79 1.12 0.59 0.21
11 2022202302 Apr 2022 to Mar 2023 (Period 02) Govia Thameslink Railway 903815.0 48.39 75.31 89.07 93.64 97.40 98.68 99.27 99.78 1.32 0.73 0.22 11288090.0 47.20 73.93 88.74 93.70 97.55 98.82 99.38 99.79 1.18 0.62 0.21
11 2022202303 Apr 2022 to Mar 2023 (Period 03) Govia Thameslink Railway 826667.0 48.92 76.17 89.97 94.52 97.99 99.15 99.57 99.86 0.85 0.43 0.14 11177225.0 47.12 73.85 88.66 93.64 97.52 98.81 99.37 99.78 1.19 0.63 0.22
11 2022202304 Apr 2022 to Mar 2023 (Period 04) Govia Thameslink Railway 856691.0 43.26 70.21 85.17 90.64 95.59 97.61 98.64 99.55 2.39 1.36 0.45 11115119.0 46.58 73.32 88.28 93.37 97.38 98.73 99.32 99.77 1.27 0.68 0.23
11 2022202305 Apr 2022 to Mar 2023 (Period 05) Govia Thameslink Railway 793706.0 41.26 67.27 83.00 89.40 95.26 97.54 98.59 99.51 2.46 1.41 0.49 11062544.0 45.96 72.67 87.76 93.00 97.20 98.64 99.27 99.75 1.36 0.73 0.25
11 2022202306 Apr 2022 to Mar 2023 (Period 06) Govia Thameslink Railway 941148.0 39.11 65.71 82.93 89.80 95.80 97.96 98.95 99.64 2.04 1.05 0.36 11152039.0 45.19 71.90 87.24 92.67 97.06 98.57 99.23 99.74 1.43 0.77 0.26
11 2022202307 Apr 2022 to Mar 2023 (Period 07) Govia Thameslink Railway 887169.0 39.65 67.00 84.66 91.30 96.68 98.54 99.30 99.79 1.46 0.70 0.21 11134748.0 44.72 71.45 86.94 92.47 96.98 98.53 99.22 99.74 1.47 0.78 0.26
11 2022202308 Apr 2022 to Mar 2023 (Period 08) Govia Thameslink Railway 870746.0 34.63 60.17 79.38 87.73 95.38 97.91 98.96 99.72 2.09 1.04 0.28 11093000.0 44.00 70.63 86.32 92.06 96.82 98.47 99.19 99.74 1.53 0.81 0.26
11 2022202309 Apr 2022 to Mar 2023 (Period 09) Govia Thameslink Railway 950273.0 35.79 62.49 81.84 89.69 96.23 98.29 99.14 99.73 1.71 0.86 0.27 11138559.0 43.42 70.04 85.93 91.80 96.72 98.42 99.16 99.72 1.58 0.84 0.28
11 2022202310 Apr 2022 to Mar 2023 (Period 10) Govia Thameslink Railway 499471.0 38.03 63.63 79.58 86.40 93.42 96.31 97.85 99.23 3.69 2.15 0.77 10896925.0 42.79 69.36 85.36 91.36 96.48 98.27 99.08 99.69 1.73 0.92 0.31
11 2022202311 Apr 2022 to Mar 2023 (Period 11) Govia Thameslink Railway 875563.0 38.10 64.16 82.24 89.47 95.87 98.02 98.92 99.63 1.98 1.08 0.37 10912925.0 42.19 68.74 84.93 91.05 96.34 98.20 99.03 99.68 1.80 0.97 0.32
11 2022202312 Apr 2022 to Mar 2023 (Period 12) Govia Thameslink Railway 954915.0 41.77 68.86 85.57 91.87 96.87 98.50 99.20 99.72 1.50 0.80 0.28 11045207.0 41.94 68.59 84.86 91.05 96.36 98.22 99.04 99.68 1.78 0.96 0.32
11 2022202313 Apr 2022 to Mar 2023 (Period 13) Govia Thameslink Railway 870290.0 44.05 72.34 88.08 93.21 97.41 98.74 99.31 99.76 1.26 0.69 0.24 11137508.0 41.69 68.42 84.78 90.99 96.34 98.21 99.03 99.68 1.79 0.97 0.32
11 2023202401 Apr 2023 to Mar 2024 (Period 01) Govia Thameslink Railway 977215.0 47.01 75.49 90.27 94.76 98.11 99.13 99.57 99.85 0.87 0.43 0.15 11207669.0 41.64 68.53 84.95 91.14 96.43 98.26 99.07 99.69 1.74 0.93 0.31
11 2023202402 Apr 2023 to Mar 2024 (Period 02) Govia Thameslink Railway 833349.0 46.34 74.48 89.27 94.01 97.78 98.92 99.42 99.79 1.08 0.58 0.21 11137203.0 41.44 68.42 84.94 91.15 96.45 98.27 99.08 99.69 1.73 0.92 0.31
11 2023202403 Apr 2023 to Mar 2024 (Period 03) Govia Thameslink Railway 853865.0 41.68 68.44 84.27 90.30 95.77 97.75 98.66 99.46 2.25 1.34 0.54 11164401.0 40.91 67.85 84.51 90.84 96.28 98.17 99.01 99.66 1.83 0.99 0.34
11 2023202404 Apr 2023 to Mar 2024 (Period 04) Govia Thameslink Railway 839545.0 42.18 70.31 86.56 92.35 97.09 98.54 99.22 99.72 1.46 0.78 0.28 11147255.0 40.82 67.86 84.62 90.97 96.40 98.24 99.06 99.68 1.76 0.94 0.32
11 2023202405 Apr 2023 to Mar 2024 (Period 05) Govia Thameslink Railway 842130.0 44.40 73.00 88.38 93.62 97.68 98.88 99.39 99.77 1.12 0.61 0.23 11195679.0 41.06 68.29 85.02 91.28 96.57 98.34 99.11 99.69 1.66 0.89 0.31
11 2023202406 Apr 2023 to Mar 2024 (Period 06) Govia Thameslink Railway 901437.0 41.75 69.80 86.15 92.08 96.92 98.49 99.18 99.68 1.51 0.82 0.32 11155968.0 41.28 68.63 85.28 91.47 96.67 98.38 99.13 99.70 1.62 0.87 0.30
11 2023202407 Apr 2023 to Mar 2024 (Period 07) Govia Thameslink Railway 858149.0 39.91 68.33 85.59 91.88 97.08 98.67 99.33 99.76 1.33 0.67 0.24 11126948.0 41.30 68.73 85.36 91.51 96.70 98.39 99.13 99.69 1.61 0.87 0.31
11 2023202408 Apr 2023 to Mar 2024 (Period 08) Govia Thameslink Railway 984325.0 37.19 64.56 82.26 89.25 95.48 97.62 98.67 99.52 2.38 1.33 0.48 11240527.0 41.46 69.03 85.55 91.61 96.69 98.36 99.11 99.68 1.64 0.89 0.32
11 2023202409 Apr 2023 to Mar 2024 (Period 09) Govia Thameslink Railway 847577.0 34.53 61.99 81.18 89.00 95.89 98.08 99.09 99.73 1.92 0.91 0.27 11137831.0 41.42 69.05 85.53 91.57 96.67 98.35 99.10 99.68 1.65 0.90 0.32
11 2023202410 Apr 2023 to Mar 2024 (Period 10) Govia Thameslink Railway 867439.0 38.38 65.12 82.71 89.73 95.96 98.03 98.95 99.64 1.97 1.05 0.36 11505799.0 41.33 68.99 85.58 91.66 96.76 98.41 99.14 99.69 1.59 0.86 0.31
11 2023202411 Apr 2023 to Mar 2024 (Period 11) Govia Thameslink Railway 899304.0 38.56 65.38 83.28 90.53 96.60 98.38 99.19 99.69 1.62 0.81 0.31 11529540.0 41.36 69.08 85.65 91.74 96.81 98.44 99.16 99.70 1.56 0.84 0.30
11 2023202412 Apr 2023 to Mar 2024 (Period 12) Govia Thameslink Railway 951173.0 40.33 67.60 85.07 91.61 96.94 98.54 99.23 99.74 1.46 0.77 0.26 11525798.0 41.24 68.97 85.61 91.71 96.82 98.44 99.17 99.70 1.56 0.83 0.30
11 2023202413 Apr 2023 to Mar 2024 (Period 13) Govia Thameslink Railway 1012648.0 42.34 70.01 86.31 92.14 96.90 98.50 99.16 99.70 1.50 0.84 0.30 11668156.0 41.13 68.81 85.49 91.64 96.78 98.42 99.16 99.70 1.58 0.84 0.30
11 2024202501 Apr 2024 to Mar 2025 (Period 01) Govia Thameslink Railway 882976.0 44.27 72.49 87.94 93.00 97.15 98.54 99.17 99.65 1.46 0.83 0.35 11573917.0 40.87 68.53 85.27 91.48 96.70 98.37 99.12 99.68 1.63 0.88 0.32
11 2024202502 Apr 2024 to Mar 2025 (Period 02) Govia Thameslink Railway 911467.0 42.99 70.73 86.67 92.25 96.90 98.49 99.20 99.73 1.51 0.80 0.27 11652035.0 40.65 68.28 85.10 91.36 96.64 98.34 99.11 99.68 1.66 0.89 0.32
11 2024202503 Apr 2024 to Mar 2025 (Period 03) Govia Thameslink Railway 988512.0 42.34 69.26 85.25 91.15 96.28 98.08 98.95 99.62 1.92 1.05 0.38 11786682.0 40.71 68.35 85.17 91.42 96.67 98.36 99.13 99.69 1.64 0.87 0.31
11 2024202504 Apr 2024 to Mar 2025 (Period 04) Govia Thameslink Railway 1015029.0 40.56 67.75 84.40 90.75 96.21 98.05 98.96 99.65 1.95 1.04 0.35 11962166.0 40.60 68.16 85.01 91.29 96.60 98.33 99.11 99.68 1.67 0.89 0.32
11 2024202505 Apr 2024 to Mar 2025 (Period 05) Govia Thameslink Railway 1012060.0 42.19 69.88 85.93 91.61 96.48 98.16 98.97 99.64 1.84 1.03 0.36 12132096.0 40.47 67.97 84.85 91.16 96.52 98.27 99.07 99.67 1.73 0.93 0.33
11 2024202506 Apr 2024 to Mar 2025 (Period 06) Govia Thameslink Railway 997966.0 41.61 69.09 85.54 91.45 96.50 98.22 99.02 99.63 1.78 0.98 0.37 12228625.0 40.47 67.92 84.81 91.11 96.49 98.25 99.06 99.67 1.75 0.94 0.33
11 2024202507 Apr 2024 to Mar 2025 (Period 07) Govia Thameslink Railway 981945.0 38.98 66.16 83.33 89.88 95.66 97.71 98.73 99.53 2.29 1.27 0.47 12352421.0 40.39 67.75 84.64 90.96 96.38 98.18 99.02 99.65 1.82 0.98 0.35
11 2024202508 Apr 2024 to Mar 2025 (Period 08) Govia Thameslink Railway 978194.0 38.95 66.35 84.24 90.96 96.52 98.30 99.14 99.69 1.70 0.86 0.31 12346290.0 40.53 67.90 84.79 91.10 96.46 98.23 99.05 99.66 1.77 0.95 0.34
11 2024202509 Apr 2024 to Mar 2025 (Period 09) Govia Thameslink Railway 982667.0 34.30 60.19 79.17 87.35 94.97 97.57 98.74 99.57 2.43 1.26 0.43 12481380.0 40.44 67.69 84.60 90.95 96.38 98.19 99.03 99.65 1.81 0.97 0.35
11 2024202510 Apr 2024 to Mar 2025 (Period 10) Govia Thameslink Railway 854752.0 40.88 68.35 85.26 91.53 96.80 98.39 99.14 99.70 1.61 0.86 0.30 12468693.0 40.62 67.91 84.77 91.07 96.44 98.22 99.04 99.66 1.78 0.96 0.34
11 2024202511 Apr 2024 to Mar 2025 (Period 11) Govia Thameslink Railway 996359.0 39.90 67.13 84.55 91.07 96.46 98.21 99.00 99.62 1.79 1.00 0.38 12565748.0 40.71 68.03 84.86 91.11 96.43 98.20 99.03 99.65 1.80 0.97 0.35
11 2024202512 Apr 2024 to Mar 2025 (Period 12) Govia Thameslink Railway 1004772.0 40.13 67.54 85.03 91.58 96.88 98.49 99.20 99.72 1.51 0.80 0.28 12619347.0 40.69 68.03 84.86 91.11 96.43 98.20 99.03 99.65 1.80 0.97 0.35
11 2024202513 Apr 2024 to Mar 2025 (Period 13) Govia Thameslink Railway 1069329.0 42.96 71.39 87.74 93.31 97.53 98.77 99.31 99.73 1.23 0.69 0.27 12676028.0 40.75 68.15 84.99 91.21 96.49 98.23 99.04 99.65 1.77 0.96 0.35
11 2025202601 Apr 2025 to Mar 2026 (Period 01) Govia Thameslink Railway 948389.0 43.24 71.77 88.01 93.47 97.63 98.87 99.37 99.78 1.13 0.63 0.22 12741441.0 40.69 68.12 85.01 91.26 96.52 98.25 99.06 99.66 1.75 0.94 0.34
11 2025202602 Apr 2025 to Mar 2026 (Period 02) Govia Thameslink Railway 1000798.0 41.65 69.45 86.46 92.56 97.32 98.73 99.37 99.82 1.27 0.63 0.18 12830772.0 40.60 68.04 85.00 91.29 96.56 98.27 99.07 99.67 1.73 0.93 0.33
11 2025202603 Apr 2025 to Mar 2026 (Period 03) Govia Thameslink Railway 1006075.0 41.13 69.04 85.60 91.58 96.43 98.11 98.93 99.61 1.89 1.07 0.39 12848335.0 40.51 68.02 85.03 91.32 96.57 98.28 99.07 99.67 1.72 0.93 0.33
11 2025202604 Apr 2025 to Mar 2026 (Period 04) Govia Thameslink Railway 1021012.0 38.92 66.22 83.43 90.20 96.33 98.25 99.12 99.73 1.75 0.88 0.27 12854318.0 40.38 67.90 84.96 91.28 96.58 98.29 99.08 99.67 1.71 0.92 0.33
11 2025202605 Apr 2025 to Mar 2026 (Period 05) Govia Thameslink Railway 1004031.0 40.91 69.09 85.70 91.76 96.88 98.51 99.20 99.75 1.49 0.80 0.25 12846289.0 40.28 67.84 84.94 91.29 96.61 98.32 99.10 99.68 1.68 0.90 0.32
11 2025202606 Apr 2025 to Mar 2026 (Period 06) Govia Thameslink Railway 1000982.0 39.56 67.21 84.40 90.77 96.24 98.08 98.99 99.67 1.92 1.01 0.33 12849305.0 40.12 67.69 84.85 91.24 96.59 98.31 99.10 99.69 1.69 0.90 0.31
11 2025202607 Apr 2025 to Mar 2026 (Period 07) Govia Thameslink Railway 1009797.0 38.47 66.98 84.95 91.32 96.48 98.17 98.99 99.63 1.83 1.01 0.37 12877157.0 40.08 67.75 84.97 91.35 96.65 98.34 99.12 99.69 1.66 0.88 0.31
11 2025202608 Apr 2025 to Mar 2026 (Period 08) Govia Thameslink Railway 1013931.0 36.49 64.43 83.24 90.45 96.48 98.33 99.13 99.69 1.67 0.87 0.31 12912894.0 39.88 67.60 84.89 91.31 96.65 98.34 99.12 99.69 1.66 0.88 0.31
11 2025202609 Apr 2025 to Mar 2026 (Period 09) Govia Thameslink Railway 999195.0 34.41 61.48 80.65 88.60 95.50 97.70 98.76 99.55 2.30 1.24 0.45 12929422.0 39.88 67.69 85.00 91.40 96.69 98.35 99.12 99.69 1.65 0.88 0.31
11 2025202610 Apr 2025 to Mar 2026 (Period 10) Govia Thameslink Railway 879449.0 39.70 67.74 84.83 91.21 96.42 98.14 98.90 99.56 1.86 1.10 0.44 12954119.0 39.81 67.65 84.97 91.38 96.66 98.34 99.10 99.68 1.66 0.90 0.32
11 2025202611 Apr 2025 to Mar 2026 (Period 11) Govia Thameslink Railway 1000498.0 38.87 66.61 84.24 90.90 96.48 98.22 98.95 99.56 1.78 1.05 0.44 12958258.0 39.73 67.61 84.94 91.36 96.66 98.34 99.10 99.68 1.66 0.90 0.32
11 2025202612 Apr 2025 to Mar 2026 (Period 12) Govia Thameslink Railway 1007805.0 39.96 68.16 85.47 91.70 96.87 98.47 99.17 99.70 1.53 0.83 0.30 12961291.0 39.71 67.66 84.98 91.37 96.66 98.34 99.09 99.68 1.66 0.91 0.32
11 2025202613 Apr 2025 to Mar 2026 (Period 13) Govia Thameslink Railway 1133331.0 43.11 71.99 87.67 92.93 97.16 98.57 99.21 99.71 1.43 0.79 0.29 13025293.0 39.74 67.73 84.99 91.35 96.64 98.32 99.09 99.67 1.68 0.91 0.33
11 2026202701 Apr 2026 to Mar 2027 (Period 01) Govia Thameslink Railway 1163081.0 43.23 71.95 87.65 92.94 97.22 98.63 99.25 99.71 1.37 0.75 0.29 13239985.0 39.80 67.81 85.00 91.34 96.61 98.31 99.08 99.67 1.69 0.92 0.33
11 2026202702 Apr 2026 to Mar 2027 (Period 02) Govia Thameslink Railway 983609.0 41.69 69.85 85.68 91.24 96.13 97.90 98.77 99.50 2.10 1.23 0.50 13222796.0 39.80 67.84 84.94 91.24 96.53 98.25 99.03 99.65 1.75 0.97 0.35
12 2014201501 Apr 2014 to Mar 2015 (Period 01) Grand Central 3027.0 34.52 61.84 81.17 88.73 95.67 97.62 98.51 99.50 2.38 1.49 0.50 3027.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201502 Apr 2014 to Mar 2015 (Period 02) Grand Central 3345.0 30.19 54.11 73.33 81.88 90.73 94.68 96.80 98.33 5.32 3.20 1.67 6372.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201503 Apr 2014 to Mar 2015 (Period 03) Grand Central 3252.0 26.01 52.71 74.20 83.33 92.28 95.45 96.74 98.37 4.55 3.26 1.63 9624.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201504 Apr 2014 to Mar 2015 (Period 04) Grand Central 3506.0 30.09 58.04 77.58 85.48 92.44 95.58 97.58 98.52 4.42 2.42 1.48 13130.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201505 Apr 2014 to Mar 2015 (Period 05) Grand Central 3481.0 24.82 51.19 71.24 80.98 89.83 93.19 94.89 96.87 6.81 5.11 3.13 16611.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201506 Apr 2014 to Mar 2015 (Period 06) Grand Central 3454.0 29.15 56.69 77.21 86.33 94.44 96.61 97.77 99.16 3.39 2.23 0.84 20065.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201507 Apr 2014 to Mar 2015 (Period 07) Grand Central 3499.0 28.69 56.22 77.88 86.91 94.83 97.06 97.97 98.86 2.94 2.03 1.14 23564.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201508 Apr 2014 to Mar 2015 (Period 08) Grand Central 3453.0 21.05 46.13 68.20 80.10 91.31 95.40 96.93 98.81 4.60 3.07 1.19 27017.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201509 Apr 2014 to Mar 2015 (Period 09) Grand Central 3528.0 23.27 46.88 68.37 79.28 90.65 93.65 96.06 98.30 6.35 3.94 1.70 30545.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201510 Apr 2014 to Mar 2015 (Period 10) Grand Central 2988.0 22.29 46.69 67.17 77.07 88.86 94.24 96.22 98.16 5.76 3.78 1.84 33533.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201511 Apr 2014 to Mar 2015 (Period 11) Grand Central 3466.0 27.35 55.28 76.46 86.79 94.26 97.26 98.24 98.64 2.74 1.76 1.36 36999.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201512 Apr 2014 to Mar 2015 (Period 12) Grand Central 3462.0 34.98 61.27 81.11 88.42 95.64 97.63 98.21 99.45 2.37 1.79 0.55 40461.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2014201513 Apr 2014 to Mar 2015 (Period 13) Grand Central 3857.0 35.68 62.69 80.19 87.68 94.66 97.51 98.83 99.38 2.49 1.17 0.62 44318.0 28.39 54.68 75.00 84.14 92.77 95.85 97.30 98.65 4.15 2.70 1.35
12 2015201601 Apr 2015 to Mar 2016 (Period 01) Grand Central 4052.0 33.09 60.24 79.57 87.54 93.90 96.22 97.38 98.69 3.78 2.62 1.31 45343.0 28.40 54.70 75.00 84.14 92.68 95.77 97.23 98.59 4.23 2.77 1.41
12 2015201602 Apr 2015 to Mar 2016 (Period 02) Grand Central 3558.0 31.25 59.50 79.03 86.99 92.69 95.39 96.66 98.37 4.61 3.34 1.63 45556.0 28.49 55.12 75.44 84.53 92.82 95.82 97.22 98.60 4.18 2.78 1.40
12 2015201603 Apr 2015 to Mar 2016 (Period 03) Grand Central 3562.0 33.77 60.95 79.93 88.52 94.47 96.97 98.29 99.38 3.03 1.71 0.62 45866.0 29.07 55.74 75.87 84.92 92.99 95.93 97.33 98.67 4.07 2.67 1.33
12 2015201604 Apr 2015 to Mar 2016 (Period 04) Grand Central 3558.0 29.17 54.10 75.83 85.53 92.75 95.62 97.50 98.96 4.38 2.50 1.04 45918.0 29.00 55.44 75.74 84.93 93.01 95.94 97.33 98.71 4.06 2.67 1.29
12 2015201605 Apr 2015 to Mar 2016 (Period 05) Grand Central 3561.0 29.12 55.27 76.07 85.54 93.63 96.04 97.02 98.20 3.96 2.98 1.80 45998.0 29.33 55.75 76.11 85.27 93.30 96.15 97.49 98.81 3.85 2.51 1.19
12 2015201606 Apr 2015 to Mar 2016 (Period 06) Grand Central 3512.0 29.33 55.35 75.68 84.77 92.91 96.07 97.15 97.95 3.93 2.85 2.05 46056.0 29.34 55.65 75.99 85.16 93.19 96.11 97.44 98.71 3.89 2.56 1.29
12 2015201607 Apr 2015 to Mar 2016 (Period 07) Grand Central 3531.0 28.86 53.24 74.17 84.31 92.75 95.64 96.71 98.13 4.36 3.29 1.87 46088.0 29.35 55.42 75.71 84.96 93.03 96.00 97.35 98.66 4.00 2.65 1.34
12 2015201608 Apr 2015 to Mar 2016 (Period 08) Grand Central 3483.0 21.22 44.36 65.81 76.89 89.32 93.43 95.26 97.01 6.57 4.74 2.99 46118.0 29.36 55.28 75.52 84.71 92.88 95.85 97.22 98.52 4.15 2.78 1.48
12 2015201609 Apr 2015 to Mar 2016 (Period 09) Grand Central 3499.0 19.89 41.84 64.22 74.68 88.14 92.03 94.00 96.34 7.97 6.00 3.66 46089.0 29.11 54.90 75.21 84.37 92.69 95.73 97.06 98.37 4.27 2.94 1.63
12 2015201610 Apr 2015 to Mar 2016 (Period 10) Grand Central 3083.0 27.12 50.54 70.78 81.87 91.50 94.52 96.27 97.60 5.48 3.73 2.40 46184.0 29.42 55.14 75.44 84.67 92.86 95.75 97.07 98.34 4.25 2.93 1.66
12 2015201611 Apr 2015 to Mar 2016 (Period 11) Grand Central 3425.0 27.56 53.90 73.40 81.87 89.96 93.81 95.71 98.25 6.19 4.29 1.75 46143.0 29.43 55.04 75.21 84.30 92.54 95.49 96.88 98.31 4.51 3.12 1.69
12 2015201612 Apr 2015 to Mar 2016 (Period 12) Grand Central 3452.0 28.94 54.26 73.87 82.07 90.35 94.32 96.21 98.52 5.68 3.79 1.48 46133.0 28.98 54.52 74.66 83.83 92.14 95.24 96.73 98.24 4.76 3.27 1.76
12 2015201613 Apr 2015 to Mar 2016 (Period 13) Grand Central 3193.0 30.69 55.62 76.17 85.78 92.89 95.08 95.99 98.00 4.92 4.01 2.00 45469.0 28.53 53.90 74.30 83.64 91.98 95.04 96.50 98.12 4.96 3.50 1.88
12 2016201701 Apr 2016 to Mar 2017 (Period 01) Grand Central 3828.0 30.22 57.45 78.16 86.83 93.99 96.29 97.47 98.62 3.71 2.53 1.38 45245.0 28.27 53.63 74.16 83.56 91.98 95.04 96.50 98.11 4.96 3.50 1.89
12 2016201702 Apr 2016 to Mar 2017 (Period 02) Grand Central 3545.0 33.60 59.18 78.62 87.11 94.39 96.70 97.49 98.48 3.30 2.51 1.52 45232.0 28.45 53.61 74.12 83.57 92.11 95.14 96.56 98.12 4.86 3.44 1.88
12 2016201703 Apr 2016 to Mar 2017 (Period 03) Grand Central 3437.0 27.06 50.42 68.55 77.51 87.58 91.50 94.21 95.96 8.50 5.79 4.04 45107.0 27.92 52.78 73.24 82.71 91.58 94.72 96.25 97.86 5.28 3.75 2.14
12 2016201704 Apr 2016 to Mar 2017 (Period 04) Grand Central 3506.0 30.63 54.85 73.73 82.40 91.70 95.32 96.55 97.97 4.68 3.45 2.03 45055.0 28.04 52.84 73.07 82.47 91.49 94.70 96.17 97.78 5.30 3.83 2.22
12 2016201705 Apr 2016 to Mar 2017 (Period 05) Grand Central 3599.0 33.04 57.18 75.58 84.41 92.28 95.03 96.92 98.75 4.97 3.08 1.25 45093.0 28.35 52.99 73.04 82.38 91.39 94.62 96.17 97.82 5.38 3.83 2.18
12 2016201706 Apr 2016 to Mar 2017 (Period 06) Grand Central 3477.0 28.99 52.49 70.61 78.89 87.69 91.11 93.24 95.60 8.89 6.76 4.40 45058.0 28.32 52.77 72.64 81.93 90.98 94.23 95.86 97.64 5.77 4.14 2.36
12 2016201707 Apr 2016 to Mar 2017 (Period 07) Grand Central 3451.0 30.11 55.84 74.85 83.34 92.67 95.91 96.93 98.17 4.09 3.07 1.83 44978.0 28.42 52.97 72.69 81.85 90.98 94.25 95.88 97.65 5.75 4.12 2.35
12 2016201708 Apr 2016 to Mar 2017 (Period 08) Grand Central 3558.0 27.18 50.56 71.36 82.55 91.51 95.14 97.30 99.18 4.86 2.70 0.82 45053.0 28.88 53.45 73.12 82.29 91.15 94.38 96.04 97.82 5.62 3.96 2.18
12 2016201709 Apr 2016 to Mar 2017 (Period 09) Grand Central 3561.0 18.84 38.33 58.27 71.38 87.62 93.18 95.51 97.81 6.82 4.49 2.19 45115.0 28.78 53.15 72.64 82.01 91.10 94.47 96.15 97.93 5.53 3.85 2.07
12 2016201710 Apr 2016 to Mar 2017 (Period 10) Grand Central 3136.0 27.68 49.62 67.51 78.06 88.68 92.47 94.80 97.03 7.53 5.20 2.97 45168.0 28.82 53.09 72.41 81.75 90.91 94.33 96.05 97.89 5.67 3.95 2.11
12 2016201711 Apr 2016 to Mar 2017 (Period 11) Grand Central 3440.0 28.90 51.83 73.14 83.46 92.18 94.24 95.58 97.30 5.76 4.42 2.70 45183.0 28.92 52.93 72.39 81.87 91.07 94.36 96.04 97.82 5.64 3.96 2.18
12 2016201712 Apr 2016 to Mar 2017 (Period 12) Grand Central 3361.0 30.20 53.91 74.44 84.05 92.44 94.79 95.98 97.83 5.21 4.02 2.17 45092.0 29.01 52.90 72.43 82.02 91.23 94.40 96.03 97.76 5.60 3.97 2.24
12 2016201713 Apr 2016 to Mar 2017 (Period 13) Grand Central 3218.0 32.16 55.75 76.54 85.74 93.51 96.36 97.39 98.10 3.64 2.61 1.90 45117.0 29.12 52.91 72.46 82.02 91.28 94.49 96.13 97.77 5.51 3.87 2.23
12 2017201801 Apr 2017 to Mar 2018 (Period 01) Grand Central 3536.0 26.47 51.98 73.95 84.42 93.55 96.30 97.17 98.59 3.70 2.83 1.41 44825.0 28.82 52.45 72.09 81.80 91.22 94.48 96.09 97.76 5.52 3.91 2.24
12 2017201802 Apr 2017 to Mar 2018 (Period 02) Grand Central 3535.0 29.14 54.60 77.11 86.22 94.63 96.69 98.22 99.18 3.31 1.78 0.82 44815.0 28.46 52.09 71.97 81.72 91.24 94.48 96.15 97.82 5.52 3.85 2.18
12 2017201803 Apr 2017 to Mar 2018 (Period 03) Grand Central 3517.0 24.31 49.59 69.89 81.40 92.78 96.33 97.73 99.06 3.67 2.27 0.94 44895.0 28.25 52.02 72.07 82.02 91.64 94.85 96.42 98.06 5.15 3.58 1.94
12 2017201804 Apr 2017 to Mar 2018 (Period 04) Grand Central 3496.0 26.66 53.18 73.43 84.44 92.48 94.94 96.08 97.91 5.06 3.92 2.09 44885.0 27.94 51.89 72.04 82.18 91.70 94.82 96.39 98.06 5.18 3.61 1.94
12 2017201805 Apr 2017 to Mar 2018 (Period 05) Grand Central 3361.0 25.53 51.59 72.30 82.71 92.00 94.82 96.40 97.56 5.18 3.60 2.44 44647.0 27.34 51.44 71.78 82.04 91.68 94.80 96.34 97.96 5.20 3.66 2.04
12 2017201806 Apr 2017 to Mar 2018 (Period 06) Grand Central 3525.0 27.72 55.29 76.11 85.42 93.93 95.89 97.30 98.78 4.11 2.70 1.22 44695.0 27.24 51.66 72.21 82.55 92.17 95.18 96.66 98.21 4.82 3.34 1.79
12 2017201807 Apr 2017 to Mar 2018 (Period 07) Grand Central 3559.0 27.00 52.35 75.84 85.78 94.55 96.38 97.19 98.90 3.62 2.81 1.10 44803.0 27.00 51.39 72.29 82.75 92.32 95.21 96.68 98.27 4.79 3.32 1.73
12 2017201808 Apr 2017 to Mar 2018 (Period 08) Grand Central 3303.0 21.89 44.69 66.52 78.75 91.55 95.13 96.88 98.73 4.87 3.12 1.27 44548.0 26.61 50.96 71.94 82.47 92.33 95.21 96.65 98.23 4.79 3.35 1.77
12 2017201809 Apr 2017 to Mar 2018 (Period 09) Grand Central 3494.0 20.41 43.25 65.05 77.82 89.38 93.33 95.48 96.97 6.67 4.52 3.03 44481.0 26.75 51.37 72.49 82.99 92.47 95.23 96.65 98.16 4.77 3.35 1.84
12 2017201810 Apr 2017 to Mar 2018 (Period 10) Grand Central 3004.0 23.00 44.71 66.25 77.43 90.51 94.47 95.67 97.47 5.53 4.33 2.53 44349.0 26.43 51.04 72.42 82.96 92.61 95.37 96.71 98.20 4.63 3.29 1.80
12 2017201811 Apr 2017 to Mar 2018 (Period 11) Grand Central 3488.0 28.76 53.53 71.85 79.27 88.90 93.18 94.81 96.82 6.82 5.19 3.18 44397.0 26.42 51.17 72.32 82.63 92.35 95.29 96.65 98.16 4.71 3.35 1.84
12 2017201812 Apr 2017 to Mar 2018 (Period 12) Grand Central 3196.0 26.69 51.10 70.53 78.88 88.80 92.96 94.96 96.71 7.04 5.04 3.29 44232.0 26.15 50.96 72.03 82.25 92.08 95.16 96.58 98.08 4.84 3.42 1.92
12 2017201813 Apr 2017 to Mar 2018 (Period 13) Grand Central 3277.0 24.78 47.67 66.71 75.77 86.45 90.88 93.93 97.16 9.12 6.07 2.84 44291.0 25.61 50.37 71.31 81.52 91.56 94.75 96.32 98.01 5.25 3.68 1.99
12 2018201901 Apr 2018 to Mar 2019 (Period 01) Grand Central 3492.0 29.07 54.04 72.94 80.73 89.18 92.90 94.42 96.36 7.10 5.58 3.64 44247.0 25.82 50.53 71.23 81.23 91.22 94.48 96.11 97.83 5.52 3.89 2.17
12 2018201902 Apr 2018 to Mar 2019 (Period 02) Grand Central 3436.0 23.05 47.53 66.24 75.67 87.22 91.27 93.57 95.78 8.73 6.43 4.22 44148.0 25.34 49.97 70.37 80.40 90.63 94.06 95.74 97.57 5.94 4.26 2.43
12 2018201903 Apr 2018 to Mar 2019 (Period 03) Grand Central 3381.0 24.13 45.99 65.16 76.75 87.43 92.78 95.68 98.11 7.22 4.32 1.89 44012.0 25.32 49.70 70.01 80.03 90.22 93.78 95.58 97.49 6.22 4.42 2.51
12 2018201904 Apr 2018 to Mar 2019 (Period 04) Grand Central 3075.0 20.72 40.78 58.89 68.68 82.96 88.55 92.29 95.32 11.45 7.71 4.68 43591.0 24.89 48.79 68.95 78.88 89.52 93.32 95.30 97.30 6.68 4.70 2.70
12 2018201905 Apr 2018 to Mar 2019 (Period 05) Grand Central 3274.0 20.59 43.46 61.42 71.99 83.81 89.25 92.49 96.09 10.75 7.51 3.91 43504.0 24.52 48.17 68.12 78.07 88.90 92.89 95.01 97.19 7.11 4.99 2.81
12 2018201906 Apr 2018 to Mar 2019 (Period 06) Grand Central 3554.0 26.76 51.55 70.12 78.93 89.42 93.13 95.33 97.55 6.87 4.67 2.45 43533.0 24.44 47.87 67.64 77.54 88.54 92.67 94.85 97.09 7.33 5.15 2.91
12 2018201907 Apr 2018 to Mar 2019 (Period 07) Grand Central 3458.0 24.35 47.14 66.11 75.94 87.74 92.22 94.39 96.04 7.78 5.61 3.96 43432.0 24.23 47.44 66.84 76.74 87.98 92.33 94.62 96.86 7.67 5.38 3.14
12 2018201908 Apr 2018 to Mar 2019 (Period 08) Grand Central 3545.0 26.83 48.27 65.98 77.69 89.25 94.47 96.19 97.88 5.53 3.81 2.12 43674.0 24.61 47.72 66.80 76.66 87.81 92.29 94.58 96.80 7.71 5.42 3.20
12 2018201909 Apr 2018 to Mar 2019 (Period 09) Grand Central 3543.0 22.33 43.92 61.13 72.59 85.77 92.27 95.51 97.60 7.73 4.49 2.40 43723.0 24.76 47.77 66.48 76.24 87.52 92.21 94.58 96.85 7.79 5.42 3.15
12 2018201910 Apr 2018 to Mar 2019 (Period 10) Grand Central 3039.0 29.09 53.64 71.64 80.85 90.92 94.57 95.76 97.50 5.43 4.24 2.50 43758.0 25.19 48.39 66.85 76.48 87.55 92.22 94.59 96.85 7.78 5.41 3.15
12 2018201911 Apr 2018 to Mar 2019 (Period 11) Grand Central 3659.0 29.11 53.87 70.84 79.80 90.87 95.38 97.21 98.50 4.62 2.79 1.50 43929.0 25.23 48.43 66.79 76.53 87.72 92.40 94.79 96.99 7.60 5.21 3.01
12 2018201912 Apr 2018 to Mar 2019 (Period 12) Grand Central 3728.0 31.60 56.57 73.47 81.95 91.04 94.21 95.44 97.26 5.79 4.56 2.74 44461.0 25.66 48.93 67.08 76.82 87.92 92.51 94.83 97.04 7.49 5.17 2.96
12 2018201913 Apr 2018 to Mar 2019 (Period 13) Grand Central 3736.0 33.51 56.85 72.40 80.59 89.91 94.06 95.96 98.18 5.94 4.04 1.82 44920.0 26.38 49.68 67.55 77.21 88.20 92.76 94.99 97.12 7.24 5.01 2.88
12 2019202001 Apr 2019 to Mar 2020 (Period 01) Grand Central 3602.0 33.43 58.00 74.01 84.06 92.89 95.81 97.31 98.70 4.19 2.69 1.30 3602.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202002 Apr 2019 to Mar 2020 (Period 02) Grand Central 3727.0 30.99 56.37 74.00 83.69 92.41 95.68 96.73 98.39 4.32 3.27 1.61 7329.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202003 Apr 2019 to Mar 2020 (Period 03) Grand Central 3661.0 25.10 49.39 67.30 77.00 85.63 89.37 91.61 95.52 10.63 8.39 4.48 10990.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202004 Apr 2019 to Mar 2020 (Period 04) Grand Central 3650.0 24.58 49.89 69.10 79.70 88.22 91.92 94.22 96.38 8.08 5.78 3.62 14640.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202005 Apr 2019 to Mar 2020 (Period 05) Grand Central 3437.0 22.72 45.68 64.04 74.31 85.54 90.11 92.23 95.29 9.89 7.77 4.71 18077.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202006 Apr 2019 to Mar 2020 (Period 06) Grand Central 3363.0 24.89 48.38 67.11 77.40 88.49 92.69 95.00 97.38 7.31 5.00 2.62 21440.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202007 Apr 2019 to Mar 2020 (Period 07) Grand Central 3736.0 26.71 51.15 72.51 83.81 92.69 95.45 96.95 98.26 4.55 3.05 1.74 25176.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202008 Apr 2019 to Mar 2020 (Period 08) Grand Central 3532.0 25.57 46.69 63.65 74.07 86.69 91.79 94.25 96.60 8.21 5.75 3.40 28708.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202009 Apr 2019 to Mar 2020 (Period 09) Grand Central 3540.0 20.68 41.78 58.64 70.20 84.21 91.07 93.81 97.03 8.93 6.19 2.97 32248.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202010 Apr 2019 to Mar 2020 (Period 10) Grand Central 3067.0 20.70 40.37 61.13 73.39 86.44 91.03 93.54 95.63 8.97 6.46 4.37 35315.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202011 Apr 2019 to Mar 2020 (Period 11) Grand Central 3188.0 25.85 47.80 68.66 79.55 90.46 94.60 96.89 99.31 5.40 3.11 0.69 38503.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202012 Apr 2019 to Mar 2020 (Period 12) Grand Central 3301.0 25.69 46.20 66.68 78.19 88.52 92.79 95.24 97.79 7.21 4.76 2.21 41804.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
12 2019202013 Apr 2019 to Mar 2020 (Period 13) Grand Central 3096.0 34.56 58.66 76.84 86.30 93.48 95.70 96.67 98.58 4.30 3.33 1.42 44900.0 26.29 49.35 68.03 78.63 88.90 92.93 94.96 97.29 7.07 5.04 2.71
12 2020202101 Apr 2020 to Mar 2021 (Period 01) Grand Central 192.0 58.33 82.29 94.79 96.88 100.00 100.00 100.00 100.00 0.00 0.00 0.00 41490.0 25.82 48.75 67.63 78.24 88.61 92.71 94.77 97.18 7.29 5.23 2.82
12 2020202102 Apr 2020 to Mar 2021 (Period 02) Grand Central 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 37763.0 25.31 48.00 67.00 77.70 88.23 92.42 94.58 97.06 7.58 5.42 2.94
12 2020202103 Apr 2020 to Mar 2021 (Period 03) Grand Central 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 34102.0 25.33 47.85 66.97 77.78 88.51 92.74 94.90 97.23 7.26 5.10 2.77
12 2020202104 Apr 2020 to Mar 2021 (Period 04) Grand Central 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 30452.0 25.42 47.61 66.72 77.55 88.55 92.84 94.98 97.33 7.16 5.02 2.67
12 2020202105 Apr 2020 to Mar 2021 (Period 05) Grand Central 2089.0 41.02 66.16 83.05 88.75 93.97 95.21 96.41 97.94 4.79 3.59 2.06 29104.0 26.86 49.17 68.21 78.73 89.29 93.33 95.41 97.62 6.67 4.59 2.38
12 2020202106 Apr 2020 to Mar 2021 (Period 06) Grand Central 2418.0 46.82 73.20 88.71 93.59 96.86 97.93 98.51 99.05 2.07 1.49 0.95 28159.0 28.80 51.32 70.10 80.17 90.04 93.81 95.72 97.77 6.19 4.28 2.23
12 2020202107 Apr 2020 to Mar 2021 (Period 07) Grand Central 3554.0 44.54 71.86 87.73 93.53 97.10 98.34 98.59 99.13 1.66 1.41 0.87 27977.0 31.08 53.96 72.02 81.38 90.58 94.16 95.93 97.87 5.84 4.07 2.13
12 2020202108 Apr 2020 to Mar 2021 (Period 08) Grand Central 2152.0 36.94 63.24 81.78 90.43 95.31 96.00 97.07 98.51 4.00 2.93 1.49 26597.0 32.29 55.67 73.92 83.08 91.48 94.63 96.24 98.09 5.37 3.76 1.91
12 2020202109 Apr 2020 to Mar 2021 (Period 09) Grand Central 999.0 34.43 60.26 79.38 86.19 92.29 94.89 95.50 97.20 5.11 4.50 2.80 24056.0 34.09 57.91 76.39 85.11 92.58 95.16 96.57 98.21 4.84 3.43 1.79
12 2020202110 Apr 2020 to Mar 2021 (Period 10) Grand Central 1735.0 44.15 73.43 88.88 93.60 96.14 97.18 97.58 97.98 2.82 2.42 2.02 22724.0 36.66 61.46 79.41 87.34 93.69 95.87 97.05 98.54 4.13 2.95 1.46
12 2020202111 Apr 2020 to Mar 2021 (Period 11) Grand Central 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 19536.0 38.43 63.69 81.16 88.61 94.21 96.08 97.08 98.42 3.92 2.92 1.58
12 2020202112 Apr 2020 to Mar 2021 (Period 12) Grand Central 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 16235.0 41.02 67.24 84.10 90.73 95.37 96.75 97.45 98.55 3.25 2.55 1.45
12 2020202113 Apr 2020 to Mar 2021 (Period 13) Grand Central 436.0 44.27 70.87 85.55 90.37 92.89 95.41 98.85 99.77 4.59 1.15 0.23 13575.0 42.59 69.32 85.80 91.73 95.72 96.94 97.67 98.58 3.06 2.33 1.42
12 2021202201 Apr 2021 to Mar 2022 (Period 01) Grand Central 2601.0 47.29 73.28 89.39 93.96 97.54 98.85 99.54 99.85 1.15 0.46 0.15 15984.0 43.17 69.81 86.28 92.03 95.96 97.22 97.95 98.77 2.78 2.05 1.23
12 2021202202 Apr 2021 to Mar 2022 (Period 02) Grand Central 2585.0 41.62 71.33 88.63 94.12 97.37 98.53 99.15 99.38 1.47 0.85 0.62 18569.0 42.95 70.02 86.61 92.32 96.16 97.40 98.12 98.85 2.60 1.88 1.15
12 2021202203 Apr 2021 to Mar 2022 (Period 03) Grand Central 2685.0 35.79 64.43 82.83 89.50 95.23 97.21 97.99 99.37 2.79 2.01 0.63 21254.0 42.05 69.31 86.13 91.96 96.04 97.37 98.10 98.92 2.63 1.90 1.08
12 2021202204 Apr 2021 to Mar 2022 (Period 04) Grand Central 3033.0 32.34 60.11 80.61 88.72 94.30 96.93 97.92 99.01 3.07 2.08 0.99 24287.0 40.84 68.16 85.44 91.56 95.82 97.32 98.08 98.93 2.68 1.92 1.07
12 2021202205 Apr 2021 to Mar 2022 (Period 05) Grand Central 3048.0 30.68 58.73 80.09 88.75 94.72 96.95 97.54 98.72 3.05 2.46 1.28 25246.0 39.59 67.19 84.99 91.45 95.84 97.45 98.15 98.99 2.55 1.85 1.01
12 2021202206 Apr 2021 to Mar 2022 (Period 06) Grand Central 3062.0 29.43 55.26 75.47 83.18 89.61 92.46 94.09 97.49 7.54 5.91 2.51 25890.0 37.72 65.22 83.52 90.27 95.01 96.81 97.64 98.80 3.19 2.36 1.20
12 2021202207 Apr 2021 to Mar 2022 (Period 07) Grand Central 3320.0 29.37 55.60 78.43 87.59 94.37 96.30 97.47 98.49 3.70 2.53 1.51 25656.0 35.69 63.05 82.28 89.48 94.64 96.53 97.48 98.72 3.47 2.52 1.28
12 2021202208 Apr 2021 to Mar 2022 (Period 08) Grand Central 3341.0 26.49 52.11 74.41 84.05 93.27 95.06 96.23 97.58 4.94 3.77 2.42 26845.0 34.45 61.68 81.34 88.72 94.42 96.39 97.36 98.59 3.61 2.64 1.41
12 2021202209 Apr 2021 to Mar 2022 (Period 09) Grand Central 3098.0 18.24 40.19 61.30 72.56 85.41 91.06 94.03 97.29 8.94 5.97 2.71 28944.0 32.71 59.43 79.26 87.08 93.53 95.87 97.07 98.50 4.13 2.93 1.50
12 2021202210 Apr 2021 to Mar 2022 (Period 10) Grand Central 3126.0 22.55 46.83 70.22 79.49 88.42 91.91 93.41 95.97 8.09 6.59 4.03 30335.0 31.01 57.33 77.78 85.93 92.85 95.39 96.66 98.27 4.61 3.34 1.73
12 2021202211 Apr 2021 to Mar 2022 (Period 11) Grand Central 3467.0 30.83 57.51 77.99 86.41 93.05 95.79 96.91 98.30 4.21 3.09 1.70 33802.0 30.99 57.35 77.80 85.98 92.87 95.43 96.69 98.27 4.57 3.31 1.73
12 2021202212 Apr 2021 to Mar 2022 (Period 12) Grand Central 3416.0 27.58 50.12 71.72 80.85 88.61 91.04 92.30 94.53 8.96 7.70 5.47 37218.0 30.68 56.68 77.24 85.51 92.48 95.03 96.28 97.93 4.97 3.72 2.07
12 2021202213 Apr 2021 to Mar 2022 (Period 13) Grand Central 3358.0 30.20 55.99 77.07 85.35 92.53 94.58 95.98 98.30 5.42 4.02 1.70 40140.0 30.49 56.47 77.14 85.44 92.48 94.99 96.23 97.94 5.01 3.77 2.06
12 2022202301 Apr 2022 to Mar 2023 (Period 01) Grand Central 3974.0 28.46 54.66 75.34 85.51 93.91 96.38 97.74 99.07 3.62 2.26 0.93 41513.0 29.24 55.24 76.20 84.91 92.30 94.88 96.17 97.93 5.12 3.83 2.07
12 2022202302 Apr 2022 to Mar 2023 (Period 02) Grand Central 3369.0 25.47 52.60 74.00 83.73 91.01 93.83 95.19 97.48 6.17 4.81 2.52 42297.0 28.19 54.05 75.26 84.26 91.89 94.57 95.91 97.80 5.43 4.09 2.20
12 2022202303 Apr 2022 to Mar 2023 (Period 03) Grand Central 3497.0 23.08 47.56 67.60 76.87 87.65 92.02 94.51 97.11 7.98 5.49 2.89 43109.0 27.30 52.88 74.17 83.33 91.33 94.20 95.66 97.65 5.80 4.34 2.35
12 2022202304 Apr 2022 to Mar 2023 (Period 04) Grand Central 3794.0 23.99 49.26 69.48 79.63 89.06 92.30 94.33 96.86 7.70 5.67 3.14 43870.0 26.66 52.06 73.32 82.64 90.93 93.85 95.39 97.49 6.15 4.61 2.51
12 2022202305 Apr 2022 to Mar 2023 (Period 05) Grand Central 3427.0 19.14 42.60 63.35 71.81 80.57 85.61 88.68 92.33 14.39 11.32 7.67 44249.0 25.80 50.87 72.08 81.38 89.87 93.00 94.73 97.00 7.00 5.27 3.00
12 2022202306 Apr 2022 to Mar 2023 (Period 06) Grand Central 3868.0 26.01 51.42 69.96 78.90 87.46 91.34 93.46 96.23 8.66 6.54 3.77 45055.0 25.58 50.62 71.67 81.04 89.68 92.89 94.66 96.90 7.11 5.34 3.10
12 2022202307 Apr 2022 to Mar 2023 (Period 07) Grand Central 3681.0 24.75 50.48 70.80 80.87 90.36 93.59 95.98 97.99 6.41 4.02 2.01 45416.0 25.23 50.24 71.10 80.55 89.39 92.70 94.56 96.88 7.30 5.44 3.12
12 2022202308 Apr 2022 to Mar 2023 (Period 08) Grand Central 3499.0 19.66 42.01 62.25 73.25 84.57 89.57 92.60 96.11 10.43 7.40 3.89 45574.0 24.71 49.48 70.18 79.73 88.74 92.29 94.29 96.77 7.71 5.71 3.23
12 2022202309 Apr 2022 to Mar 2023 (Period 09) Grand Central 3751.0 15.22 33.40 51.67 62.84 77.07 85.68 91.23 96.27 14.32 8.77 3.73 46227.0 24.38 48.79 69.27 78.84 88.01 91.83 94.06 96.69 8.17 5.94 3.31
12 2022202310 Apr 2022 to Mar 2023 (Period 10) Grand Central 2006.0 16.30 37.59 52.89 64.36 79.76 86.94 90.58 94.52 13.06 9.42 5.48 45107.0 24.14 48.43 68.48 78.15 87.62 91.61 93.95 96.64 8.39 6.05 3.36
12 2022202311 Apr 2022 to Mar 2023 (Period 11) Grand Central 3363.0 20.61 43.06 61.88 74.19 86.74 92.18 94.20 96.37 7.82 5.80 3.63 45003.0 23.36 47.33 67.25 77.22 87.13 91.33 93.74 96.50 8.67 6.26 3.50
12 2022202312 Apr 2022 to Mar 2023 (Period 12) Grand Central 3298.0 22.80 48.88 68.71 78.68 89.08 92.66 95.06 97.48 7.34 4.94 2.52 44885.0 23.00 47.23 67.02 77.05 87.16 91.45 93.94 96.72 8.55 6.06 3.28
12 2022202313 Apr 2022 to Mar 2023 (Period 13) Grand Central 3375.0 25.33 53.13 72.33 81.75 89.54 92.36 94.19 96.86 7.64 5.81 3.14 44902.0 22.64 47.02 66.67 76.78 86.94 91.28 93.81 96.61 8.72 6.19 3.39
12 2023202401 Apr 2023 to Mar 2024 (Period 01) Grand Central 4015.0 25.31 53.45 73.47 82.94 90.98 94.12 96.61 97.96 5.88 3.39 2.04 44943.0 22.36 46.92 66.51 76.56 86.69 91.09 93.71 96.51 8.91 6.29 3.49
12 2023202402 Apr 2023 to Mar 2024 (Period 02) Grand Central 3434.0 25.33 50.23 68.93 78.60 88.00 90.33 92.63 95.57 9.67 7.37 4.43 45008.0 22.36 46.75 66.13 76.18 86.46 90.82 93.52 96.37 9.18 6.48 3.63
12 2023202403 Apr 2023 to Mar 2024 (Period 03) Grand Central 3393.0 21.22 45.45 62.78 70.50 81.05 85.85 89.74 93.63 14.15 10.26 6.37 44904.0 22.21 46.59 65.76 75.70 85.96 90.35 93.16 96.11 9.65 6.84 3.89
12 2023202404 Apr 2023 to Mar 2024 (Period 04) Grand Central 3085.0 20.62 44.41 66.16 76.63 86.97 91.99 94.13 96.69 8.01 5.87 3.31 44195.0 21.95 46.20 65.47 75.43 85.77 90.30 93.13 96.08 9.70 6.87 3.92
12 2023202405 Apr 2023 to Mar 2024 (Period 05) Grand Central 3403.0 21.04 42.26 63.00 72.82 84.66 89.30 91.57 95.74 10.70 8.43 4.26 44171.0 22.10 46.18 65.45 75.51 86.09 90.59 93.35 96.35 9.41 6.65 3.65
12 2023202406 Apr 2023 to Mar 2024 (Period 06) Grand Central 3463.0 20.10 43.17 61.19 70.98 83.48 89.60 92.67 96.30 10.40 7.33 3.70 43766.0 21.59 45.48 64.71 74.85 85.76 90.44 93.29 96.35 9.56 6.71 3.65
12 2023202407 Apr 2023 to Mar 2024 (Period 07) Grand Central 3764.0 18.57 42.35 61.50 72.40 85.39 90.46 92.64 95.48 9.54 7.36 4.52 43849.0 21.07 44.79 63.93 74.13 85.34 90.18 93.01 96.14 9.82 6.99 3.86
12 2023202408 Apr 2023 to Mar 2024 (Period 08) Grand Central 3759.0 15.99 38.28 58.95 69.62 84.06 90.32 93.32 96.14 9.68 6.68 3.86 44109.0 20.75 44.46 63.64 73.82 85.29 90.24 93.06 96.14 9.76 6.94 3.86
12 2023202409 Apr 2023 to Mar 2024 (Period 09) Grand Central 3794.0 16.37 36.64 54.14 65.95 80.15 87.56 91.38 95.28 12.44 8.62 4.72 44152.0 20.84 44.72 63.84 74.07 85.55 90.40 93.08 96.06 9.60 6.92 3.94
12 2023202410 Apr 2023 to Mar 2024 (Period 10) Grand Central 3127.0 14.58 34.06 50.18 62.58 76.43 83.37 87.14 90.28 16.63 12.86 9.72 45273.0 20.61 44.30 63.38 73.71 85.18 90.07 92.78 95.73 9.93 7.22 4.27
12 2023202411 Apr 2023 to Mar 2024 (Period 11) Grand Central 3532.0 21.60 43.63 62.06 72.37 83.72 89.10 91.65 94.37 10.90 8.35 5.63 45442.0 20.69 44.34 63.39 73.57 84.95 89.84 92.58 95.57 10.16 7.42 4.43
12 2023202412 Apr 2023 to Mar 2024 (Period 12) Grand Central 3206.0 23.24 46.85 67.90 78.70 88.96 92.83 94.10 96.76 7.17 5.90 3.24 45350.0 20.71 44.19 63.32 73.56 84.93 89.84 92.51 95.52 10.16 7.49 4.48
12 2023202413 Apr 2023 to Mar 2024 (Period 13) Grand Central 4149.0 26.15 49.60 71.03 81.13 90.46 94.22 96.22 97.61 5.78 3.78 2.39 46124.0 20.87 44.02 63.35 73.64 85.09 90.05 92.72 95.61 9.95 7.28 4.39
12 2024202501 Apr 2024 to Mar 2025 (Period 01) Grand Central 3995.0 26.38 51.81 72.77 84.18 92.49 95.02 96.30 98.25 4.98 3.70 1.75 46104.0 20.96 43.88 63.29 73.75 85.22 90.13 92.69 95.63 9.87 7.31 4.37
12 2024202502 Apr 2024 to Mar 2025 (Period 02) Grand Central 4074.0 22.70 46.39 67.77 78.96 88.29 93.03 95.36 97.37 6.97 4.64 2.63 46744.0 20.79 43.63 63.26 73.84 85.28 90.36 92.93 95.79 9.64 7.07 4.21
12 2024202503 Apr 2024 to Mar 2025 (Period 03) Grand Central 4143.0 25.10 49.17 71.54 81.51 91.17 94.93 96.62 97.76 5.07 3.38 2.24 47494.0 21.13 43.98 64.02 74.75 86.10 91.09 93.48 96.12 8.91 6.52 3.88
12 2024202504 Apr 2024 to Mar 2025 (Period 04) Grand Central 4212.0 20.20 41.67 63.30 75.05 85.66 90.08 92.47 95.30 9.92 7.53 4.70 48621.0 21.09 43.75 63.82 74.66 86.00 90.94 93.35 96.01 9.06 6.65 3.99
12 2024202505 Apr 2024 to Mar 2025 (Period 05) Grand Central 4175.0 21.25 44.17 64.91 75.19 85.08 90.23 93.41 96.74 9.77 6.59 3.26 49393.0 21.10 43.89 63.97 74.83 86.02 90.99 93.48 96.09 9.01 6.52 3.91
12 2024202506 Apr 2024 to Mar 2025 (Period 06) Grand Central 3966.0 23.47 46.77 65.91 75.82 85.73 90.44 92.71 94.93 9.56 7.29 5.07 49896.0 21.36 44.17 64.32 75.18 86.17 91.05 93.47 95.98 8.95 6.53 4.02
12 2024202507 Apr 2024 to Mar 2025 (Period 07) Grand Central 3982.0 22.65 45.13 64.97 75.97 87.09 91.06 93.37 95.55 8.94 6.63 4.45 50114.0 21.67 44.38 64.58 75.45 86.30 91.09 93.53 95.99 8.91 6.47 4.01
12 2024202508 Apr 2024 to Mar 2025 (Period 08) Grand Central 3947.0 20.60 42.94 64.53 76.62 88.17 93.11 94.93 97.97 6.89 5.07 2.03 50302.0 22.01 44.73 65.00 75.98 86.62 91.31 93.65 96.13 8.69 6.35 3.87
12 2024202509 Apr 2024 to Mar 2025 (Period 09) Grand Central 3895.0 18.82 37.87 56.23 67.91 81.18 86.70 89.96 94.38 13.30 10.04 5.62 50403.0 22.19 44.81 65.14 76.11 86.68 91.23 93.54 96.06 8.77 6.46 3.94
12 2024202510 Apr 2024 to Mar 2025 (Period 10) Grand Central 3478.0 22.97 45.92 66.10 76.51 87.29 90.94 93.30 96.58 9.06 6.70 3.42 50754.0 22.71 45.55 66.12 76.97 87.36 91.70 93.92 96.45 8.30 6.08 3.55
12 2024202511 Apr 2024 to Mar 2025 (Period 11) Grand Central 3738.0 21.70 42.13 60.25 70.52 83.33 87.80 90.48 94.28 12.20 9.52 5.72 50960.0 22.72 45.43 65.98 76.81 87.31 91.59 93.82 96.43 8.41 6.18 3.57
12 2024202512 Apr 2024 to Mar 2025 (Period 12) Grand Central 3787.0 23.71 46.47 67.23 78.69 89.57 94.16 95.83 97.49 5.84 4.17 2.51 51541.0 22.76 45.42 65.95 76.83 87.38 91.70 93.95 96.49 8.30 6.05 3.51
12 2024202513 Apr 2024 to Mar 2025 (Period 13) Grand Central 4182.0 26.69 51.65 73.86 83.41 91.70 95.00 96.44 98.52 5.00 3.56 1.48 51574.0 22.80 45.58 66.18 77.02 87.48 91.77 93.97 96.57 8.23 6.03 3.43
12 2025202601 Apr 2025 to Mar 2026 (Period 01) Grand Central 3871.0 24.54 48.02 67.94 78.17 88.40 92.43 94.11 95.66 7.57 5.89 4.34 51450.0 22.66 45.28 65.80 76.55 87.16 91.57 93.80 96.37 8.43 6.20 3.63
12 2025202602 Apr 2025 to Mar 2026 (Period 02) Grand Central 3979.0 21.94 45.41 64.66 75.97 87.69 91.88 93.92 97.16 8.12 6.08 2.84 51355.0 22.60 45.21 65.56 76.32 87.11 91.48 93.69 96.35 8.52 6.31 3.65
12 2025202603 Apr 2025 to Mar 2026 (Period 03) Grand Central 3933.0 25.96 48.79 69.57 78.11 87.62 92.19 94.30 97.13 7.81 5.70 2.87 51145.0 22.65 45.16 65.38 76.03 86.82 91.25 93.50 96.29 8.75 6.50 3.71
12 2025202604 Apr 2025 to Mar 2026 (Period 04) Grand Central 4216.0 25.74 47.32 66.75 75.81 87.12 90.96 93.00 95.94 9.04 7.00 4.06 51149.0 23.11 45.63 65.67 76.10 86.94 91.32 93.54 96.35 8.68 6.46 3.65
12 2025202605 Apr 2025 to Mar 2026 (Period 05) Grand Central 4006.0 22.89 44.73 61.83 71.44 82.28 86.32 88.79 92.46 13.68 11.21 7.54 50980.0 23.24 45.68 65.43 75.80 86.73 91.02 93.18 96.01 8.98 6.82 3.99
12 2025202606 Apr 2025 to Mar 2026 (Period 06) Grand Central 4075.0 24.88 45.69 64.49 76.52 88.27 92.81 95.85 98.21 7.19 4.15 1.79 51089.0 23.36 45.59 65.31 75.86 86.93 91.21 93.43 96.27 8.79 6.57 3.73
12 2025202607 Apr 2025 to Mar 2026 (Period 07) Grand Central 4233.0 25.61 48.17 67.97 78.43 89.82 93.29 95.42 97.54 6.71 4.58 2.46 51340.0 23.60 45.84 65.56 76.06 87.15 91.39 93.60 96.43 8.61 6.40 3.57
12 2025202608 Apr 2025 to Mar 2026 (Period 08) Grand Central 3745.0 23.02 44.22 64.09 75.51 87.10 91.75 94.79 98.10 8.25 5.21 1.90 51138.0 23.78 45.95 65.53 75.98 87.07 91.28 93.58 96.43 8.72 6.42 3.57
12 2025202609 Apr 2025 to Mar 2026 (Period 09) Grand Central 3780.0 20.85 40.87 60.16 72.38 85.87 89.97 92.49 94.87 10.03 7.51 5.13 51023.0 23.95 46.19 65.84 76.33 87.43 91.54 93.78 96.47 8.46 6.22 3.53
12 2025202610 Apr 2025 to Mar 2026 (Period 10) Grand Central 3762.0 18.98 41.92 64.83 75.97 87.85 92.45 95.06 97.63 7.55 4.94 2.37 51307.0 23.65 45.89 65.75 76.29 87.47 91.64 93.90 96.55 8.36 6.10 3.45
12 2025202611 Apr 2025 to Mar 2026 (Period 11) Grand Central 4315.0 24.66 49.62 69.57 79.05 89.46 93.70 95.87 98.29 6.30 4.13 1.71 51884.0 23.87 46.47 66.47 76.94 87.94 92.09 94.31 96.86 7.91 5.69 3.14
12 2025202612 Apr 2025 to Mar 2026 (Period 12) Grand Central 3543.0 20.01 43.47 65.42 76.63 89.11 93.73 95.63 96.98 6.27 4.37 3.02 51640.0 23.62 46.27 66.34 76.79 87.90 92.05 94.29 96.82 7.95 5.71 3.18
12 2025202613 Apr 2025 to Mar 2026 (Period 13) Grand Central 4447.0 23.88 48.77 70.16 80.84 90.74 94.87 96.72 98.43 5.13 3.28 1.57 51905.0 23.39 46.05 66.06 76.60 87.83 92.06 94.33 96.82 7.94 5.67 3.18
12 2026202701 Apr 2026 to Mar 2027 (Period 01) Grand Central 5029.0 20.20 41.10 62.26 73.39 85.64 90.28 92.96 96.12 9.72 7.04 3.88 53063.0 23.01 45.43 65.56 76.18 87.58 91.86 94.21 96.84 8.14 5.79 3.16
12 2026202702 Apr 2026 to Mar 2027 (Period 02) Grand Central 3864.0 19.95 40.35 57.45 67.62 79.79 85.56 88.61 93.12 14.44 11.39 6.88 52948.0 22.87 45.06 65.04 75.57 87.01 91.40 93.83 96.55 8.60 6.17 3.45
13 2014201501 Apr 2014 to Mar 2015 (Period 01) Great Western Railway 257986.0 29.18 60.25 80.99 89.66 96.66 98.45 99.21 99.73 1.55 0.79 0.27 257986.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201502 Apr 2014 to Mar 2015 (Period 02) Great Western Railway 281273.0 30.45 61.40 82.15 90.31 96.64 98.33 99.14 99.72 1.67 0.86 0.28 539259.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201503 Apr 2014 to Mar 2015 (Period 03) Great Western Railway 281408.0 27.67 57.70 78.97 87.70 95.23 97.53 98.62 99.47 2.47 1.38 0.53 820667.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201504 Apr 2014 to Mar 2015 (Period 04) Great Western Railway 280411.0 25.94 54.66 75.87 85.61 94.48 97.15 98.29 99.27 2.85 1.71 0.73 1101078.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201505 Apr 2014 to Mar 2015 (Period 05) Great Western Railway 279995.0 26.00 54.91 76.39 85.95 94.52 97.05 98.28 99.30 2.95 1.72 0.70 1381073.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201506 Apr 2014 to Mar 2015 (Period 06) Great Western Railway 278932.0 28.96 60.08 81.35 89.93 96.80 98.42 99.14 99.67 1.58 0.86 0.33 1660005.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201507 Apr 2014 to Mar 2015 (Period 07) Great Western Railway 273449.0 25.04 53.39 75.13 85.43 94.75 97.18 98.34 99.35 2.82 1.66 0.65 1933454.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201508 Apr 2014 to Mar 2015 (Period 08) Great Western Railway 273910.0 21.36 47.63 69.19 80.61 92.55 96.37 98.04 99.29 3.63 1.96 0.71 2207364.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201509 Apr 2014 to Mar 2015 (Period 09) Great Western Railway 273957.0 23.28 50.34 71.73 82.65 93.49 96.78 98.22 99.29 3.22 1.78 0.71 2481321.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201510 Apr 2014 to Mar 2015 (Period 10) Great Western Railway 240968.0 27.39 55.77 75.84 85.16 94.38 97.13 98.28 99.35 2.87 1.72 0.65 2722289.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201511 Apr 2014 to Mar 2015 (Period 11) Great Western Railway 275406.0 30.61 60.81 80.29 88.58 95.85 97.88 98.79 99.53 2.12 1.21 0.47 2997695.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201512 Apr 2014 to Mar 2015 (Period 12) Great Western Railway 278367.0 32.95 64.54 83.73 91.00 96.88 98.46 99.13 99.64 1.54 0.87 0.36 3276062.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2014201513 Apr 2014 to Mar 2015 (Period 13) Great Western Railway 305922.0 32.37 64.14 83.40 90.82 96.86 98.48 99.20 99.74 1.52 0.80 0.26 3581984.0 27.83 57.43 78.15 87.24 95.33 97.64 98.67 99.49 2.36 1.33 0.51
13 2015201601 Apr 2015 to Mar 2016 (Period 01) Great Western Railway 303467.0 30.93 61.34 80.62 88.52 95.50 97.67 98.64 99.41 2.33 1.36 0.59 3627465.0 27.99 57.56 78.15 87.17 95.25 97.59 98.63 99.47 2.41 1.37 0.53
13 2015201602 Apr 2015 to Mar 2016 (Period 02) Great Western Railway 278078.0 30.70 62.20 81.96 89.76 96.29 97.99 98.80 99.50 2.01 1.20 0.50 3624270.0 28.01 57.62 78.14 87.13 95.23 97.56 98.61 99.45 2.44 1.39 0.55
13 2015201603 Apr 2015 to Mar 2016 (Period 03) Great Western Railway 283813.0 28.73 59.49 80.56 89.19 96.44 98.35 99.11 99.72 1.65 0.89 0.28 3626675.0 28.09 57.76 78.26 87.24 95.32 97.62 98.64 99.47 2.38 1.36 0.53
13 2015201604 Apr 2015 to Mar 2016 (Period 04) Great Western Railway 273076.0 26.65 55.79 77.36 86.81 95.08 97.48 98.54 99.43 2.52 1.46 0.57 3619340.0 28.15 57.85 78.38 87.34 95.37 97.65 98.66 99.48 2.35 1.34 0.52
13 2015201605 Apr 2015 to Mar 2016 (Period 05) Great Western Railway 279841.0 28.38 58.03 79.46 88.43 95.91 97.97 98.83 99.49 2.03 1.17 0.51 3619186.0 28.34 58.09 78.62 87.53 95.48 97.72 98.71 99.50 2.28 1.29 0.50
13 2015201606 Apr 2015 to Mar 2016 (Period 06) Great Western Railway 267762.0 30.53 60.01 80.66 89.01 95.97 97.95 98.87 99.57 2.05 1.13 0.43 3608016.0 28.45 58.08 78.56 87.45 95.41 97.68 98.69 99.49 2.32 1.31 0.51
13 2015201607 Apr 2015 to Mar 2016 (Period 07) Great Western Railway 283436.0 27.97 57.02 78.14 87.32 95.40 97.73 98.69 99.49 2.27 1.31 0.51 3618003.0 28.67 58.35 78.78 87.60 95.46 97.73 98.71 99.50 2.27 1.29 0.50
13 2015201608 Apr 2015 to Mar 2016 (Period 08) Great Western Railway 279173.0 24.55 51.88 73.30 83.66 93.74 96.96 98.37 99.48 3.04 1.63 0.52 3623266.0 28.91 58.66 79.09 87.82 95.55 97.77 98.74 99.51 2.23 1.26 0.49
13 2015201609 Apr 2015 to Mar 2016 (Period 09) Great Western Railway 277489.0 26.01 53.43 74.48 84.72 94.61 97.50 98.67 99.51 2.50 1.33 0.49 3626798.0 29.11 58.89 79.29 87.98 95.63 97.82 98.77 99.53 2.18 1.23 0.47
13 2015201610 Apr 2015 to Mar 2016 (Period 10) Great Western Railway 244162.0 33.58 63.60 82.82 90.36 96.49 98.21 98.97 99.57 1.79 1.03 0.43 3629992.0 29.53 59.42 79.76 88.32 95.77 97.90 98.82 99.54 2.10 1.18 0.46
13 2015201611 Apr 2015 to Mar 2016 (Period 11) Great Western Railway 280092.0 34.24 64.98 83.87 91.18 96.86 98.38 99.07 99.62 1.62 0.93 0.38 3634678.0 29.81 59.74 80.03 88.52 95.85 97.93 98.84 99.55 2.07 1.16 0.45
13 2015201612 Apr 2015 to Mar 2016 (Period 12) Great Western Railway 276206.0 32.90 63.66 82.62 90.06 96.25 97.87 98.63 99.33 2.13 1.37 0.67 3632517.0 29.80 59.67 79.95 88.45 95.80 97.89 98.80 99.53 2.11 1.20 0.47
13 2015201613 Apr 2015 to Mar 2016 (Period 13) Great Western Railway 255337.0 33.59 64.27 83.36 90.80 96.71 98.35 99.02 99.59 1.65 0.98 0.41 3581932.0 29.85 59.61 79.89 88.42 95.78 97.87 98.78 99.51 2.13 1.22 0.49
13 2016201701 Apr 2016 to Mar 2017 (Period 01) Great Western Railway 300297.0 35.55 67.00 85.39 92.09 97.21 98.58 99.18 99.61 1.42 0.82 0.39 3578762.0 30.24 60.09 80.29 88.72 95.92 97.95 98.83 99.53 2.05 1.17 0.47
13 2016201702 Apr 2016 to Mar 2017 (Period 02) Great Western Railway 279871.0 32.09 62.80 82.20 89.88 96.19 98.01 98.85 99.51 1.99 1.15 0.49 3580555.0 30.35 60.13 80.31 88.72 95.91 97.95 98.83 99.53 2.05 1.17 0.47
13 2016201703 Apr 2016 to Mar 2017 (Period 03) Great Western Railway 280452.0 30.25 60.65 80.68 89.00 95.79 97.80 98.71 99.50 2.20 1.29 0.50 3577194.0 30.47 60.23 80.32 88.71 95.86 97.91 98.80 99.51 2.09 1.20 0.49
13 2016201704 Apr 2016 to Mar 2017 (Period 04) Great Western Railway 286264.0 27.60 56.77 77.39 86.42 94.69 97.20 98.37 99.37 2.80 1.63 0.63 3590382.0 30.53 60.29 80.31 88.67 95.83 97.88 98.78 99.51 2.12 1.22 0.49
13 2016201705 Apr 2016 to Mar 2017 (Period 05) Great Western Railway 281911.0 27.41 56.90 78.09 87.45 95.59 97.84 98.81 99.53 2.16 1.19 0.47 3592452.0 30.45 60.20 80.21 88.59 95.80 97.87 98.78 99.51 2.13 1.22 0.49
13 2016201706 Apr 2016 to Mar 2017 (Period 06) Great Western Railway 276361.0 26.01 54.33 74.63 84.03 93.41 96.45 97.94 99.10 3.55 2.06 0.90 3601051.0 30.10 59.76 79.74 88.21 95.61 97.76 98.71 99.48 2.24 1.29 0.52
13 2016201707 Apr 2016 to Mar 2017 (Period 07) Great Western Railway 273646.0 29.08 58.87 79.47 88.38 95.96 98.10 98.94 99.57 1.90 1.06 0.43 3591261.0 30.19 59.91 79.85 88.30 95.65 97.78 98.73 99.48 2.22 1.27 0.52
13 2016201708 Apr 2016 to Mar 2017 (Period 08) Great Western Railway 275256.0 25.56 52.95 73.48 83.60 93.63 96.82 98.20 99.24 3.18 1.80 0.76 3587344.0 30.28 60.00 79.87 88.30 95.64 97.78 98.72 99.46 2.22 1.28 0.54
13 2016201709 Apr 2016 to Mar 2017 (Period 09) Great Western Railway 276491.0 22.61 48.16 68.84 79.93 91.83 95.82 97.60 98.93 4.18 2.40 1.07 3586346.0 30.02 59.60 79.44 87.93 95.43 97.65 98.64 99.42 2.35 1.36 0.58
13 2016201710 Apr 2016 to Mar 2017 (Period 10) Great Western Railway 250465.0 31.24 60.23 79.88 88.14 95.64 97.83 98.79 99.53 2.17 1.21 0.47 3592649.0 29.86 59.37 79.24 87.78 95.37 97.62 98.62 99.42 2.38 1.38 0.58
13 2016201711 Apr 2016 to Mar 2017 (Period 11) Great Western Railway 284194.0 32.21 61.58 80.65 88.92 96.03 98.02 98.86 99.58 1.98 1.14 0.42 3596751.0 29.71 59.11 78.99 87.60 95.31 97.59 98.61 99.41 2.41 1.39 0.59
13 2016201712 Apr 2016 to Mar 2017 (Period 12) Great Western Railway 287147.0 32.10 62.35 81.89 89.82 96.38 98.23 99.04 99.65 1.77 0.96 0.35 3607692.0 29.65 59.02 78.94 87.59 95.32 97.62 98.64 99.44 2.38 1.36 0.56
13 2016201713 Apr 2016 to Mar 2017 (Period 13) Great Western Railway 277551.0 33.13 63.33 82.44 90.01 96.47 98.29 99.05 99.65 1.71 0.95 0.35 3629906.0 29.64 58.98 78.90 87.55 95.31 97.62 98.64 99.44 2.38 1.36 0.56
13 2017201801 Apr 2017 to Mar 2018 (Period 01) Great Western Railway 287314.0 33.43 64.01 83.14 90.57 96.54 98.23 98.97 99.57 1.77 1.03 0.43 3616923.0 29.45 58.71 78.70 87.41 95.25 97.59 98.63 99.44 2.41 1.37 0.56
13 2017201802 Apr 2017 to Mar 2018 (Period 02) Great Western Railway 286668.0 32.01 61.94 81.09 89.00 95.86 97.94 98.91 99.60 2.06 1.09 0.40 3623720.0 29.45 58.65 78.62 87.35 95.23 97.59 98.63 99.45 2.41 1.37 0.55
13 2017201803 Apr 2017 to Mar 2018 (Period 03) Great Western Railway 287054.0 27.49 55.32 74.71 83.80 92.92 96.00 97.44 98.83 4.00 2.56 1.17 3630322.0 29.23 58.23 78.15 86.94 95.00 97.44 98.53 99.39 2.56 1.47 0.61
13 2017201804 Apr 2017 to Mar 2018 (Period 04) Great Western Railway 284904.0 25.84 52.63 72.54 82.37 92.83 96.33 97.90 99.16 3.67 2.10 0.84 3628962.0 29.10 57.91 77.77 86.62 94.85 97.38 98.49 99.38 2.62 1.51 0.62
13 2017201805 Apr 2017 to Mar 2018 (Period 05) Great Western Railway 288078.0 30.27 58.84 78.54 87.52 95.56 97.83 98.82 99.58 2.17 1.18 0.42 3635129.0 29.32 58.06 77.80 86.63 94.85 97.37 98.50 99.38 2.63 1.50 0.62
13 2017201806 Apr 2017 to Mar 2018 (Period 06) Great Western Railway 282431.0 28.31 56.30 76.14 85.40 94.45 97.37 98.56 99.50 2.63 1.44 0.50 3641199.0 29.49 58.21 77.92 86.73 94.93 97.44 98.54 99.41 2.56 1.46 0.59
13 2017201807 Apr 2017 to Mar 2018 (Period 07) Great Western Railway 280110.0 27.95 55.65 75.94 85.62 94.63 97.32 98.58 99.53 2.68 1.42 0.47 3647663.0 29.41 57.96 77.65 86.52 94.83 97.39 98.52 99.41 2.61 1.48 0.59
13 2017201808 Apr 2017 to Mar 2018 (Period 08) Great Western Railway 282958.0 26.01 52.37 71.87 81.97 92.50 95.91 97.62 99.01 4.09 2.38 0.99 3655365.0 29.43 57.90 77.51 86.39 94.74 97.31 98.47 99.39 2.69 1.53 0.61
13 2017201809 Apr 2017 to Mar 2018 (Period 09) Great Western Railway 281759.0 26.41 52.98 72.76 82.79 93.09 96.40 97.95 99.15 3.60 2.05 0.85 3660633.0 29.71 58.26 77.80 86.60 94.83 97.36 98.50 99.41 2.64 1.50 0.59
13 2017201810 Apr 2017 to Mar 2018 (Period 10) Great Western Railway 242501.0 27.74 54.42 72.99 82.23 92.10 95.66 97.42 98.94 4.34 2.58 1.06 3652669.0 29.48 57.87 77.34 86.21 94.60 97.21 98.40 99.37 2.79 1.60 0.63
13 2017201811 Apr 2017 to Mar 2018 (Period 11) Great Western Railway 292280.0 35.16 63.93 81.07 88.57 95.56 97.79 98.78 99.50 2.21 1.22 0.50 3660755.0 29.72 58.07 77.38 86.18 94.56 97.19 98.40 99.36 2.81 1.60 0.64
13 2017201812 Apr 2017 to Mar 2018 (Period 12) Great Western Railway 276401.0 32.79 59.99 77.44 85.51 93.58 96.40 97.78 99.01 3.60 2.22 0.99 3650009.0 29.76 57.88 77.03 85.85 94.34 97.05 98.30 99.32 2.95 1.70 0.68
13 2017201813 Apr 2017 to Mar 2018 (Period 13) Great Western Railway 277150.0 33.74 61.30 78.27 86.09 94.09 96.89 98.18 99.32 3.11 1.82 0.68 3649608.0 29.81 57.72 76.71 85.55 94.16 96.95 98.24 99.29 3.05 1.76 0.71
13 2018201901 Apr 2018 to Mar 2019 (Period 01) Great Western Railway 283805.0 31.83 58.85 76.20 84.54 93.15 96.22 97.80 99.16 3.78 2.20 0.84 3646099.0 29.68 57.31 76.17 85.07 93.90 96.79 98.14 99.26 3.21 1.86 0.74
13 2018201902 Apr 2018 to Mar 2019 (Period 02) Great Western Railway 278566.0 29.54 55.92 73.70 82.58 92.51 96.07 97.75 99.18 3.93 2.25 0.82 3637997.0 29.49 56.84 75.59 84.57 93.64 96.64 98.05 99.23 3.36 1.95 0.77
13 2018201903 Apr 2018 to Mar 2019 (Period 03) Great Western Railway 276368.0 30.69 56.23 73.65 82.54 92.26 95.80 97.57 99.07 4.20 2.43 0.93 3627311.0 29.74 56.92 75.51 84.48 93.59 96.63 98.06 99.25 3.37 1.94 0.75
13 2018201904 Apr 2018 to Mar 2019 (Period 04) Great Western Railway 265334.0 28.50 52.85 70.00 79.43 90.37 94.66 96.86 98.77 5.34 3.14 1.23 3607741.0 29.95 56.95 75.34 84.28 93.41 96.51 97.99 99.22 3.49 2.01 0.78
13 2018201905 Apr 2018 to Mar 2019 (Period 05) Great Western Railway 275656.0 30.55 55.57 72.65 81.75 92.05 95.78 97.59 99.08 4.22 2.41 0.92 3595319.0 29.97 56.70 74.88 83.82 93.14 96.35 97.89 99.18 3.65 2.11 0.82
13 2018201906 Apr 2018 to Mar 2019 (Period 06) Great Western Railway 282327.0 32.19 58.44 75.93 84.66 94.02 97.05 98.37 99.39 2.95 1.63 0.61 3595215.0 30.28 56.87 74.86 83.76 93.10 96.32 97.88 99.17 3.68 2.12 0.83
13 2018201907 Apr 2018 to Mar 2019 (Period 07) Great Western Railway 276430.0 30.28 55.96 73.26 82.44 92.64 96.09 97.75 99.09 3.91 2.25 0.91 3591535.0 30.46 56.89 74.66 83.52 92.95 96.23 97.81 99.13 3.77 2.19 0.87
13 2018201908 Apr 2018 to Mar 2019 (Period 08) Great Western Railway 270243.0 30.06 56.03 73.54 82.63 92.63 96.09 97.73 99.07 3.91 2.27 0.93 3578820.0 30.78 57.18 74.79 83.57 92.96 96.24 97.82 99.14 3.76 2.18 0.86
13 2018201909 Apr 2018 to Mar 2019 (Period 09) Great Western Railway 276950.0 29.72 55.28 72.96 82.12 92.50 96.26 97.93 99.20 3.74 2.07 0.80 3574011.0 31.04 57.37 74.81 83.52 92.91 96.23 97.82 99.14 3.77 2.18 0.86
13 2018201910 Apr 2018 to Mar 2019 (Period 10) Great Western Railway 243345.0 37.89 67.14 83.51 90.34 96.47 98.28 98.98 99.58 1.72 1.02 0.42 3574855.0 31.73 58.23 75.53 84.07 93.21 96.41 97.93 99.19 3.59 2.07 0.81
13 2018201911 Apr 2018 to Mar 2019 (Period 11) Great Western Railway 284989.0 40.59 69.03 84.55 90.73 96.30 97.98 98.78 99.45 2.02 1.22 0.55 3567564.0 32.16 58.63 75.79 84.24 93.26 96.42 97.92 99.18 3.58 2.08 0.82
13 2018201912 Apr 2018 to Mar 2019 (Period 12) Great Western Railway 282516.0 40.54 69.32 85.09 91.38 96.88 98.41 99.13 99.65 1.59 0.87 0.35 3573679.0 32.77 59.37 76.40 84.71 93.53 96.58 98.03 99.23 3.42 1.97 0.77
13 2018201913 Apr 2018 to Mar 2019 (Period 13) Great Western Railway 288690.0 40.51 68.98 84.67 91.02 96.56 98.18 98.94 99.53 1.82 1.06 0.47 3585219.0 33.32 59.99 76.92 85.11 93.73 96.69 98.09 99.25 3.31 1.91 0.75
13 2019202001 Apr 2019 to Mar 2020 (Period 01) Great Western Railway 276937.0 42.69 71.36 86.25 92.09 97.02 98.43 99.09 99.65 1.57 0.91 0.35 276937.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202002 Apr 2019 to Mar 2020 (Period 02) Great Western Railway 287730.0 43.25 72.29 87.01 92.62 97.31 98.63 99.21 99.69 1.37 0.79 0.31 564667.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202003 Apr 2019 to Mar 2020 (Period 03) Great Western Railway 290409.0 42.37 70.37 85.33 91.47 96.78 98.29 98.96 99.56 1.71 1.04 0.44 855076.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202004 Apr 2019 to Mar 2020 (Period 04) Great Western Railway 288911.0 36.24 63.81 80.54 87.98 95.05 97.30 98.38 99.25 2.70 1.62 0.75 1143987.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202005 Apr 2019 to Mar 2020 (Period 05) Great Western Railway 288596.0 39.62 66.15 81.83 88.67 95.20 97.41 98.51 99.41 2.59 1.49 0.59 1432583.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202006 Apr 2019 to Mar 2020 (Period 06) Great Western Railway 287186.0 41.86 69.17 84.69 91.21 96.67 98.20 98.96 99.61 1.80 1.04 0.39 1719769.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202007 Apr 2019 to Mar 2020 (Period 07) Great Western Railway 289102.0 40.94 68.42 84.52 91.27 96.96 98.59 99.28 99.73 1.41 0.72 0.27 2008871.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202008 Apr 2019 to Mar 2020 (Period 08) Great Western Railway 284143.0 38.37 64.66 80.87 88.32 95.38 97.51 98.50 99.42 2.49 1.50 0.58 2293014.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202009 Apr 2019 to Mar 2020 (Period 09) Great Western Railway 286604.0 36.37 62.07 78.57 86.55 94.81 97.47 98.59 99.43 2.53 1.41 0.57 2579618.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202010 Apr 2019 to Mar 2020 (Period 10) Great Western Railway 239471.0 34.73 62.98 79.59 86.87 93.96 96.58 97.87 98.97 3.42 2.13 1.03 2819089.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202011 Apr 2019 to Mar 2020 (Period 11) Great Western Railway 280080.0 33.94 63.66 80.95 88.27 95.14 97.38 98.49 99.35 2.62 1.51 0.65 3099169.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202012 Apr 2019 to Mar 2020 (Period 12) Great Western Railway 268707.0 32.78 62.17 79.07 86.35 93.71 96.18 97.48 98.79 3.82 2.52 1.21 3367876.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
13 2019202013 Apr 2019 to Mar 2020 (Period 13) Great Western Railway 257350.0 40.54 70.86 85.91 91.54 96.66 98.21 98.89 99.49 1.79 1.11 0.51 3625226.0 38.82 66.81 82.73 89.51 95.77 97.72 98.64 99.42 2.28 1.36 0.58
13 2020202101 Apr 2020 to Mar 2021 (Period 01) Great Western Railway 163430.0 58.03 88.76 96.02 97.86 99.19 99.58 99.77 99.93 0.42 0.23 0.07 3511719.0 39.41 67.47 83.07 89.70 95.83 97.75 98.66 99.43 2.25 1.34 0.57
13 2020202102 Apr 2020 to Mar 2021 (Period 02) Great Western Railway 166716.0 57.75 87.35 95.12 97.18 98.80 99.32 99.56 99.83 0.68 0.44 0.17 3390705.0 39.98 68.04 83.33 89.81 95.85 97.76 98.66 99.42 2.24 1.34 0.58
13 2020202103 Apr 2020 to Mar 2021 (Period 03) Great Western Railway 189795.0 55.58 85.33 94.18 96.42 98.38 99.04 99.43 99.71 0.96 0.57 0.29 3290091.0 40.67 68.83 83.78 90.05 95.91 97.78 98.68 99.43 2.22 1.32 0.57
13 2020202104 Apr 2020 to Mar 2021 (Period 04) Great Western Railway 212169.0 54.43 85.37 94.77 97.13 98.95 99.49 99.68 99.85 0.51 0.32 0.15 3213349.0 41.98 70.37 84.80 90.70 96.19 97.94 98.77 99.47 2.06 1.23 0.53
13 2020202105 Apr 2020 to Mar 2021 (Period 05) Great Western Railway 222402.0 46.32 76.96 89.26 93.45 97.13 98.37 99.00 99.59 1.63 1.00 0.41 3147155.0 42.50 71.22 85.39 91.08 96.35 98.02 98.81 99.48 1.98 1.19 0.52
13 2020202106 Apr 2020 to Mar 2021 (Period 06) Great Western Railway 232853.0 46.23 77.25 90.54 94.74 97.81 98.74 99.22 99.61 1.26 0.78 0.39 3092822.0 42.84 71.87 85.84 91.35 96.43 98.06 98.83 99.48 1.94 1.17 0.52
13 2020202107 Apr 2020 to Mar 2021 (Period 07) Great Western Railway 260107.0 45.00 76.23 90.32 94.71 97.98 98.92 99.35 99.72 1.08 0.65 0.28 3063827.0 43.20 72.56 86.34 91.64 96.51 98.08 98.83 99.48 1.92 1.17 0.52
13 2020202108 Apr 2020 to Mar 2021 (Period 08) Great Western Railway 254500.0 43.39 73.94 88.77 93.65 97.63 98.78 99.29 99.76 1.22 0.71 0.24 3034184.0 43.67 73.42 87.06 92.12 96.71 98.19 98.90 99.51 1.81 1.10 0.49
13 2020202109 Apr 2020 to Mar 2021 (Period 09) Great Western Railway 253564.0 47.22 77.41 90.69 94.88 98.08 99.01 99.38 99.73 0.99 0.62 0.27 3001144.0 44.67 74.84 88.18 92.88 97.01 98.33 98.97 99.53 1.67 1.03 0.47
13 2020202110 Apr 2020 to Mar 2021 (Period 10) Great Western Railway 234480.0 48.97 77.28 89.38 93.48 97.08 98.27 98.91 99.46 1.73 1.09 0.54 2996153.0 45.80 75.98 88.96 93.41 97.26 98.47 99.05 99.57 1.53 0.95 0.43
13 2020202111 Apr 2020 to Mar 2021 (Period 11) Great Western Railway 256620.0 54.21 81.61 92.67 95.89 98.35 99.08 99.40 99.72 0.92 0.60 0.28 2972693.0 47.64 77.63 90.03 94.11 97.55 98.62 99.14 99.61 1.38 0.86 0.39
13 2020202112 Apr 2020 to Mar 2021 (Period 12) Great Western Railway 246728.0 54.65 82.09 92.64 95.45 97.86 98.69 99.13 99.56 1.31 0.87 0.44 2950714.0 49.58 79.41 91.25 94.93 97.92 98.85 99.29 99.68 1.15 0.71 0.32
13 2020202113 Apr 2020 to Mar 2021 (Period 13) Great Western Railway 233741.0 53.92 81.72 93.26 96.36 98.54 99.22 99.52 99.78 0.78 0.48 0.22 2927105.0 50.73 80.34 91.88 95.34 98.08 98.94 99.34 99.70 1.06 0.66 0.30
13 2021202201 Apr 2021 to Mar 2022 (Period 01) Great Western Railway 302008.0 51.42 80.49 92.82 95.95 98.31 99.05 99.43 99.73 0.95 0.57 0.27 3065683.0 50.40 79.91 91.75 95.26 98.05 98.91 99.33 99.69 1.09 0.67 0.31
13 2021202202 Apr 2021 to Mar 2022 (Period 02) Great Western Railway 282508.0 47.67 76.37 89.63 93.94 97.44 98.54 99.12 99.60 1.46 0.88 0.40 3181475.0 49.78 79.20 91.39 95.05 97.95 98.86 99.29 99.68 1.14 0.71 0.32
13 2021202203 Apr 2021 to Mar 2022 (Period 03) Great Western Railway 311571.0 41.56 69.12 84.71 90.50 95.89 97.74 98.61 99.39 2.26 1.39 0.61 3303251.0 48.67 77.90 90.60 94.54 97.74 98.74 99.22 99.65 1.26 0.78 0.35
13 2021202204 Apr 2021 to Mar 2022 (Period 04) Great Western Railway 300649.0 41.27 69.07 84.25 90.11 95.52 97.43 98.49 99.34 2.57 1.51 0.66 3391731.0 47.65 76.65 89.77 93.99 97.46 98.58 99.13 99.61 1.42 0.87 0.39
13 2021202205 Apr 2021 to Mar 2022 (Period 05) Great Western Railway 285764.0 40.08 68.19 83.99 90.17 95.76 97.64 98.55 99.33 2.36 1.45 0.67 3455093.0 47.11 75.93 89.33 93.70 97.34 98.52 99.09 99.59 1.48 0.91 0.41
13 2021202206 Apr 2021 to Mar 2022 (Period 06) Great Western Railway 285730.0 39.39 67.11 82.94 89.45 95.41 97.43 98.41 99.24 2.57 1.59 0.76 3507970.0 46.54 75.13 88.73 93.29 97.15 98.41 99.02 99.56 1.59 0.98 0.44
13 2021202207 Apr 2021 to Mar 2022 (Period 07) Great Western Railway 313445.0 41.18 69.33 85.35 91.42 96.67 98.23 98.98 99.55 1.77 1.02 0.45 3561308.0 46.18 74.53 88.31 93.02 97.05 98.36 99.00 99.54 1.64 1.00 0.46
13 2021202208 Apr 2021 to Mar 2022 (Period 08) Great Western Railway 310032.0 37.47 64.70 81.37 88.44 94.94 97.15 98.18 99.08 2.85 1.82 0.92 3616840.0 45.63 73.73 87.69 92.58 96.83 98.23 98.91 99.49 1.77 1.09 0.51
13 2021202209 Apr 2021 to Mar 2022 (Period 09) Great Western Railway 314827.0 37.34 64.48 81.72 88.75 95.03 97.11 98.21 99.15 2.89 1.79 0.85 3678103.0 44.81 72.69 86.97 92.10 96.59 98.08 98.81 99.44 1.92 1.19 0.56
13 2021202210 Apr 2021 to Mar 2022 (Period 10) Great Western Railway 287263.0 46.91 74.15 87.61 92.41 96.65 98.15 98.87 99.46 1.85 1.13 0.54 3730886.0 44.71 72.51 86.87 92.04 96.56 98.07 98.81 99.44 1.93 1.19 0.56
13 2021202211 Apr 2021 to Mar 2022 (Period 11) Great Western Railway 315328.0 46.16 74.50 88.52 93.20 97.18 98.46 99.08 99.62 1.54 0.92 0.38 3789594.0 44.19 72.06 86.61 91.87 96.49 98.03 98.79 99.44 1.97 1.21 0.56
13 2021202212 Apr 2021 to Mar 2022 (Period 12) Great Western Railway 292074.0 44.14 71.86 86.16 91.10 95.58 97.16 98.04 98.92 2.84 1.96 1.08 3834940.0 43.51 71.40 86.19 91.58 96.34 97.92 98.72 99.39 2.08 1.28 0.61
13 2021202213 Apr 2021 to Mar 2022 (Period 13) Great Western Railway 298159.0 44.47 71.96 86.26 91.53 96.44 97.96 98.77 99.45 2.04 1.23 0.55 3899358.0 42.96 70.82 85.77 91.29 96.21 97.85 98.67 99.37 2.15 1.33 0.63
13 2022202301 Apr 2022 to Mar 2023 (Period 01) Great Western Railway 345120.0 43.66 71.49 85.73 90.98 95.83 97.59 98.46 99.29 2.41 1.54 0.71 3942470.0 42.37 70.14 85.23 90.91 96.02 97.73 98.59 99.34 2.27 1.41 0.66
13 2022202302 Apr 2022 to Mar 2023 (Period 02) Great Western Railway 332090.0 42.06 70.34 85.99 91.82 96.76 98.23 98.89 99.49 1.77 1.11 0.51 3992052.0 41.97 69.72 84.98 90.77 95.98 97.72 98.58 99.33 2.28 1.42 0.67
13 2022202303 Apr 2022 to Mar 2023 (Period 03) Great Western Railway 296928.0 38.48 65.62 81.79 88.45 94.87 97.06 98.10 99.05 2.94 1.90 0.95 3977409.0 41.75 69.46 84.76 90.62 95.90 97.67 98.54 99.31 2.33 1.46 0.69
13 2022202304 Apr 2022 to Mar 2023 (Period 04) Great Western Railway 326884.0 34.72 61.12 77.71 85.07 92.75 95.56 97.12 98.62 4.44 2.88 1.38 4003644.0 41.21 68.81 84.23 90.20 95.67 97.51 98.43 99.25 2.49 1.57 0.75
13 2022202305 Apr 2022 to Mar 2023 (Period 05) Great Western Railway 267808.0 32.34 57.72 74.54 82.62 91.61 95.01 96.77 98.47 4.99 3.23 1.53 3985688.0 40.69 68.11 83.59 89.70 95.40 97.34 98.31 99.19 2.66 1.69 0.81
13 2022202306 Apr 2022 to Mar 2023 (Period 06) Great Western Railway 333324.0 35.60 62.50 79.85 87.40 94.75 97.17 98.27 99.23 2.83 1.73 0.77 4033282.0 40.36 67.71 83.33 89.52 95.34 97.32 98.30 99.19 2.68 1.70 0.81
13 2022202307 Apr 2022 to Mar 2023 (Period 07) Great Western Railway 274117.0 37.62 65.16 82.10 88.80 95.15 97.28 98.23 99.11 2.72 1.77 0.89 3993954.0 40.11 67.41 83.09 89.33 95.22 97.24 98.24 99.16 2.76 1.76 0.84
13 2022202308 Apr 2022 to Mar 2023 (Period 08) Great Western Railway 310199.0 31.90 57.42 75.25 83.97 93.01 96.15 97.67 99.06 3.85 2.33 0.94 3994121.0 39.68 66.85 82.61 88.98 95.07 97.16 98.20 99.16 2.84 1.80 0.84
13 2022202309 Apr 2022 to Mar 2023 (Period 09) Great Western Railway 304224.0 31.12 56.41 74.31 83.05 92.25 95.54 97.19 98.74 4.46 2.81 1.26 3983518.0 39.21 66.24 82.05 88.54 94.86 97.04 98.13 99.13 2.96 1.87 0.87
13 2022202310 Apr 2022 to Mar 2023 (Period 10) Great Western Railway 185603.0 35.82 62.51 78.29 85.34 92.59 95.56 97.06 98.58 4.44 2.94 1.42 3881858.0 38.48 65.47 81.45 88.10 94.62 96.89 98.02 99.07 3.11 1.98 0.93
13 2022202311 Apr 2022 to Mar 2023 (Period 11) Great Western Railway 298440.0 35.67 62.40 79.40 86.69 94.09 96.71 97.96 99.05 3.29 2.04 0.95 3864970.0 37.63 64.50 80.72 87.58 94.37 96.75 97.93 99.03 3.25 2.07 0.97
13 2022202312 Apr 2022 to Mar 2023 (Period 12) Great Western Railway 312594.0 38.31 66.44 82.73 89.29 95.43 97.49 98.49 99.34 2.51 1.51 0.66 3885490.0 37.20 64.10 80.47 87.45 94.37 96.78 97.97 99.06 3.22 2.03 0.94
13 2022202313 Apr 2022 to Mar 2023 (Period 13) Great Western Railway 282782.0 38.66 65.91 81.74 88.28 94.62 96.81 98.03 99.11 3.19 1.97 0.89 3870113.0 36.75 63.63 80.12 87.20 94.23 96.69 97.91 99.03 3.31 2.09 0.97
13 2023202401 Apr 2023 to Mar 2024 (Period 01) Great Western Railway 322629.0 38.15 64.92 80.75 87.59 94.25 96.65 97.87 98.95 3.35 2.13 1.05 3847622.0 36.24 63.03 79.67 86.89 94.08 96.60 97.86 99.00 3.40 2.14 1.00
13 2023202402 Apr 2023 to Mar 2024 (Period 02) Great Western Railway 297521.0 37.29 63.82 79.57 86.56 93.72 96.43 97.77 99.04 3.57 2.23 0.96 3813053.0 35.82 62.46 79.11 86.44 93.82 96.45 97.76 98.96 3.55 2.24 1.04
13 2023202403 Apr 2023 to Mar 2024 (Period 03) Great Western Railway 285525.0 33.03 59.45 76.66 84.50 92.73 95.76 97.32 98.77 4.24 2.68 1.23 3801650.0 35.40 61.98 78.72 86.13 93.66 96.35 97.70 98.94 3.65 2.30 1.06
13 2023202404 Apr 2023 to Mar 2024 (Period 04) Great Western Railway 307496.0 34.41 61.06 77.91 85.52 93.54 96.43 97.84 99.07 3.57 2.16 0.93 3782262.0 35.38 61.98 78.74 86.18 93.73 96.43 97.76 98.98 3.57 2.24 1.02
13 2023202405 Apr 2023 to Mar 2024 (Period 05) Great Western Railway 311342.0 33.54 59.70 76.22 83.92 92.35 95.57 97.27 98.82 4.43 2.73 1.18 3825796.0 35.44 62.10 78.83 86.24 93.76 96.45 97.79 99.00 3.55 2.21 1.00
13 2023202406 Apr 2023 to Mar 2024 (Period 06) Great Western Railway 298192.0 32.34 58.76 75.71 83.78 92.31 95.42 97.05 98.58 4.58 2.95 1.42 3790664.0 35.19 61.80 78.49 85.94 93.56 96.31 97.69 98.95 3.69 2.31 1.05
13 2023202407 Apr 2023 to Mar 2024 (Period 07) Great Western Railway 301924.0 33.37 60.95 78.42 86.16 94.05 96.79 98.06 99.21 3.21 1.94 0.79 3818471.0 34.87 61.49 78.23 85.76 93.49 96.28 97.68 98.96 3.72 2.32 1.04
13 2023202408 Apr 2023 to Mar 2024 (Period 08) Great Western Railway 312377.0 29.55 55.49 73.27 81.89 91.59 95.15 96.95 98.69 4.85 3.05 1.31 3820649.0 34.67 61.33 78.06 85.58 93.37 96.20 97.62 98.93 3.80 2.38 1.07
13 2023202409 Apr 2023 to Mar 2024 (Period 09) Great Western Railway 303862.0 28.24 53.53 70.53 79.36 89.47 93.66 95.97 98.15 6.34 4.03 1.85 3820287.0 34.45 61.10 77.76 85.29 93.15 96.05 97.52 98.88 3.95 2.48 1.12
13 2023202410 Apr 2023 to Mar 2024 (Period 10) Great Western Railway 286471.0 32.90 58.59 74.44 82.02 90.42 94.04 95.95 97.86 5.96 4.05 2.14 3921155.0 34.27 60.85 77.49 85.05 92.98 95.92 97.43 98.82 4.08 2.57 1.18
13 2023202411 Apr 2023 to Mar 2024 (Period 11) Great Western Railway 319303.0 34.64 61.87 78.14 85.68 93.47 96.29 97.70 99.03 3.71 2.30 0.97 3942018.0 34.19 60.82 77.40 84.98 92.93 95.89 97.41 98.82 4.11 2.59 1.18
13 2023202412 Apr 2023 to Mar 2024 (Period 12) Great Western Railway 301303.0 35.11 62.62 79.23 86.61 94.15 96.72 97.87 98.99 3.28 2.13 1.01 3930727.0 33.93 60.51 77.12 84.76 92.83 95.83 97.36 98.79 4.17 2.64 1.21
13 2023202413 Apr 2023 to Mar 2024 (Period 13) Great Western Railway 325095.0 34.52 60.67 77.20 84.58 92.35 95.44 97.11 98.73 4.56 2.89 1.27 3973040.0 33.65 60.14 76.80 84.49 92.66 95.73 97.29 98.76 4.27 2.71 1.24
13 2024202501 Apr 2024 to Mar 2025 (Period 01) Great Western Railway 309145.0 38.39 66.23 82.53 89.26 95.39 97.41 98.45 99.36 2.59 1.55 0.64 3959556.0 33.65 60.22 76.92 84.61 92.74 95.79 97.34 98.80 4.21 2.66 1.20
13 2024202502 Apr 2024 to Mar 2025 (Period 02) Great Western Railway 316407.0 36.42 63.68 80.09 87.02 94.21 96.81 98.13 99.26 3.19 1.87 0.74 3978442.0 33.60 60.23 76.98 84.66 92.79 95.82 97.37 98.82 4.18 2.63 1.18
13 2024202503 Apr 2024 to Mar 2025 (Period 03) Great Western Railway 330307.0 36.13 63.74 80.70 87.92 94.86 97.17 98.30 99.28 2.83 1.70 0.72 4023224.0 33.85 60.57 77.30 84.94 92.96 95.93 97.45 98.86 4.07 2.55 1.14
13 2024202504 Apr 2024 to Mar 2025 (Period 04) Great Western Railway 320338.0 34.63 61.13 77.74 85.12 92.93 95.85 97.33 98.77 4.15 2.67 1.23 4036066.0 33.86 60.58 77.29 84.91 92.92 95.89 97.41 98.83 4.11 2.59 1.17
13 2024202505 Apr 2024 to Mar 2025 (Period 05) Great Western Railway 328690.0 33.99 60.33 77.52 85.43 93.70 96.57 98.08 99.30 3.43 1.92 0.70 4053414.0 33.90 60.63 77.39 85.03 93.02 95.97 97.47 98.87 4.03 2.53 1.13
13 2024202506 Apr 2024 to Mar 2025 (Period 06) Great Western Railway 322886.0 33.83 60.90 78.34 86.04 94.01 96.66 97.90 99.09 3.34 2.10 0.91 4078108.0 34.01 60.78 77.59 85.20 93.15 96.06 97.54 98.91 3.94 2.46 1.09
13 2024202507 Apr 2024 to Mar 2025 (Period 07) Great Western Railway 321357.0 31.23 57.36 75.12 83.54 92.47 95.67 97.31 98.76 4.33 2.69 1.24 4097541.0 33.84 60.50 77.34 85.00 93.03 95.98 97.48 98.88 4.02 2.52 1.12
13 2024202508 Apr 2024 to Mar 2025 (Period 08) Great Western Railway 322439.0 29.80 55.60 73.65 82.62 92.25 95.73 97.42 98.95 4.27 2.58 1.05 4107603.0 33.85 60.50 77.36 85.05 93.08 96.02 97.52 98.90 3.98 2.48 1.10
13 2024202509 Apr 2024 to Mar 2025 (Period 09) Great Western Railway 305254.0 27.88 52.43 70.13 79.46 90.25 94.45 96.54 98.46 5.55 3.46 1.54 4108995.0 33.82 60.42 77.32 85.05 93.14 96.08 97.56 98.92 3.92 2.44 1.08
13 2024202510 Apr 2024 to Mar 2025 (Period 10) Great Western Railway 276004.0 33.79 61.14 78.06 85.85 93.76 96.65 98.06 99.20 3.35 1.94 0.80 4098528.0 33.88 60.59 77.58 85.32 93.37 96.26 97.71 99.01 3.74 2.29 0.99
13 2024202511 Apr 2024 to Mar 2025 (Period 11) Great Western Railway 323336.0 36.85 64.51 81.24 88.22 94.83 97.18 98.28 99.20 2.82 1.72 0.80 4102561.0 34.05 60.80 77.82 85.52 93.48 96.33 97.75 99.03 3.67 2.25 0.97
13 2024202512 Apr 2024 to Mar 2025 (Period 12) Great Western Railway 325279.0 37.70 65.90 82.51 89.26 95.27 97.46 98.51 99.35 2.54 1.49 0.65 4126537.0 34.26 61.07 78.09 85.74 93.57 96.39 97.80 99.06 3.61 2.20 0.94
13 2024202513 Apr 2024 to Mar 2025 (Period 13) Great Western Railway 342801.0 37.85 66.03 82.62 89.30 95.44 97.47 98.45 99.36 2.53 1.55 0.64 4144243.0 34.54 61.51 78.53 86.12 93.82 96.56 97.91 99.11 3.44 2.09 0.89
13 2025202601 Apr 2025 to Mar 2026 (Period 01) Great Western Railway 310188.0 38.92 67.37 83.62 89.97 95.66 97.47 98.42 99.31 2.53 1.58 0.69 4145286.0 34.58 61.60 78.61 86.17 93.84 96.56 97.91 99.10 3.44 2.09 0.90
13 2025202602 Apr 2025 to Mar 2026 (Period 02) Great Western Railway 331160.0 37.50 65.42 81.99 88.68 95.14 97.42 98.44 99.30 2.58 1.56 0.70 4160039.0 34.67 61.74 78.77 86.31 93.91 96.61 97.93 99.11 3.39 2.07 0.89
13 2025202603 Apr 2025 to Mar 2026 (Period 03) Great Western Railway 330184.0 36.68 64.09 80.74 87.84 94.77 97.05 98.21 99.23 2.95 1.79 0.77 4159916.0 34.72 61.77 78.77 86.30 93.91 96.60 97.93 99.10 3.40 2.07 0.90
13 2025202604 Apr 2025 to Mar 2026 (Period 04) Great Western Railway 328410.0 32.36 58.59 75.91 84.03 92.48 95.76 97.45 98.91 4.24 2.55 1.09 4167988.0 34.54 61.57 78.63 86.21 93.87 96.59 97.94 99.11 3.41 2.06 0.89
13 2025202605 Apr 2025 to Mar 2026 (Period 05) Great Western Railway 331036.0 34.03 61.61 78.86 86.56 94.21 96.76 98.03 99.18 3.24 1.97 0.82 4170334.0 34.54 61.67 78.73 86.30 93.91 96.61 97.93 99.10 3.39 2.07 0.90
13 2025202606 Apr 2025 to Mar 2026 (Period 06) Great Western Railway 328859.0 31.94 57.86 75.72 84.14 92.98 96.10 97.63 99.04 3.90 2.37 0.96 4176307.0 34.39 61.43 78.53 86.15 93.83 96.56 97.91 99.10 3.44 2.09 0.90
13 2025202607 Apr 2025 to Mar 2026 (Period 07) Great Western Railway 326664.0 31.32 57.59 75.80 84.48 93.20 96.22 97.75 99.05 3.78 2.25 0.95 4181614.0 34.39 61.45 78.58 86.22 93.89 96.61 97.94 99.12 3.39 2.06 0.88
13 2025202608 Apr 2025 to Mar 2026 (Period 08) Great Western Railway 320661.0 27.79 53.13 72.00 81.74 92.15 95.85 97.54 98.98 4.15 2.46 1.02 4179836.0 34.24 61.26 78.45 86.16 93.88 96.62 97.95 99.12 3.38 2.05 0.88
13 2025202609 Apr 2025 to Mar 2026 (Period 09) Great Western Railway 304850.0 25.33 49.95 68.58 78.49 90.07 94.45 96.66 98.56 5.55 3.34 1.44 4179432.0 34.06 61.08 78.34 86.09 93.87 96.62 97.96 99.13 3.38 2.04 0.87
13 2025202610 Apr 2025 to Mar 2026 (Period 10) Great Western Railway 292600.0 32.17 57.57 74.78 83.04 91.96 95.37 97.15 98.78 4.63 2.85 1.22 4196028.0 33.94 60.83 78.11 85.89 93.74 96.53 97.90 99.10 3.47 2.10 0.90
13 2025202611 Apr 2025 to Mar 2026 (Period 11) Great Western Railway 308908.0 36.67 64.34 81.13 88.30 95.04 97.25 98.31 99.22 2.75 1.69 0.78 4181600.0 33.92 60.81 78.09 85.89 93.75 96.53 97.90 99.10 3.47 2.10 0.90
13 2025202612 Apr 2025 to Mar 2026 (Period 12) Great Western Railway 314448.0 38.61 67.21 83.58 90.28 96.14 97.94 98.78 99.55 2.06 1.22 0.45 4170769.0 33.98 60.89 78.16 85.96 93.81 96.56 97.92 99.12 3.44 2.08 0.88
13 2025202613 Apr 2025 to Mar 2026 (Period 13) Great Western Railway 368138.0 37.81 65.58 82.30 89.21 95.55 97.61 98.53 99.40 2.39 1.47 0.60 4196106.0 34.00 60.88 78.16 85.97 93.83 96.58 97.93 99.12 3.42 2.07 0.88
13 2026202701 Apr 2026 to Mar 2027 (Period 01) Great Western Railway 395150.0 37.07 64.41 81.04 88.28 95.22 97.45 98.55 99.42 2.55 1.45 0.58 4281068.0 33.93 60.74 78.03 85.89 93.83 96.60 97.95 99.14 3.40 2.05 0.86
13 2026202702 Apr 2026 to Mar 2027 (Period 02) Great Western Railway 336499.0 33.33 59.30 76.00 83.85 92.46 95.66 97.29 98.79 4.34 2.71 1.21 4286407.0 33.60 60.26 77.56 85.52 93.62 96.46 97.86 99.10 3.54 2.14 0.90
14 2014201501 Apr 2014 to Mar 2015 (Period 01) Greater Anglia 217396.0 35.27 68.96 88.77 94.61 98.45 99.42 99.72 99.91 0.58 0.28 0.09 217396.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201502 Apr 2014 to Mar 2015 (Period 02) Greater Anglia 234212.0 37.99 71.57 89.61 94.77 98.39 99.26 99.62 99.87 0.74 0.38 0.13 451608.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201503 Apr 2014 to Mar 2015 (Period 03) Greater Anglia 233394.0 37.67 70.99 88.75 94.09 97.98 98.97 99.42 99.72 1.03 0.58 0.28 685002.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201504 Apr 2014 to Mar 2015 (Period 04) Greater Anglia 235922.0 35.43 67.30 85.22 91.52 96.83 98.45 99.15 99.68 1.55 0.85 0.32 920924.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201505 Apr 2014 to Mar 2015 (Period 05) Greater Anglia 234784.0 33.52 65.55 84.67 91.31 96.69 98.33 99.06 99.62 1.67 0.94 0.38 1155708.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201506 Apr 2014 to Mar 2015 (Period 06) Greater Anglia 235683.0 36.84 69.76 88.71 94.43 98.33 99.19 99.55 99.83 0.81 0.45 0.17 1391391.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201507 Apr 2014 to Mar 2015 (Period 07) Greater Anglia 238840.0 35.18 68.19 88.15 94.20 98.24 99.13 99.49 99.80 0.87 0.51 0.20 1630231.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201508 Apr 2014 to Mar 2015 (Period 08) Greater Anglia 235858.0 29.49 60.36 82.78 91.16 97.61 99.09 99.55 99.86 0.91 0.45 0.14 1866089.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201509 Apr 2014 to Mar 2015 (Period 09) Greater Anglia 236634.0 27.99 58.13 80.58 89.37 96.69 98.65 99.33 99.82 1.35 0.67 0.18 2102723.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201510 Apr 2014 to Mar 2015 (Period 10) Greater Anglia 209236.0 33.68 65.79 85.97 92.83 97.62 98.84 99.33 99.73 1.16 0.67 0.27 2311959.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201511 Apr 2014 to Mar 2015 (Period 11) Greater Anglia 224467.0 34.56 66.98 86.57 93.25 98.09 99.19 99.55 99.81 0.81 0.45 0.19 2536426.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201512 Apr 2014 to Mar 2015 (Period 12) Greater Anglia 229237.0 36.07 68.14 86.61 93.07 98.01 99.18 99.57 99.86 0.82 0.43 0.14 2765663.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2014201513 Apr 2014 to Mar 2015 (Period 13) Greater Anglia 255505.0 38.49 71.46 89.46 94.73 98.34 99.23 99.59 99.82 0.77 0.41 0.18 3021168.0 34.81 67.19 86.61 93.03 97.79 98.99 99.46 99.79 1.01 0.54 0.21
14 2015201601 Apr 2015 to Mar 2016 (Period 01) Greater Anglia 266091.0 38.91 72.22 89.81 94.72 98.23 99.15 99.54 99.84 0.85 0.46 0.16 3069863.0 35.13 67.50 86.74 93.06 97.78 98.98 99.44 99.79 1.02 0.56 0.21
14 2015201602 Apr 2015 to Mar 2016 (Period 02) Greater Anglia 230391.0 36.59 68.93 87.13 93.05 97.49 98.83 99.38 99.77 1.17 0.62 0.23 3066042.0 35.02 67.30 86.55 92.93 97.71 98.94 99.43 99.78 1.06 0.57 0.22
14 2015201603 Apr 2015 to Mar 2016 (Period 03) Greater Anglia 234435.0 33.65 65.78 85.61 92.27 97.43 98.77 99.30 99.75 1.23 0.70 0.25 3067083.0 34.71 66.90 86.31 92.79 97.67 98.93 99.42 99.78 1.07 0.58 0.22
14 2015201604 Apr 2015 to Mar 2016 (Period 04) Greater Anglia 234094.0 32.10 63.62 84.14 91.19 97.00 98.71 99.26 99.75 1.29 0.74 0.25 3065255.0 34.46 66.62 86.23 92.77 97.68 98.95 99.42 99.79 1.05 0.58 0.21
14 2015201605 Apr 2015 to Mar 2016 (Period 05) Greater Anglia 234228.0 32.94 64.77 85.34 92.48 97.72 99.01 99.53 99.87 0.99 0.47 0.13 3064699.0 34.42 66.56 86.28 92.86 97.76 99.00 99.46 99.81 1.00 0.54 0.19
14 2015201606 Apr 2015 to Mar 2016 (Period 06) Greater Anglia 230507.0 36.02 67.92 87.96 94.09 98.19 99.19 99.60 99.86 0.81 0.40 0.14 3059523.0 34.35 66.41 86.22 92.83 97.75 99.00 99.46 99.81 1.00 0.54 0.19
14 2015201607 Apr 2015 to Mar 2016 (Period 07) Greater Anglia 231286.0 33.31 64.86 84.80 91.74 97.20 98.68 99.27 99.73 1.32 0.73 0.27 3051969.0 34.21 66.16 85.96 92.64 97.67 98.97 99.45 99.81 1.03 0.55 0.19
14 2015201608 Apr 2015 to Mar 2016 (Period 08) Greater Anglia 231960.0 28.09 58.83 81.07 89.70 96.69 98.47 99.19 99.66 1.53 0.81 0.34 3048071.0 34.10 66.05 85.83 92.53 97.60 98.92 99.42 99.79 1.08 0.58 0.21
14 2015201609 Apr 2015 to Mar 2016 (Period 09) Greater Anglia 229486.0 27.79 57.63 79.74 88.41 95.90 97.98 98.80 99.47 2.02 1.20 0.53 3040923.0 34.10 66.03 85.78 92.46 97.54 98.87 99.38 99.76 1.13 0.62 0.24
14 2015201610 Apr 2015 to Mar 2016 (Period 10) Greater Anglia 202265.0 33.95 65.67 85.82 92.49 97.54 98.84 99.37 99.79 1.16 0.63 0.21 3033952.0 34.12 66.02 85.77 92.44 97.54 98.87 99.38 99.77 1.13 0.62 0.23
14 2015201611 Apr 2015 to Mar 2016 (Period 11) Greater Anglia 225532.0 33.64 65.79 86.01 92.56 97.54 98.84 99.38 99.78 1.16 0.62 0.22 3035017.0 34.06 65.93 85.73 92.39 97.50 98.84 99.37 99.77 1.16 0.63 0.23
14 2015201612 Apr 2015 to Mar 2016 (Period 12) Greater Anglia 231012.0 31.78 63.54 84.87 92.14 97.56 98.96 99.48 99.83 1.04 0.52 0.17 3036792.0 33.73 65.59 85.60 92.32 97.46 98.83 99.37 99.76 1.17 0.63 0.24
14 2015201613 Apr 2015 to Mar 2016 (Period 13) Greater Anglia 203852.0 35.44 68.63 88.22 94.00 97.98 98.96 99.37 99.73 1.04 0.63 0.27 2985139.0 33.44 65.29 85.45 92.23 97.42 98.80 99.35 99.76 1.20 0.65 0.24
14 2016201701 Apr 2016 to Mar 2017 (Period 01) Greater Anglia 252624.0 35.28 68.54 87.53 93.25 97.66 98.90 99.37 99.77 1.10 0.63 0.23 2971672.0 33.11 64.95 85.23 92.09 97.37 98.78 99.33 99.75 1.22 0.67 0.25
14 2016201702 Apr 2016 to Mar 2017 (Period 02) Greater Anglia 232101.0 36.58 70.57 89.18 94.52 98.37 99.25 99.60 99.83 0.75 0.40 0.17 2973382.0 33.11 65.08 85.39 92.21 97.44 98.81 99.35 99.76 1.19 0.65 0.24
14 2016201703 Apr 2016 to Mar 2017 (Period 03) Greater Anglia 229055.0 35.40 68.65 87.57 93.36 97.55 98.66 99.16 99.62 1.34 0.84 0.38 2968002.0 33.24 65.30 85.54 92.29 97.45 98.80 99.34 99.75 1.20 0.66 0.25
14 2016201704 Apr 2016 to Mar 2017 (Period 04) Greater Anglia 237606.0 33.63 65.78 85.80 92.33 97.31 98.69 99.29 99.74 1.31 0.71 0.26 2971514.0 33.36 65.47 85.67 92.38 97.47 98.80 99.34 99.74 1.20 0.66 0.26
14 2016201705 Apr 2016 to Mar 2017 (Period 05) Greater Anglia 238124.0 34.45 67.55 87.79 94.04 98.26 99.24 99.64 99.90 0.76 0.36 0.10 2975410.0 33.48 65.69 85.87 92.51 97.52 98.82 99.35 99.75 1.18 0.65 0.25
14 2016201706 Apr 2016 to Mar 2017 (Period 06) Greater Anglia 230642.0 30.86 61.92 83.37 91.19 96.87 98.49 99.15 99.68 1.51 0.85 0.32 2975545.0 33.08 65.22 85.51 92.28 97.41 98.77 99.31 99.73 1.23 0.69 0.27
14 2016201707 Apr 2016 to Mar 2017 (Period 07) Greater Anglia 230826.0 29.89 60.74 83.24 91.74 97.54 98.85 99.30 99.72 1.15 0.70 0.28 2975085.0 32.82 64.91 85.39 92.28 97.44 98.78 99.32 99.73 1.22 0.68 0.27
14 2016201708 Apr 2016 to Mar 2017 (Period 08) Greater Anglia 230539.0 27.30 57.25 80.80 89.68 96.77 98.43 99.06 99.61 1.57 0.94 0.39 2973664.0 32.76 64.79 85.37 92.28 97.45 98.78 99.30 99.73 1.22 0.70 0.27
14 2016201709 Apr 2016 to Mar 2017 (Period 09) Greater Anglia 230488.0 23.40 50.77 74.12 85.09 94.92 97.54 98.65 99.52 2.46 1.35 0.48 2974666.0 32.42 64.25 84.94 92.02 97.37 98.74 99.29 99.73 1.26 0.71 0.27
14 2016201710 Apr 2016 to Mar 2017 (Period 10) Greater Anglia 210407.0 31.94 63.48 84.99 92.66 98.03 99.17 99.53 99.81 0.83 0.47 0.19 2982808.0 32.28 64.10 84.88 92.04 97.41 98.77 99.30 99.73 1.23 0.70 0.27
14 2016201711 Apr 2016 to Mar 2017 (Period 11) Greater Anglia 233129.0 32.54 64.01 84.36 91.63 97.11 98.51 99.20 99.67 1.49 0.80 0.33 2990405.0 32.20 63.97 84.76 91.97 97.37 98.74 99.29 99.73 1.26 0.71 0.27
14 2016201712 Apr 2016 to Mar 2017 (Period 12) Greater Anglia 242033.0 32.31 64.97 85.83 92.67 97.68 98.82 99.29 99.66 1.18 0.71 0.34 3001426.0 32.24 64.08 84.83 92.01 97.38 98.73 99.28 99.71 1.27 0.72 0.29
14 2016201713 Apr 2016 to Mar 2017 (Period 13) Greater Anglia 232593.0 35.49 68.76 88.02 93.98 98.00 98.99 99.41 99.74 1.01 0.59 0.26 3030167.0 32.27 64.13 84.85 92.03 97.39 98.73 99.28 99.71 1.27 0.72 0.29
14 2017201801 Apr 2017 to Mar 2018 (Period 01) Greater Anglia 252000.0 37.15 71.24 89.55 94.81 98.30 99.25 99.60 99.87 0.75 0.40 0.13 3029543.0 32.43 64.36 85.02 92.16 97.45 98.76 99.30 99.72 1.24 0.70 0.28
14 2017201802 Apr 2017 to Mar 2018 (Period 02) Greater Anglia 246166.0 36.51 69.46 88.12 93.86 97.76 98.84 99.28 99.64 1.16 0.72 0.36 3043608.0 32.44 64.30 84.95 92.11 97.40 98.73 99.28 99.71 1.27 0.72 0.29
14 2017201803 Apr 2017 to Mar 2018 (Period 03) Greater Anglia 251320.0 32.12 62.72 83.89 91.59 97.32 98.67 99.25 99.66 1.33 0.75 0.34 3065873.0 32.19 63.84 84.67 91.98 97.38 98.73 99.28 99.71 1.27 0.72 0.29
14 2017201804 Apr 2017 to Mar 2018 (Period 04) Greater Anglia 253089.0 31.91 62.19 83.79 92.04 97.78 99.00 99.48 99.83 1.00 0.52 0.17 3081356.0 32.06 63.56 84.51 91.96 97.42 98.76 99.30 99.72 1.24 0.70 0.28
14 2017201805 Apr 2017 to Mar 2018 (Period 05) Greater Anglia 255063.0 33.98 65.69 86.61 93.14 97.75 98.83 99.38 99.73 1.17 0.62 0.27 3098295.0 32.03 63.42 84.43 91.89 97.38 98.73 99.28 99.70 1.27 0.72 0.30
14 2017201806 Apr 2017 to Mar 2018 (Period 06) Greater Anglia 249196.0 36.01 69.02 88.37 94.15 98.17 99.12 99.50 99.78 0.88 0.50 0.22 3116849.0 32.44 63.98 84.82 92.13 97.48 98.78 99.31 99.71 1.22 0.69 0.29
14 2017201807 Apr 2017 to Mar 2018 (Period 07) Greater Anglia 246476.0 32.35 64.93 85.62 92.44 97.66 98.91 99.46 99.84 1.09 0.54 0.16 3132499.0 32.62 64.30 85.00 92.18 97.49 98.78 99.32 99.72 1.22 0.68 0.28
14 2017201808 Apr 2017 to Mar 2018 (Period 08) Greater Anglia 246177.0 28.30 58.32 81.38 90.46 97.17 98.73 99.29 99.65 1.27 0.71 0.35 3148137.0 32.67 64.35 85.03 92.23 97.52 98.80 99.34 99.72 1.20 0.66 0.28
14 2017201809 Apr 2017 to Mar 2018 (Period 09) Greater Anglia 251457.0 28.51 57.98 80.68 89.95 97.16 98.83 99.43 99.84 1.17 0.57 0.16 3169106.0 33.02 64.83 85.48 92.57 97.68 98.90 99.39 99.75 1.10 0.61 0.25
14 2017201810 Apr 2017 to Mar 2018 (Period 10) Greater Anglia 204656.0 31.08 62.30 83.70 91.48 97.50 98.92 99.44 99.81 1.08 0.56 0.19 3163355.0 32.96 64.75 85.39 92.49 97.65 98.88 99.39 99.75 1.12 0.61 0.25
14 2017201811 Apr 2017 to Mar 2018 (Period 11) Greater Anglia 235930.0 31.08 62.99 85.09 92.74 97.92 99.09 99.48 99.76 0.91 0.52 0.24 3166156.0 32.85 64.68 85.45 92.57 97.71 98.92 99.41 99.75 1.08 0.59 0.25
14 2017201812 Apr 2017 to Mar 2018 (Period 12) Greater Anglia 215708.0 29.84 60.06 81.31 89.11 95.56 97.57 98.43 99.22 2.43 1.57 0.78 3139831.0 32.69 64.34 85.13 92.32 97.56 98.84 99.35 99.73 1.16 0.65 0.27
14 2017201813 Apr 2017 to Mar 2018 (Period 13) Greater Anglia 234285.0 31.43 62.45 84.17 92.24 97.82 99.05 99.56 99.86 0.95 0.44 0.14 3141523.0 32.39 63.87 84.85 92.20 97.55 98.84 99.36 99.73 1.16 0.64 0.27
14 2018201901 Apr 2018 to Mar 2019 (Period 01) Greater Anglia 241438.0 32.98 63.54 84.48 92.14 97.57 98.89 99.37 99.75 1.11 0.63 0.25 3130961.0 32.05 63.25 84.44 91.98 97.49 98.81 99.34 99.73 1.19 0.66 0.27
14 2018201902 Apr 2018 to Mar 2019 (Period 02) Greater Anglia 247628.0 34.17 65.81 86.29 93.29 97.97 99.12 99.57 99.84 0.88 0.43 0.16 3132423.0 31.86 62.97 84.30 91.94 97.51 98.84 99.36 99.74 1.16 0.64 0.26
14 2018201903 Apr 2018 to Mar 2019 (Period 03) Greater Anglia 249103.0 34.97 66.17 86.36 93.01 97.67 98.91 99.42 99.75 1.09 0.58 0.25 3130206.0 32.09 63.24 84.50 92.05 97.53 98.85 99.38 99.75 1.15 0.62 0.25
14 2018201904 Apr 2018 to Mar 2019 (Period 04) Greater Anglia 251352.0 33.29 63.80 84.74 91.93 97.32 98.72 99.36 99.79 1.28 0.64 0.21 3128469.0 32.20 63.37 84.57 92.04 97.50 98.83 99.37 99.75 1.17 0.63 0.25
14 2018201905 Apr 2018 to Mar 2019 (Period 05) Greater Anglia 246173.0 29.86 58.63 79.92 88.23 95.61 97.80 98.71 99.42 2.20 1.29 0.58 3119579.0 31.87 62.81 84.04 91.65 97.33 98.75 99.31 99.72 1.25 0.69 0.28
14 2018201906 Apr 2018 to Mar 2019 (Period 06) Greater Anglia 243819.0 34.16 65.13 85.53 92.55 97.77 99.02 99.53 99.85 0.98 0.47 0.15 3114202.0 31.72 62.49 83.81 91.52 97.29 98.74 99.32 99.73 1.26 0.68 0.27
14 2018201907 Apr 2018 to Mar 2019 (Period 07) Greater Anglia 243785.0 30.15 60.34 82.68 91.04 97.19 98.72 99.31 99.77 1.28 0.69 0.23 3111511.0 31.55 62.13 83.58 91.41 97.26 98.73 99.30 99.72 1.27 0.70 0.28
14 2018201908 Apr 2018 to Mar 2019 (Period 08) Greater Anglia 241397.0 26.62 55.20 78.31 88.19 96.42 98.56 99.30 99.82 1.44 0.70 0.18 3106731.0 31.42 61.89 83.34 91.24 97.20 98.71 99.30 99.73 1.29 0.70 0.27
14 2018201909 Apr 2018 to Mar 2019 (Period 09) Greater Anglia 248019.0 25.12 53.25 77.04 87.20 95.82 98.18 99.15 99.74 1.82 0.85 0.26 3103293.0 31.15 61.52 83.05 91.02 97.09 98.66 99.28 99.73 1.34 0.72 0.27
14 2018201910 Apr 2018 to Mar 2019 (Period 10) Greater Anglia 204242.0 36.66 68.08 86.70 93.02 97.87 99.07 99.50 99.83 0.93 0.50 0.17 3102879.0 31.52 61.90 83.25 91.12 97.12 98.67 99.29 99.73 1.33 0.71 0.27
14 2018201911 Apr 2018 to Mar 2019 (Period 11) Greater Anglia 232850.0 37.36 68.25 86.69 93.00 97.77 98.88 99.38 99.73 1.12 0.62 0.27 3099799.0 31.99 62.29 83.37 91.14 97.11 98.65 99.28 99.72 1.35 0.72 0.28
14 2018201912 Apr 2018 to Mar 2019 (Period 12) Greater Anglia 240453.0 38.96 70.98 88.53 94.05 97.97 98.99 99.46 99.79 1.01 0.54 0.21 3124544.0 32.68 63.12 83.91 91.50 97.28 98.76 99.35 99.76 1.24 0.65 0.24
14 2018201913 Apr 2018 to Mar 2019 (Period 13) Greater Anglia 240407.0 40.96 72.80 89.74 94.84 98.33 99.25 99.59 99.86 0.75 0.41 0.14 3130666.0 33.41 63.91 84.34 91.70 97.32 98.77 99.35 99.77 1.23 0.65 0.23
14 2019202001 Apr 2019 to Mar 2020 (Period 01) Greater Anglia 237282.0 43.27 75.34 91.36 95.68 98.70 99.41 99.69 99.88 0.59 0.31 0.12 237282.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202002 Apr 2019 to Mar 2020 (Period 02) Greater Anglia 247052.0 45.30 77.62 92.42 96.23 98.86 99.47 99.72 99.91 0.53 0.28 0.09 484334.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202003 Apr 2019 to Mar 2020 (Period 03) Greater Anglia 242424.0 44.33 75.87 91.59 95.94 98.78 99.47 99.75 99.93 0.53 0.25 0.07 726758.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202004 Apr 2019 to Mar 2020 (Period 04) Greater Anglia 250435.0 40.53 70.45 88.26 94.22 98.17 99.16 99.55 99.85 0.84 0.45 0.15 977193.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202005 Apr 2019 to Mar 2020 (Period 05) Greater Anglia 250936.0 40.25 70.39 88.31 93.81 97.65 98.72 99.20 99.65 1.28 0.80 0.35 1228129.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202006 Apr 2019 to Mar 2020 (Period 06) Greater Anglia 247845.0 37.41 66.42 86.56 93.21 97.90 99.06 99.50 99.80 0.94 0.50 0.20 1475974.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202007 Apr 2019 to Mar 2020 (Period 07) Greater Anglia 254303.0 36.49 67.86 87.26 93.38 97.93 99.04 99.47 99.81 0.96 0.53 0.19 1730277.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202008 Apr 2019 to Mar 2020 (Period 08) Greater Anglia 253459.0 33.29 64.14 84.71 91.83 97.49 99.00 99.50 99.87 1.00 0.50 0.13 1983736.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202009 Apr 2019 to Mar 2020 (Period 09) Greater Anglia 254284.0 31.32 61.15 82.57 90.54 96.88 98.60 99.23 99.76 1.40 0.77 0.24 2238020.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202010 Apr 2019 to Mar 2020 (Period 10) Greater Anglia 216808.0 37.35 67.63 85.95 92.21 97.24 98.74 99.37 99.78 1.26 0.63 0.22 2454828.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202011 Apr 2019 to Mar 2020 (Period 11) Greater Anglia 246474.0 37.52 66.76 85.09 91.72 97.15 98.65 99.29 99.74 1.35 0.71 0.26 2701302.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202012 Apr 2019 to Mar 2020 (Period 12) Greater Anglia 240739.0 38.44 66.93 84.18 90.75 96.80 98.39 99.13 99.75 1.61 0.87 0.25 2942041.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
14 2019202013 Apr 2019 to Mar 2020 (Period 13) Greater Anglia 252815.0 50.54 78.26 90.80 95.00 98.49 99.28 99.63 99.88 0.72 0.37 0.12 3194856.0 39.68 69.89 87.61 93.43 97.85 99.00 99.46 99.82 1.00 0.54 0.18
14 2020202101 Apr 2020 to Mar 2021 (Period 01) Greater Anglia 201994.0 67.32 90.62 96.81 98.28 99.35 99.68 99.83 99.97 0.32 0.17 0.03 3159568.0 41.18 70.81 87.92 93.57 97.88 99.01 99.47 99.82 0.99 0.53 0.18
14 2020202102 Apr 2020 to Mar 2021 (Period 02) Greater Anglia 203143.0 67.76 90.48 96.20 97.83 99.11 99.53 99.72 99.92 0.47 0.28 0.08 3115659.0 42.59 71.55 88.11 93.63 97.89 99.01 99.47 99.82 0.99 0.53 0.18
14 2020202103 Apr 2020 to Mar 2021 (Period 03) Greater Anglia 235051.0 67.42 90.91 96.66 98.12 99.24 99.61 99.78 99.90 0.39 0.22 0.10 3108286.0 44.33 72.68 88.48 93.79 97.92 99.02 99.47 99.82 0.98 0.53 0.18
14 2020202104 Apr 2020 to Mar 2021 (Period 04) Greater Anglia 254353.0 65.79 89.94 96.31 97.91 99.23 99.62 99.80 99.93 0.38 0.20 0.07 3112204.0 46.39 74.27 89.14 94.09 98.01 99.06 99.49 99.83 0.94 0.51 0.17
14 2020202105 Apr 2020 to Mar 2021 (Period 05) Greater Anglia 257142.0 56.75 83.52 93.63 96.44 98.71 99.33 99.60 99.82 0.67 0.40 0.18 3118410.0 47.74 75.34 89.57 94.31 98.09 99.11 99.52 99.84 0.89 0.48 0.16
14 2020202106 Apr 2020 to Mar 2021 (Period 06) Greater Anglia 260041.0 57.14 85.29 95.11 97.41 99.18 99.62 99.81 99.95 0.38 0.19 0.05 3130606.0 49.34 76.88 90.27 94.66 98.20 99.16 99.55 99.85 0.84 0.45 0.15
14 2020202107 Apr 2020 to Mar 2021 (Period 07) Greater Anglia 257161.0 53.21 81.46 93.42 96.64 98.94 99.52 99.74 99.90 0.48 0.26 0.10 3133464.0 50.70 77.98 90.78 94.92 98.28 99.19 99.57 99.86 0.81 0.43 0.14
14 2020202108 Apr 2020 to Mar 2021 (Period 08) Greater Anglia 255215.0 51.49 79.41 92.05 95.56 98.16 98.98 99.38 99.68 1.02 0.62 0.32 3135220.0 52.17 79.22 91.37 95.22 98.33 99.19 99.56 99.84 0.81 0.44 0.16
14 2020202109 Apr 2020 to Mar 2021 (Period 09) Greater Anglia 259306.0 55.67 82.83 94.03 96.87 98.93 99.43 99.65 99.83 0.57 0.35 0.17 3140242.0 54.15 80.98 92.30 95.74 98.50 99.26 99.59 99.85 0.74 0.41 0.15
14 2020202110 Apr 2020 to Mar 2021 (Period 10) Greater Anglia 220521.0 57.61 84.89 94.98 97.42 99.08 99.60 99.80 99.93 0.40 0.20 0.07 3143955.0 55.55 82.18 92.93 96.10 98.63 99.32 99.62 99.86 0.68 0.38 0.14
14 2020202111 Apr 2020 to Mar 2021 (Period 11) Greater Anglia 222668.0 57.28 83.37 93.04 95.79 98.37 99.19 99.57 99.87 0.81 0.43 0.13 3120149.0 57.10 83.48 93.55 96.42 98.73 99.36 99.65 99.87 0.64 0.35 0.13
14 2020202112 Apr 2020 to Mar 2021 (Period 12) Greater Anglia 214223.0 58.38 84.06 93.39 95.99 98.18 98.99 99.41 99.76 1.01 0.59 0.24 3093633.0 58.64 84.81 94.27 96.84 98.84 99.41 99.67 99.87 0.59 0.33 0.13
14 2020202113 Apr 2020 to Mar 2021 (Period 13) Greater Anglia 197126.0 62.83 88.06 95.65 97.50 99.04 99.51 99.69 99.88 0.49 0.31 0.12 3037944.0 59.58 85.56 94.65 97.03 98.88 99.43 99.67 99.87 0.57 0.33 0.13
14 2021202201 Apr 2021 to Mar 2022 (Period 01) Greater Anglia 252977.0 65.07 89.86 96.75 98.22 99.40 99.72 99.83 99.92 0.28 0.17 0.08 3088927.0 59.52 85.58 94.68 97.05 98.89 99.44 99.68 99.87 0.56 0.32 0.13
14 2021202202 Apr 2021 to Mar 2022 (Period 02) Greater Anglia 237280.0 60.34 86.22 95.01 97.26 98.97 99.50 99.73 99.88 0.50 0.27 0.12 3123064.0 59.05 85.31 94.61 97.01 98.89 99.44 99.68 99.87 0.56 0.32 0.13
14 2021202203 Apr 2021 to Mar 2022 (Period 03) Greater Anglia 246734.0 57.45 83.33 93.78 96.71 98.80 99.41 99.64 99.86 0.59 0.36 0.14 3134747.0 58.30 84.74 94.39 96.91 98.85 99.42 99.67 99.86 0.58 0.33 0.14
14 2021202204 Apr 2021 to Mar 2022 (Period 04) Greater Anglia 250398.0 60.32 86.09 94.22 96.57 98.64 99.29 99.62 99.88 0.71 0.38 0.12 3130792.0 57.85 84.42 94.22 96.80 98.80 99.39 99.65 99.86 0.61 0.35 0.14
14 2021202205 Apr 2021 to Mar 2022 (Period 05) Greater Anglia 251107.0 61.00 86.84 95.08 97.29 99.04 99.51 99.72 99.89 0.49 0.28 0.11 3124757.0 58.19 84.69 94.34 96.87 98.83 99.41 99.66 99.86 0.59 0.34 0.14
14 2021202206 Apr 2021 to Mar 2022 (Period 06) Greater Anglia 254735.0 60.16 86.58 95.14 97.36 99.02 99.49 99.72 99.89 0.51 0.28 0.11 3119451.0 58.44 84.79 94.34 96.86 98.82 99.40 99.66 99.86 0.60 0.34 0.14
14 2021202207 Apr 2021 to Mar 2022 (Period 07) Greater Anglia 261700.0 56.62 84.41 94.37 96.89 98.92 99.43 99.66 99.87 0.57 0.34 0.13 3123990.0 58.72 85.04 94.42 96.88 98.82 99.39 99.65 99.86 0.61 0.35 0.14
14 2021202208 Apr 2021 to Mar 2022 (Period 08) Greater Anglia 260042.0 53.83 81.99 93.33 96.35 98.74 99.40 99.66 99.84 0.60 0.34 0.16 3128817.0 58.90 85.24 94.52 96.95 98.86 99.42 99.67 99.87 0.58 0.33 0.13
14 2021202209 Apr 2021 to Mar 2022 (Period 09) Greater Anglia 262906.0 53.74 81.67 93.09 96.18 98.56 99.22 99.52 99.78 0.78 0.48 0.22 3132417.0 58.74 85.14 94.44 96.89 98.83 99.41 99.66 99.87 0.59 0.34 0.13
14 2021202210 Apr 2021 to Mar 2022 (Period 10) Greater Anglia 225827.0 60.73 86.85 95.06 97.27 99.06 99.60 99.80 99.91 0.40 0.20 0.09 3137723.0 58.96 85.28 94.45 96.88 98.83 99.41 99.66 99.86 0.59 0.34 0.14
14 2021202211 Apr 2021 to Mar 2022 (Period 11) Greater Anglia 205711.0 63.44 89.11 96.36 98.06 99.31 99.70 99.83 99.92 0.30 0.17 0.08 3120766.0 59.38 85.67 94.67 97.03 98.90 99.44 99.68 99.87 0.56 0.32 0.13
14 2021202212 Apr 2021 to Mar 2022 (Period 12) Greater Anglia 226260.0 61.38 86.02 93.84 96.13 98.30 99.13 99.49 99.77 0.87 0.51 0.23 3132803.0 59.59 85.81 94.70 97.04 98.90 99.45 99.68 99.87 0.55 0.32 0.13
14 2021202213 Apr 2021 to Mar 2022 (Period 13) Greater Anglia 228129.0 63.81 88.07 95.39 97.29 98.90 99.42 99.64 99.83 0.58 0.36 0.17 3163806.0 59.69 85.83 94.69 97.03 98.89 99.44 99.68 99.86 0.56 0.32 0.14
14 2022202301 Apr 2022 to Mar 2023 (Period 01) Greater Anglia 262376.0 65.51 89.31 96.11 97.77 99.23 99.63 99.82 99.92 0.37 0.18 0.08 3173205.0 59.74 85.80 94.64 97.00 98.88 99.44 99.68 99.87 0.56 0.32 0.13
14 2022202302 Apr 2022 to Mar 2023 (Period 02) Greater Anglia 247464.0 62.92 87.61 95.76 97.78 99.26 99.68 99.84 99.96 0.32 0.16 0.04 3183389.0 59.95 85.90 94.70 97.04 98.90 99.45 99.69 99.87 0.55 0.31 0.13
14 2022202303 Apr 2022 to Mar 2023 (Period 03) Greater Anglia 224993.0 61.53 85.55 93.95 96.32 98.29 99.08 99.43 99.72 0.92 0.57 0.28 3161648.0 60.25 86.08 94.72 97.01 98.87 99.43 99.67 99.86 0.57 0.33 0.14
14 2022202304 Apr 2022 to Mar 2023 (Period 04) Greater Anglia 234464.0 60.35 84.54 93.37 96.14 98.47 99.23 99.52 99.77 0.77 0.48 0.23 3145714.0 60.26 85.96 94.66 96.98 98.86 99.42 99.67 99.85 0.58 0.33 0.15
14 2022202305 Apr 2022 to Mar 2023 (Period 05) Greater Anglia 208599.0 56.44 80.97 91.25 94.64 97.76 98.88 99.34 99.76 1.12 0.66 0.24 3103206.0 59.94 85.56 94.40 96.80 98.77 99.38 99.64 99.84 0.62 0.36 0.16
14 2022202306 Apr 2022 to Mar 2023 (Period 06) Greater Anglia 249898.0 51.47 78.18 90.88 94.78 98.02 99.00 99.43 99.83 1.00 0.57 0.17 3098369.0 59.24 84.88 94.05 96.59 98.69 99.34 99.62 99.84 0.66 0.38 0.16
14 2022202307 Apr 2022 to Mar 2023 (Period 07) Greater Anglia 227476.0 48.81 76.24 90.97 95.18 98.30 99.19 99.55 99.81 0.81 0.45 0.19 3064145.0 58.69 84.28 93.80 96.46 98.64 99.32 99.61 99.83 0.68 0.39 0.17
14 2022202308 Apr 2022 to Mar 2023 (Period 08) Greater Anglia 242200.0 47.39 74.38 89.54 94.48 98.23 99.17 99.48 99.79 0.83 0.52 0.21 3046303.0 58.20 83.69 93.50 96.31 98.60 99.30 99.59 99.83 0.70 0.41 0.17
14 2022202309 Apr 2022 to Mar 2023 (Period 09) Greater Anglia 246324.0 46.43 73.46 88.88 94.01 97.92 98.96 99.43 99.80 1.04 0.57 0.20 3029721.0 57.63 83.03 93.16 96.13 98.55 99.28 99.59 99.83 0.72 0.41 0.17
14 2022202310 Apr 2022 to Mar 2023 (Period 10) Greater Anglia 140772.0 50.09 76.22 89.06 93.58 97.47 98.77 99.32 99.74 1.23 0.68 0.26 2944666.0 57.03 82.41 92.82 95.93 98.45 99.23 99.56 99.82 0.77 0.44 0.18
14 2022202311 Apr 2022 to Mar 2023 (Period 11) Greater Anglia 226359.0 53.80 80.08 91.79 95.44 98.45 99.29 99.60 99.84 0.71 0.40 0.16 2965314.0 56.34 81.77 92.49 95.74 98.39 99.21 99.54 99.82 0.79 0.46 0.18
14 2022202312 Apr 2022 to Mar 2023 (Period 12) Greater Anglia 248796.0 60.74 85.75 94.68 97.19 99.01 99.56 99.76 99.92 0.44 0.24 0.08 2987850.0 56.33 81.78 92.57 95.83 98.45 99.24 99.56 99.83 0.76 0.44 0.17
14 2022202313 Apr 2022 to Mar 2023 (Period 13) Greater Anglia 230789.0 62.35 87.12 95.04 97.37 99.05 99.55 99.77 99.94 0.45 0.23 0.06 2990510.0 56.22 81.71 92.55 95.84 98.47 99.25 99.57 99.84 0.75 0.43 0.16
14 2023202401 Apr 2023 to Mar 2024 (Period 01) Greater Anglia 260726.0 64.54 88.48 95.46 97.41 98.99 99.43 99.66 99.84 0.57 0.34 0.16 2988860.0 56.13 81.64 92.49 95.81 98.44 99.23 99.56 99.83 0.77 0.44 0.17
14 2023202402 Apr 2023 to Mar 2024 (Period 02) Greater Anglia 237633.0 65.19 88.99 95.68 97.56 99.07 99.53 99.74 99.91 0.47 0.26 0.09 2979029.0 56.29 81.73 92.47 95.78 98.43 99.22 99.55 99.83 0.78 0.45 0.17
14 2023202403 Apr 2023 to Mar 2024 (Period 03) Greater Anglia 234340.0 61.80 85.62 93.17 95.79 98.20 99.04 99.46 99.81 0.96 0.54 0.19 2988376.0 56.33 81.74 92.42 95.74 98.42 99.22 99.55 99.83 0.78 0.45 0.17
14 2023202404 Apr 2023 to Mar 2024 (Period 04) Greater Anglia 244300.0 63.65 87.49 94.72 96.86 98.82 99.42 99.66 99.86 0.58 0.34 0.14 2998212.0 56.61 81.99 92.53 95.80 98.45 99.23 99.56 99.84 0.77 0.44 0.16
14 2023202405 Apr 2023 to Mar 2024 (Period 05) Greater Anglia 248051.0 62.93 87.66 95.16 97.33 98.98 99.49 99.71 99.88 0.51 0.29 0.12 3037664.0 57.14 82.53 92.83 96.01 98.54 99.28 99.59 99.85 0.72 0.41 0.15
14 2023202406 Apr 2023 to Mar 2024 (Period 06) Greater Anglia 236180.0 62.25 86.71 94.29 96.68 98.77 99.37 99.65 99.85 0.63 0.35 0.15 3023946.0 58.01 83.21 93.11 96.16 98.60 99.31 99.61 99.85 0.69 0.39 0.15
14 2023202407 Apr 2023 to Mar 2024 (Period 07) Greater Anglia 235579.0 61.56 86.65 94.79 97.23 99.13 99.63 99.82 99.95 0.37 0.18 0.05 3032049.0 58.97 84.00 93.40 96.32 98.66 99.34 99.63 99.86 0.66 0.37 0.14
14 2023202408 Apr 2023 to Mar 2024 (Period 08) Greater Anglia 251315.0 57.95 83.52 92.89 95.84 98.14 98.92 99.34 99.71 1.08 0.66 0.29 3041164.0 59.81 84.73 93.66 96.43 98.65 99.32 99.62 99.85 0.68 0.38 0.15
14 2023202409 Apr 2023 to Mar 2024 (Period 09) Greater Anglia 242252.0 55.65 82.24 92.32 95.65 98.28 99.11 99.45 99.75 0.89 0.55 0.25 3037092.0 60.56 85.44 93.94 96.56 98.68 99.33 99.62 99.85 0.67 0.38 0.15
14 2023202410 Apr 2023 to Mar 2024 (Period 10) Greater Anglia 234342.0 59.86 86.13 94.43 96.77 98.71 99.29 99.55 99.82 0.71 0.45 0.18 3130662.0 60.98 85.91 94.20 96.71 98.74 99.36 99.63 99.85 0.64 0.37 0.15
14 2023202411 Apr 2023 to Mar 2024 (Period 11) Greater Anglia 240261.0 60.35 86.20 94.31 96.69 98.55 99.23 99.54 99.80 0.77 0.46 0.20 3144564.0 61.45 86.35 94.38 96.80 98.75 99.35 99.62 99.85 0.65 0.38 0.15
14 2023202412 Apr 2023 to Mar 2024 (Period 12) Greater Anglia 248514.0 59.82 85.27 94.27 96.83 98.90 99.52 99.75 99.92 0.48 0.25 0.08 3144282.0 61.38 86.31 94.35 96.77 98.74 99.35 99.62 99.85 0.65 0.38 0.15
14 2023202413 Apr 2023 to Mar 2024 (Period 13) Greater Anglia 262965.0 60.53 85.96 94.61 96.95 98.87 99.46 99.69 99.89 0.54 0.31 0.11 3176458.0 61.24 86.23 94.32 96.74 98.72 99.34 99.62 99.85 0.66 0.38 0.15
14 2024202501 Apr 2024 to Mar 2025 (Period 01) Greater Anglia 237328.0 61.19 86.55 94.35 96.75 98.74 99.35 99.64 99.85 0.65 0.36 0.15 3153060.0 60.96 86.06 94.23 96.69 98.70 99.34 99.62 99.85 0.66 0.38 0.15
14 2024202502 Apr 2024 to Mar 2025 (Period 02) Greater Anglia 248732.0 62.91 88.38 95.59 97.49 99.09 99.56 99.79 99.90 0.44 0.21 0.10 3164159.0 60.80 86.03 94.23 96.69 98.71 99.34 99.62 99.85 0.66 0.38 0.15
14 2024202503 Apr 2024 to Mar 2025 (Period 03) Greater Anglia 262842.0 60.24 87.13 94.85 96.98 98.76 99.32 99.59 99.83 0.68 0.41 0.17 3192661.0 60.68 86.15 94.35 96.78 98.75 99.36 99.63 99.85 0.64 0.37 0.15
14 2024202504 Apr 2024 to Mar 2025 (Period 04) Greater Anglia 264323.0 57.57 85.27 94.40 96.86 98.79 99.36 99.63 99.84 0.64 0.37 0.16 3212684.0 60.20 85.97 94.33 96.78 98.75 99.35 99.63 99.85 0.65 0.37 0.15
14 2024202505 Apr 2024 to Mar 2025 (Period 05) Greater Anglia 258173.0 59.48 86.09 94.75 97.11 98.89 99.42 99.64 99.84 0.58 0.36 0.16 3222806.0 59.93 85.85 94.30 96.76 98.74 99.35 99.62 99.84 0.65 0.38 0.16
14 2024202506 Apr 2024 to Mar 2025 (Period 06) Greater Anglia 263060.0 59.33 86.64 94.79 97.00 98.70 99.26 99.56 99.80 0.74 0.44 0.20 3249686.0 59.71 85.85 94.34 96.79 98.73 99.34 99.61 99.84 0.66 0.39 0.16
14 2024202507 Apr 2024 to Mar 2025 (Period 07) Greater Anglia 260663.0 55.16 83.09 92.93 95.93 98.33 99.05 99.41 99.66 0.95 0.59 0.34 3274770.0 59.22 85.57 94.20 96.69 98.67 99.30 99.58 99.82 0.70 0.42 0.18
14 2024202508 Apr 2024 to Mar 2025 (Period 08) Greater Anglia 267518.0 55.88 83.98 93.47 96.35 98.69 99.38 99.67 99.91 0.62 0.33 0.09 3290973.0 59.04 85.60 94.24 96.72 98.72 99.33 99.61 99.83 0.67 0.39 0.17
14 2024202509 Apr 2024 to Mar 2025 (Period 09) Greater Anglia 263008.0 49.71 79.17 90.70 94.46 97.86 98.87 99.34 99.74 1.13 0.66 0.26 3311729.0 58.55 85.34 94.10 96.62 98.68 99.31 99.60 99.83 0.69 0.40 0.17
14 2024202510 Apr 2024 to Mar 2025 (Period 10) Greater Anglia 231779.0 56.66 85.87 94.75 97.15 99.04 99.54 99.77 99.90 0.46 0.23 0.10 3309166.0 58.32 85.32 94.12 96.65 98.70 99.33 99.61 99.84 0.67 0.39 0.16
14 2024202511 Apr 2024 to Mar 2025 (Period 11) Greater Anglia 255473.0 55.45 83.66 93.47 96.28 98.45 99.10 99.39 99.64 0.90 0.61 0.36 3324378.0 57.96 85.13 94.05 96.62 98.69 99.32 99.60 99.82 0.68 0.40 0.18
14 2024202512 Apr 2024 to Mar 2025 (Period 12) Greater Anglia 259975.0 56.41 84.57 94.24 96.91 98.86 99.41 99.66 99.85 0.59 0.34 0.15 3335839.0 57.70 85.07 94.05 96.62 98.69 99.31 99.60 99.82 0.69 0.40 0.18
14 2024202513 Apr 2024 to Mar 2025 (Period 13) Greater Anglia 275517.0 55.29 82.92 92.98 96.06 98.50 99.20 99.59 99.84 0.80 0.41 0.16 3348391.0 57.28 84.83 93.92 96.55 98.66 99.29 99.59 99.81 0.71 0.41 0.19
14 2025202601 Apr 2025 to Mar 2026 (Period 01) Greater Anglia 246789.0 57.49 85.40 94.29 96.85 98.90 99.48 99.73 99.93 0.52 0.27 0.07 3357852.0 57.02 84.75 93.92 96.56 98.68 99.30 99.59 99.82 0.70 0.41 0.18
14 2025202602 Apr 2025 to Mar 2026 (Period 02) Greater Anglia 264494.0 55.58 83.05 92.77 95.72 98.29 99.04 99.39 99.69 0.96 0.61 0.31 3373614.0 56.47 84.35 93.70 96.43 98.61 99.26 99.56 99.80 0.74 0.44 0.20
14 2025202603 Apr 2025 to Mar 2026 (Period 03) Greater Anglia 269132.0 55.13 82.66 93.51 96.54 98.78 99.34 99.57 99.79 0.66 0.43 0.21 3379904.0 56.07 84.00 93.60 96.39 98.62 99.26 99.56 99.80 0.74 0.44 0.20
14 2025202604 Apr 2025 to Mar 2026 (Period 04) Greater Anglia 270014.0 53.45 81.00 92.32 95.62 98.28 99.12 99.54 99.84 0.88 0.46 0.16 3385595.0 55.74 83.66 93.44 96.29 98.58 99.24 99.56 99.80 0.76 0.44 0.20
14 2025202605 Apr 2025 to Mar 2026 (Period 05) Greater Anglia 271229.0 53.31 80.59 91.76 95.61 98.49 99.24 99.56 99.82 0.76 0.44 0.18 3398651.0 55.27 83.23 93.20 96.18 98.55 99.23 99.55 99.80 0.77 0.45 0.20
14 2025202606 Apr 2025 to Mar 2026 (Period 06) Greater Anglia 267048.0 48.95 75.60 89.46 94.61 98.28 99.13 99.51 99.82 0.87 0.49 0.18 3402639.0 54.45 82.37 92.79 95.99 98.51 99.22 99.55 99.80 0.78 0.45 0.20
14 2025202607 Apr 2025 to Mar 2026 (Period 07) Greater Anglia 265782.0 48.40 76.04 89.68 94.29 97.84 98.99 99.44 99.81 1.01 0.56 0.19 3407758.0 53.93 81.82 92.53 95.86 98.47 99.21 99.55 99.81 0.79 0.45 0.19
14 2025202608 Apr 2025 to Mar 2026 (Period 08) Greater Anglia 266145.0 48.50 77.11 90.62 94.82 97.99 98.91 99.30 99.66 1.09 0.70 0.34 3406385.0 53.35 81.28 92.31 95.74 98.42 99.18 99.52 99.79 0.82 0.48 0.21
14 2025202609 Apr 2025 to Mar 2026 (Period 09) Greater Anglia 271470.0 46.49 76.45 89.88 94.36 97.92 99.14 99.58 99.85 0.86 0.42 0.15 3414847.0 53.09 81.06 92.24 95.73 98.42 99.20 99.54 99.80 0.80 0.46 0.20
14 2025202610 Apr 2025 to Mar 2026 (Period 10) Greater Anglia 234306.0 50.57 80.65 92.20 95.74 98.56 99.28 99.58 99.79 0.72 0.42 0.21 3417374.0 52.67 80.70 92.07 95.64 98.39 99.18 99.53 99.79 0.82 0.47 0.21
14 2025202611 Apr 2025 to Mar 2026 (Period 11) Greater Anglia 273559.0 53.25 82.25 92.80 96.17 98.70 99.37 99.65 99.85 0.63 0.35 0.15 3435460.0 52.51 80.61 92.02 95.63 98.41 99.20 99.55 99.81 0.80 0.45 0.19
14 2025202612 Apr 2025 to Mar 2026 (Period 12) Greater Anglia 272685.0 54.02 81.96 92.54 96.00 98.53 99.21 99.54 99.80 0.79 0.46 0.20 3448170.0 52.34 80.42 91.90 95.56 98.39 99.19 99.54 99.81 0.81 0.46 0.19
14 2025202613 Apr 2025 to Mar 2026 (Period 13) Greater Anglia 294309.0 55.45 82.46 92.29 95.67 98.48 99.22 99.53 99.82 0.78 0.47 0.18 3466962.0 52.37 80.39 91.84 95.53 98.38 99.19 99.53 99.81 0.81 0.47 0.19
14 2026202701 Apr 2026 to Mar 2027 (Period 01) Greater Anglia 310850.0 57.78 84.40 93.07 95.78 98.16 99.01 99.42 99.73 0.99 0.58 0.27 3531023.0 52.48 80.39 91.78 95.46 98.33 99.15 99.51 99.79 0.85 0.49 0.21
14 2026202702 Apr 2026 to Mar 2027 (Period 02) Greater Anglia 266016.0 56.52 83.80 92.92 95.69 98.22 99.09 99.44 99.78 0.91 0.56 0.22 3532545.0 52.56 80.45 91.79 95.46 98.32 99.16 99.51 99.80 0.84 0.49 0.20
15 2014201501 Apr 2014 to Mar 2015 (Period 01) Heathrow Express 10475.0 36.56 81.91 94.01 97.64 99.43 99.89 99.98 100.00 0.11 0.02 0.00 10475.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201502 Apr 2014 to Mar 2015 (Period 02) Heathrow Express 11404.0 36.22 82.82 94.77 97.30 99.09 99.73 99.95 99.99 0.27 0.05 0.01 21879.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201503 Apr 2014 to Mar 2015 (Period 03) Heathrow Express 11932.0 35.13 79.82 92.75 96.25 98.67 99.79 99.96 99.97 0.21 0.04 0.03 33811.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201504 Apr 2014 to Mar 2015 (Period 04) Heathrow Express 12102.0 33.77 80.50 93.37 96.46 98.79 99.58 99.83 99.96 0.42 0.17 0.04 45913.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201505 Apr 2014 to Mar 2015 (Period 05) Heathrow Express 12181.0 35.61 82.26 94.47 97.75 99.24 99.78 99.93 99.98 0.22 0.07 0.02 58094.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201506 Apr 2014 to Mar 2015 (Period 06) Heathrow Express 11388.0 38.64 85.75 96.03 98.16 99.40 99.77 99.92 99.97 0.23 0.08 0.03 69482.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201507 Apr 2014 to Mar 2015 (Period 07) Heathrow Express 11723.0 39.13 82.34 93.88 97.32 99.17 99.72 99.91 100.00 0.28 0.09 0.00 81205.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201508 Apr 2014 to Mar 2015 (Period 08) Heathrow Express 11736.0 33.89 76.10 89.66 94.19 97.60 99.12 99.68 99.89 0.88 0.32 0.11 92941.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201509 Apr 2014 to Mar 2015 (Period 09) Heathrow Express 11671.0 32.83 75.04 89.10 94.49 98.27 99.52 99.87 99.97 0.48 0.13 0.03 104612.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201510 Apr 2014 to Mar 2015 (Period 10) Heathrow Express 9743.0 33.92 76.04 90.01 95.08 98.51 99.40 99.63 99.91 0.60 0.37 0.09 114355.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201511 Apr 2014 to Mar 2015 (Period 11) Heathrow Express 11286.0 38.84 80.83 92.11 95.83 98.52 99.47 99.68 99.89 0.53 0.32 0.11 125641.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201512 Apr 2014 to Mar 2015 (Period 12) Heathrow Express 11721.0 37.33 81.91 93.21 96.68 99.18 99.87 99.97 100.00 0.13 0.03 0.00 137362.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2014201513 Apr 2014 to Mar 2015 (Period 13) Heathrow Express 13206.0 37.85 82.54 92.71 96.27 98.67 99.63 99.82 99.97 0.37 0.18 0.03 150568.0 36.15 80.66 92.80 96.42 98.81 99.64 99.86 99.96 0.36 0.14 0.04
15 2015201601 Apr 2015 to Mar 2016 (Period 01) Heathrow Express 13173.0 34.38 80.62 92.55 95.97 98.29 99.33 99.65 99.89 0.67 0.35 0.11 153266.0 35.97 80.57 92.69 96.30 98.72 99.59 99.83 99.95 0.41 0.17 0.05
15 2015201602 Apr 2015 to Mar 2016 (Period 02) Heathrow Express 11774.0 34.78 82.06 93.69 97.23 99.30 99.90 99.99 100.00 0.10 0.01 0.00 153636.0 35.86 80.52 92.62 96.30 98.74 99.61 99.84 99.95 0.39 0.16 0.05
15 2015201603 Apr 2015 to Mar 2016 (Period 03) Heathrow Express 11967.0 32.89 80.92 92.40 96.02 98.69 99.69 99.87 99.92 0.31 0.13 0.08 153671.0 35.69 80.61 92.59 96.28 98.74 99.60 99.83 99.95 0.40 0.17 0.05
15 2015201604 Apr 2015 to Mar 2016 (Period 04) Heathrow Express 12149.0 32.21 80.19 92.62 96.09 98.44 99.46 99.70 99.98 0.54 0.30 0.02 153718.0 35.57 80.58 92.53 96.25 98.71 99.59 99.82 99.95 0.41 0.18 0.05
15 2015201605 Apr 2015 to Mar 2016 (Period 05) Heathrow Express 11967.0 30.76 79.59 92.61 95.97 98.40 99.44 99.69 99.93 0.56 0.31 0.07 153504.0 35.19 80.37 92.38 96.11 98.65 99.56 99.80 99.95 0.44 0.20 0.05
15 2015201606 Apr 2015 to Mar 2016 (Period 06) Heathrow Express 11814.0 34.54 81.32 92.71 96.28 98.85 99.71 99.87 99.99 0.29 0.13 0.01 153930.0 34.88 80.05 92.14 95.97 98.61 99.56 99.80 99.95 0.44 0.20 0.05
15 2015201607 Apr 2015 to Mar 2016 (Period 07) Heathrow Express 12105.0 32.65 77.57 90.71 94.96 98.41 99.41 99.74 99.95 0.59 0.26 0.05 154312.0 34.38 79.68 91.89 95.79 98.55 99.54 99.78 99.94 0.46 0.22 0.06
15 2015201608 Apr 2015 to Mar 2016 (Period 08) Heathrow Express 11635.0 35.34 78.19 90.51 94.79 98.50 99.56 99.87 99.99 0.44 0.13 0.01 154211.0 34.49 79.84 91.96 95.84 98.62 99.57 99.80 99.95 0.43 0.20 0.05
15 2015201609 Apr 2015 to Mar 2016 (Period 09) Heathrow Express 10964.0 36.83 77.82 91.12 95.91 98.76 99.72 99.92 99.97 0.28 0.08 0.03 153504.0 34.79 80.06 92.12 95.94 98.65 99.58 99.80 99.95 0.42 0.20 0.05
15 2015201610 Apr 2015 to Mar 2016 (Period 10) Heathrow Express 8587.0 39.96 80.10 91.39 95.25 98.28 99.42 99.70 99.97 0.58 0.30 0.03 152348.0 35.13 80.32 92.21 95.96 98.64 99.59 99.81 99.96 0.41 0.19 0.04
15 2015201611 Apr 2015 to Mar 2016 (Period 11) Heathrow Express 11248.0 43.17 82.77 93.90 96.90 98.97 99.68 99.86 99.96 0.32 0.14 0.04 152310.0 35.45 80.46 92.34 96.04 98.67 99.60 99.82 99.96 0.40 0.18 0.04
15 2015201612 Apr 2015 to Mar 2016 (Period 12) Heathrow Express 11556.0 44.76 83.38 93.53 96.47 98.94 99.62 99.94 99.99 0.38 0.06 0.01 152145.0 36.01 80.57 92.37 96.02 98.65 99.58 99.82 99.96 0.42 0.18 0.04
15 2015201613 Apr 2015 to Mar 2016 (Period 13) Heathrow Express 10380.0 37.65 80.56 93.75 97.01 99.15 99.79 99.92 99.99 0.21 0.08 0.01 149319.0 35.97 80.39 92.43 96.07 98.69 99.59 99.82 99.96 0.41 0.18 0.04
15 2016201701 Apr 2016 to Mar 2017 (Period 01) Heathrow Express 12312.0 28.83 70.91 89.68 95.28 98.68 99.66 99.90 99.95 0.34 0.10 0.05 148458.0 35.51 79.59 92.19 96.01 98.72 99.62 99.85 99.97 0.38 0.15 0.03
15 2016201702 Apr 2016 to Mar 2017 (Period 02) Heathrow Express 11040.0 27.42 66.30 86.13 92.58 97.30 98.98 99.46 99.84 1.02 0.54 0.16 147724.0 34.97 78.40 91.62 95.66 98.57 99.55 99.81 99.96 0.45 0.19 0.04
15 2016201703 Apr 2016 to Mar 2017 (Period 03) Heathrow Express 11045.0 32.92 73.46 89.66 95.38 98.96 99.65 99.89 99.95 0.35 0.11 0.05 146802.0 34.98 77.82 91.41 95.61 98.59 99.55 99.81 99.96 0.45 0.19 0.04
15 2016201704 Apr 2016 to Mar 2017 (Period 04) Heathrow Express 12085.0 39.64 79.90 92.35 96.38 98.97 99.49 99.78 99.98 0.51 0.22 0.02 146738.0 35.60 77.80 91.39 95.63 98.63 99.55 99.81 99.96 0.45 0.19 0.04
15 2016201705 Apr 2016 to Mar 2017 (Period 05) Heathrow Express 12056.0 40.22 83.71 94.86 97.77 99.49 99.85 99.93 99.95 0.15 0.07 0.05 146827.0 36.37 78.14 91.57 95.78 98.72 99.58 99.83 99.96 0.42 0.17 0.04
15 2016201706 Apr 2016 to Mar 2017 (Period 06) Heathrow Express 11869.0 36.36 76.96 90.23 94.73 98.60 99.60 99.88 99.97 0.40 0.12 0.03 146882.0 36.52 77.78 91.37 95.66 98.70 99.57 99.83 99.96 0.43 0.17 0.04
15 2016201707 Apr 2016 to Mar 2017 (Period 07) Heathrow Express 11513.0 39.44 77.82 90.73 95.29 98.71 99.66 99.81 99.95 0.34 0.19 0.05 146290.0 37.07 77.80 91.38 95.68 98.73 99.59 99.84 99.96 0.41 0.16 0.04
15 2016201708 Apr 2016 to Mar 2017 (Period 08) Heathrow Express 11683.0 37.76 74.61 89.44 94.92 98.79 99.73 99.96 99.99 0.27 0.04 0.01 146338.0 37.26 77.52 91.29 95.69 98.75 99.61 99.84 99.96 0.39 0.16 0.04
15 2016201709 Apr 2016 to Mar 2017 (Period 09) Heathrow Express 11354.0 35.05 72.08 87.85 93.71 98.27 99.39 99.77 99.98 0.61 0.23 0.02 146728.0 37.12 77.08 91.04 95.52 98.71 99.58 99.83 99.96 0.42 0.17 0.04
15 2016201710 Apr 2016 to Mar 2017 (Period 10) Heathrow Express 8534.0 35.58 70.73 85.52 92.16 97.86 99.34 99.80 99.99 0.66 0.20 0.01 146675.0 36.86 76.53 90.70 95.34 98.69 99.58 99.84 99.96 0.42 0.16 0.04
15 2016201711 Apr 2016 to Mar 2017 (Period 11) Heathrow Express 11721.0 31.96 69.19 85.65 92.04 97.48 98.81 99.39 99.82 1.19 0.61 0.18 147148.0 35.99 75.47 90.05 94.96 98.57 99.51 99.80 99.95 0.49 0.20 0.05
15 2016201712 Apr 2016 to Mar 2017 (Period 12) Heathrow Express 12194.0 35.00 73.46 89.88 95.10 98.75 99.53 99.88 99.99 0.47 0.12 0.01 147786.0 35.22 74.68 89.76 94.86 98.56 99.50 99.80 99.95 0.50 0.20 0.05
15 2016201713 Apr 2016 to Mar 2017 (Period 13) Heathrow Express 11719.0 35.14 75.79 90.52 95.31 98.86 99.62 99.87 99.98 0.38 0.13 0.02 149125.0 35.05 74.36 89.54 94.74 98.54 99.49 99.80 99.95 0.51 0.20 0.05
15 2017201801 Apr 2017 to Mar 2018 (Period 01) Heathrow Express 11463.0 36.00 75.05 90.06 94.90 98.57 99.61 99.83 99.96 0.39 0.17 0.04 148276.0 35.64 74.70 89.57 94.71 98.53 99.49 99.79 99.95 0.51 0.21 0.05
15 2017201802 Apr 2017 to Mar 2018 (Period 02) Heathrow Express 12170.0 35.66 76.27 91.24 95.77 99.13 99.88 99.96 99.98 0.12 0.04 0.02 149406.0 36.25 75.45 89.96 94.95 98.67 99.56 99.83 99.96 0.44 0.17 0.04
15 2017201803 Apr 2017 to Mar 2018 (Period 03) Heathrow Express 12354.0 38.53 76.61 90.37 95.23 98.75 99.46 99.74 99.92 0.54 0.26 0.08 150715.0 36.68 75.69 90.02 94.94 98.66 99.54 99.82 99.96 0.46 0.18 0.04
15 2017201804 Apr 2017 to Mar 2018 (Period 04) Heathrow Express 11980.0 34.87 76.21 90.99 95.63 98.80 99.76 99.88 99.96 0.24 0.12 0.04 150610.0 36.30 75.39 89.91 94.88 98.64 99.56 99.82 99.96 0.44 0.18 0.04
15 2017201805 Apr 2017 to Mar 2018 (Period 05) Heathrow Express 12445.0 39.81 82.66 94.73 97.67 99.26 99.76 99.88 99.94 0.24 0.12 0.06 150999.0 36.27 75.33 89.91 94.88 98.63 99.56 99.82 99.96 0.44 0.18 0.04
15 2017201806 Apr 2017 to Mar 2018 (Period 06) Heathrow Express 12443.0 37.77 80.54 93.17 96.91 99.26 99.84 99.94 99.98 0.16 0.06 0.02 151573.0 36.39 75.63 90.15 95.06 98.68 99.58 99.83 99.96 0.42 0.17 0.04
15 2017201807 Apr 2017 to Mar 2018 (Period 07) Heathrow Express 12369.0 38.88 79.69 93.10 96.76 99.26 99.79 99.94 99.99 0.21 0.06 0.01 152429.0 36.36 75.79 90.35 95.18 98.72 99.59 99.84 99.96 0.41 0.16 0.04
15 2017201808 Apr 2017 to Mar 2018 (Period 08) Heathrow Express 12276.0 31.64 74.32 89.50 94.50 98.13 99.35 99.76 99.96 0.65 0.24 0.04 153022.0 35.88 75.76 90.35 95.15 98.67 99.56 99.82 99.96 0.44 0.18 0.04
15 2017201809 Apr 2017 to Mar 2018 (Period 09) Heathrow Express 12295.0 30.22 71.83 87.87 94.10 98.40 99.46 99.71 99.92 0.54 0.29 0.08 153963.0 35.49 75.72 90.34 95.17 98.68 99.56 99.81 99.95 0.44 0.19 0.05
15 2017201810 Apr 2017 to Mar 2018 (Period 10) Heathrow Express 9652.0 27.46 66.34 83.64 90.65 96.30 98.50 99.17 99.72 1.50 0.83 0.28 155081.0 34.98 75.41 90.19 95.05 98.58 99.51 99.78 99.94 0.49 0.22 0.06
15 2017201811 Apr 2017 to Mar 2018 (Period 11) Heathrow Express 12403.0 34.69 78.05 91.59 96.33 99.11 99.82 99.97 100.00 0.18 0.03 0.00 155763.0 35.19 76.09 90.64 95.38 98.70 99.59 99.82 99.95 0.41 0.18 0.05
15 2017201812 Apr 2017 to Mar 2018 (Period 12) Heathrow Express 11581.0 38.65 80.54 92.31 96.23 98.95 99.64 99.94 99.99 0.36 0.06 0.01 155150.0 35.46 76.63 90.82 95.47 98.72 99.59 99.82 99.95 0.41 0.18 0.05
15 2017201813 Apr 2017 to Mar 2018 (Period 13) Heathrow Express 11544.0 33.79 77.01 90.75 95.47 98.66 99.51 99.78 99.92 0.49 0.22 0.08 154975.0 35.36 76.72 90.84 95.48 98.70 99.59 99.82 99.95 0.41 0.18 0.05
15 2018201901 Apr 2018 to Mar 2019 (Period 01) Heathrow Express 12138.0 33.89 76.23 89.88 94.80 98.20 99.18 99.56 99.93 0.82 0.44 0.07 155650.0 35.20 76.81 90.82 95.47 98.67 99.55 99.80 99.94 0.45 0.20 0.06
15 2018201902 Apr 2018 to Mar 2019 (Period 02) Heathrow Express 11335.0 30.49 68.76 85.57 91.82 97.00 98.71 99.44 99.90 1.29 0.56 0.10 154815.0 34.82 76.26 90.41 95.18 98.51 99.46 99.76 99.94 0.54 0.24 0.06
15 2018201903 Apr 2018 to Mar 2019 (Period 03) Heathrow Express 12514.0 34.87 75.30 90.24 95.49 98.89 99.76 99.91 99.94 0.24 0.09 0.06 154975.0 34.52 76.15 90.40 95.20 98.52 99.49 99.77 99.94 0.51 0.23 0.06
15 2018201904 Apr 2018 to Mar 2019 (Period 04) Heathrow Express 12452.0 37.62 78.56 91.74 95.98 98.87 99.52 99.86 99.98 0.48 0.14 0.02 155447.0 34.75 76.34 90.46 95.23 98.53 99.47 99.77 99.94 0.53 0.23 0.06
15 2018201905 Apr 2018 to Mar 2019 (Period 05) Heathrow Express 12465.0 38.44 80.99 93.35 97.05 99.47 99.90 99.98 100.00 0.10 0.02 0.00 155467.0 34.64 76.21 90.35 95.18 98.55 99.48 99.78 99.95 0.52 0.22 0.05
15 2018201906 Apr 2018 to Mar 2019 (Period 06) Heathrow Express 12299.0 43.39 83.90 94.45 97.63 99.47 99.84 99.93 99.99 0.16 0.07 0.01 155323.0 35.08 76.47 90.45 95.23 98.56 99.48 99.78 99.95 0.52 0.22 0.05
15 2018201907 Apr 2018 to Mar 2019 (Period 07) Heathrow Express 12364.0 42.12 75.53 88.88 94.39 98.60 99.72 99.91 99.99 0.28 0.09 0.01 155318.0 35.34 76.14 90.11 95.05 98.51 99.48 99.78 99.95 0.52 0.22 0.05
15 2018201908 Apr 2018 to Mar 2019 (Period 08) Heathrow Express 11653.0 43.68 78.17 91.11 95.60 98.70 99.71 99.95 99.98 0.29 0.05 0.02 154695.0 36.26 76.44 90.23 95.13 98.56 99.50 99.79 99.95 0.50 0.21 0.05
15 2018201909 Apr 2018 to Mar 2019 (Period 09) Heathrow Express 12250.0 41.33 75.96 89.44 94.47 98.47 99.45 99.84 99.97 0.55 0.16 0.03 154650.0 37.14 76.77 90.36 95.16 98.56 99.50 99.80 99.95 0.50 0.20 0.05
15 2018201910 Apr 2018 to Mar 2019 (Period 10) Heathrow Express 9309.0 45.25 78.40 91.45 95.91 98.89 99.59 99.71 99.98 0.41 0.29 0.02 154307.0 38.24 77.52 90.84 95.49 98.72 99.57 99.83 99.97 0.43 0.17 0.03
15 2018201911 Apr 2018 to Mar 2019 (Period 11) Heathrow Express 12297.0 50.82 83.39 94.34 97.51 99.41 99.80 99.91 99.96 0.20 0.09 0.04 154201.0 39.52 77.94 91.06 95.58 98.75 99.57 99.83 99.96 0.43 0.17 0.04
15 2018201912 Apr 2018 to Mar 2019 (Period 12) Heathrow Express 12371.0 52.24 84.76 93.96 97.05 99.02 99.62 99.87 100.00 0.38 0.13 0.00 154991.0 40.60 78.29 91.20 95.65 98.75 99.57 99.82 99.97 0.43 0.18 0.03
15 2018201913 Apr 2018 to Mar 2019 (Period 13) Heathrow Express 12861.0 52.69 83.84 92.98 96.00 98.72 99.68 99.91 99.97 0.32 0.09 0.03 156308.0 42.10 78.84 91.38 95.69 98.76 99.58 99.83 99.97 0.42 0.17 0.03
15 2019202001 Apr 2019 to Mar 2020 (Period 01) Heathrow Express 11990.0 52.08 85.08 94.03 97.05 99.27 99.89 99.98 99.99 0.11 0.02 0.01 11990.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202002 Apr 2019 to Mar 2020 (Period 02) Heathrow Express 12415.0 53.52 87.88 96.27 98.49 99.69 99.91 99.94 99.99 0.09 0.06 0.01 24405.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202003 Apr 2019 to Mar 2020 (Period 03) Heathrow Express 12303.0 54.43 87.19 95.08 97.45 99.21 99.69 99.85 99.93 0.31 0.15 0.07 36708.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202004 Apr 2019 to Mar 2020 (Period 04) Heathrow Express 12426.0 46.48 83.96 93.46 96.56 98.83 99.63 99.90 99.97 0.37 0.10 0.03 49134.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202005 Apr 2019 to Mar 2020 (Period 05) Heathrow Express 12448.0 46.40 81.89 92.86 96.51 99.01 99.66 99.83 99.94 0.34 0.17 0.06 61582.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202006 Apr 2019 to Mar 2020 (Period 06) Heathrow Express 12401.0 60.60 90.03 96.11 97.99 99.33 99.82 99.94 99.98 0.18 0.06 0.02 73983.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202007 Apr 2019 to Mar 2020 (Period 07) Heathrow Express 12286.0 53.25 88.40 95.65 97.91 99.46 99.90 99.99 100.00 0.10 0.01 0.00 86269.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202008 Apr 2019 to Mar 2020 (Period 08) Heathrow Express 11633.0 54.24 87.87 95.27 97.53 99.28 99.72 99.85 99.95 0.28 0.15 0.05 97902.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202009 Apr 2019 to Mar 2020 (Period 09) Heathrow Express 12279.0 52.26 86.01 94.92 97.42 99.21 99.76 99.98 100.00 0.24 0.02 0.00 110181.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202010 Apr 2019 to Mar 2020 (Period 10) Heathrow Express 11736.0 48.17 83.96 93.38 96.58 99.17 99.74 99.92 100.00 0.26 0.08 0.00 121917.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202011 Apr 2019 to Mar 2020 (Period 11) Heathrow Express 12366.0 49.94 80.39 92.00 95.99 99.10 99.81 99.90 99.98 0.19 0.10 0.02 134283.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202012 Apr 2019 to Mar 2020 (Period 12) Heathrow Express 11796.0 49.78 79.83 91.73 95.99 98.75 99.56 99.82 99.94 0.44 0.18 0.06 146079.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
15 2019202013 Apr 2019 to Mar 2020 (Period 13) Heathrow Express 11480.0 51.11 86.45 95.17 97.69 99.40 99.83 99.91 99.96 0.17 0.09 0.04 157559.0 51.72 85.31 94.31 97.17 99.21 99.76 99.91 99.97 0.24 0.09 0.03
15 2020202101 Apr 2020 to Mar 2021 (Period 01) Heathrow Express 7197.0 63.25 96.44 98.71 99.28 99.85 99.97 100.00 100.00 0.03 0.00 0.00 152766.0 52.23 85.85 94.54 97.28 99.23 99.76 99.91 99.97 0.24 0.09 0.03
15 2020202102 Apr 2020 to Mar 2021 (Period 02) Heathrow Express 6311.0 63.75 95.85 98.65 99.32 99.73 99.89 99.98 99.98 0.11 0.02 0.02 146662.0 52.62 86.11 94.57 97.26 99.22 99.76 99.91 99.97 0.24 0.09 0.03
15 2020202103 Apr 2020 to Mar 2021 (Period 03) Heathrow Express 6117.0 58.67 92.15 96.70 98.28 99.43 99.80 99.87 100.00 0.20 0.13 0.00 140476.0 52.73 86.28 94.61 97.29 99.23 99.76 99.91 99.97 0.24 0.09 0.03
15 2020202104 Apr 2020 to Mar 2021 (Period 04) Heathrow Express 6327.0 60.14 95.38 98.53 99.27 99.81 99.97 99.98 100.00 0.03 0.02 0.00 134377.0 53.65 86.92 94.90 97.45 99.29 99.79 99.92 99.98 0.21 0.08 0.02
15 2020202105 Apr 2020 to Mar 2021 (Period 05) Heathrow Express 6361.0 54.99 92.03 97.17 98.48 99.61 99.81 99.92 99.97 0.19 0.08 0.03 128290.0 54.42 87.66 95.22 97.59 99.33 99.80 99.93 99.98 0.20 0.07 0.02
15 2020202106 Apr 2020 to Mar 2021 (Period 06) Heathrow Express 6330.0 54.36 92.58 97.63 98.89 99.61 99.89 99.95 100.00 0.11 0.05 0.00 122219.0 53.79 87.67 95.25 97.62 99.35 99.80 99.93 99.98 0.20 0.07 0.02
15 2020202107 Apr 2020 to Mar 2021 (Period 07) Heathrow Express 6338.0 51.04 89.05 96.01 98.25 99.50 99.79 99.98 100.00 0.21 0.02 0.00 116271.0 53.70 87.67 95.25 97.62 99.34 99.79 99.92 99.98 0.21 0.08 0.02
15 2020202108 Apr 2020 to Mar 2021 (Period 08) Heathrow Express 6320.0 48.01 87.69 95.89 98.07 99.49 99.92 100.00 100.00 0.08 0.00 0.00 110958.0 53.32 87.65 95.28 97.66 99.36 99.81 99.93 99.98 0.19 0.07 0.02
15 2020202109 Apr 2020 to Mar 2021 (Period 09) Heathrow Express 5854.0 49.30 87.89 94.99 97.20 99.01 99.69 99.93 100.00 0.31 0.07 0.00 104533.0 53.22 87.86 95.31 97.66 99.36 99.80 99.93 99.98 0.20 0.07 0.02
15 2020202110 Apr 2020 to Mar 2021 (Period 10) Heathrow Express 5959.0 49.61 83.96 91.54 94.60 97.20 98.69 99.24 99.80 1.31 0.76 0.20 98756.0 53.60 88.09 95.31 97.60 99.25 99.74 99.89 99.97 0.26 0.11 0.03
15 2020202111 Apr 2020 to Mar 2021 (Period 11) Heathrow Express 6250.0 59.04 82.72 90.94 93.54 96.59 98.61 99.50 99.89 1.39 0.50 0.11 92640.0 54.46 88.75 95.46 97.55 99.09 99.66 99.86 99.96 0.34 0.14 0.04
15 2020202112 Apr 2020 to Mar 2021 (Period 12) Heathrow Express 7369.0 62.15 84.35 90.56 92.96 97.00 98.93 99.39 99.84 1.07 0.61 0.16 88213.0 55.73 89.58 95.55 97.37 98.96 99.61 99.83 99.96 0.39 0.17 0.04
15 2020202113 Apr 2020 to Mar 2021 (Period 13) Heathrow Express 9930.0 58.03 80.78 88.80 92.18 96.66 99.05 99.55 99.89 0.95 0.45 0.11 86663.0 56.60 88.98 94.82 96.73 98.64 99.52 99.78 99.95 0.48 0.22 0.05
15 2021202201 Apr 2021 to Mar 2022 (Period 01) Heathrow Express 13023.0 64.47 85.34 91.13 93.89 97.73 99.19 99.71 99.90 0.81 0.29 0.10 92489.0 57.19 87.89 94.00 96.13 98.42 99.44 99.75 99.94 0.56 0.25 0.06
15 2021202202 Apr 2021 to Mar 2022 (Period 02) Heathrow Express 11774.0 63.28 85.48 92.21 94.89 98.15 99.31 99.67 99.89 0.69 0.33 0.11 97952.0 57.50 87.09 93.49 95.78 98.30 99.39 99.73 99.93 0.61 0.27 0.07
15 2021202203 Apr 2021 to Mar 2022 (Period 03) Heathrow Express 11835.0 62.20 85.79 94.37 97.02 99.06 99.62 99.78 99.92 0.38 0.22 0.08 103670.0 57.97 86.64 93.40 95.77 98.32 99.40 99.73 99.92 0.60 0.27 0.08
15 2021202204 Apr 2021 to Mar 2022 (Period 04) Heathrow Express 12188.0 62.30 85.95 93.54 96.09 98.31 99.33 99.57 99.84 0.67 0.43 0.16 109531.0 58.32 86.06 93.12 95.61 98.23 99.35 99.69 99.91 0.65 0.31 0.09
15 2021202205 Apr 2021 to Mar 2022 (Period 05) Heathrow Express 12159.0 61.45 87.13 93.60 96.04 98.25 99.37 99.69 99.89 0.63 0.31 0.11 115329.0 58.84 85.84 92.94 95.49 98.16 99.33 99.68 99.90 0.67 0.32 0.10
15 2021202206 Apr 2021 to Mar 2022 (Period 06) Heathrow Express 12225.0 57.33 85.41 93.69 96.48 98.41 99.30 99.73 99.95 0.70 0.27 0.05 121224.0 58.92 85.45 92.77 95.42 98.11 99.30 99.67 99.90 0.70 0.33 0.10
15 2021202207 Apr 2021 to Mar 2022 (Period 07) Heathrow Express 11735.0 52.13 81.53 91.21 94.83 98.22 99.25 99.68 99.86 0.75 0.32 0.14 126621.0 58.68 84.91 92.47 95.22 98.05 99.27 99.66 99.89 0.73 0.34 0.11
15 2021202208 Apr 2021 to Mar 2022 (Period 08) Heathrow Express 12036.0 55.36 83.77 92.36 95.03 97.77 98.90 99.34 99.80 1.10 0.66 0.20 132337.0 58.89 84.67 92.29 95.07 97.96 99.21 99.61 99.88 0.79 0.39 0.12
15 2021202209 Apr 2021 to Mar 2022 (Period 09) Heathrow Express 11391.0 57.51 85.93 94.71 97.12 98.84 99.75 99.89 99.96 0.25 0.11 0.04 137874.0 59.18 84.64 92.38 95.15 97.98 99.23 99.62 99.88 0.77 0.38 0.12
15 2021202210 Apr 2021 to Mar 2022 (Period 10) Heathrow Express 11845.0 55.84 86.23 94.50 96.81 98.67 99.37 99.63 99.83 0.63 0.37 0.17 143760.0 59.31 84.80 92.59 95.31 98.07 99.26 99.64 99.88 0.74 0.36 0.12
15 2021202211 Apr 2021 to Mar 2022 (Period 11) Heathrow Express 12193.0 51.56 81.57 92.63 95.70 98.14 99.16 99.61 99.93 0.84 0.39 0.07 149703.0 58.69 84.62 92.66 95.41 98.14 99.28 99.64 99.89 0.72 0.36 0.11
15 2021202212 Apr 2021 to Mar 2022 (Period 12) Heathrow Express 11201.0 47.98 80.26 91.22 95.02 98.33 99.46 99.80 99.93 0.54 0.20 0.07 153535.0 57.74 84.31 92.66 95.50 98.21 99.31 99.66 99.89 0.69 0.34 0.11
15 2021202213 Apr 2021 to Mar 2022 (Period 13) Heathrow Express 11297.0 45.62 79.08 92.17 95.81 98.60 99.54 99.82 99.98 0.46 0.18 0.02 154902.0 56.84 84.16 92.87 95.74 98.34 99.35 99.68 99.90 0.65 0.32 0.10
15 2022202301 Apr 2022 to Mar 2023 (Period 01) Heathrow Express 12274.0 48.87 81.84 92.76 95.70 98.26 99.36 99.70 99.98 0.64 0.30 0.02 154153.0 55.56 83.88 93.01 95.89 98.38 99.36 99.68 99.90 0.64 0.32 0.10
15 2022202302 Apr 2022 to Mar 2023 (Period 02) Heathrow Express 12239.0 49.06 81.49 92.79 95.91 98.43 99.47 99.81 99.89 0.53 0.19 0.11 154618.0 54.46 83.56 93.05 95.97 98.40 99.37 99.69 99.90 0.63 0.31 0.10
15 2022202303 Apr 2022 to Mar 2023 (Period 03) Heathrow Express 11321.0 52.50 81.95 92.74 95.92 98.63 99.45 99.79 99.98 0.55 0.21 0.02 154104.0 53.72 83.27 92.92 95.88 98.37 99.36 99.69 99.91 0.64 0.31 0.09
15 2022202304 Apr 2022 to Mar 2023 (Period 04) Heathrow Express 12038.0 42.60 74.04 88.09 93.45 97.62 98.98 99.63 99.92 1.02 0.37 0.08 153954.0 52.17 82.34 92.50 95.68 98.32 99.33 99.70 99.92 0.67 0.30 0.08
15 2022202305 Apr 2022 to Mar 2023 (Period 05) Heathrow Express 10573.0 48.90 78.65 91.20 95.50 98.50 99.34 99.62 99.90 0.66 0.38 0.10 152368.0 51.20 81.70 92.32 95.63 98.33 99.33 99.69 99.92 0.67 0.31 0.08
15 2022202306 Apr 2022 to Mar 2023 (Period 06) Heathrow Express 12186.0 45.91 75.47 89.20 94.30 98.24 99.25 99.61 99.88 0.75 0.39 0.12 152329.0 50.29 80.91 91.96 95.46 98.32 99.32 99.68 99.91 0.68 0.32 0.09
15 2022202307 Apr 2022 to Mar 2023 (Period 07) Heathrow Express 10074.0 48.32 78.79 91.11 94.95 98.19 99.37 99.65 99.81 0.63 0.35 0.19 150668.0 50.01 80.72 91.96 95.47 98.32 99.33 99.68 99.91 0.67 0.32 0.09
15 2022202308 Apr 2022 to Mar 2023 (Period 08) Heathrow Express 11840.0 46.94 77.69 91.23 95.44 98.75 99.54 99.80 99.97 0.46 0.20 0.03 150472.0 49.34 80.23 91.87 95.51 98.40 99.38 99.72 99.92 0.62 0.28 0.08
15 2022202309 Apr 2022 to Mar 2023 (Period 09) Heathrow Express 10397.0 48.60 76.52 89.44 94.36 98.06 99.14 99.49 99.74 0.86 0.51 0.26 149478.0 48.67 79.54 91.49 95.30 98.34 99.34 99.69 99.91 0.66 0.31 0.09
15 2022202310 Apr 2022 to Mar 2023 (Period 10) Heathrow Express 9374.0 54.06 84.10 93.48 96.42 99.08 99.78 99.90 99.97 0.22 0.10 0.03 147007.0 48.43 79.29 91.37 95.25 98.36 99.37 99.71 99.91 0.63 0.29 0.09
15 2022202311 Apr 2022 to Mar 2023 (Period 11) Heathrow Express 11403.0 49.70 77.44 89.66 94.46 98.09 99.24 99.66 99.91 0.76 0.34 0.09 146217.0 48.27 78.96 91.13 95.15 98.36 99.37 99.71 99.91 0.63 0.29 0.09
15 2022202312 Apr 2022 to Mar 2023 (Period 12) Heathrow Express 12398.0 51.57 80.01 90.94 95.39 98.44 99.52 99.85 99.99 0.48 0.15 0.01 147414.0 48.57 78.95 91.11 95.18 98.37 99.38 99.72 99.92 0.62 0.28 0.08
15 2022202313 Apr 2022 to Mar 2023 (Period 13) Heathrow Express 11021.0 51.82 80.85 90.90 94.68 98.00 99.32 99.62 99.86 0.68 0.38 0.14 147138.0 49.04 79.08 91.01 95.10 98.32 99.36 99.70 99.91 0.64 0.30 0.09
15 2023202401 Apr 2023 to Mar 2024 (Period 01) Heathrow Express 12785.0 53.60 82.10 92.40 96.07 98.84 99.57 99.78 99.94 0.43 0.22 0.06 147649.0 49.45 79.11 90.99 95.13 98.37 99.38 99.71 99.91 0.62 0.29 0.09
15 2023202402 Apr 2023 to Mar 2024 (Period 02) Heathrow Express 11878.0 52.97 82.79 92.73 95.63 98.38 99.26 99.66 99.95 0.74 0.34 0.05 147288.0 49.77 79.21 90.98 95.11 98.37 99.36 99.70 99.91 0.64 0.30 0.09
15 2023202403 Apr 2023 to Mar 2024 (Period 03) Heathrow Express 11440.0 46.42 76.24 89.26 93.76 97.93 99.20 99.71 99.97 0.80 0.29 0.03 147407.0 49.30 78.77 90.71 94.94 98.31 99.34 99.69 99.91 0.66 0.31 0.09
15 2023202404 Apr 2023 to Mar 2024 (Period 04) Heathrow Express 12232.0 44.55 75.17 88.27 93.55 97.55 99.07 99.56 99.92 0.93 0.44 0.08 147601.0 49.45 78.86 90.72 94.95 98.30 99.35 99.69 99.91 0.65 0.31 0.09
15 2023202405 Apr 2023 to Mar 2024 (Period 05) Heathrow Express 11873.0 44.50 76.31 89.33 93.85 97.45 98.90 99.51 99.94 1.10 0.49 0.06 148901.0 49.09 78.67 90.58 94.82 98.22 99.32 99.68 99.91 0.68 0.32 0.09
15 2023202406 Apr 2023 to Mar 2024 (Period 06) Heathrow Express 11479.0 44.07 75.01 88.66 93.22 97.51 98.84 99.31 99.63 1.16 0.69 0.37 148194.0 48.97 78.65 90.54 94.74 98.17 99.28 99.65 99.89 0.72 0.35 0.11
15 2023202407 Apr 2023 to Mar 2024 (Period 07) Heathrow Express 11657.0 43.84 76.27 90.11 94.36 97.92 99.03 99.50 99.81 0.97 0.50 0.19 149777.0 48.61 78.46 90.47 94.70 98.15 99.26 99.64 99.89 0.74 0.36 0.11
15 2023202408 Apr 2023 to Mar 2024 (Period 08) Heathrow Express 11893.0 39.74 70.58 86.72 93.46 98.27 99.29 99.71 99.90 0.71 0.29 0.10 149830.0 48.04 77.89 90.11 94.54 98.11 99.24 99.63 99.89 0.76 0.37 0.11
15 2023202409 Apr 2023 to Mar 2024 (Period 09) Heathrow Express 9944.0 30.89 58.34 75.00 83.70 93.06 97.01 98.62 99.78 2.99 1.38 0.22 149377.0 46.86 76.69 89.15 93.83 97.77 99.10 99.58 99.89 0.90 0.42 0.11
15 2023202410 Apr 2023 to Mar 2024 (Period 10) Heathrow Express 11257.0 34.24 64.35 79.90 87.46 95.16 97.90 98.98 99.76 2.10 1.02 0.24 151260.0 45.47 75.31 88.20 93.20 97.50 98.97 99.51 99.88 1.03 0.49 0.12
15 2023202411 Apr 2023 to Mar 2024 (Period 11) Heathrow Express 11599.0 40.08 70.69 86.52 92.39 97.12 98.70 99.45 99.83 1.30 0.55 0.17 151456.0 44.74 74.79 87.96 93.04 97.43 98.93 99.50 99.87 1.07 0.50 0.13
15 2023202412 Apr 2023 to Mar 2024 (Period 12) Heathrow Express 11767.0 43.72 75.81 90.61 95.22 98.29 99.34 99.72 99.86 0.66 0.28 0.14 150825.0 44.10 74.44 87.92 93.02 97.41 98.91 99.49 99.86 1.09 0.51 0.14
15 2023202413 Apr 2023 to Mar 2024 (Period 13) Heathrow Express 11564.0 38.72 71.39 87.07 93.09 97.50 98.96 99.51 99.84 1.04 0.49 0.16 151368.0 43.13 73.74 87.64 92.90 97.37 98.88 99.48 99.86 1.12 0.52 0.14
15 2024202501 Apr 2024 to Mar 2025 (Period 01) Heathrow Express 11015.0 39.67 72.92 88.62 93.96 97.65 98.82 99.42 99.87 1.18 0.58 0.13 149598.0 41.98 72.97 87.30 92.71 97.27 98.82 99.45 99.85 1.18 0.55 0.15
15 2024202502 Apr 2024 to Mar 2025 (Period 02) Heathrow Express 11515.0 43.64 76.41 90.71 95.41 98.39 99.37 99.74 99.91 0.63 0.26 0.09 149235.0 41.23 72.45 87.13 92.68 97.27 98.83 99.45 99.85 1.17 0.55 0.15
15 2024202503 Apr 2024 to Mar 2025 (Period 03) Heathrow Express 12003.0 44.90 78.26 91.17 95.03 97.77 98.93 99.58 99.93 1.07 0.42 0.07 149798.0 41.13 72.63 87.29 92.79 97.26 98.81 99.44 99.85 1.19 0.56 0.15
15 2024202504 Apr 2024 to Mar 2025 (Period 04) Heathrow Express 11569.0 42.27 75.16 88.54 93.29 97.69 99.13 99.63 99.88 0.87 0.37 0.12 149135.0 40.94 72.61 87.31 92.77 97.27 98.81 99.45 99.84 1.19 0.55 0.16
15 2024202505 Apr 2024 to Mar 2025 (Period 05) Heathrow Express 12009.0 45.52 76.52 89.69 94.03 97.47 98.89 99.51 99.90 1.11 0.49 0.10 149271.0 41.02 72.64 87.34 92.78 97.27 98.81 99.45 99.84 1.19 0.55 0.16
15 2024202506 Apr 2024 to Mar 2025 (Period 06) Heathrow Express 12004.0 45.49 77.00 91.22 95.36 98.28 99.30 99.57 99.88 0.70 0.43 0.12 149796.0 41.15 72.80 87.55 92.95 97.33 98.85 99.47 99.86 1.15 0.53 0.14
15 2024202507 Apr 2024 to Mar 2025 (Period 07) Heathrow Express 11478.0 41.49 72.45 88.06 93.30 97.70 99.00 99.43 99.90 1.00 0.57 0.10 149617.0 40.96 72.51 87.39 92.87 97.31 98.84 99.46 99.87 1.16 0.54 0.13
15 2024202508 Apr 2024 to Mar 2025 (Period 08) Heathrow Express 11651.0 41.88 73.62 89.52 94.91 98.58 99.54 99.86 99.98 0.46 0.14 0.02 149375.0 41.13 72.75 87.61 92.98 97.34 98.86 99.47 99.87 1.14 0.53 0.13
15 2024202509 Apr 2024 to Mar 2025 (Period 09) Heathrow Express 10271.0 36.40 66.22 84.30 91.84 97.48 98.84 99.66 99.91 1.16 0.34 0.09 149702.0 41.49 73.26 88.22 93.52 97.63 98.98 99.54 99.88 1.02 0.46 0.12
15 2024202510 Apr 2024 to Mar 2025 (Period 10) Heathrow Express 11373.0 44.99 79.13 92.90 96.78 99.07 99.64 99.79 99.85 0.36 0.21 0.15 149818.0 42.30 74.37 89.20 94.23 97.93 99.11 99.60 99.89 0.89 0.40 0.11
15 2024202511 Apr 2024 to Mar 2025 (Period 11) Heathrow Express 12000.0 40.93 72.38 87.62 93.48 97.91 98.97 99.51 99.86 1.03 0.49 0.14 150219.0 42.36 74.50 89.28 94.31 97.99 99.14 99.61 99.89 0.86 0.39 0.11
15 2024202512 Apr 2024 to Mar 2025 (Period 12) Heathrow Express 11814.0 39.59 69.44 85.92 92.42 97.13 98.67 99.42 99.81 1.33 0.58 0.19 150266.0 42.04 74.00 88.91 94.09 97.90 99.08 99.58 99.89 0.92 0.42 0.11
15 2024202513 Apr 2024 to Mar 2025 (Period 13) Heathrow Express 12691.0 41.45 72.89 89.05 94.75 98.71 99.51 99.86 99.96 0.49 0.14 0.04 151393.0 42.24 74.10 89.07 94.22 97.99 99.13 99.61 99.90 0.87 0.39 0.10
15 2025202601 Apr 2025 to Mar 2026 (Period 01) Heathrow Express 10512.0 41.83 73.54 89.21 95.16 98.63 99.54 99.86 99.93 0.46 0.14 0.07 150890.0 42.40 74.15 89.11 94.30 98.06 99.18 99.64 99.90 0.82 0.36 0.10
15 2025202602 Apr 2025 to Mar 2026 (Period 02) Heathrow Express 11972.0 45.26 77.17 91.88 96.05 98.83 99.57 99.76 99.92 0.43 0.24 0.08 151347.0 42.53 74.22 89.21 94.36 98.10 99.20 99.65 99.90 0.80 0.35 0.10
15 2025202603 Apr 2025 to Mar 2026 (Period 03) Heathrow Express 11972.0 44.26 77.76 90.77 94.94 97.74 99.00 99.53 99.86 1.00 0.47 0.14 151316.0 42.48 74.18 89.17 94.35 98.10 99.20 99.64 99.90 0.80 0.36 0.10
15 2025202604 Apr 2025 to Mar 2026 (Period 04) Heathrow Express 12484.0 39.93 76.72 91.51 95.96 98.63 99.26 99.61 99.94 0.74 0.39 0.06 152231.0 42.29 74.31 89.41 94.56 98.17 99.21 99.64 99.90 0.79 0.36 0.10
15 2025202605 Apr 2025 to Mar 2026 (Period 05) Heathrow Express 12475.0 48.60 80.46 93.35 96.62 98.88 99.58 99.73 99.90 0.42 0.27 0.10 152697.0 42.55 74.64 89.71 94.77 98.28 99.27 99.66 99.90 0.73 0.34 0.10
15 2025202606 Apr 2025 to Mar 2026 (Period 06) Heathrow Express 12258.0 41.96 73.05 87.71 93.37 97.36 98.93 99.49 99.84 1.07 0.51 0.16 152951.0 42.27 74.33 89.43 94.61 98.21 99.24 99.65 99.90 0.76 0.35 0.10
15 2025202607 Apr 2025 to Mar 2026 (Period 07) Heathrow Express 12029.0 40.52 72.49 87.97 94.29 97.89 99.11 99.51 99.88 0.89 0.49 0.12 153502.0 42.19 74.32 89.42 94.69 98.22 99.24 99.66 99.90 0.76 0.34 0.10
15 2025202608 Apr 2025 to Mar 2026 (Period 08) Heathrow Express 11896.0 39.24 69.30 87.00 93.37 97.73 98.97 99.46 99.73 1.03 0.54 0.27 153747.0 41.99 73.99 89.23 94.57 98.16 99.20 99.63 99.88 0.80 0.37 0.12
15 2025202609 Apr 2025 to Mar 2026 (Period 09) Heathrow Express 11098.0 43.29 73.00 88.44 94.06 98.22 99.32 99.71 99.91 0.68 0.29 0.09 154574.0 42.45 74.43 89.50 94.71 98.21 99.23 99.63 99.88 0.77 0.37 0.12
15 2025202610 Apr 2025 to Mar 2026 (Period 10) Heathrow Express 12338.0 46.94 78.95 91.20 95.42 98.40 99.22 99.49 99.79 0.78 0.51 0.21 155539.0 42.62 74.45 89.39 94.62 98.16 99.20 99.61 99.87 0.80 0.39 0.13
15 2025202611 Apr 2025 to Mar 2026 (Period 11) Heathrow Express 11753.0 46.06 77.21 91.14 95.35 98.40 99.16 99.43 99.78 0.84 0.57 0.22 155292.0 43.01 74.82 89.65 94.76 98.20 99.22 99.60 99.86 0.78 0.40 0.14
15 2025202612 Apr 2025 to Mar 2026 (Period 12) Heathrow Express 12264.0 45.23 77.22 92.02 96.30 99.16 99.71 99.92 100.00 0.29 0.08 0.00 155742.0 43.45 75.41 90.12 95.06 98.35 99.30 99.64 99.88 0.70 0.36 0.12
15 2025202613 Apr 2025 to Mar 2026 (Period 13) Heathrow Express 13402.0 44.83 78.20 92.83 96.78 98.98 99.57 99.76 99.92 0.43 0.24 0.08 156453.0 43.73 75.86 90.44 95.23 98.38 99.30 99.63 99.88 0.70 0.37 0.12
15 2026202701 Apr 2026 to Mar 2027 (Period 01) Heathrow Express 13576.0 44.53 77.09 90.95 95.19 97.93 98.87 99.27 99.70 1.13 0.73 0.30 159517.0 43.92 76.11 90.57 95.23 98.32 99.25 99.59 99.86 0.75 0.41 0.14
15 2026202702 Apr 2026 to Mar 2027 (Period 02) Heathrow Express 12194.0 46.51 77.42 90.46 94.73 97.64 98.91 99.49 99.73 1.09 0.51 0.27 159739.0 44.02 76.13 90.46 95.13 98.23 99.20 99.57 99.84 0.80 0.43 0.16
16 2014201501 Apr 2014 to Mar 2015 (Period 01) Hull Trains 2267.0 25.58 55.23 76.05 88.00 95.68 98.19 99.51 99.74 1.81 0.49 0.26 2267.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201502 Apr 2014 to Mar 2015 (Period 02) Hull Trains 2502.0 27.82 57.83 76.98 86.41 93.80 96.68 97.80 98.56 3.32 2.20 1.44 4769.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201503 Apr 2014 to Mar 2015 (Period 03) Hull Trains 2428.0 18.99 47.65 69.73 82.08 91.68 94.36 95.84 97.57 5.64 4.16 2.43 7197.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201504 Apr 2014 to Mar 2015 (Period 04) Hull Trains 2512.0 20.14 49.60 70.26 80.61 91.36 94.98 96.22 97.33 5.02 3.78 2.67 9709.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201505 Apr 2014 to Mar 2015 (Period 05) Hull Trains 2479.0 25.49 54.13 70.88 79.79 90.12 94.07 96.17 98.43 5.93 3.83 1.57 12188.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201506 Apr 2014 to Mar 2015 (Period 06) Hull Trains 2324.0 32.01 61.75 78.36 87.48 93.72 96.43 97.76 99.10 3.57 2.24 0.90 14512.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201507 Apr 2014 to Mar 2015 (Period 07) Hull Trains 2390.0 29.37 60.92 77.49 84.98 92.76 95.48 97.11 98.49 4.52 2.89 1.51 16902.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201508 Apr 2014 to Mar 2015 (Period 08) Hull Trains 2515.0 19.48 44.06 63.86 76.86 88.83 93.56 96.54 99.20 6.44 3.46 0.80 19417.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201509 Apr 2014 to Mar 2015 (Period 09) Hull Trains 2478.0 20.42 47.05 66.34 77.80 89.95 93.99 95.72 97.05 6.01 4.28 2.95 21895.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201510 Apr 2014 to Mar 2015 (Period 10) Hull Trains 2131.0 23.84 51.43 70.86 81.60 92.63 95.78 97.84 99.11 4.22 2.16 0.89 24026.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201511 Apr 2014 to Mar 2015 (Period 11) Hull Trains 2471.0 26.31 58.32 80.78 90.00 96.48 98.26 98.66 99.19 1.74 1.34 0.81 26497.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201512 Apr 2014 to Mar 2015 (Period 12) Hull Trains 2461.0 30.35 61.48 80.62 87.04 93.62 96.42 97.48 98.46 3.58 2.52 1.54 28958.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2014201513 Apr 2014 to Mar 2015 (Period 13) Hull Trains 2651.0 27.61 57.30 76.16 84.35 92.83 95.85 96.57 98.04 4.15 3.43 1.96 31609.0 25.16 54.35 73.70 83.58 92.54 95.68 97.14 98.46 4.32 2.86 1.54
16 2015201601 Apr 2015 to Mar 2016 (Period 01) Hull Trains 2855.0 28.34 56.92 76.22 85.39 94.29 96.32 97.76 98.74 3.68 2.24 1.26 32197.0 25.42 54.51 73.76 83.43 92.48 95.56 97.03 98.40 4.44 2.97 1.60
16 2015201602 Apr 2015 to Mar 2016 (Period 02) Hull Trains 2519.0 24.34 55.58 75.03 85.35 93.13 96.19 97.66 98.53 3.81 2.34 1.47 32214.0 25.14 54.34 73.61 83.35 92.43 95.52 97.02 98.40 4.48 2.98 1.60
16 2015201603 Apr 2015 to Mar 2016 (Period 03) Hull Trains 2572.0 29.39 60.42 80.83 88.26 94.67 97.01 97.67 99.11 2.99 2.33 0.89 32358.0 25.94 55.32 74.48 83.83 92.66 95.72 97.16 98.51 4.28 2.84 1.49
16 2015201604 Apr 2015 to Mar 2016 (Period 04) Hull Trains 2554.0 28.15 60.34 81.36 87.39 93.58 96.40 97.34 99.06 3.60 2.66 0.94 32400.0 26.57 56.16 75.35 84.36 92.83 95.83 97.25 98.65 4.17 2.75 1.35
16 2015201605 Apr 2015 to Mar 2016 (Period 05) Hull Trains 2512.0 24.44 55.81 77.11 86.23 92.71 94.15 95.66 97.21 5.85 4.34 2.79 32433.0 26.49 56.29 75.82 84.86 93.03 95.84 97.21 98.55 4.16 2.79 1.45
16 2015201606 Apr 2015 to Mar 2016 (Period 06) Hull Trains 2530.0 23.79 53.20 72.92 85.97 93.91 96.01 96.92 98.10 3.99 3.08 1.90 32639.0 25.88 55.66 75.42 84.76 93.05 95.81 97.14 98.48 4.19 2.86 1.52
16 2015201607 Apr 2015 to Mar 2016 (Period 07) Hull Trains 2531.0 19.44 47.65 71.08 82.22 92.14 94.67 96.09 97.47 5.33 3.91 2.53 32780.0 25.13 54.66 74.93 84.55 93.00 95.74 97.07 98.40 4.26 2.93 1.60
16 2015201608 Apr 2015 to Mar 2016 (Period 08) Hull Trains 2509.0 14.67 39.94 62.57 75.25 88.28 92.43 95.46 97.81 7.57 4.54 2.19 32774.0 24.76 54.34 74.84 84.42 92.96 95.66 96.98 98.29 4.34 3.02 1.71
16 2015201609 Apr 2015 to Mar 2016 (Period 09) Hull Trains 2517.0 12.51 36.83 59.20 74.73 89.39 95.43 96.94 97.97 4.57 3.06 2.03 32813.0 24.15 53.55 74.28 84.18 92.91 95.77 97.07 98.36 4.23 2.93 1.64
16 2015201610 Apr 2015 to Mar 2016 (Period 10) Hull Trains 2079.0 15.97 43.87 65.80 78.55 90.48 93.65 95.29 97.50 6.35 4.71 2.50 32761.0 23.65 53.08 73.96 83.99 92.78 95.63 96.91 98.26 4.37 3.09 1.74
16 2015201611 Apr 2015 to Mar 2016 (Period 11) Hull Trains 2482.0 16.92 44.84 68.41 78.97 88.88 93.27 95.53 97.54 6.73 4.47 2.46 32772.0 22.94 52.06 73.03 83.16 92.20 95.26 96.67 98.14 4.74 3.33 1.86
16 2015201612 Apr 2015 to Mar 2016 (Period 12) Hull Trains 2576.0 17.59 46.66 68.67 79.58 90.76 93.44 94.99 96.93 6.56 5.01 3.07 32887.0 21.97 50.93 72.12 82.59 91.98 95.03 96.48 98.02 4.97 3.52 1.98
16 2015201613 Apr 2015 to Mar 2016 (Period 13) Hull Trains 2299.0 26.92 56.89 78.08 86.86 94.65 97.00 97.61 98.48 3.00 2.39 1.52 32535.0 21.86 50.83 72.21 82.74 92.10 95.10 96.55 98.05 4.90 3.45 1.95
16 2016201701 Apr 2016 to Mar 2017 (Period 01) Hull Trains 2756.0 22.21 53.52 76.71 86.28 94.48 96.63 97.71 98.73 3.37 2.29 1.27 32436.0 21.32 50.52 72.24 82.81 92.11 95.12 96.55 98.05 4.88 3.45 1.95
16 2016201702 Apr 2016 to Mar 2017 (Period 02) Hull Trains 2551.0 18.70 49.98 73.77 84.67 92.75 96.32 97.02 97.73 3.68 2.98 2.27 32468.0 20.88 50.09 72.14 82.76 92.08 95.13 96.50 97.98 4.87 3.50 2.02
16 2016201703 Apr 2016 to Mar 2017 (Period 03) Hull Trains 2501.0 13.43 41.42 65.77 75.29 86.57 89.60 91.52 93.28 10.40 8.48 6.72 32397.0 19.63 48.60 70.96 81.75 91.45 94.56 96.02 97.53 5.44 3.98 2.47
16 2016201704 Apr 2016 to Mar 2017 (Period 04) Hull Trains 2550.0 16.51 44.39 67.41 79.88 90.94 94.78 96.08 97.41 5.22 3.92 2.59 32393.0 18.71 47.34 69.86 81.16 91.25 94.43 95.92 97.40 5.57 4.08 2.60
16 2016201705 Apr 2016 to Mar 2017 (Period 05) Hull Trains 2580.0 15.16 42.98 67.87 80.81 93.18 96.55 97.67 98.18 3.45 2.33 1.82 32461.0 17.98 46.34 69.14 80.74 91.28 94.62 96.08 97.48 5.38 3.92 2.52
16 2016201706 Apr 2016 to Mar 2017 (Period 06) Hull Trains 2474.0 12.25 38.88 60.59 73.00 86.01 91.43 94.18 96.12 8.57 5.82 3.88 32405.0 17.09 45.24 68.20 79.74 90.68 94.27 95.87 97.32 5.73 4.13 2.68
16 2016201707 Apr 2016 to Mar 2017 (Period 07) Hull Trains 2548.0 16.56 44.62 68.17 79.71 90.35 94.03 95.49 96.74 5.97 4.51 3.26 32422.0 16.87 45.00 67.97 79.54 90.54 94.22 95.82 97.27 5.78 4.18 2.73
16 2016201708 Apr 2016 to Mar 2017 (Period 08) Hull Trains 2522.0 13.76 39.97 63.08 77.64 91.08 95.00 96.47 98.18 5.00 3.53 1.82 32435.0 16.80 45.00 68.01 79.73 90.75 94.42 95.90 97.30 5.58 4.10 2.70
16 2016201709 Apr 2016 to Mar 2017 (Period 09) Hull Trains 2455.0 10.47 34.83 56.37 69.33 85.58 90.43 93.44 96.70 9.57 6.56 3.30 32373.0 16.65 44.86 67.81 79.33 90.47 94.04 95.64 97.20 5.96 4.36 2.80
16 2016201710 Apr 2016 to Mar 2017 (Period 10) Hull Trains 2303.0 16.89 44.59 68.43 79.68 90.19 94.01 95.40 97.39 5.99 4.60 2.61 32597.0 16.71 44.91 67.98 79.40 90.45 94.06 95.64 97.19 5.94 4.36 2.81
16 2016201711 Apr 2016 to Mar 2017 (Period 11) Hull Trains 2414.0 19.10 49.46 72.78 82.56 90.02 92.79 94.24 95.98 7.21 5.76 4.02 32529.0 16.87 45.25 68.31 79.67 90.53 94.02 95.55 97.08 5.98 4.45 2.92
16 2016201712 Apr 2016 to Mar 2017 (Period 12) Hull Trains 2490.0 13.78 40.72 62.41 76.14 88.07 92.69 94.74 96.63 7.31 5.26 3.37 32443.0 16.58 44.79 67.82 79.40 90.33 93.97 95.53 97.05 6.03 4.47 2.95
16 2016201713 Apr 2016 to Mar 2017 (Period 13) Hull Trains 2492.0 15.53 46.11 71.31 81.86 91.41 95.59 96.95 97.95 4.41 3.05 2.05 32636.0 15.77 44.04 67.37 79.07 90.11 93.88 95.49 97.02 6.12 4.51 2.98
16 2017201801 Apr 2017 to Mar 2018 (Period 01) Hull Trains 2645.0 14.25 42.68 69.45 81.85 91.27 94.22 95.31 97.16 5.78 4.69 2.84 32525.0 15.10 43.13 66.75 78.68 89.83 93.67 95.29 96.89 6.33 4.71 3.11
16 2017201802 Apr 2017 to Mar 2018 (Period 02) Hull Trains 2533.0 15.32 43.03 68.57 79.59 91.20 94.87 97.20 98.50 5.13 2.80 1.50 32507.0 14.83 42.58 66.34 78.28 89.71 93.56 95.30 96.95 6.44 4.70 3.05
16 2017201803 Apr 2017 to Mar 2018 (Period 03) Hull Trains 2557.0 14.47 42.63 66.56 79.08 90.61 93.86 95.42 98.08 6.14 4.58 1.92 32563.0 14.91 42.67 66.40 78.57 90.02 93.89 95.60 97.32 6.11 4.40 2.68
16 2017201804 Apr 2017 to Mar 2018 (Period 04) Hull Trains 2567.0 14.53 43.47 69.58 81.18 92.05 96.42 98.09 98.83 3.58 1.91 1.17 32580.0 14.76 42.60 66.57 78.68 90.11 94.01 95.76 97.43 5.99 4.24 2.57
16 2017201805 Apr 2017 to Mar 2018 (Period 05) Hull Trains 2579.0 11.36 38.74 62.82 75.73 89.34 95.08 97.40 99.11 4.92 2.60 0.89 32579.0 14.46 42.27 66.17 78.27 89.80 93.90 95.74 97.50 6.10 4.26 2.50
16 2017201806 Apr 2017 to Mar 2018 (Period 06) Hull Trains 2556.0 9.47 35.02 61.50 75.31 88.46 94.41 97.26 99.22 5.59 2.74 0.78 32661.0 14.23 41.96 66.23 78.44 89.98 94.12 95.97 97.74 5.88 4.03 2.26
16 2017201807 Apr 2017 to Mar 2018 (Period 07) Hull Trains 2628.0 14.08 41.48 67.47 80.78 90.87 94.06 96.16 97.34 5.94 3.84 2.66 32741.0 14.04 41.71 66.17 78.53 90.03 94.13 96.03 97.79 5.87 3.97 2.21
16 2017201808 Apr 2017 to Mar 2018 (Period 08) Hull Trains 2371.0 12.74 37.96 60.69 74.82 87.35 92.37 94.64 97.55 7.63 5.36 2.45 32590.0 13.97 41.57 66.01 78.33 89.75 93.93 95.89 97.74 6.07 4.11 2.26
16 2017201809 Apr 2017 to Mar 2018 (Period 09) Hull Trains 2341.0 12.56 37.04 60.66 74.84 86.97 92.31 94.36 96.24 7.69 5.64 3.76 32476.0 14.13 41.75 66.36 78.76 89.87 94.08 95.97 97.71 5.92 4.03 2.29
16 2017201810 Apr 2017 to Mar 2018 (Period 10) Hull Trains 2242.0 13.51 38.98 62.27 73.68 87.24 92.02 94.20 96.48 7.98 5.80 3.52 32415.0 13.89 41.36 65.93 78.34 89.66 93.94 95.88 97.65 6.06 4.12 2.35
16 2017201811 Apr 2017 to Mar 2018 (Period 11) Hull Trains 2405.0 7.40 30.02 51.48 66.74 82.45 88.73 91.89 95.80 11.27 8.11 4.20 32406.0 13.02 39.92 64.34 77.17 89.10 93.64 95.71 97.64 6.36 4.29 2.36
16 2017201812 Apr 2017 to Mar 2018 (Period 12) Hull Trains 2308.0 10.27 34.62 53.99 65.94 80.29 87.74 90.12 93.46 12.26 9.88 6.54 32224.0 12.77 39.47 63.75 76.44 88.55 93.29 95.39 97.41 6.71 4.61 2.59
16 2017201813 Apr 2017 to Mar 2018 (Period 13) Hull Trains 1455.0 12.23 36.08 54.91 67.84 84.12 90.31 93.26 96.01 9.69 6.74 3.99 31187.0 12.52 38.79 62.73 75.61 88.11 92.97 95.16 97.31 7.03 4.84 2.69
16 2018201901 Apr 2018 to Mar 2019 (Period 01) Hull Trains 2402.0 14.57 43.34 64.36 74.73 88.47 92.71 94.88 96.63 7.29 5.12 3.37 30944.0 12.53 38.81 62.29 75.01 87.87 92.84 95.13 97.27 7.16 4.87 2.73
16 2018201902 Apr 2018 to Mar 2019 (Period 02) Hull Trains 2318.0 11.17 38.14 59.15 72.04 86.71 92.28 95.25 97.58 7.72 4.75 2.42 30729.0 12.20 38.41 61.53 74.41 87.51 92.63 94.97 97.19 7.37 5.03 2.81
16 2018201903 Apr 2018 to Mar 2019 (Period 03) Hull Trains 2318.0 12.17 36.24 59.28 72.65 89.39 93.66 95.13 97.50 6.34 4.87 2.50 30490.0 12.01 37.89 60.94 73.88 87.39 92.61 94.94 97.14 7.39 5.06 2.86
16 2018201904 Apr 2018 to Mar 2019 (Period 04) Hull Trains 2480.0 11.45 33.55 55.16 68.79 85.89 92.42 95.44 97.58 7.58 4.56 2.42 30403.0 11.75 37.06 59.74 72.85 86.88 92.27 94.71 97.03 7.73 5.29 2.97
16 2018201905 Apr 2018 to Mar 2019 (Period 05) Hull Trains 2455.0 6.60 25.91 47.05 59.55 78.94 88.31 94.79 98.41 11.69 5.21 1.59 30279.0 11.36 36.02 58.45 71.52 86.02 91.71 94.49 96.96 8.29 5.51 3.04
16 2018201906 Apr 2018 to Mar 2019 (Period 06) Hull Trains 2599.0 13.08 37.59 59.68 72.91 88.73 93.96 96.31 98.50 6.04 3.69 1.50 30322.0 11.67 36.23 58.29 71.32 86.05 91.68 94.41 96.91 8.32 5.59 3.09
16 2018201907 Apr 2018 to Mar 2019 (Period 07) Hull Trains 1887.0 10.70 33.55 55.70 69.32 84.05 91.15 94.44 96.98 8.85 5.56 3.02 29581.0 11.40 35.60 57.31 70.36 85.49 91.43 94.26 96.87 8.57 5.74 3.13
16 2018201908 Apr 2018 to Mar 2019 (Period 08) Hull Trains 1506.0 7.30 29.15 51.66 65.94 83.13 90.11 92.96 97.21 9.89 7.04 2.79 28716.0 11.07 35.06 56.74 69.76 85.22 91.28 94.16 96.83 8.72 5.84 3.17
16 2018201909 Apr 2018 to Mar 2019 (Period 09) Hull Trains 1864.0 5.42 24.41 43.29 57.30 77.58 86.75 93.13 96.62 13.25 6.87 3.38 28239.0 10.57 34.20 55.53 68.51 84.57 90.90 94.08 96.87 9.10 5.92 3.13
16 2018201910 Apr 2018 to Mar 2019 (Period 10) Hull Trains 2213.0 10.66 31.99 53.95 67.24 86.99 92.63 95.44 97.74 7.37 4.56 2.26 28210.0 10.35 33.64 54.87 68.00 84.54 90.95 94.17 96.97 9.05 5.83 3.03
16 2018201911 Apr 2018 to Mar 2019 (Period 11) Hull Trains 2692.0 12.52 35.40 56.43 69.99 85.48 91.60 93.50 95.65 8.40 6.50 4.35 28497.0 10.80 34.12 55.30 68.29 84.81 91.20 94.30 96.94 8.80 5.70 3.06
16 2018201912 Apr 2018 to Mar 2019 (Period 12) Hull Trains 2927.0 15.78 38.74 64.40 75.67 88.93 93.37 94.67 97.61 6.63 5.33 2.39 29116.0 11.34 34.54 56.32 69.22 85.58 91.69 94.67 97.29 8.31 5.33 2.71
16 2018201913 Apr 2018 to Mar 2019 (Period 13) Hull Trains 2911.0 16.18 40.85 63.17 74.96 86.40 92.03 94.50 96.91 7.97 5.50 3.09 30572.0 11.76 35.07 57.04 69.84 85.73 91.79 94.72 97.31 8.21 5.28 2.69
16 2019202001 Apr 2019 to Mar 2020 (Period 01) Hull Trains 2804.0 20.44 47.86 73.75 83.27 92.58 95.97 97.15 98.97 4.03 2.85 1.03 2804.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202002 Apr 2019 to Mar 2020 (Period 02) Hull Trains 2799.0 19.19 45.09 70.70 81.03 90.21 93.50 95.32 97.36 6.50 4.68 2.64 5603.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202003 Apr 2019 to Mar 2020 (Period 03) Hull Trains 2629.0 15.37 40.13 64.40 75.69 88.09 92.66 95.13 97.22 7.34 4.87 2.78 8232.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202004 Apr 2019 to Mar 2020 (Period 04) Hull Trains 2680.0 17.31 43.99 67.09 77.61 88.47 93.17 95.71 97.54 6.83 4.29 2.46 10912.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202005 Apr 2019 to Mar 2020 (Period 05) Hull Trains 2439.0 14.88 41.78 65.60 76.67 87.00 91.31 93.77 97.09 8.69 6.23 2.91 13351.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202006 Apr 2019 to Mar 2020 (Period 06) Hull Trains 2740.0 16.24 42.92 65.69 76.86 89.23 92.74 95.95 98.47 7.26 4.05 1.53 16091.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202007 Apr 2019 to Mar 2020 (Period 07) Hull Trains 2964.0 16.67 42.75 65.92 77.26 89.57 93.76 96.32 98.85 6.24 3.68 1.15 19055.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202008 Apr 2019 to Mar 2020 (Period 08) Hull Trains 2730.0 10.77 33.15 55.71 67.95 83.41 90.48 94.65 97.11 9.52 5.35 2.89 21785.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202009 Apr 2019 to Mar 2020 (Period 09) Hull Trains 2963.0 10.33 31.29 50.59 63.18 81.17 89.20 94.09 97.91 10.80 5.91 2.09 24748.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202010 Apr 2019 to Mar 2020 (Period 10) Hull Trains 2734.0 17.45 38.33 60.97 75.13 89.14 94.04 96.31 97.92 5.96 3.69 2.08 27482.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202011 Apr 2019 to Mar 2020 (Period 11) Hull Trains 2738.0 20.49 44.78 67.09 77.47 89.55 94.56 96.46 97.81 5.44 3.54 2.19 30220.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202012 Apr 2019 to Mar 2020 (Period 12) Hull Trains 2844.0 18.32 40.37 65.65 77.39 89.06 92.09 94.02 96.73 7.91 5.98 3.27 33064.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
16 2019202013 Apr 2019 to Mar 2020 (Period 13) Hull Trains 2255.0 25.76 50.86 75.79 85.50 94.59 97.83 98.67 99.42 2.17 1.33 0.58 35319.0 17.04 41.62 65.10 76.36 88.53 93.11 95.63 97.87 6.89 4.37 2.13
16 2020202101 Apr 2020 to Mar 2021 (Period 01) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 32515.0 16.75 41.09 64.35 75.77 88.18 92.86 95.49 97.77 7.14 4.51 2.23
16 2020202102 Apr 2020 to Mar 2021 (Period 02) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 29716.0 16.52 40.71 63.75 75.27 87.99 92.81 95.51 97.81 7.19 4.49 2.19
16 2020202103 Apr 2020 to Mar 2021 (Period 03) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 27087.0 16.64 40.76 63.69 75.23 87.98 92.82 95.55 97.87 7.18 4.45 2.13
16 2020202104 Apr 2020 to Mar 2021 (Period 04) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 24407.0 16.56 40.41 63.32 74.97 87.92 92.78 95.53 97.91 7.22 4.47 2.09
16 2020202105 Apr 2020 to Mar 2021 (Period 05) Hull Trains 51.0 35.29 58.82 78.43 84.31 84.31 84.31 84.31 90.20 15.69 15.69 9.80 22019.0 16.79 40.30 63.10 74.80 88.01 92.92 95.70 97.98 7.08 4.30 2.02
16 2020202106 Apr 2020 to Mar 2021 (Period 06) Hull Trains 937.0 29.35 50.91 74.71 82.50 89.65 92.85 94.98 97.87 7.15 5.02 2.13 20216.0 17.45 40.44 63.29 74.88 87.93 92.95 95.63 97.91 7.05 4.37 2.09
16 2020202107 Apr 2020 to Mar 2021 (Period 07) Hull Trains 1076.0 31.41 55.76 82.06 92.10 95.07 96.10 97.68 98.23 3.90 2.32 1.77 18328.0 18.39 40.96 63.96 75.50 88.08 93.00 95.64 97.77 7.00 4.36 2.23
16 2020202108 Apr 2020 to Mar 2021 (Period 08) Hull Trains 684.0 31.73 55.99 78.80 89.62 94.74 97.22 97.81 99.42 2.78 2.19 0.58 16282.0 20.23 42.91 65.97 77.36 89.14 93.60 95.90 97.95 6.40 4.10 2.05
16 2020202109 Apr 2020 to Mar 2021 (Period 09) Hull Trains 396.0 27.53 52.78 78.03 88.64 92.42 97.98 99.49 99.75 2.02 0.51 0.25 13715.0 22.58 45.70 69.64 80.75 90.96 94.68 96.39 98.02 5.32 3.61 1.98
16 2020202110 Apr 2020 to Mar 2021 (Period 10) Hull Trains 1028.0 34.05 64.01 86.77 93.68 98.15 98.64 98.64 98.64 1.36 1.36 1.36 12009.0 24.73 48.95 73.08 83.14 91.99 95.16 96.60 98.09 4.84 3.40 1.91
16 2020202111 Apr 2020 to Mar 2021 (Period 11) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 9271.0 25.98 50.18 74.85 84.81 92.71 95.34 96.65 98.18 4.66 3.35 1.82
16 2020202112 Apr 2020 to Mar 2021 (Period 12) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 6427.0 29.38 54.52 78.92 88.10 94.32 96.78 97.81 98.82 3.22 2.19 1.18
16 2020202113 Apr 2020 to Mar 2021 (Period 13) Hull Trains 0.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] 4172.0 31.33 56.50 80.61 89.50 94.18 96.21 97.34 98.49 3.79 2.66 1.51
16 2021202201 Apr 2021 to Mar 2022 (Period 01) Hull Trains 636.0 45.28 69.50 85.22 89.15 95.44 96.38 97.48 97.48 3.62 2.52 2.52 4808.0 33.17 58.22 81.22 89.46 94.34 96.24 97.36 98.36 3.76 2.64 1.64
16 2021202202 Apr 2021 to Mar 2022 (Period 02) Hull Trains 1576.0 48.16 72.14 88.52 92.51 96.32 98.03 98.67 98.98 1.97 1.33 1.02 6384.0 36.87 61.65 83.02 90.21 94.83 96.68 97.68 98.51 3.32 2.32 1.49
16 2021202203 Apr 2021 to Mar 2022 (Period 03) Hull Trains 2358.0 43.09 70.48 86.47 91.69 95.42 96.95 97.54 98.30 3.05 2.46 1.70 8742.0 38.55 64.04 83.95 90.61 94.99 96.75 97.64 98.46 3.25 2.36 1.54
16 2021202204 Apr 2021 to Mar 2022 (Period 04) Hull Trains 2605.0 41.42 68.10 85.76 91.90 96.31 98.27 99.08 99.16 1.73 0.92 0.84 11347.0 39.21 64.97 84.37 90.91 95.29 97.10 97.97 98.62 2.90 2.03 1.38
16 2021202205 Apr 2021 to Mar 2022 (Period 05) Hull Trains 2671.0 41.41 69.30 86.78 91.65 95.54 96.89 97.75 98.99 3.11 2.25 1.01 13967.0 39.64 65.82 84.85 91.07 95.38 97.11 97.98 98.72 2.89 2.02 1.28
16 2021202206 Apr 2021 to Mar 2022 (Period 06) Hull Trains 2615.0 36.25 63.33 79.08 83.82 89.52 92.24 94.38 96.86 7.76 5.62 3.14 15645.0 39.69 66.30 84.49 90.37 94.75 96.55 97.56 98.46 3.45 2.44 1.54
16 2021202207 Apr 2021 to Mar 2022 (Period 07) Hull Trains 2670.0 37.15 62.92 84.16 90.97 96.40 97.94 98.73 99.03 2.06 1.27 0.97 17239.0 39.82 66.43 84.59 90.36 94.98 96.79 97.73 98.56 3.21 2.27 1.44
16 2021202208 Apr 2021 to Mar 2022 (Period 08) Hull Trains 2650.0 29.02 51.36 74.68 83.47 91.25 95.06 95.92 96.64 4.94 4.08 3.36 19205.0 38.61 64.72 83.43 89.44 94.48 96.54 97.48 98.27 3.46 2.52 1.73
16 2021202209 Apr 2021 to Mar 2022 (Period 09) Hull Trains 2438.0 15.87 35.32 56.69 70.84 88.68 94.54 96.55 98.11 5.46 3.45 1.89 21247.0 36.21 61.57 80.46 87.32 93.85 96.28 97.34 98.22 3.72 2.66 1.78
16 2021202210 Apr 2021 to Mar 2022 (Period 10) Hull Trains 2486.0 26.95 51.45 73.77 81.98 90.10 92.84 95.41 96.42 7.16 4.59 3.58 22705.0 35.30 60.35 79.45 86.44 93.24 95.80 97.07 98.00 4.20 2.93 2.00
16 2021202211 Apr 2021 to Mar 2022 (Period 11) Hull Trains 2066.0 31.32 57.55 79.48 87.46 93.22 95.69 97.19 97.92 4.31 2.81 2.08 24771.0 34.96 60.12 79.45 86.53 93.24 95.79 97.08 98.00 4.21 2.92 2.00
16 2021202212 Apr 2021 to Mar 2022 (Period 12) Hull Trains 2765.0 33.09 57.72 77.58 85.64 92.66 93.96 94.76 96.93 6.04 5.24 3.07 27536.0 34.78 59.88 79.26 86.44 93.18 95.61 96.84 97.89 4.39 3.16 2.11
16 2021202213 Apr 2021 to Mar 2022 (Period 13) Hull Trains 2554.0 36.69 62.45 82.03 88.65 94.21 96.28 97.61 98.04 3.72 2.39 1.96 30090.0 34.94 60.10 79.49 86.63 93.27 95.66 96.91 97.90 4.34 3.09 2.10
16 2022202301 Apr 2022 to Mar 2023 (Period 01) Hull Trains 3103.0 39.22 68.10 85.85 91.43 96.17 98.29 98.97 99.45 1.71 1.03 0.55 32557.0 35.14 60.68 79.99 87.04 93.50 95.90 97.09 98.06 4.10 2.91 1.94
16 2022202302 Apr 2022 to Mar 2023 (Period 02) Hull Trains 3042.0 36.65 63.45 83.79 90.60 94.35 96.19 97.04 98.22 3.81 2.96 1.78 34023.0 34.68 60.39 79.93 87.10 93.45 95.83 97.02 98.03 4.17 2.98 1.97
16 2022202303 Apr 2022 to Mar 2023 (Period 03) Hull Trains 2809.0 35.10 62.66 82.84 89.14 94.30 97.33 98.11 99.07 2.67 1.89 0.93 34474.0 34.14 59.89 79.72 86.95 93.38 95.87 97.07 98.10 4.13 2.93 1.90
16 2022202304 Apr 2022 to Mar 2023 (Period 04) Hull Trains 2485.0 26.12 50.99 72.31 81.37 90.87 93.84 95.69 97.10 6.16 4.31 2.90 34354.0 33.00 58.62 78.73 86.17 92.98 95.54 96.82 97.94 4.46 3.18 2.06
16 2022202305 Apr 2022 to Mar 2023 (Period 05) Hull Trains 2442.0 26.21 51.88 74.65 81.98 88.41 91.44 92.83 95.66 8.56 7.17 4.34 34125.0 31.86 57.30 77.81 85.44 92.45 95.14 96.46 97.70 4.86 3.54 2.30
16 2022202306 Apr 2022 to Mar 2023 (Period 06) Hull Trains 3065.0 29.46 55.43 76.74 85.22 92.20 94.68 95.89 96.87 5.32 4.11 3.13 34575.0 31.31 56.68 77.62 85.55 92.65 95.32 96.57 97.69 4.68 3.43 2.31
16 2022202307 Apr 2022 to Mar 2023 (Period 07) Hull Trains 2851.0 27.25 53.42 76.92 86.78 94.07 96.49 97.54 98.67 3.51 2.46 1.33 34756.0 30.53 55.93 77.06 85.23 92.48 95.22 96.48 97.67 4.78 3.52 2.33
16 2022202308 Apr 2022 to Mar 2023 (Period 08) Hull Trains 2974.0 17.62 39.07 61.70 75.18 88.97 94.18 95.83 97.51 5.82 4.17 2.49 35080.0 29.55 54.85 75.94 84.51 92.27 95.14 96.47 97.73 4.86 3.53 2.27
16 2022202309 Apr 2022 to Mar 2023 (Period 09) Hull Trains 2888.0 13.61 34.80 59.56 71.95 85.87 92.59 95.67 97.71 7.41 4.33 2.29 35530.0 29.20 54.56 75.92 84.43 92.00 94.98 96.40 97.70 5.02 3.60 2.30
16 2022202310 Apr 2022 to Mar 2023 (Period 10) Hull Trains 2082.0 20.46 42.41 64.36 74.74 86.55 91.69 94.57 97.21 8.31 5.43 2.79 35126.0 28.84 54.06 75.39 84.03 91.81 94.93 96.36 97.77 5.07 3.64 2.23
16 2022202311 Apr 2022 to Mar 2023 (Period 11) Hull Trains 3050.0 24.56 49.38 74.00 84.10 93.11 97.11 97.87 98.36 2.89 2.13 1.64 36110.0 28.33 53.46 75.04 83.84 91.84 95.07 96.44 97.81 4.93 3.56 2.19
16 2022202312 Apr 2022 to Mar 2023 (Period 12) Hull Trains 2998.0 30.49 57.71 80.42 89.29 95.90 97.97 99.03 99.63 2.03 0.97 0.37 36343.0 28.15 53.49 75.29 84.15 92.11 95.40 96.78 98.02 4.60 3.22 1.98
16 2022202313 Apr 2022 to Mar 2023 (Period 13) Hull Trains 3075.0 30.93 55.87 76.42 83.58 90.76 93.37 95.38 97.72 6.63 4.62 2.28 36864.0 27.79 53.07 74.92 83.79 91.86 95.17 96.61 98.00 4.83 3.39 2.00
16 2023202401 Apr 2023 to Mar 2024 (Period 01) Hull Trains 3236.0 28.21 53.31 76.76 85.44 91.75 95.06 96.85 99.01 4.94 3.15 0.99 36997.0 26.87 51.83 74.16 83.30 91.49 94.89 96.43 97.96 5.11 3.57 2.04
16 2023202402 Apr 2023 to Mar 2024 (Period 02) Hull Trains 2950.0 28.75 55.22 75.12 84.14 90.81 94.41 96.03 97.90 5.59 3.97 2.10 36905.0 26.21 51.14 73.45 82.76 91.20 94.75 96.35 97.94 5.25 3.65 2.06
16 2023202403 Apr 2023 to Mar 2024 (Period 03) Hull Trains 3066.0 26.06 51.30 71.95 80.30 88.78 92.30 94.32 97.06 7.70 5.68 2.94 37162.0 25.53 50.29 72.61 82.08 90.76 94.35 96.05 97.78 5.65 3.95 2.22
16 2023202404 Apr 2023 to Mar 2024 (Period 04) Hull Trains 3014.0 30.42 57.00 79.10 86.40 93.30 96.22 97.38 98.77 3.78 2.62 1.23 37691.0 25.88 50.78 73.15 82.47 90.96 94.53 96.18 97.90 5.47 3.82 2.10
16 2023202405 Apr 2023 to Mar 2024 (Period 05) Hull Trains 3169.0 31.46 57.84 77.41 84.25 91.42 94.19 95.52 97.32 5.81 4.48 2.68 38418.0 26.32 51.29 73.41 82.65 91.16 94.70 96.34 98.00 5.30 3.66 2.00
16 2023202406 Apr 2023 to Mar 2024 (Period 06) Hull Trains 3076.0 29.78 55.59 75.75 83.36 90.73 94.90 96.75 98.96 5.10 3.25 1.04 38429.0 26.34 51.30 73.33 82.50 91.04 94.72 96.40 98.17 5.28 3.60 1.83
16 2023202407 Apr 2023 to Mar 2024 (Period 07) Hull Trains 3161.0 26.32 50.78 71.88 81.52 89.43 94.12 95.60 97.53 5.88 4.40 2.47 38739.0 26.28 51.10 72.94 82.10 90.69 94.54 96.25 98.08 5.46 3.75 1.92
16 2023202408 Apr 2023 to Mar 2024 (Period 08) Hull Trains 3099.0 20.39 43.95 66.89 78.35 90.96 94.61 96.71 98.06 5.39 3.29 1.94 38864.0 26.47 51.45 73.32 82.33 90.84 94.57 96.32 98.12 5.43 3.68 1.88
16 2023202409 Apr 2023 to Mar 2024 (Period 09) Hull Trains 3015.0 18.01 38.01 59.90 71.74 85.57 91.11 93.67 96.55 8.89 6.33 3.45 38991.0 26.77 51.65 73.30 82.28 90.80 94.45 96.17 98.03 5.55 3.83 1.97
16 2023202410 Apr 2023 to Mar 2024 (Period 10) Hull Trains 2626.0 20.83 42.54 63.94 72.85 83.17 89.49 93.34 94.86 10.51 6.66 5.14 39535.0 26.71 51.53 73.15 82.05 90.52 94.27 96.06 97.86 5.73 3.94 2.14
16 2023202411 Apr 2023 to Mar 2024 (Period 11) Hull Trains 2911.0 23.77 48.23 73.03 82.65 91.55 95.26 96.60 98.18 4.74 3.40 1.82 39396.0 26.65 51.45 73.08 81.94 90.39 94.12 95.96 97.84 5.88 4.04 2.16
16 2023202412 Apr 2023 to Mar 2024 (Period 12) Hull Trains 2637.0 21.43 46.38 69.09 78.84 88.21 93.25 95.71 97.88 6.75 4.29 2.12 39035.0 26.01 50.63 72.25 81.17 89.82 93.77 95.71 97.71 6.23 4.29 2.29
16 2023202413 Apr 2023 to Mar 2024 (Period 13) Hull Trains 3249.0 27.12 52.39 72.82 81.44 91.04 94.61 96.52 97.91 5.39 3.48 2.09 39209.0 25.71 50.36 71.97 81.00 89.85 93.87 95.80 97.73 6.13 4.20 2.27
16 2024202501 Apr 2024 to Mar 2025 (Period 01) Hull Trains 3007.0 31.29 56.47 78.15 85.43 93.05 97.04 98.54 99.20 2.96 1.46 0.80 38980.0 25.94 50.59 72.04 80.97 89.94 94.01 95.93 97.73 5.99 4.07 2.27
16 2024202502 Apr 2024 to Mar 2025 (Period 02) Hull Trains 2997.0 30.06 56.19 75.11 82.85 91.19 94.56 96.33 98.10 5.44 3.67 1.90 39027.0 26.04 50.67 72.05 80.88 89.97 94.03 95.95 97.75 5.97 4.05 2.25
16 2024202503 Apr 2024 to Mar 2025 (Period 03) Hull Trains 3139.0 30.77 56.71 76.94 84.20 90.83 93.28 94.49 96.85 6.72 5.51 3.15 39100.0 26.42 51.10 72.45 81.19 90.13 94.10 95.96 97.73 5.90 4.04 2.27
16 2024202504 Apr 2024 to Mar 2025 (Period 04) Hull Trains 3147.0 29.01 54.21 73.66 81.54 89.10 93.10 95.01 96.03 6.90 4.99 3.97 39233.0 26.32 50.90 72.03 80.82 89.80 93.86 95.77 97.51 6.14 4.23 2.49
16 2024202505 Apr 2024 to Mar 2025 (Period 05) Hull Trains 3103.0 26.62 51.40 71.93 80.76 87.66 91.69 93.23 95.23 8.31 6.77 4.77 39167.0 25.93 50.38 71.59 80.53 89.50 93.66 95.59 97.35 6.34 4.41 2.65
16 2024202506 Apr 2024 to Mar 2025 (Period 06) Hull Trains 3061.0 27.96 54.36 74.98 82.65 90.40 94.02 95.20 98.20 5.98 4.80 1.80 39152.0 25.78 50.28 71.53 80.48 89.48 93.59 95.47 97.29 6.41 4.53 2.71
16 2024202507 Apr 2024 to Mar 2025 (Period 07) Hull Trains 2933.0 25.84 49.74 70.06 78.86 86.84 91.58 93.73 96.39 8.42 6.27 3.61 38924.0 25.75 50.20 71.39 80.27 89.28 93.40 95.33 97.20 6.60 4.67 2.80
16 2024202508 Apr 2024 to Mar 2025 (Period 08) Hull Trains 2929.0 22.33 46.40 68.18 79.72 90.44 94.16 96.45 97.78 5.84 3.55 2.22 38754.0 25.91 50.41 71.51 80.38 89.23 93.36 95.30 97.17 6.64 4.70 2.83
16 2024202509 Apr 2024 to Mar 2025 (Period 09) Hull Trains 2745.0 17.78 37.63 58.91 71.11 83.53 90.24 93.55 95.85 9.76 6.45 4.15 38484.0 25.95 50.47 71.52 80.40 89.11 93.31 95.31 97.13 6.69 4.69 2.87
16 2024202510 Apr 2024 to Mar 2025 (Period 10) Hull Trains 2785.0 22.76 45.64 67.58 77.52 87.76 92.85 95.22 97.31 7.15 4.78 2.69 38643.0 26.07 50.66 71.75 80.71 89.42 93.54 95.44 97.30 6.46 4.56 2.70
16 2024202511 Apr 2024 to Mar 2025 (Period 11) Hull Trains 2803.0 20.91 43.06 63.72 72.60 83.27 88.90 91.87 94.08 11.10 8.13 5.92 38535.0 25.87 50.29 71.07 79.97 88.81 93.07 95.09 96.99 6.93 4.91 3.01
16 2024202512 Apr 2024 to Mar 2025 (Period 12) Hull Trains 3023.0 26.30 51.01 70.59 78.17 87.30 91.70 94.11 95.77 8.30 5.89 4.23 38921.0 26.20 50.62 71.16 79.91 88.74 92.95 94.97 96.84 7.05 5.03 3.16
16 2024202513 Apr 2024 to Mar 2025 (Period 13) Hull Trains 3228.0 30.55 58.02 77.82 86.28 92.53 95.85 97.46 98.95 4.15 2.54 1.05 38900.0 26.49 51.08 71.58 80.31 88.86 93.05 95.05 96.93 6.95 4.95 3.07
16 2025202601 Apr 2025 to Mar 2026 (Period 01) Hull Trains 2678.0 28.75 54.89 75.09 83.20 89.88 92.61 93.58 95.89 7.39 6.42 4.11 38571.0 26.27 50.93 71.31 80.11 88.60 92.71 94.67 96.68 7.29 5.33 3.32
16 2025202602 Apr 2025 to Mar 2026 (Period 02) Hull Trains 2791.0 26.59 52.88 74.70 83.38 90.76 93.69 95.06 97.17 6.31 4.94 2.83 38365.0 26.00 50.66 71.26 80.13 88.56 92.64 94.57 96.60 7.36 5.43 3.40
16 2025202603 Apr 2025 to Mar 2026 (Period 03) Hull Trains 2427.0 23.16 48.13 68.36 76.51 86.28 91.80 94.19 96.54 8.20 5.81 3.46 37653.0 25.42 49.99 70.60 79.56 88.22 92.53 94.55 96.58 7.47 5.45 3.42
16 2025202604 Apr 2025 to Mar 2026 (Period 04) Hull Trains 2182.0 25.53 48.40 69.02 77.50 87.49 90.60 92.67 96.15 9.40 7.33 3.85 36688.0 25.11 49.53 70.24 79.27 88.10 92.37 94.40 96.60 7.63 5.60 3.40
16 2025202605 Apr 2025 to Mar 2026 (Period 05) Hull Trains 2610.0 26.13 49.96 70.19 77.78 85.29 90.08 92.18 94.94 9.92 7.82 5.06 36195.0 25.06 49.40 70.10 79.03 87.94 92.26 94.34 96.60 7.74 5.66 3.40
16 2025202606 Apr 2025 to Mar 2026 (Period 06) Hull Trains 3043.0 24.29 49.10 73.87 83.21 91.59 95.00 96.58 98.26 5.00 3.42 1.74 36177.0 24.75 48.96 70.00 79.08 88.04 92.34 94.46 96.60 7.66 5.54 3.40
16 2025202607 Apr 2025 to Mar 2026 (Period 07) Hull Trains 3068.0 22.03 46.19 71.45 81.62 90.48 94.13 95.99 99.48 5.87 4.01 0.52 36312.0 24.43 48.66 70.12 79.31 88.34 92.56 94.65 96.86 7.44 5.35 3.14
16 2025202608 Apr 2025 to Mar 2026 (Period 08) Hull Trains 3138.0 19.09 40.98 64.82 76.70 87.99 92.51 95.00 97.61 7.49 5.00 2.39 36521.0 24.14 48.18 69.82 79.05 88.14 92.42 94.53 96.85 7.58 5.47 3.15
16 2025202609 Apr 2025 to Mar 2026 (Period 09) Hull Trains 2886.0 15.42 35.59 60.60 72.73 85.55 91.79 94.39 96.50 8.21 5.61 3.50 36662.0 23.93 47.98 69.91 79.15 88.28 92.54 94.59 96.90 7.46 5.41 3.10
16 2025202610 Apr 2025 to Mar 2026 (Period 10) Hull Trains 2812.0 21.05 43.56 68.07 81.37 92.32 95.31 96.30 98.12 4.69 3.70 1.88 36689.0 23.80 47.82 69.94 79.44 88.63 92.73 94.68 96.96 7.27 5.32 3.04
16 2025202611 Apr 2025 to Mar 2026 (Period 11) Hull Trains 2998.0 22.41 46.80 70.85 81.39 90.76 94.73 96.50 98.23 5.27 3.50 1.77 36884.0 23.90 48.10 70.49 80.12 89.21 93.18 95.04 97.28 6.82 4.96 2.72
16 2025202612 Apr 2025 to Mar 2026 (Period 12) Hull Trains 2702.0 20.43 44.34 69.62 80.94 89.97 93.34 95.41 97.89 6.66 4.59 2.11 36563.0 23.45 47.58 70.42 80.34 89.43 93.31 95.14 97.45 6.69 4.86 2.55
16 2025202613 Apr 2025 to Mar 2026 (Period 13) Hull Trains 3441.0 26.27 51.76 75.79 84.66 91.60 93.58 95.03 96.66 6.42 4.97 3.34 36776.0 23.09 47.06 70.27 80.22 89.36 93.12 94.93 97.25 6.88 5.07 2.75
16 2026202701 Apr 2026 to Mar 2027 (Period 01) Hull Trains 3580.0 24.75 49.27 73.63 83.58 89.80 92.43 93.69 95.87 7.57 6.31 4.13 37678.0 22.85 46.71 70.25 80.33 89.36 93.09 94.91 97.21 6.91 5.09 2.79
16 2026202702 Apr 2026 to Mar 2027 (Period 02) Hull Trains 3175.0 23.40 44.79 68.13 77.80 87.78 91.40 93.45 94.83 8.60 6.55 5.17 38062.0 22.62 46.10 69.74 79.90 89.13 92.90 94.77 97.02 7.10 5.23 2.98
17 2014201501 Apr 2014 to Mar 2015 (Period 01) London North Eastern Railway 27787.0 32.31 55.22 77.50 87.15 94.98 97.30 98.34 99.13 2.70 1.66 0.87 27787.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201502 Apr 2014 to Mar 2015 (Period 02) London North Eastern Railway 30233.0 37.00 59.97 78.73 87.23 94.91 97.08 98.04 99.14 2.92 1.96 0.86 58020.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201503 Apr 2014 to Mar 2015 (Period 03) London North Eastern Railway 29974.0 32.73 54.40 73.95 84.09 93.75 96.70 97.87 98.90 3.30 2.13 1.10 87994.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201504 Apr 2014 to Mar 2015 (Period 04) London North Eastern Railway 30509.0 33.10 54.47 74.55 84.28 93.42 96.41 97.88 98.88 3.59 2.12 1.12 118503.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201505 Apr 2014 to Mar 2015 (Period 05) London North Eastern Railway 30019.0 29.24 49.43 69.58 80.19 91.57 95.46 97.16 98.55 4.54 2.84 1.45 148522.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201506 Apr 2014 to Mar 2015 (Period 06) London North Eastern Railway 30090.0 32.69 53.41 73.67 83.63 92.83 96.12 97.50 98.53 3.88 2.50 1.47 178612.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201507 Apr 2014 to Mar 2015 (Period 07) London North Eastern Railway 29985.0 30.76 52.36 73.46 83.51 93.15 96.05 97.41 98.52 3.95 2.59 1.48 208597.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201508 Apr 2014 to Mar 2015 (Period 08) London North Eastern Railway 29749.0 23.48 41.92 62.61 75.21 89.39 94.50 96.59 98.55 5.50 3.41 1.45 238346.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201509 Apr 2014 to Mar 2015 (Period 09) London North Eastern Railway 30131.0 27.14 46.16 65.40 76.19 87.96 92.71 95.26 97.46 7.29 4.74 2.54 268477.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201510 Apr 2014 to Mar 2015 (Period 10) London North Eastern Railway 26454.0 26.11 44.69 63.94 74.80 86.92 91.27 93.99 96.41 8.73 6.01 3.59 294931.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201511 Apr 2014 to Mar 2015 (Period 11) London North Eastern Railway 30405.0 36.13 58.40 77.35 86.03 94.35 96.89 97.94 98.93 3.11 2.06 1.07 325336.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201512 Apr 2014 to Mar 2015 (Period 12) London North Eastern Railway 30180.0 39.14 61.32 80.01 87.89 95.44 97.54 98.43 99.32 2.46 1.57 0.68 355516.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2014201513 Apr 2014 to Mar 2015 (Period 13) London North Eastern Railway 33209.0 35.63 57.73 75.85 84.61 93.45 96.41 97.68 98.89 3.59 2.32 1.11 388725.0 32.06 53.16 72.91 82.75 92.52 95.77 97.27 98.58 4.23 2.73 1.42
17 2015201601 Apr 2015 to Mar 2016 (Period 01) London North Eastern Railway 34458.0 33.80 56.67 76.21 85.14 93.74 96.63 97.97 98.99 3.37 2.03 1.01 395396.0 32.19 53.32 72.88 82.65 92.46 95.73 97.25 98.57 4.27 2.75 1.43
17 2015201602 Apr 2015 to Mar 2016 (Period 02) London North Eastern Railway 29907.0 34.37 55.58 74.47 84.01 93.07 96.20 97.67 98.98 3.80 2.33 1.02 395070.0 31.99 52.98 72.55 82.41 92.31 95.67 97.22 98.56 4.33 2.78 1.44
17 2015201603 Apr 2015 to Mar 2016 (Period 03) London North Eastern Railway 30546.0 37.54 59.68 77.97 85.95 93.19 95.55 96.78 98.22 4.45 3.22 1.78 395642.0 32.36 53.39 72.86 82.55 92.27 95.58 97.14 98.51 4.42 2.86 1.49
17 2015201604 Apr 2015 to Mar 2016 (Period 04) London North Eastern Railway 30072.0 32.04 52.49 71.28 81.27 91.45 94.67 96.33 98.21 5.33 3.67 1.79 395205.0 32.28 53.24 72.61 82.32 92.12 95.45 97.02 98.46 4.55 2.98 1.54
17 2015201605 Apr 2015 to Mar 2016 (Period 05) London North Eastern Railway 30221.0 34.97 56.82 75.24 84.03 92.39 94.94 96.33 97.92 5.06 3.67 2.08 395407.0 32.71 53.80 73.04 82.61 92.18 95.41 96.96 98.41 4.59 3.04 1.59
17 2015201606 Apr 2015 to Mar 2016 (Period 06) London North Eastern Railway 29986.0 35.80 56.90 75.95 84.58 92.37 95.23 96.70 97.94 4.77 3.30 2.06 395303.0 32.95 54.07 73.22 82.69 92.15 95.34 96.90 98.36 4.66 3.10 1.64
17 2015201607 Apr 2015 to Mar 2016 (Period 07) London North Eastern Railway 30019.0 31.11 51.64 70.92 80.95 91.18 94.51 96.19 97.68 5.49 3.81 2.32 395337.0 32.98 54.01 73.02 82.49 92.00 95.22 96.81 98.30 4.78 3.19 1.70
17 2015201608 Apr 2015 to Mar 2016 (Period 08) London North Eastern Railway 30244.0 24.26 43.06 62.10 74.11 87.90 93.17 95.72 97.79 6.83 4.28 2.21 395832.0 33.02 54.09 72.97 82.40 91.88 95.12 96.74 98.24 4.88 3.26 1.76
17 2015201609 Apr 2015 to Mar 2016 (Period 09) London North Eastern Railway 29995.0 20.53 37.92 56.76 68.96 83.65 89.56 92.53 95.51 10.44 7.47 4.49 395696.0 32.53 53.46 72.32 81.85 91.56 94.88 96.53 98.09 5.12 3.47 1.91
17 2015201610 Apr 2015 to Mar 2016 (Period 10) London North Eastern Railway 26621.0 25.90 43.82 62.42 73.89 86.86 91.68 94.37 96.95 8.32 5.63 3.05 395863.0 32.51 53.40 72.21 81.79 91.55 94.91 96.56 98.13 5.09 3.44 1.87
17 2015201611 Apr 2015 to Mar 2016 (Period 11) London North Eastern Railway 29800.0 25.72 44.99 65.47 76.13 87.78 91.96 94.51 97.02 8.04 5.49 2.98 395258.0 31.72 52.38 71.31 81.03 91.05 94.53 96.30 97.98 5.47 3.70 2.02
17 2015201612 Apr 2015 to Mar 2016 (Period 12) London North Eastern Railway 30452.0 27.20 46.82 67.46 78.95 90.50 94.40 96.28 97.98 5.60 3.72 2.02 395530.0 30.80 51.27 70.35 80.35 90.67 94.29 96.13 97.88 5.71 3.87 2.12
17 2015201613 Apr 2015 to Mar 2016 (Period 13) London North Eastern Railway 27789.0 34.36 56.83 74.83 83.85 92.41 94.87 96.20 97.41 5.13 3.80 2.59 390110.0 30.65 51.12 70.20 80.24 90.56 94.15 96.01 97.76 5.85 3.99 2.24
17 2016201701 Apr 2016 to Mar 2017 (Period 01) London North Eastern Railway 32163.0 34.18 55.22 73.77 82.83 91.78 94.68 96.31 97.85 5.32 3.69 2.15 387815.0 30.66 50.97 69.96 80.02 90.38 93.98 95.86 97.66 6.02 4.14 2.34
17 2016201702 Apr 2016 to Mar 2017 (Period 02) London North Eastern Railway 30665.0 34.29 56.98 76.04 84.83 92.93 95.74 97.10 98.32 4.26 2.90 1.68 388573.0 30.66 51.09 70.10 80.09 90.38 93.95 95.81 97.61 6.05 4.19 2.39
17 2016201703 Apr 2016 to Mar 2017 (Period 03) London North Eastern Railway 30033.0 26.73 47.42 66.95 77.64 88.22 91.81 93.69 95.89 8.19 6.31 4.11 388060.0 29.81 50.13 69.23 79.44 89.99 93.65 95.57 97.43 6.35 4.43 2.57
17 2016201704 Apr 2016 to Mar 2017 (Period 04) London North Eastern Railway 30696.0 28.76 49.86 68.77 78.62 89.10 92.86 94.59 96.77 7.14 5.41 3.23 388684.0 29.56 49.92 69.04 79.23 89.80 93.51 95.44 97.32 6.49 4.56 2.68
17 2016201705 Apr 2016 to Mar 2017 (Period 05) London North Eastern Railway 30619.0 30.32 51.41 70.64 80.58 90.40 93.88 95.90 97.77 6.12 4.10 2.23 389082.0 29.20 49.50 68.68 78.96 89.65 93.43 95.40 97.31 6.57 4.60 2.69
17 2016201706 Apr 2016 to Mar 2017 (Period 06) London North Eastern Railway 29683.0 27.01 47.18 66.13 76.24 86.62 90.68 92.91 95.45 9.32 7.09 4.55 388779.0 28.52 48.76 67.93 78.32 89.21 93.08 95.11 97.12 6.92 4.89 2.88
17 2016201707 Apr 2016 to Mar 2017 (Period 07) London North Eastern Railway 29993.0 24.85 45.21 65.82 76.98 88.41 92.58 94.94 97.31 7.42 5.06 2.69 388753.0 28.04 48.26 67.53 78.02 88.99 92.93 95.02 97.09 7.07 4.98 2.91
17 2016201708 Apr 2016 to Mar 2017 (Period 08) London North Eastern Railway 30448.0 22.93 42.57 63.39 75.00 87.87 92.68 95.28 97.84 7.32 4.72 2.16 388957.0 27.93 48.22 67.63 78.08 88.99 92.90 94.98 97.09 7.10 5.02 2.91
17 2016201709 Apr 2016 to Mar 2017 (Period 09) London North Eastern Railway 30527.0 19.17 37.00 56.15 68.48 83.96 90.30 93.47 96.62 9.70 6.53 3.38 389489.0 27.82 48.13 67.57 78.03 89.01 92.95 95.05 97.18 7.05 4.95 2.82
17 2016201710 Apr 2016 to Mar 2017 (Period 10) London North Eastern Railway 28282.0 26.09 46.14 65.74 76.17 87.50 92.12 94.80 97.49 7.88 5.20 2.51 391150.0 27.82 48.28 67.79 78.18 89.04 92.97 95.08 97.21 7.03 4.92 2.79
17 2016201711 Apr 2016 to Mar 2017 (Period 11) London North Eastern Railway 31024.0 32.26 54.58 74.14 82.87 90.76 94.06 95.89 97.64 5.94 4.11 2.36 392374.0 28.33 49.03 68.46 78.71 89.28 93.14 95.19 97.26 6.86 4.81 2.74
17 2016201712 Apr 2016 to Mar 2017 (Period 12) London North Eastern Railway 30172.0 31.08 53.82 74.30 83.73 92.21 94.84 96.08 97.35 5.16 3.92 2.65 392094.0 28.63 49.57 68.99 79.08 89.41 93.17 95.17 97.21 6.83 4.83 2.79
17 2016201713 Apr 2016 to Mar 2017 (Period 13) London North Eastern Railway 30121.0 31.69 53.89 74.00 83.15 92.28 95.28 96.79 97.99 4.72 3.21 2.01 394426.0 28.46 49.39 68.96 79.05 89.41 93.21 95.22 97.26 6.79 4.78 2.74
17 2017201801 Apr 2017 to Mar 2018 (Period 01) London North Eastern Railway 31491.0 33.71 55.65 75.92 85.06 92.70 94.91 96.02 97.39 5.09 3.98 2.61 393754.0 28.42 49.41 69.13 79.22 89.48 93.23 95.20 97.22 6.77 4.80 2.78
17 2017201802 Apr 2017 to Mar 2018 (Period 02) London North Eastern Railway 31243.0 32.04 53.85 74.36 84.01 93.04 96.12 97.59 98.73 3.88 2.41 1.27 394332.0 28.25 49.17 69.00 79.17 89.50 93.26 95.24 97.25 6.74 4.76 2.75
17 2017201803 Apr 2017 to Mar 2018 (Period 03) London North Eastern Railway 31438.0 28.82 50.51 70.63 80.57 91.00 94.91 96.77 98.51 5.09 3.23 1.49 395737.0 28.41 49.41 69.29 79.39 89.71 93.50 95.48 97.46 6.50 4.52 2.54
17 2017201804 Apr 2017 to Mar 2018 (Period 04) London North Eastern Railway 31977.0 28.95 51.22 72.68 82.91 92.78 95.78 97.12 98.51 4.22 2.88 1.49 397018.0 28.42 49.52 69.60 79.74 90.01 93.73 95.68 97.60 6.27 4.32 2.40
17 2017201805 Apr 2017 to Mar 2018 (Period 05) London North Eastern Railway 31785.0 29.55 51.47 71.86 81.89 91.74 94.99 96.61 98.26 5.01 3.39 1.74 398184.0 28.37 49.54 69.70 79.84 90.12 93.82 95.74 97.64 6.18 4.26 2.36
17 2017201806 Apr 2017 to Mar 2018 (Period 06) London North Eastern Railway 31622.0 30.39 52.69 72.62 81.84 91.60 94.88 96.54 98.27 5.12 3.46 1.73 400123.0 28.63 49.96 70.20 80.27 90.49 94.14 96.01 97.85 5.86 3.99 2.15
17 2017201807 Apr 2017 to Mar 2018 (Period 07) London North Eastern Railway 30946.0 25.43 46.46 67.38 78.76 90.04 93.59 95.59 97.40 6.41 4.41 2.60 401076.0 28.66 50.04 70.31 80.40 90.62 94.21 96.06 97.85 5.79 3.94 2.15
17 2017201808 Apr 2017 to Mar 2018 (Period 08) London North Eastern Railway 30298.0 19.57 38.37 59.09 71.25 85.32 90.57 93.45 96.18 9.43 6.55 3.82 400926.0 28.41 49.73 69.99 80.12 90.42 94.06 95.92 97.73 5.94 4.08 2.27
17 2017201809 Apr 2017 to Mar 2018 (Period 09) London North Eastern Railway 30186.0 19.71 39.07 60.03 72.64 86.30 91.56 94.46 96.99 8.44 5.54 3.01 400585.0 28.46 49.90 70.29 80.44 90.61 94.15 96.00 97.76 5.85 4.00 2.24
17 2017201810 Apr 2017 to Mar 2018 (Period 10) London North Eastern Railway 28980.0 21.00 39.68 59.63 71.50 85.45 90.53 93.59 96.56 9.47 6.41 3.44 401283.0 28.09 49.42 69.84 80.10 90.45 94.04 95.91 97.69 5.96 4.09 2.31
17 2017201811 Apr 2017 to Mar 2018 (Period 11) London North Eastern Railway 31556.0 22.16 41.34 61.59 73.06 85.64 90.87 93.51 96.43 9.13 6.49 3.57 401815.0 27.30 48.39 68.86 79.33 90.05 93.79 95.72 97.59 6.21 4.28 2.41
17 2017201812 Apr 2017 to Mar 2018 (Period 12) London North Eastern Railway 29230.0 19.32 37.54 56.98 68.75 82.59 88.54 91.59 95.22 11.46 8.41 4.78 400873.0 26.43 47.19 67.59 78.23 89.34 93.32 95.39 97.44 6.68 4.61 2.56
17 2017201813 Apr 2017 to Mar 2018 (Period 13) London North Eastern Railway 31258.0 18.85 36.74 57.60 70.15 85.66 91.70 94.71 97.74 8.30 5.29 2.26 402010.0 25.45 45.88 66.33 77.23 88.84 93.05 95.24 97.42 6.95 4.76 2.58
17 2018201901 Apr 2018 to Mar 2019 (Period 01) London North Eastern Railway 31776.0 21.88 40.97 61.83 74.02 87.34 92.07 94.34 96.80 7.93 5.66 3.20 402295.0 24.52 44.72 65.22 76.36 88.42 92.83 95.10 97.38 7.17 4.90 2.62
17 2018201902 Apr 2018 to Mar 2019 (Period 02) London North Eastern Railway 32200.0 21.32 39.64 59.59 70.89 85.12 90.57 93.45 96.36 9.43 6.55 3.64 403252.0 23.68 43.61 64.06 75.33 87.79 92.39 94.78 97.19 7.61 5.22 2.81
17 2018201903 Apr 2018 to Mar 2019 (Period 03) London North Eastern Railway 31953.0 22.31 40.66 60.04 72.01 86.58 91.94 94.73 97.13 8.06 5.27 2.87 403767.0 23.17 42.84 63.23 74.66 87.45 92.16 94.62 97.08 7.84 5.38 2.92
17 2018201904 Apr 2018 to Mar 2019 (Period 04) London North Eastern Railway 32181.0 17.86 34.87 52.89 65.19 81.62 89.25 93.50 96.94 10.75 6.50 3.06 403971.0 22.29 41.54 61.66 73.26 86.56 91.64 94.33 96.96 8.36 5.67 3.04
17 2018201905 Apr 2018 to Mar 2019 (Period 05) London North Eastern Railway 31334.0 17.43 33.72 51.44 63.60 79.81 86.91 90.83 94.89 13.09 9.17 5.11 403520.0 21.34 40.15 60.06 71.83 85.63 91.01 93.88 96.70 8.99 6.12 3.30
17 2018201906 Apr 2018 to Mar 2019 (Period 06) London North Eastern Railway 32035.0 22.23 41.70 62.67 74.91 89.12 94.15 96.59 98.55 5.85 3.41 1.45 403933.0 20.71 39.29 59.29 71.29 85.44 90.96 93.89 96.72 9.04 6.11 3.28
17 2018201907 Apr 2018 to Mar 2019 (Period 07) London North Eastern Railway 30128.0 18.55 34.81 53.40 65.80 81.89 88.63 92.36 95.90 11.37 7.64 4.10 403115.0 20.18 38.41 58.23 70.30 84.82 90.58 93.64 96.61 9.42 6.36 3.39
17 2018201908 Apr 2018 to Mar 2019 (Period 08) London North Eastern Railway 31146.0 17.23 33.69 52.63 66.58 84.09 91.57 95.01 97.68 8.43 4.99 2.32 403963.0 20.00 38.05 57.73 69.95 84.73 90.66 93.76 96.72 9.34 6.24 3.28
17 2018201909 Apr 2018 to Mar 2019 (Period 09) London North Eastern Railway 30156.0 15.17 31.81 50.47 63.51 81.28 89.24 93.34 96.80 10.76 6.66 3.20 403933.0 19.66 37.50 57.02 69.26 84.35 90.49 93.68 96.71 9.51 6.32 3.29
17 2018201910 Apr 2018 to Mar 2019 (Period 10) London North Eastern Railway 28749.0 24.41 43.66 63.51 75.56 89.30 94.18 96.47 98.60 5.82 3.53 1.40 403702.0 19.91 37.79 57.29 69.55 84.63 90.74 93.88 96.85 9.26 6.12 3.15
17 2018201911 Apr 2018 to Mar 2019 (Period 11) London North Eastern Railway 31106.0 25.77 45.49 64.85 75.93 88.84 93.87 96.19 98.01 6.13 3.81 1.99 403252.0 20.18 38.10 57.54 69.77 84.87 90.98 94.09 96.97 9.02 5.91 3.03
17 2018201912 Apr 2018 to Mar 2019 (Period 12) London North Eastern Railway 31686.0 26.52 46.22 66.33 77.79 89.80 93.80 95.77 98.06 6.20 4.23 1.94 405708.0 20.74 38.78 58.26 70.47 85.42 91.37 94.40 97.18 8.63 5.60 2.82
17 2018201913 Apr 2018 to Mar 2019 (Period 13) London North Eastern Railway 31920.0 25.99 44.34 62.96 74.04 86.18 90.88 93.68 96.79 9.12 6.32 3.21 406370.0 21.30 39.37 58.68 70.77 85.46 91.31 94.32 97.11 8.69 5.68 2.89
17 2019202001 Apr 2019 to Mar 2020 (Period 01) London North Eastern Railway 30853.0 27.67 47.11 66.95 78.26 90.30 94.20 96.34 98.43 5.80 3.66 1.57 30853.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202002 Apr 2019 to Mar 2020 (Period 02) London North Eastern Railway 31991.0 26.77 46.40 66.44 77.87 89.65 93.72 95.72 97.69 6.28 4.28 2.31 62844.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202003 Apr 2019 to Mar 2020 (Period 03) London North Eastern Railway 31155.0 27.49 45.92 64.71 75.80 87.02 91.27 93.64 96.15 8.73 6.36 3.85 93999.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202004 Apr 2019 to Mar 2020 (Period 04) London North Eastern Railway 31127.0 28.42 46.68 66.21 77.04 88.09 92.30 94.41 96.60 7.70 5.59 3.40 125126.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202005 Apr 2019 to Mar 2020 (Period 05) London North Eastern Railway 30828.0 23.42 39.75 58.09 68.88 82.06 88.12 91.38 94.87 11.88 8.62 5.13 155954.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202006 Apr 2019 to Mar 2020 (Period 06) London North Eastern Railway 30952.0 24.15 41.96 62.25 74.24 87.20 92.24 94.29 96.74 7.76 5.71 3.26 186906.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202007 Apr 2019 to Mar 2020 (Period 07) London North Eastern Railway 31675.0 26.66 44.62 63.93 75.76 89.05 93.70 95.80 97.82 6.30 4.20 2.18 218581.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202008 Apr 2019 to Mar 2020 (Period 08) London North Eastern Railway 30213.0 22.69 37.64 54.88 66.63 81.73 88.30 91.96 95.33 11.70 8.04 4.67 248794.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202009 Apr 2019 to Mar 2020 (Period 09) London North Eastern Railway 30868.0 21.00 35.14 51.72 63.21 79.27 87.50 91.87 96.11 12.50 8.13 3.89 279662.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202010 Apr 2019 to Mar 2020 (Period 10) London North Eastern Railway 28909.0 27.22 42.68 59.69 70.09 84.14 90.33 93.43 96.41 9.67 6.57 3.59 308571.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202011 Apr 2019 to Mar 2020 (Period 11) London North Eastern Railway 31020.0 32.39 49.45 67.21 77.58 88.99 93.08 95.33 97.84 6.92 4.67 2.16 339591.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202012 Apr 2019 to Mar 2020 (Period 12) London North Eastern Railway 31585.0 30.69 46.59 63.72 73.55 85.52 90.51 93.26 96.40 9.49 6.74 3.60 371176.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
17 2019202013 Apr 2019 to Mar 2020 (Period 13) London North Eastern Railway 32131.0 45.54 62.50 77.74 85.04 92.50 95.39 96.79 98.27 4.61 3.21 1.73 403307.0 28.08 45.20 63.44 74.23 86.63 91.62 94.19 96.83 8.38 5.81 3.17
17 2020202101 Apr 2020 to Mar 2021 (Period 01) London North Eastern Railway 17239.0 70.50 84.87 93.06 95.56 97.93 98.66 99.07 99.65 1.34 0.93 0.35 389693.0 29.98 46.80 64.47 74.86 86.84 91.73 94.24 96.83 8.27 5.76 3.17
17 2020202102 Apr 2020 to Mar 2021 (Period 02) London North Eastern Railway 18859.0 64.97 79.80 88.72 91.99 95.42 96.88 97.95 98.89 3.12 2.05 1.11 376561.0 32.01 48.49 65.52 75.46 87.03 91.82 94.30 96.86 8.18 5.70 3.14
17 2020202103 Apr 2020 to Mar 2021 (Period 03) London North Eastern Railway 22532.0 70.34 84.82 92.77 95.45 97.79 98.66 99.13 99.68 1.34 0.87 0.32 367938.0 34.74 50.93 67.26 76.66 87.69 92.28 94.65 97.09 7.72 5.35 2.91
17 2020202104 Apr 2020 to Mar 2021 (Period 04) London North Eastern Railway 25210.0 70.73 85.46 93.15 95.57 97.81 98.56 98.96 99.54 1.44 1.04 0.46 362021.0 37.79 53.70 69.15 77.94 88.36 92.72 94.97 97.31 7.28 5.03 2.69
17 2020202105 Apr 2020 to Mar 2021 (Period 05) London North Eastern Railway 26215.0 65.33 80.13 89.20 92.43 95.31 96.55 97.36 98.47 3.45 2.64 1.53 357408.0 41.05 56.84 71.58 79.79 89.42 93.40 95.46 97.60 6.60 4.54 2.40
17 2020202106 Apr 2020 to Mar 2021 (Period 06) London North Eastern Railway 25863.0 66.25 80.44 89.57 93.03 96.50 97.75 98.43 99.21 2.25 1.57 0.79 352319.0 44.38 59.88 73.72 81.24 90.13 93.82 95.78 97.80 6.18 4.22 2.20
17 2020202107 Apr 2020 to Mar 2021 (Period 07) London North Eastern Railway 26051.0 60.66 76.02 87.54 91.84 96.09 97.52 98.25 99.15 2.48 1.75 0.85 346695.0 47.23 62.49 75.65 82.54 90.68 94.11 95.96 97.89 5.89 4.04 2.11
17 2020202108 Apr 2020 to Mar 2021 (Period 08) London North Eastern Railway 27272.0 58.28 74.27 86.64 91.57 96.16 97.64 98.39 99.27 2.36 1.61 0.73 343754.0 50.26 65.61 78.35 84.66 91.90 94.90 96.51 98.23 5.10 3.49 1.77
17 2020202109 Apr 2020 to Mar 2021 (Period 09) London North Eastern Railway 24800.0 56.03 72.46 85.07 90.23 94.76 96.54 97.48 98.59 3.46 2.52 1.41 337686.0 53.36 68.90 81.27 87.03 93.26 95.69 97.00 98.45 4.31 3.00 1.55
17 2020202110 Apr 2020 to Mar 2021 (Period 10) London North Eastern Railway 26014.0 66.12 81.06 89.47 92.79 96.05 97.17 97.71 98.40 2.83 2.29 1.60 334791.0 56.61 72.10 83.77 88.94 94.27 96.27 97.36 98.62 3.73 2.64 1.38
17 2020202111 Apr 2020 to Mar 2021 (Period 11) London North Eastern Railway 24563.0 65.44 78.70 87.75 91.37 95.08 96.92 97.91 98.96 3.08 2.09 1.04 328334.0 59.56 74.74 85.64 90.19 94.83 96.62 97.60 98.72 3.38 2.40 1.28
17 2020202112 Apr 2020 to Mar 2021 (Period 12) London North Eastern Railway 21913.0 61.69 73.68 83.28 87.69 93.14 95.34 96.46 97.84 4.66 3.54 2.16 318662.0 62.56 77.46 87.65 91.67 95.63 97.14 97.95 98.89 2.86 2.05 1.11
17 2020202113 Apr 2020 to Mar 2021 (Period 13) London North Eastern Railway 24383.0 68.24 81.49 90.07 92.90 96.29 97.55 98.31 99.15 2.45 1.69 0.85 310914.0 64.77 79.32 88.86 92.45 96.01 97.35 98.10 98.97 2.65 1.90 1.03
17 2021202201 Apr 2021 to Mar 2022 (Period 01) London North Eastern Railway 31188.0 67.55 81.21 89.95 93.08 96.10 97.46 98.05 98.83 2.54 1.95 1.17 324863.0 64.73 79.20 88.74 92.35 95.91 97.29 98.04 98.93 2.71 1.96 1.07
17 2021202202 Apr 2021 to Mar 2022 (Period 02) London North Eastern Railway 26820.0 65.44 79.15 88.64 92.20 95.43 96.94 97.82 98.77 3.06 2.18 1.23 332824.0 64.77 79.17 88.74 92.35 95.90 97.29 98.03 98.91 2.71 1.97 1.09
17 2021202203 Apr 2021 to Mar 2022 (Period 03) London North Eastern Railway 29402.0 60.97 76.16 86.36 90.88 95.41 97.02 97.92 98.71 2.98 2.08 1.29 339694.0 64.08 78.53 88.26 92.02 95.74 97.17 97.95 98.85 2.83 2.05 1.15
17 2021202204 Apr 2021 to Mar 2022 (Period 04) London North Eastern Railway 31633.0 60.37 75.03 85.65 90.06 94.62 96.38 97.32 98.32 3.62 2.68 1.68 346117.0 63.25 77.71 87.67 91.58 95.48 97.00 97.81 98.75 3.00 2.19 1.25
17 2021202205 Apr 2021 to Mar 2022 (Period 05) London North Eastern Railway 32308.0 58.54 74.04 85.37 89.74 94.04 95.70 96.77 98.26 4.30 3.23 1.74 352210.0 62.66 77.19 87.34 91.35 95.36 96.91 97.75 98.72 3.09 2.25 1.28
17 2021202206 Apr 2021 to Mar 2022 (Period 06) London North Eastern Railway 31601.0 53.93 69.10 80.83 85.86 91.06 93.26 94.60 96.75 6.74 5.40 3.25 357948.0 61.63 76.24 86.61 90.74 94.90 96.53 97.43 98.51 3.47 2.57 1.49
17 2021202207 Apr 2021 to Mar 2022 (Period 07) London North Eastern Railway 29819.0 54.74 70.85 84.12 89.58 94.62 96.52 97.47 98.71 3.48 2.53 1.29 361716.0 61.13 75.81 86.33 90.57 94.79 96.46 97.37 98.48 3.54 2.63 1.52
17 2021202208 Apr 2021 to Mar 2022 (Period 08) London North Eastern Railway 31634.0 48.54 64.30 78.28 84.73 91.33 93.78 95.21 97.22 6.22 4.79 2.78 366078.0 60.26 74.93 85.62 89.99 94.39 96.14 97.11 98.32 3.86 2.89 1.68
17 2021202209 Apr 2021 to Mar 2022 (Period 09) London North Eastern Railway 29050.0 42.39 58.41 74.83 82.93 90.98 94.05 95.71 97.46 5.95 4.29 2.54 370328.0 59.14 73.80 84.81 89.42 94.10 95.95 96.97 98.23 4.05 3.03 1.77
17 2021202210 Apr 2021 to Mar 2022 (Period 10) London North Eastern Railway 29153.0 47.65 63.38 77.43 83.74 90.66 93.42 94.94 96.59 6.58 5.06 3.41 373467.0 57.76 72.48 83.91 88.74 93.69 95.67 96.76 98.09 4.33 3.24 1.91
17 2021202211 Apr 2021 to Mar 2022 (Period 11) London North Eastern Railway 29551.0 54.66 71.45 83.89 88.87 93.80 95.77 96.79 98.10 4.23 3.21 1.90 378455.0 57.02 72.00 83.65 88.58 93.61 95.59 96.69 98.04 4.41 3.31 1.96
17 2021202212 Apr 2021 to Mar 2022 (Period 12) London North Eastern Railway 30401.0 43.48 59.61 74.50 81.44 88.78 91.58 93.38 95.41 8.42 6.62 4.59 386943.0 55.69 70.93 82.96 88.07 93.26 95.29 96.44 97.84 4.71 3.56 2.16
17 2021202213 Apr 2021 to Mar 2022 (Period 13) London North Eastern Railway 30344.0 54.82 71.16 84.24 89.85 95.16 96.66 97.45 98.51 3.34 2.55 1.49 392904.0 54.84 70.29 82.61 87.91 93.22 95.26 96.40 97.81 4.74 3.60 2.19
17 2022202301 Apr 2022 to Mar 2023 (Period 01) London North Eastern Railway 35828.0 51.46 68.19 82.22 88.31 94.40 96.60 97.69 98.76 3.40 2.31 1.24 397544.0 53.54 69.25 82.00 87.54 93.10 95.21 96.39 97.82 4.79 3.61 2.18
17 2022202302 Apr 2022 to Mar 2023 (Period 02) London North Eastern Railway 33873.0 52.84 69.66 82.95 88.60 93.88 95.82 96.76 97.85 4.18 3.24 2.15 404597.0 52.69 68.63 81.64 87.32 93.01 95.14 96.33 97.76 4.86 3.67 2.24
17 2022202303 Apr 2022 to Mar 2023 (Period 03) London North Eastern Railway 30808.0 50.10 66.41 79.62 86.10 92.56 94.98 96.36 97.74 5.02 3.64 2.26 406003.0 51.90 67.91 81.15 86.97 92.80 95.00 96.21 97.69 5.00 3.79 2.31
17 2022202304 Apr 2022 to Mar 2023 (Period 04) London North Eastern Railway 31429.0 46.33 62.37 75.86 82.29 89.31 92.07 93.68 95.63 7.93 6.32 4.37 405799.0 50.81 66.93 80.39 86.37 92.39 94.66 95.93 97.48 5.34 4.07 2.52
17 2022202305 Apr 2022 to Mar 2023 (Period 05) London North Eastern Railway 26802.0 43.92 59.38 72.58 79.08 86.72 89.84 91.99 94.69 10.16 8.01 5.31 400293.0 49.72 65.85 79.46 85.61 91.88 94.25 95.60 97.23 5.75 4.40 2.77
17 2022202306 Apr 2022 to Mar 2023 (Period 06) London North Eastern Railway 32365.0 44.18 61.23 75.84 82.87 90.27 92.94 94.43 96.28 7.06 5.57 3.72 401057.0 48.94 65.22 79.06 85.37 91.81 94.23 95.58 97.19 5.77 4.42 2.81
17 2022202307 Apr 2022 to Mar 2023 (Period 07) London North Eastern Railway 27984.0 43.86 61.01 76.92 84.60 92.25 95.15 96.71 98.28 4.85 3.29 1.72 399222.0 48.15 64.50 78.53 85.00 91.63 94.12 95.52 97.15 5.88 4.48 2.85
17 2022202308 Apr 2022 to Mar 2023 (Period 08) London North Eastern Railway 30358.0 33.97 50.10 66.96 76.31 86.39 90.71 93.16 95.84 9.29 6.84 4.16 397946.0 47.04 63.42 77.67 84.36 91.26 93.89 95.37 97.05 6.11 4.63 2.95
17 2022202309 Apr 2022 to Mar 2023 (Period 09) London North Eastern Railway 29699.0 27.74 42.10 57.93 68.28 82.08 87.50 90.60 94.38 12.50 9.40 5.62 398595.0 45.94 62.20 76.41 83.26 90.59 93.40 94.99 96.82 6.60 5.01 3.18
17 2022202310 Apr 2022 to Mar 2023 (Period 10) London North Eastern Railway 18590.0 29.13 43.88 59.41 68.83 81.65 87.21 90.41 94.55 12.79 9.59 5.45 388032.0 45.01 61.23 75.52 82.53 90.16 93.10 94.77 96.73 6.90 5.23 3.27
17 2022202311 Apr 2022 to Mar 2023 (Period 11) London North Eastern Railway 28762.0 37.06 55.67 73.07 81.84 90.79 93.85 95.59 97.38 6.15 4.41 2.62 387243.0 43.68 60.04 74.70 82.00 89.93 92.95 94.68 96.67 7.05 5.32 3.33
17 2022202312 Apr 2022 to Mar 2023 (Period 12) London North Eastern Railway 31160.0 42.70 61.84 79.17 86.31 92.95 95.20 96.49 98.00 4.80 3.51 2.00 388002.0 43.62 60.22 75.07 82.39 90.26 93.24 94.92 96.87 6.76 5.08 3.13
17 2022202313 Apr 2022 to Mar 2023 (Period 13) London North Eastern Railway 29896.0 41.25 58.70 74.31 81.43 89.23 92.53 94.46 96.62 7.47 5.54 3.38 387554.0 42.56 59.24 74.29 81.73 89.80 92.92 94.69 96.73 7.08 5.31 3.27
17 2023202401 Apr 2023 to Mar 2024 (Period 01) London North Eastern Railway 34256.0 44.27 62.25 78.21 85.32 92.41 94.90 96.23 98.15 5.10 3.77 1.85 385982.0 41.89 58.68 73.91 81.44 89.60 92.75 94.55 96.66 7.25 5.45 3.34
17 2023202402 Apr 2023 to Mar 2024 (Period 02) London North Eastern Railway 30126.0 44.96 62.28 76.57 83.47 90.54 93.18 95.00 96.93 6.82 5.00 3.07 382235.0 41.16 57.99 73.31 80.96 89.30 92.51 94.39 96.58 7.49 5.61 3.42
17 2023202403 Apr 2023 to Mar 2024 (Period 03) London North Eastern Railway 30130.0 40.72 56.66 71.93 79.45 88.31 91.92 94.11 96.82 8.08 5.89 3.18 381557.0 40.40 57.20 72.70 80.43 88.96 92.27 94.21 96.51 7.73 5.79 3.49
17 2023202404 Apr 2023 to Mar 2024 (Period 04) London North Eastern Railway 32049.0 43.51 61.15 77.45 85.19 92.85 95.36 96.84 98.24 4.64 3.16 1.76 382177.0 40.17 57.11 72.83 80.67 89.25 92.54 94.47 96.72 7.46 5.53 3.28
17 2023202405 Apr 2023 to Mar 2024 (Period 05) London North Eastern Railway 32540.0 43.53 60.63 76.18 83.58 91.08 93.97 95.57 97.36 6.03 4.43 2.64 387915.0 40.20 57.25 73.13 81.03 89.58 92.85 94.73 96.92 7.15 5.27 3.08
17 2023202406 Apr 2023 to Mar 2024 (Period 06) London North Eastern Railway 30610.0 42.63 60.34 76.35 84.24 91.93 94.72 96.55 98.44 5.28 3.45 1.56 386160.0 40.05 57.16 73.16 81.13 89.71 92.99 94.90 97.09 7.01 5.10 2.91
17 2023202407 Apr 2023 to Mar 2024 (Period 07) London North Eastern Railway 29912.0 38.67 55.57 70.83 78.42 87.19 91.59 94.09 96.83 8.41 5.91 3.17 388088.0 39.67 56.76 72.71 80.67 89.33 92.73 94.71 96.99 7.27 5.29 3.01
17 2023202408 Apr 2023 to Mar 2024 (Period 08) London North Eastern Railway 29407.0 28.97 43.79 58.89 67.45 79.27 85.61 89.23 93.43 14.39 10.77 6.57 387137.0 39.31 56.30 72.11 80.01 88.80 92.35 94.42 96.81 7.65 5.58 3.19
17 2023202409 Apr 2023 to Mar 2024 (Period 09) London North Eastern Railway 30800.0 32.63 48.98 65.27 74.39 85.25 90.20 92.90 96.25 9.80 7.10 3.75 388238.0 39.66 56.80 72.65 80.46 89.03 92.55 94.59 96.95 7.45 5.41 3.05
17 2023202410 Apr 2023 to Mar 2024 (Period 10) London North Eastern Railway 26410.0 32.98 48.63 63.37 71.72 81.61 86.27 89.14 92.59 13.73 10.86 7.41 396058.0 39.71 56.86 72.66 80.42 88.88 92.38 94.42 96.77 7.62 5.58 3.23
17 2023202411 Apr 2023 to Mar 2024 (Period 11) London North Eastern Railway 29533.0 39.29 56.48 71.68 79.50 88.43 92.40 94.47 97.17 7.60 5.53 2.83 396829.0 39.87 56.92 72.55 80.25 88.71 92.27 94.34 96.76 7.73 5.66 3.24
17 2023202412 Apr 2023 to Mar 2024 (Period 12) London North Eastern Railway 28344.0 38.32 55.79 72.66 81.28 90.77 94.21 96.05 98.05 5.79 3.95 1.95 394013.0 39.54 56.45 72.04 79.85 88.52 92.18 94.29 96.75 7.82 5.71 3.25
17 2023202413 Apr 2023 to Mar 2024 (Period 13) London North Eastern Railway 32765.0 42.91 60.72 76.19 83.63 91.38 94.36 96.19 98.00 5.64 3.81 2.00 396882.0 39.69 56.63 72.21 80.04 88.71 92.33 94.44 96.86 7.67 5.56 3.14
17 2024202501 Apr 2024 to Mar 2025 (Period 01) London North Eastern Railway 30587.0 41.67 59.59 76.12 83.92 92.16 95.24 96.88 98.60 4.76 3.12 1.40 393213.0 39.44 56.37 71.99 79.88 88.65 92.34 94.47 96.89 7.66 5.53 3.11
17 2024202502 Apr 2024 to Mar 2025 (Period 02) London North Eastern Railway 32025.0 42.00 59.76 76.03 82.86 90.38 93.42 94.94 96.79 6.58 5.06 3.21 395112.0 39.23 56.20 71.97 79.85 88.65 92.36 94.47 96.87 7.64 5.53 3.13
17 2024202503 Apr 2024 to Mar 2025 (Period 03) London North Eastern Railway 32950.0 42.18 59.67 75.96 83.56 91.22 94.15 95.89 97.81 5.85 4.11 2.19 397932.0 39.36 56.45 72.30 80.19 88.89 92.54 94.61 96.96 7.46 5.39 3.04
17 2024202504 Apr 2024 to Mar 2025 (Period 04) London North Eastern Railway 32642.0 39.79 56.98 72.23 80.20 89.03 92.41 94.49 96.59 7.59 5.51 3.41 398525.0 39.06 56.12 71.88 79.78 88.58 92.30 94.43 96.82 7.70 5.57 3.18
17 2024202505 Apr 2024 to Mar 2025 (Period 05) London North Eastern Railway 32203.0 39.30 56.83 72.74 80.46 89.10 92.70 94.70 97.13 7.30 5.30 2.87 398188.0 38.72 55.81 71.60 79.53 88.42 92.20 94.35 96.80 7.80 5.65 3.20
17 2024202506 Apr 2024 to Mar 2025 (Period 06) London North Eastern Railway 31075.0 39.18 57.04 73.00 80.65 89.25 92.41 94.38 96.86 7.59 5.62 3.14 398653.0 38.45 55.55 71.35 79.26 88.21 92.02 94.19 96.68 7.98 5.81 3.32
17 2024202507 Apr 2024 to Mar 2025 (Period 07) London North Eastern Railway 30824.0 37.74 55.36 71.86 80.21 89.38 92.71 94.62 96.77 7.29 5.38 3.23 399565.0 38.38 55.54 71.42 79.39 88.38 92.11 94.23 96.68 7.89 5.77 3.32
17 2024202508 Apr 2024 to Mar 2025 (Period 08) London North Eastern Railway 32547.0 38.99 56.97 74.81 83.50 92.38 95.59 97.21 98.73 4.41 2.79 1.27 402705.0 39.12 56.51 72.61 80.60 89.37 92.86 94.83 97.08 7.14 5.17 2.92
17 2024202509 Apr 2024 to Mar 2025 (Period 09) London North Eastern Railway 31998.0 30.56 45.76 61.64 70.61 81.87 86.86 89.72 93.59 13.14 10.28 6.41 403903.0 38.93 56.23 72.30 80.28 89.09 92.59 94.58 96.87 7.41 5.42 3.13
17 2024202510 Apr 2024 to Mar 2025 (Period 10) London North Eastern Railway 31266.0 37.08 54.82 71.23 79.60 88.37 91.94 94.04 96.47 8.06 5.96 3.53 408759.0 39.18 56.62 72.80 80.78 89.52 92.95 94.89 97.11 7.05 5.11 2.89
17 2024202511 Apr 2024 to Mar 2025 (Period 11) London North Eastern Railway 32623.0 36.16 53.67 69.80 78.07 87.09 90.75 93.04 95.45 9.25 6.96 4.55 411849.0 38.93 56.39 72.64 80.66 89.40 92.82 94.77 96.98 7.18 5.23 3.02
17 2024202512 Apr 2024 to Mar 2025 (Period 12) London North Eastern Railway 32679.0 37.43 55.79 73.12 81.76 90.69 93.95 95.73 97.69 6.05 4.27 2.31 416184.0 38.85 56.39 72.68 80.70 89.41 92.81 94.76 96.96 7.19 5.24 3.04
17 2024202513 Apr 2024 to Mar 2025 (Period 13) London North Eastern Railway 35965.0 42.40 61.32 77.46 84.58 91.89 94.61 96.21 98.00 5.39 3.79 2.00 419384.0 38.84 56.47 72.81 80.80 89.47 92.84 94.77 96.97 7.16 5.23 3.03
17 2025202601 Apr 2025 to Mar 2026 (Period 01) London North Eastern Railway 32910.0 39.85 59.26 75.78 83.29 91.32 94.08 95.51 96.96 5.92 4.49 3.04 421707.0 38.71 56.46 72.80 80.77 89.42 92.77 94.68 96.85 7.23 5.32 3.15
17 2025202602 Apr 2025 to Mar 2026 (Period 02) London North Eastern Railway 34810.0 39.16 57.45 73.61 81.36 89.79 93.53 95.64 97.65 6.47 4.36 2.35 424492.0 38.50 56.30 72.63 80.66 89.38 92.78 94.73 96.92 7.22 5.27 3.08
17 2025202603 Apr 2025 to Mar 2026 (Period 03) London North Eastern Railway 35321.0 41.80 60.00 76.44 84.32 93.28 96.03 97.53 98.92 3.97 2.47 1.08 426863.0 38.49 56.34 72.69 80.74 89.56 92.94 94.88 97.02 7.06 5.12 2.98
17 2025202604 Apr 2025 to Mar 2026 (Period 04) London North Eastern Railway 35752.0 39.16 57.45 74.35 82.23 90.42 93.37 95.08 97.09 6.63 4.92 2.91 429973.0 38.45 56.38 72.86 80.91 89.67 93.02 94.92 97.05 6.98 5.08 2.95
17 2025202605 Apr 2025 to Mar 2026 (Period 05) London North Eastern Railway 34631.0 36.59 53.29 68.50 76.19 85.37 89.39 91.90 94.94 10.61 8.10 5.06 432401.0 38.24 56.10 72.52 80.56 89.37 92.75 94.70 96.88 7.25 5.30 3.12
17 2025202606 Apr 2025 to Mar 2026 (Period 06) London North Eastern Railway 35451.0 41.05 59.32 75.75 83.75 92.46 95.40 97.07 98.51 4.60 2.93 1.49 436777.0 38.40 56.30 72.75 80.81 89.63 92.99 94.91 97.01 7.01 5.09 2.99
17 2025202607 Apr 2025 to Mar 2026 (Period 07) London North Eastern Railway 34811.0 39.17 57.28 74.67 82.95 91.50 94.40 96.13 98.01 5.60 3.87 1.99 440764.0 38.50 56.44 72.96 81.02 89.79 93.12 95.03 97.11 6.88 4.97 2.89
17 2025202608 Apr 2025 to Mar 2026 (Period 08) London North Eastern Railway 34526.0 36.64 54.54 72.58 81.70 90.76 94.11 95.83 97.77 5.89 4.17 2.23 442743.0 38.32 56.25 72.79 80.90 89.68 93.02 94.93 97.04 6.98 5.07 2.96
17 2025202609 Apr 2025 to Mar 2026 (Period 09) London North Eastern Railway 33362.0 33.14 50.77 68.73 77.92 88.78 93.09 95.23 97.37 6.91 4.77 2.63 444107.0 38.49 56.60 73.29 81.41 90.17 93.47 95.33 97.31 6.53 4.67 2.69
17 2025202610 Apr 2025 to Mar 2026 (Period 10) London North Eastern Railway 33728.0 32.91 50.29 67.98 77.04 87.06 91.21 93.89 96.67 8.79 6.11 3.33 446569.0 38.17 56.25 73.04 81.21 90.06 93.40 95.31 97.33 6.60 4.69 2.67
17 2025202611 Apr 2025 to Mar 2026 (Period 11) London North Eastern Railway 36498.0 32.85 50.79 69.19 78.05 88.04 92.04 94.30 96.84 7.96 5.70 3.16 450444.0 37.88 55.99 72.96 81.18 90.12 93.48 95.39 97.42 6.52 4.61 2.58
17 2025202612 Apr 2025 to Mar 2026 (Period 12) London North Eastern Railway 35598.0 34.08 52.91 71.12 80.05 89.49 93.22 95.31 97.62 6.78 4.69 2.38 453363.0 37.62 55.76 72.80 81.05 90.02 93.43 95.36 97.42 6.57 4.64 2.58
17 2025202613 Apr 2025 to Mar 2026 (Period 13) London North Eastern Railway 39515.0 37.18 55.38 72.75 80.91 89.27 92.83 94.81 97.25 7.17 5.19 2.75 456913.0 37.20 55.29 72.43 80.76 89.81 93.28 95.25 97.36 6.72 4.75 2.64
17 2026202701 Apr 2026 to Mar 2027 (Period 01) London North Eastern Railway 43637.0 32.77 49.68 66.44 75.23 85.20 89.83 92.58 96.02 10.17 7.42 3.98 467640.0 36.60 54.49 71.64 80.07 89.28 92.91 94.98 97.26 7.09 5.02 2.74
17 2026202702 Apr 2026 to Mar 2027 (Period 02) London North Eastern Railway 37840.0 33.15 50.11 66.20 74.29 83.31 87.57 90.34 93.99 12.43 9.66 6.01 470670.0 36.14 53.92 71.05 79.51 88.76 92.43 94.56 96.97 7.57 5.44 3.03
18 2014201501 Apr 2014 to Mar 2015 (Period 01) London Overground 438712.0 32.28 75.36 94.79 98.25 99.65 99.86 99.94 99.98 0.14 0.06 0.02 438712.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201502 Apr 2014 to Mar 2015 (Period 02) London Overground 435889.0 31.04 72.78 93.29 97.47 99.45 99.83 99.94 99.99 0.17 0.06 0.01 874601.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201503 Apr 2014 to Mar 2015 (Period 03) London Overground 448066.0 32.43 74.91 93.89 97.58 99.42 99.82 99.94 99.99 0.18 0.06 0.01 1322667.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201504 Apr 2014 to Mar 2015 (Period 04) London Overground 464746.0 30.51 72.78 93.66 97.80 99.56 99.88 99.96 99.99 0.12 0.04 0.01 1787413.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201505 Apr 2014 to Mar 2015 (Period 05) London Overground 460765.0 30.93 73.31 93.41 97.26 99.20 99.66 99.84 99.97 0.34 0.16 0.03 2248178.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201506 Apr 2014 to Mar 2015 (Period 06) London Overground 458548.0 31.54 73.00 93.02 97.17 99.22 99.66 99.80 99.95 0.34 0.20 0.05 2706726.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201507 Apr 2014 to Mar 2015 (Period 07) London Overground 449253.0 30.16 71.11 91.93 96.72 99.39 99.78 99.90 99.98 0.22 0.10 0.02 3155979.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201508 Apr 2014 to Mar 2015 (Period 08) London Overground 461523.0 26.98 65.82 89.24 95.42 99.07 99.72 99.89 99.99 0.28 0.11 0.01 3617502.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201509 Apr 2014 to Mar 2015 (Period 09) London Overground 458503.0 26.62 63.34 87.38 94.42 98.87 99.68 99.87 99.95 0.32 0.13 0.05 4076005.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201510 Apr 2014 to Mar 2015 (Period 10) London Overground 429508.0 29.99 70.23 92.01 96.86 99.35 99.78 99.90 99.98 0.22 0.10 0.02 4505513.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201511 Apr 2014 to Mar 2015 (Period 11) London Overground 475120.0 26.65 65.54 88.66 94.94 98.99 99.72 99.90 99.98 0.28 0.10 0.02 4980633.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201512 Apr 2014 to Mar 2015 (Period 12) London Overground 463237.0 25.98 65.85 89.63 95.77 99.15 99.73 99.91 99.98 0.27 0.09 0.02 5443870.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2014201513 Apr 2014 to Mar 2015 (Period 13) London Overground 503430.0 28.44 68.12 90.64 96.05 99.12 99.67 99.86 99.96 0.33 0.14 0.04 5947300.0 29.46 70.10 91.62 96.57 99.26 99.75 99.90 99.98 0.25 0.10 0.02
18 2015201601 Apr 2015 to Mar 2016 (Period 01) London Overground 531722.0 29.44 69.64 91.91 96.81 99.33 99.76 99.89 99.97 0.24 0.11 0.03 6040310.0 29.26 69.67 91.41 96.47 99.24 99.74 99.89 99.98 0.26 0.11 0.02
18 2015201602 Apr 2015 to Mar 2016 (Period 02) London Overground 476578.0 29.12 69.36 91.87 96.71 99.32 99.75 99.90 99.96 0.25 0.10 0.04 6080999.0 29.12 69.43 91.31 96.42 99.23 99.74 99.89 99.97 0.26 0.11 0.03
18 2015201603 Apr 2015 to Mar 2016 (Period 03) London Overground 478520.0 27.53 67.55 90.28 95.75 99.03 99.68 99.87 99.98 0.32 0.13 0.02 6111453.0 28.75 68.88 91.04 96.28 99.20 99.73 99.88 99.97 0.27 0.12 0.03
18 2015201604 Apr 2015 to Mar 2016 (Period 04) London Overground 459848.0 26.80 65.51 89.17 95.11 98.74 99.49 99.78 99.94 0.51 0.22 0.06 6106555.0 28.47 68.33 90.71 96.08 99.14 99.70 99.87 99.97 0.30 0.13 0.03
18 2015201605 Apr 2015 to Mar 2016 (Period 05) London Overground 462943.0 29.83 70.12 92.10 96.84 99.27 99.73 99.88 99.96 0.27 0.12 0.04 6108733.0 28.39 68.09 90.61 96.05 99.14 99.70 99.87 99.97 0.30 0.13 0.03
18 2015201606 Apr 2015 to Mar 2016 (Period 06) London Overground 470724.0 31.36 70.65 92.36 97.18 99.51 99.87 99.94 99.98 0.13 0.06 0.02 6120909.0 28.38 67.92 90.56 96.05 99.16 99.72 99.88 99.97 0.28 0.12 0.03
18 2015201607 Apr 2015 to Mar 2016 (Period 07) London Overground 467964.0 29.12 68.17 90.42 96.05 99.30 99.82 99.96 99.99 0.18 0.04 0.01 6139620.0 28.31 67.70 90.45 96.00 99.16 99.72 99.89 99.97 0.28 0.11 0.03
18 2015201608 Apr 2015 to Mar 2016 (Period 08) London Overground 487832.0 26.74 62.91 87.46 94.48 98.85 99.62 99.82 99.94 0.38 0.18 0.06 6165929.0 28.28 67.46 90.30 95.92 99.14 99.71 99.88 99.97 0.29 0.12 0.03
18 2015201609 Apr 2015 to Mar 2016 (Period 09) London Overground 497516.0 26.53 61.70 86.43 93.92 98.78 99.65 99.88 99.97 0.35 0.12 0.03 6204942.0 28.26 67.31 90.21 95.87 99.13 99.71 99.88 99.97 0.29 0.12 0.03
18 2015201610 Apr 2015 to Mar 2016 (Period 10) London Overground 463808.0 30.75 68.22 90.53 95.88 99.26 99.75 99.90 99.98 0.25 0.10 0.02 6239242.0 28.33 67.17 90.11 95.81 99.13 99.71 99.88 99.97 0.29 0.12 0.03
18 2015201611 Apr 2015 to Mar 2016 (Period 11) London Overground 514073.0 27.85 64.36 88.30 94.63 98.97 99.71 99.90 99.97 0.29 0.10 0.03 6278195.0 28.42 67.07 90.07 95.78 99.12 99.71 99.88 99.97 0.29 0.12 0.03
18 2015201612 Apr 2015 to Mar 2016 (Period 12) London Overground 482596.0 29.19 65.40 89.00 95.56 99.40 99.85 99.94 99.98 0.15 0.06 0.02 6297554.0 28.65 67.03 90.02 95.76 99.14 99.72 99.89 99.97 0.28 0.11 0.03
18 2015201613 Apr 2015 to Mar 2016 (Period 13) London Overground 442589.0 30.73 68.17 90.47 96.01 99.15 99.66 99.85 99.97 0.34 0.15 0.03 6236713.0 28.82 67.02 90.00 95.76 99.15 99.72 99.89 99.97 0.28 0.11 0.03
18 2016201701 Apr 2016 to Mar 2017 (Period 01) London Overground 544741.0 28.64 67.42 90.85 96.24 99.26 99.69 99.86 99.96 0.31 0.14 0.04 6249732.0 28.75 66.83 89.92 95.71 99.14 99.71 99.88 99.97 0.29 0.12 0.03
18 2016201702 Apr 2016 to Mar 2017 (Period 02) London Overground 514433.0 29.44 68.53 91.59 96.53 99.44 99.81 99.95 99.99 0.19 0.05 0.01 6287587.0 28.78 66.78 89.90 95.70 99.15 99.72 99.89 99.97 0.28 0.11 0.03
18 2016201703 Apr 2016 to Mar 2017 (Period 03) London Overground 489832.0 29.82 68.13 90.96 95.98 99.15 99.64 99.79 99.91 0.36 0.21 0.09 6298899.0 28.95 66.83 89.96 95.72 99.16 99.72 99.88 99.97 0.28 0.12 0.03
18 2016201704 Apr 2016 to Mar 2017 (Period 04) London Overground 493451.0 28.60 67.04 91.13 96.48 99.36 99.76 99.90 99.98 0.24 0.10 0.02 6332502.0 29.08 66.94 90.11 95.82 99.21 99.73 99.89 99.97 0.27 0.11 0.03
18 2016201705 Apr 2016 to Mar 2017 (Period 05) London Overground 465876.0 29.77 67.73 91.30 96.67 99.59 99.85 99.94 99.98 0.15 0.06 0.02 6335435.0 29.08 66.77 90.05 95.81 99.23 99.74 99.89 99.97 0.26 0.11 0.03
18 2016201706 Apr 2016 to Mar 2017 (Period 06) London Overground 492394.0 28.34 65.59 89.87 95.58 99.19 99.71 99.86 99.95 0.29 0.14 0.05 6357105.0 28.85 66.39 89.86 95.69 99.21 99.73 99.89 99.97 0.27 0.11 0.03
18 2016201707 Apr 2016 to Mar 2017 (Period 07) London Overground 483790.0 27.43 63.61 88.94 95.33 99.28 99.77 99.90 99.97 0.23 0.10 0.03 6372931.0 28.72 66.05 89.75 95.63 99.21 99.73 99.88 99.97 0.27 0.12 0.03
18 2016201708 Apr 2016 to Mar 2017 (Period 08) London Overground 498708.0 27.04 63.67 88.91 95.29 99.27 99.80 99.92 99.99 0.20 0.08 0.01 6383807.0 28.74 66.10 89.86 95.70 99.24 99.74 99.89 99.97 0.26 0.11 0.03
18 2016201709 Apr 2016 to Mar 2017 (Period 09) London Overground 495623.0 24.75 59.03 85.37 93.20 98.84 99.59 99.84 99.96 0.41 0.16 0.04 6381914.0 28.61 65.89 89.78 95.64 99.24 99.74 99.89 99.97 0.26 0.11 0.03
18 2016201710 Apr 2016 to Mar 2017 (Period 10) London Overground 464675.0 31.41 70.01 92.10 96.75 99.60 99.90 99.97 99.99 0.10 0.03 0.01 6382781.0 28.66 66.02 89.90 95.70 99.27 99.75 99.89 99.97 0.25 0.11 0.03
18 2016201711 Apr 2016 to Mar 2017 (Period 11) London Overground 520359.0 28.29 64.79 88.26 94.57 99.11 99.75 99.93 99.99 0.25 0.07 0.01 6389067.0 28.69 66.06 89.89 95.70 99.28 99.75 99.90 99.97 0.25 0.10 0.03
18 2016201712 Apr 2016 to Mar 2017 (Period 12) London Overground 524588.0 30.21 67.57 90.48 95.57 99.07 99.61 99.81 99.93 0.39 0.19 0.07 6431059.0 28.78 66.23 90.01 95.70 99.25 99.73 99.89 99.97 0.27 0.11 0.03
18 2016201713 Apr 2016 to Mar 2017 (Period 13) London Overground 516497.0 31.94 69.22 91.85 96.72 99.36 99.76 99.88 99.96 0.24 0.12 0.04 6504967.0 28.90 66.34 90.12 95.76 99.27 99.74 99.89 99.97 0.26 0.11 0.03
18 2017201801 Apr 2017 to Mar 2018 (Period 01) London Overground 553646.0 33.79 72.57 93.39 97.22 99.48 99.81 99.93 99.98 0.19 0.07 0.02 6513872.0 29.33 66.78 90.34 95.84 99.29 99.75 99.89 99.97 0.25 0.11 0.03
18 2017201802 Apr 2017 to Mar 2018 (Period 02) London Overground 552704.0 31.54 70.36 92.95 97.34 99.64 99.90 99.95 99.98 0.10 0.05 0.02 6552143.0 29.51 66.94 90.46 95.91 99.30 99.76 99.90 99.97 0.24 0.10 0.03
18 2017201803 Apr 2017 to Mar 2018 (Period 03) London Overground 539476.0 30.26 66.13 90.16 95.56 99.03 99.60 99.82 99.94 0.40 0.18 0.06 6601787.0 29.55 66.78 90.40 95.88 99.29 99.75 99.90 99.97 0.25 0.10 0.03
18 2017201804 Apr 2017 to Mar 2018 (Period 04) London Overground 551020.0 29.73 66.02 90.43 96.07 99.35 99.82 99.94 99.98 0.18 0.06 0.02 6659356.0 29.63 66.70 90.35 95.85 99.29 99.76 99.90 99.97 0.24 0.10 0.03
18 2017201805 Apr 2017 to Mar 2018 (Period 05) London Overground 553288.0 30.82 68.37 92.07 96.84 99.40 99.80 99.92 99.99 0.20 0.08 0.01 6746768.0 29.72 66.77 90.42 95.87 99.28 99.75 99.90 99.97 0.25 0.10 0.03
18 2017201806 Apr 2017 to Mar 2018 (Period 06) London Overground 542142.0 31.44 69.89 92.43 96.96 99.46 99.81 99.93 99.98 0.19 0.07 0.02 6796516.0 29.96 67.10 90.62 95.98 99.30 99.76 99.90 99.97 0.24 0.10 0.03
18 2017201807 Apr 2017 to Mar 2018 (Period 07) London Overground 527243.0 28.67 65.34 89.49 95.45 99.25 99.78 99.91 99.99 0.22 0.09 0.01 6839969.0 30.04 67.21 90.65 95.99 99.30 99.76 99.90 99.97 0.24 0.10 0.03
18 2017201808 Apr 2017 to Mar 2018 (Period 08) London Overground 534381.0 27.45 61.29 87.21 94.31 98.95 99.68 99.88 99.96 0.32 0.12 0.04 6875642.0 30.06 67.01 90.51 95.91 99.27 99.75 99.90 99.97 0.25 0.10 0.03
18 2017201809 Apr 2017 to Mar 2018 (Period 09) London Overground 519471.0 26.72 60.27 85.85 93.51 98.81 99.69 99.90 99.99 0.31 0.10 0.01 6899490.0 30.19 67.08 90.53 95.92 99.27 99.76 99.91 99.97 0.24 0.09 0.03
18 2017201810 Apr 2017 to Mar 2018 (Period 10) London Overground 467132.0 31.61 68.16 90.21 95.84 99.09 99.69 99.88 99.96 0.31 0.12 0.04 6901947.0 30.20 66.95 90.40 95.86 99.24 99.75 99.90 99.97 0.25 0.10 0.03
18 2017201811 Apr 2017 to Mar 2018 (Period 11) London Overground 555921.0 31.24 68.25 90.91 96.42 99.29 99.79 99.92 99.98 0.21 0.08 0.02 6937509.0 30.43 67.22 90.60 96.00 99.25 99.75 99.90 99.97 0.25 0.10 0.03
18 2017201812 Apr 2017 to Mar 2018 (Period 12) London Overground 528530.0 30.69 66.74 88.95 94.89 98.59 99.43 99.72 99.89 0.57 0.28 0.11 6941451.0 30.46 67.16 90.49 95.95 99.21 99.74 99.89 99.97 0.26 0.11 0.03
18 2017201813 Apr 2017 to Mar 2018 (Period 13) London Overground 552605.0 31.21 67.89 90.76 96.37 99.33 99.80 99.92 99.98 0.20 0.08 0.02 6977559.0 30.41 67.06 90.41 95.93 99.21 99.74 99.90 99.97 0.26 0.10 0.03
18 2018201901 Apr 2018 to Mar 2019 (Period 01) London Overground 558384.0 31.70 69.42 91.71 96.74 99.24 99.70 99.87 99.95 0.30 0.13 0.05 6982297.0 30.25 66.81 90.28 95.89 99.19 99.73 99.89 99.97 0.27 0.11 0.03
18 2018201902 Apr 2018 to Mar 2019 (Period 02) London Overground 559031.0 34.40 71.74 92.38 97.07 99.39 99.82 99.94 99.99 0.18 0.06 0.01 6988624.0 30.48 66.93 90.23 95.87 99.17 99.72 99.89 99.97 0.28 0.11 0.03
18 2018201903 Apr 2018 to Mar 2019 (Period 03) London Overground 574660.0 39.81 74.74 92.85 96.98 99.28 99.72 99.86 99.95 0.28 0.14 0.05 7023808.0 31.26 67.63 90.45 95.99 99.19 99.73 99.89 99.97 0.27 0.11 0.03
18 2018201904 Apr 2018 to Mar 2019 (Period 04) London Overground 573636.0 34.48 69.00 90.13 95.39 98.64 99.40 99.70 99.91 0.60 0.30 0.09 7046424.0 31.64 67.87 90.43 95.93 99.14 99.70 99.87 99.96 0.30 0.13 0.04
18 2018201905 Apr 2018 to Mar 2019 (Period 05) London Overground 559122.0 33.70 68.29 90.78 95.90 98.85 99.54 99.80 99.94 0.46 0.20 0.06 7052258.0 31.87 67.86 90.33 95.86 99.09 99.68 99.86 99.96 0.32 0.14 0.04
18 2018201906 Apr 2018 to Mar 2019 (Period 06) London Overground 577828.0 36.85 73.59 93.04 97.10 99.39 99.81 99.94 99.99 0.19 0.06 0.01 7087944.0 32.31 68.17 90.39 95.87 99.09 99.68 99.86 99.96 0.32 0.14 0.04
18 2018201907 Apr 2018 to Mar 2019 (Period 07) London Overground 589843.0 33.74 69.14 91.08 96.33 99.15 99.67 99.83 99.93 0.33 0.17 0.07 7150544.0 32.69 68.46 90.51 95.94 99.08 99.67 99.86 99.96 0.33 0.14 0.04
18 2018201908 Apr 2018 to Mar 2019 (Period 08) London Overground 588290.0 33.33 66.93 88.93 95.16 99.00 99.71 99.90 99.97 0.29 0.10 0.03 7204453.0 33.13 68.87 90.63 96.00 99.08 99.67 99.86 99.96 0.33 0.14 0.04
18 2018201909 Apr 2018 to Mar 2019 (Period 09) London Overground 589108.0 31.88 65.33 88.26 94.83 98.79 99.58 99.85 99.95 0.42 0.15 0.05 7274090.0 33.49 69.19 90.78 96.08 99.08 99.67 99.86 99.95 0.33 0.14 0.05
18 2018201910 Apr 2018 to Mar 2019 (Period 10) London Overground 530076.0 36.89 73.44 92.52 96.77 99.18 99.70 99.86 99.96 0.30 0.14 0.04 7337034.0 33.86 69.57 90.94 96.15 99.09 99.67 99.85 99.95 0.33 0.15 0.05
18 2018201911 Apr 2018 to Mar 2019 (Period 11) London Overground 604543.0 34.17 70.44 91.29 96.32 99.24 99.73 99.87 99.95 0.27 0.13 0.05 7385656.0 34.08 69.74 90.97 96.14 99.08 99.66 99.85 99.95 0.34 0.15 0.05
18 2018201912 Apr 2018 to Mar 2019 (Period 12) London Overground 597290.0 34.13 71.15 91.92 96.67 99.28 99.74 99.89 99.96 0.26 0.11 0.04 7454416.0 34.32 70.06 91.19 96.27 99.14 99.69 99.86 99.96 0.31 0.14 0.04
18 2018201913 Apr 2018 to Mar 2019 (Period 13) London Overground 606256.0 34.80 71.46 91.82 96.40 99.01 99.58 99.77 99.94 0.42 0.23 0.06 7508067.0 34.59 70.34 91.27 96.27 99.11 99.67 99.85 99.95 0.33 0.15 0.05
18 2019202001 Apr 2019 to Mar 2020 (Period 01) London Overground 557633.0 36.89 73.98 93.43 97.31 99.41 99.79 99.91 99.97 0.21 0.09 0.03 557633.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202002 Apr 2019 to Mar 2020 (Period 02) London Overground 574924.0 36.99 73.43 92.63 96.81 99.27 99.75 99.91 99.99 0.25 0.09 0.01 1132557.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202003 Apr 2019 to Mar 2020 (Period 03) London Overground 578414.0 37.34 73.25 92.23 96.63 99.15 99.67 99.87 99.97 0.33 0.13 0.03 1710971.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202004 Apr 2019 to Mar 2020 (Period 04) London Overground 554908.0 35.46 69.40 89.83 95.26 98.68 99.49 99.80 99.95 0.51 0.20 0.05 2265879.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202005 Apr 2019 to Mar 2020 (Period 05) London Overground 559662.0 35.50 69.95 90.49 95.67 98.84 99.56 99.79 99.93 0.44 0.21 0.07 2825541.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202006 Apr 2019 to Mar 2020 (Period 06) London Overground 591425.0 36.29 71.99 91.38 96.16 98.93 99.58 99.81 99.94 0.42 0.19 0.06 3416966.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202007 Apr 2019 to Mar 2020 (Period 07) London Overground 597483.0 34.74 70.22 90.62 95.98 99.13 99.68 99.86 99.95 0.32 0.14 0.05 4014449.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202008 Apr 2019 to Mar 2020 (Period 08) London Overground 612120.0 37.03 70.75 90.51 95.91 99.16 99.72 99.89 99.94 0.28 0.11 0.06 4626569.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202009 Apr 2019 to Mar 2020 (Period 09) London Overground 595504.0 33.46 66.49 88.04 94.60 98.73 99.54 99.84 99.97 0.46 0.16 0.03 5222073.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202010 Apr 2019 to Mar 2020 (Period 10) London Overground 576038.0 36.52 72.29 91.39 96.18 99.15 99.67 99.83 99.93 0.33 0.17 0.07 5798111.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202011 Apr 2019 to Mar 2020 (Period 11) London Overground 613001.0 33.88 68.49 88.98 94.89 98.68 99.43 99.72 99.93 0.57 0.28 0.07 6411112.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202012 Apr 2019 to Mar 2020 (Period 12) London Overground 595098.0 34.77 69.24 89.29 95.13 98.96 99.67 99.87 99.96 0.33 0.13 0.04 7006210.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
18 2019202013 Apr 2019 to Mar 2020 (Period 13) London Overground 605470.0 42.46 76.88 92.71 96.49 98.97 99.55 99.76 99.91 0.45 0.24 0.09 7611680.0 36.26 71.25 90.87 95.92 99.00 99.62 99.83 99.95 0.38 0.17 0.05
18 2020202101 Apr 2020 to Mar 2021 (Period 01) London Overground 384046.0 56.10 89.70 98.12 99.12 99.71 99.90 99.96 99.99 0.10 0.04 0.01 7438093.0 37.24 72.00 91.05 95.98 99.01 99.63 99.83 99.95 0.37 0.17 0.05
18 2020202102 Apr 2020 to Mar 2021 (Period 02) London Overground 378725.0 54.07 87.08 96.77 98.40 99.40 99.68 99.79 99.89 0.32 0.21 0.11 7241894.0 38.14 72.67 91.23 96.04 99.01 99.62 99.83 99.94 0.38 0.17 0.06
18 2020202103 Apr 2020 to Mar 2021 (Period 03) London Overground 471247.0 50.48 86.09 97.31 98.89 99.71 99.89 99.96 99.99 0.11 0.04 0.01 7134727.0 39.02 73.51 91.55 96.18 99.05 99.63 99.83 99.94 0.37 0.17 0.06
18 2020202104 Apr 2020 to Mar 2021 (Period 04) London Overground 491162.0 48.65 84.86 96.86 98.70 99.66 99.89 99.94 99.97 0.11 0.06 0.03 7070981.0 39.97 74.62 92.05 96.43 99.12 99.66 99.84 99.95 0.34 0.16 0.05
18 2020202105 Apr 2020 to Mar 2021 (Period 05) London Overground 488114.0 45.91 82.56 95.75 98.18 99.56 99.84 99.93 99.98 0.16 0.07 0.02 6999433.0 40.74 75.55 92.43 96.61 99.17 99.68 99.85 99.95 0.32 0.15 0.05
18 2020202106 Apr 2020 to Mar 2021 (Period 06) London Overground 539096.0 45.97 82.61 96.47 98.64 99.70 99.91 99.97 100.00 0.09 0.03 0.00 6947104.0 41.52 76.40 92.84 96.81 99.23 99.71 99.87 99.95 0.29 0.13 0.05
18 2020202107 Apr 2020 to Mar 2021 (Period 07) London Overground 571242.0 41.65 79.35 95.22 97.93 99.46 99.77 99.87 99.96 0.23 0.13 0.04 6920863.0 42.12 77.18 93.22 96.97 99.26 99.71 99.87 99.95 0.29 0.13 0.05
18 2020202108 Apr 2020 to Mar 2021 (Period 08) London Overground 579382.0 42.06 78.80 94.92 97.88 99.41 99.75 99.87 99.95 0.25 0.13 0.05 6888125.0 42.56 77.88 93.61 97.14 99.28 99.72 99.86 99.96 0.28 0.14 0.04
18 2020202109 Apr 2020 to Mar 2021 (Period 09) London Overground 590193.0 43.96 81.14 96.05 98.45 99.59 99.82 99.90 99.96 0.18 0.10 0.04 6882814.0 43.47 79.15 94.30 97.47 99.35 99.74 99.87 99.96 0.26 0.13 0.04
18 2020202110 Apr 2020 to Mar 2021 (Period 10) London Overground 530622.0 43.37 81.66 95.99 98.14 99.39 99.71 99.82 99.90 0.29 0.18 0.10 6837398.0 44.05 79.92 94.67 97.63 99.37 99.74 99.87 99.95 0.26 0.13 0.05
18 2020202111 Apr 2020 to Mar 2021 (Period 11) London Overground 583818.0 45.13 83.32 96.71 98.69 99.66 99.89 99.95 99.99 0.11 0.05 0.01 6808215.0 45.06 81.24 95.36 97.97 99.46 99.78 99.89 99.96 0.22 0.11 0.04
18 2020202112 Apr 2020 to Mar 2021 (Period 12) London Overground 574598.0 45.85 83.92 96.70 98.56 99.57 99.78 99.87 99.94 0.22 0.13 0.06 6787715.0 46.03 82.52 96.01 98.27 99.51 99.79 99.89 99.96 0.21 0.11 0.04
18 2020202113 Apr 2020 to Mar 2021 (Period 13) London Overground 499584.0 47.23 85.25 97.22 98.89 99.69 99.86 99.93 99.97 0.14 0.07 0.03 6681829.0 46.44 83.24 96.40 98.48 99.58 99.82 99.90 99.96 0.18 0.10 0.04
18 2021202201 Apr 2021 to Mar 2022 (Period 01) London Overground 646041.0 45.15 83.88 96.88 98.67 99.54 99.76 99.86 99.93 0.24 0.14 0.07 6943824.0 45.79 82.94 96.35 98.46 99.56 99.81 99.90 99.96 0.19 0.10 0.04
18 2021202202 Apr 2021 to Mar 2022 (Period 02) London Overground 599475.0 41.89 81.45 96.32 98.61 99.66 99.86 99.94 99.99 0.14 0.06 0.01 7164574.0 45.02 82.60 96.32 98.47 99.58 99.82 99.91 99.96 0.18 0.09 0.04
18 2021202203 Apr 2021 to Mar 2022 (Period 03) London Overground 586627.0 40.49 78.46 95.10 98.06 99.59 99.82 99.91 99.97 0.18 0.09 0.03 7279954.0 44.30 82.04 96.16 98.41 99.57 99.82 99.90 99.96 0.18 0.10 0.04
18 2021202204 Apr 2021 to Mar 2022 (Period 04) London Overground 591533.0 42.07 80.88 95.55 97.99 99.45 99.74 99.85 99.95 0.26 0.15 0.05 7380325.0 43.84 81.76 96.06 98.36 99.56 99.81 99.90 99.96 0.19 0.10 0.04
18 2021202205 Apr 2021 to Mar 2022 (Period 05) London Overground 604214.0 42.46 81.20 96.11 98.41 99.54 99.81 99.90 99.96 0.19 0.10 0.04 7496425.0 43.59 81.66 96.09 98.38 99.56 99.81 99.89 99.96 0.20 0.11 0.04
18 2021202206 Apr 2021 to Mar 2022 (Period 06) London Overground 625878.0 40.60 79.81 95.46 98.01 99.46 99.74 99.88 99.97 0.26 0.12 0.03 7583207.0 43.17 81.44 96.01 98.33 99.54 99.79 99.89 99.96 0.21 0.11 0.04
18 2021202207 Apr 2021 to Mar 2022 (Period 07) London Overground 624988.0 39.93 78.50 94.97 97.92 99.51 99.79 99.89 99.95 0.21 0.11 0.05 7636953.0 43.02 81.35 95.98 98.32 99.54 99.79 99.89 99.96 0.21 0.11 0.04
18 2021202208 Apr 2021 to Mar 2022 (Period 08) London Overground 609508.0 38.15 76.35 93.91 97.41 99.42 99.77 99.92 99.98 0.23 0.08 0.02 7667079.0 42.71 81.15 95.90 98.28 99.54 99.79 99.89 99.96 0.21 0.11 0.04
18 2021202209 Apr 2021 to Mar 2022 (Period 09) London Overground 634018.0 38.13 76.30 93.83 97.42 99.35 99.77 99.90 99.98 0.23 0.10 0.02 7710904.0 42.24 80.75 95.72 98.20 99.52 99.79 99.89 99.96 0.21 0.11 0.04
18 2021202210 Apr 2021 to Mar 2022 (Period 10) London Overground 570520.0 42.41 81.24 95.74 98.16 99.46 99.77 99.87 99.97 0.23 0.13 0.03 7750802.0 42.17 80.72 95.70 98.20 99.53 99.79 99.90 99.96 0.21 0.10 0.04
18 2021202211 Apr 2021 to Mar 2022 (Period 11) London Overground 602394.0 40.89 80.61 95.60 98.31 99.67 99.86 99.93 99.98 0.14 0.07 0.02 7769378.0 41.85 80.52 95.62 98.17 99.53 99.79 99.90 99.96 0.21 0.10 0.04
18 2021202212 Apr 2021 to Mar 2022 (Period 12) London Overground 600266.0 38.55 77.50 94.55 97.56 99.24 99.69 99.86 99.97 0.31 0.14 0.03 7795046.0 41.30 80.04 95.46 98.10 99.50 99.79 99.89 99.97 0.21 0.11 0.03
18 2021202213 Apr 2021 to Mar 2022 (Period 13) London Overground 573312.0 38.68 77.87 94.69 97.72 99.43 99.78 99.92 99.99 0.22 0.08 0.01 7868774.0 40.73 79.55 95.29 98.02 99.49 99.78 99.89 99.97 0.22 0.11 0.03
18 2022202301 Apr 2022 to Mar 2023 (Period 01) London Overground 672549.0 41.10 80.59 95.60 98.03 99.46 99.79 99.90 99.98 0.21 0.10 0.02 7895282.0 40.40 79.28 95.18 97.97 99.48 99.78 99.90 99.97 0.22 0.10 0.03
18 2022202302 Apr 2022 to Mar 2023 (Period 02) London Overground 636898.0 40.00 79.44 95.40 98.14 99.57 99.83 99.92 99.96 0.17 0.08 0.04 7932705.0 40.26 79.13 95.11 97.93 99.47 99.78 99.90 99.97 0.22 0.10 0.03
18 2022202303 Apr 2022 to Mar 2023 (Period 03) London Overground 561106.0 39.14 77.56 94.36 97.48 99.28 99.73 99.86 99.94 0.27 0.14 0.06 7907184.0 40.16 79.07 95.06 97.89 99.45 99.77 99.89 99.97 0.23 0.11 0.03
18 2022202304 Apr 2022 to Mar 2023 (Period 04) London Overground 606800.0 37.50 75.37 93.35 97.02 99.25 99.75 99.90 99.99 0.25 0.10 0.01 7922451.0 39.82 78.65 94.90 97.82 99.44 99.78 99.90 99.97 0.22 0.10 0.03
18 2022202305 Apr 2022 to Mar 2023 (Period 05) London Overground 511901.0 36.49 73.77 92.43 96.59 99.19 99.69 99.86 99.97 0.31 0.14 0.03 7830138.0 39.39 78.13 94.64 97.69 99.41 99.77 99.89 99.97 0.23 0.11 0.03
18 2022202306 Apr 2022 to Mar 2023 (Period 06) London Overground 626721.0 37.59 75.81 93.73 97.20 99.28 99.69 99.83 99.93 0.31 0.17 0.07 7830981.0 39.15 77.81 94.50 97.63 99.40 99.76 99.89 99.97 0.24 0.11 0.03
18 2022202307 Apr 2022 to Mar 2023 (Period 07) London Overground 576949.0 37.18 74.55 93.30 97.38 99.52 99.82 99.93 99.99 0.18 0.07 0.01 7782942.0 38.94 77.52 94.38 97.58 99.40 99.77 99.89 99.97 0.23 0.11 0.03
18 2022202308 Apr 2022 to Mar 2023 (Period 08) London Overground 610059.0 35.12 71.17 91.32 96.21 99.21 99.76 99.92 99.98 0.24 0.08 0.02 7783493.0 38.71 77.11 94.17 97.49 99.38 99.77 99.89 99.97 0.23 0.11 0.03
18 2022202309 Apr 2022 to Mar 2023 (Period 09) London Overground 621358.0 34.26 69.62 90.57 95.83 98.95 99.58 99.82 99.98 0.42 0.18 0.02 7770833.0 38.40 76.58 93.91 97.36 99.35 99.75 99.89 99.97 0.25 0.11 0.03
18 2022202310 Apr 2022 to Mar 2023 (Period 10) London Overground 333107.0 33.51 69.41 89.71 94.83 98.51 99.35 99.70 99.92 0.65 0.30 0.08 7533420.0 37.88 75.91 93.59 97.19 99.30 99.73 99.88 99.97 0.27 0.12 0.03
18 2022202311 Apr 2022 to Mar 2023 (Period 11) London Overground 624966.0 35.12 72.38 91.97 96.47 99.16 99.69 99.84 99.95 0.31 0.16 0.05 7555992.0 37.41 75.24 93.29 97.04 99.26 99.72 99.87 99.97 0.28 0.13 0.03
18 2022202312 Apr 2022 to Mar 2023 (Period 12) London Overground 601287.0 36.27 74.50 93.59 97.48 99.56 99.85 99.94 99.98 0.15 0.06 0.02 7557013.0 37.23 75.00 93.22 97.04 99.29 99.73 99.88 99.97 0.27 0.12 0.03
18 2022202313 Apr 2022 to Mar 2023 (Period 13) London Overground 599002.0 36.46 74.37 92.94 96.98 99.37 99.77 99.90 99.98 0.23 0.10 0.02 7582703.0 37.06 74.74 93.08 96.98 99.28 99.73 99.88 99.97 0.27 0.12 0.03
18 2023202401 Apr 2023 to Mar 2024 (Period 01) London Overground 655452.0 39.19 77.66 94.28 97.55 99.45 99.80 99.90 99.98 0.20 0.10 0.02 7565606.0 36.88 74.47 92.96 96.94 99.28 99.73 99.88 99.97 0.27 0.12 0.03
18 2023202402 Apr 2023 to Mar 2024 (Period 02) London Overground 648484.0 37.47 75.21 92.84 96.73 99.18 99.67 99.87 99.97 0.33 0.13 0.03 7577192.0 36.67 74.12 92.75 96.82 99.25 99.72 99.87 99.97 0.28 0.13 0.03
18 2023202403 Apr 2023 to Mar 2024 (Period 03) London Overground 648293.0 37.08 74.21 92.56 96.76 99.23 99.70 99.83 99.93 0.30 0.17 0.07 7664379.0 36.53 73.87 92.62 96.76 99.24 99.72 99.87 99.97 0.28 0.13 0.03
18 2023202404 Apr 2023 to Mar 2024 (Period 04) London Overground 629745.0 37.70 74.36 92.64 96.80 99.29 99.77 99.90 99.99 0.23 0.10 0.01 7687324.0 36.54 73.79 92.56 96.75 99.25 99.72 99.87 99.97 0.28 0.13 0.03
18 2023202405 Apr 2023 to Mar 2024 (Period 05) London Overground 580946.0 37.98 76.76 94.44 97.74 99.55 99.82 99.92 99.99 0.18 0.08 0.01 7756369.0 36.66 74.02 92.71 96.83 99.27 99.73 99.87 99.97 0.27 0.13 0.03
18 2023202406 Apr 2023 to Mar 2024 (Period 06) London Overground 632428.0 36.24 74.97 93.65 97.39 99.40 99.75 99.87 99.97 0.25 0.13 0.03 7762076.0 36.55 73.95 92.70 96.85 99.28 99.73 99.88 99.97 0.27 0.12 0.03
18 2023202407 Apr 2023 to Mar 2024 (Period 07) London Overground 635096.0 33.74 71.08 91.18 96.03 99.03 99.63 99.82 99.95 0.37 0.18 0.05 7820223.0 36.27 73.67 92.53 96.74 99.25 99.72 99.87 99.97 0.28 0.13 0.03
18 2023202408 Apr 2023 to Mar 2024 (Period 08) London Overground 633974.0 33.83 70.44 91.47 96.34 99.16 99.71 99.89 99.98 0.29 0.11 0.02 7844138.0 36.16 73.61 92.54 96.75 99.24 99.71 99.87 99.97 0.29 0.13 0.03
18 2023202409 Apr 2023 to Mar 2024 (Period 09) London Overground 622903.0 31.08 66.74 88.70 94.74 98.72 99.58 99.85 99.97 0.42 0.15 0.03 7845683.0 35.91 73.38 92.39 96.66 99.22 99.71 99.87 99.97 0.29 0.13 0.03
18 2023202410 Apr 2023 to Mar 2024 (Period 10) London Overground 543635.0 35.13 72.57 91.66 96.27 99.15 99.74 99.88 99.98 0.26 0.12 0.02 8056211.0 35.96 73.49 92.46 96.71 99.25 99.73 99.88 99.97 0.27 0.12 0.03
18 2023202411 Apr 2023 to Mar 2024 (Period 11) London Overground 600381.0 35.26 72.48 91.81 96.29 99.07 99.63 99.83 99.97 0.37 0.17 0.03 8031626.0 35.97 73.50 92.44 96.70 99.24 99.72 99.88 99.97 0.28 0.12 0.03
18 2023202412 Apr 2023 to Mar 2024 (Period 12) London Overground 608331.0 34.79 72.27 92.20 96.64 99.20 99.72 99.88 99.96 0.28 0.12 0.04 8038670.0 35.86 73.33 92.34 96.64 99.21 99.71 99.87 99.97 0.29 0.13 0.03
18 2023202413 Apr 2023 to Mar 2024 (Period 13) London Overground 623644.0 36.49 74.88 93.17 96.99 99.29 99.74 99.89 99.96 0.26 0.11 0.04 8063312.0 35.86 73.37 92.36 96.64 99.21 99.71 99.87 99.97 0.29 0.13 0.03
18 2024202501 Apr 2024 to Mar 2025 (Period 01) London Overground 613579.0 35.68 73.90 92.73 96.59 99.02 99.56 99.76 99.91 0.44 0.24 0.09 8021439.0 35.58 73.06 92.23 96.56 99.18 99.69 99.86 99.96 0.31 0.14 0.04
18 2024202502 Apr 2024 to Mar 2025 (Period 02) London Overground 649625.0 36.22 74.59 93.03 96.84 99.23 99.73 99.89 99.98 0.27 0.11 0.02 8022580.0 35.48 73.01 92.25 96.57 99.18 99.70 99.86 99.96 0.30 0.14 0.04
18 2024202503 Apr 2024 to Mar 2025 (Period 03) London Overground 614854.0 37.29 74.70 93.09 96.87 99.19 99.69 99.85 99.95 0.31 0.15 0.05 7989141.0 35.49 73.05 92.29 96.58 99.18 99.70 99.86 99.97 0.30 0.14 0.03
18 2024202504 Apr 2024 to Mar 2025 (Period 04) London Overground 621792.0 34.79 72.33 91.36 95.80 98.85 99.57 99.81 99.94 0.43 0.19 0.06 7981188.0 35.26 72.89 92.19 96.50 99.14 99.68 99.86 99.96 0.32 0.14 0.04
18 2024202505 Apr 2024 to Mar 2025 (Period 05) London Overground 605402.0 34.43 71.67 91.48 95.92 98.73 99.43 99.68 99.89 0.57 0.32 0.11 8005644.0 35.00 72.51 91.97 96.36 99.08 99.65 99.84 99.96 0.35 0.16 0.04
18 2024202506 Apr 2024 to Mar 2025 (Period 06) London Overground 625394.0 35.98 74.47 92.67 96.51 98.84 99.44 99.72 99.96 0.56 0.28 0.04 7998610.0 34.98 72.47 91.89 96.30 99.04 99.63 99.83 99.95 0.37 0.17 0.05
18 2024202507 Apr 2024 to Mar 2025 (Period 07) London Overground 650192.0 34.74 71.54 91.06 95.77 98.94 99.63 99.86 99.98 0.37 0.14 0.02 8013706.0 35.05 72.51 91.88 96.27 99.03 99.63 99.83 99.96 0.37 0.17 0.04
18 2024202508 Apr 2024 to Mar 2025 (Period 08) London Overground 630184.0 34.46 70.30 89.81 94.85 98.37 99.29 99.67 99.91 0.71 0.33 0.09 8009916.0 35.10 72.50 91.75 96.16 98.97 99.59 99.81 99.95 0.41 0.19 0.05
18 2024202509 Apr 2024 to Mar 2025 (Period 09) London Overground 629632.0 31.52 65.98 87.05 93.09 97.55 98.90 99.53 99.91 1.10 0.47 0.09 8016645.0 35.14 72.43 91.62 96.03 98.88 99.54 99.79 99.95 0.46 0.21 0.05
18 2024202510 Apr 2024 to Mar 2025 (Period 10) London Overground 587437.0 34.72 72.26 91.69 96.07 98.81 99.50 99.80 99.96 0.50 0.20 0.04 8060447.0 35.11 72.41 91.62 96.01 98.85 99.53 99.78 99.95 0.47 0.22 0.05
18 2024202511 Apr 2024 to Mar 2025 (Period 11) London Overground 611253.0 32.07 69.34 89.93 95.25 98.80 99.52 99.78 99.94 0.48 0.22 0.06 8071319.0 34.86 72.17 91.48 95.93 98.83 99.52 99.78 99.94 0.48 0.22 0.06
18 2024202512 Apr 2024 to Mar 2025 (Period 12) London Overground 620938.0 34.48 73.22 92.70 96.98 99.30 99.74 99.91 99.99 0.26 0.09 0.01 8083926.0 34.84 72.25 91.52 95.96 98.84 99.52 99.78 99.95 0.48 0.22 0.05
18 2024202513 Apr 2024 to Mar 2025 (Period 13) London Overground 684841.0 34.24 72.23 91.71 96.36 99.11 99.63 99.83 99.96 0.37 0.17 0.04 8145123.0 34.66 72.04 91.41 95.92 98.83 99.51 99.78 99.95 0.49 0.22 0.05
18 2025202601 Apr 2025 to Mar 2026 (Period 01) London Overground 601444.0 34.41 72.94 91.83 96.15 99.01 99.65 99.87 99.98 0.35 0.13 0.02 8132988.0 34.57 71.97 91.34 95.88 98.83 99.52 99.79 99.95 0.48 0.21 0.05
18 2025202602 Apr 2025 to Mar 2026 (Period 02) London Overground 643115.0 31.66 69.36 90.10 95.12 98.62 99.39 99.70 99.93 0.61 0.30 0.07 8126478.0 34.21 71.55 91.11 95.75 98.78 99.49 99.77 99.95 0.51 0.23 0.05
18 2025202603 Apr 2025 to Mar 2026 (Period 03) London Overground 615458.0 31.12 68.85 90.59 95.65 98.82 99.50 99.76 99.92 0.50 0.24 0.08 8127082.0 33.74 71.11 90.92 95.65 98.75 99.48 99.76 99.94 0.52 0.24 0.06
18 2025202604 Apr 2025 to Mar 2026 (Period 04) London Overground 655202.0 29.64 67.49 89.80 95.32 98.86 99.60 99.84 99.97 0.40 0.16 0.03 8160492.0 33.33 70.73 90.79 95.62 98.75 99.48 99.77 99.95 0.52 0.23 0.05
18 2025202605 Apr 2025 to Mar 2026 (Period 05) London Overground 658002.0 32.87 72.47 92.73 96.90 99.29 99.74 99.89 99.97 0.26 0.11 0.03 8213092.0 33.21 70.80 90.90 95.70 98.80 99.50 99.78 99.95 0.50 0.22 0.05
18 2025202606 Apr 2025 to Mar 2026 (Period 06) London Overground 666828.0 30.73 69.59 91.01 95.73 98.74 99.48 99.76 99.91 0.52 0.24 0.09 8254526.0 32.80 70.42 90.77 95.64 98.79 99.51 99.79 99.95 0.49 0.21 0.05
18 2025202607 Apr 2025 to Mar 2026 (Period 07) London Overground 667520.0 31.15 68.32 90.51 95.92 99.17 99.68 99.86 99.95 0.32 0.14 0.05 8271854.0 32.52 70.16 90.73 95.65 98.81 99.51 99.78 99.95 0.49 0.22 0.05
18 2025202608 Apr 2025 to Mar 2026 (Period 08) London Overground 654816.0 29.79 65.69 88.99 94.89 98.68 99.49 99.76 99.95 0.51 0.24 0.05 8296486.0 32.15 69.80 90.66 95.65 98.83 99.53 99.79 99.95 0.47 0.21 0.05
18 2025202609 Apr 2025 to Mar 2026 (Period 09) London Overground 641164.0 28.14 62.96 86.96 93.51 98.15 99.26 99.70 99.94 0.74 0.30 0.06 8308018.0 31.89 69.56 90.65 95.68 98.88 99.55 99.80 99.95 0.45 0.20 0.05
18 2025202610 Apr 2025 to Mar 2026 (Period 10) London Overground 571070.0 32.01 68.93 90.74 95.90 99.03 99.60 99.81 99.96 0.40 0.19 0.04 8291651.0 31.70 69.33 90.58 95.67 98.89 99.56 99.80 99.95 0.44 0.20 0.05
18 2025202611 Apr 2025 to Mar 2026 (Period 11) London Overground 653110.0 32.14 68.77 90.13 95.45 98.92 99.63 99.86 99.96 0.37 0.14 0.04 8333508.0 31.71 69.28 90.59 95.68 98.90 99.57 99.81 99.95 0.43 0.19 0.05
18 2025202612 Apr 2025 to Mar 2026 (Period 12) London Overground 656015.0 33.34 70.24 91.01 95.99 99.09 99.63 99.80 99.94 0.37 0.20 0.06 8368585.0 31.63 69.06 90.47 95.61 98.89 99.56 99.80 99.95 0.44 0.20 0.05
18 2025202613 Apr 2025 to Mar 2026 (Period 13) London Overground 703772.0 35.04 72.01 91.96 96.58 99.27 99.75 99.90 99.99 0.25 0.10 0.01 8387516.0 31.70 69.05 90.49 95.63 98.90 99.57 99.81 99.95 0.43 0.19 0.05
18 2026202701 Apr 2026 to Mar 2027 (Period 01) London Overground 760607.0 34.47 71.33 91.26 95.93 99.00 99.63 99.85 99.98 0.37 0.15 0.02 8546679.0 31.76 68.98 90.47 95.62 98.90 99.57 99.81 99.95 0.43 0.19 0.05
18 2026202702 Apr 2026 to Mar 2027 (Period 02) London Overground 642294.0 33.81 70.24 89.86 94.75 98.38 99.32 99.67 99.91 0.68 0.33 0.09 8545858.0 31.92 69.05 90.45 95.59 98.88 99.57 99.81 99.95 0.43 0.19 0.05
19 2021202208 Apr 2021 to Mar 2022 (Period 08) Lumo (East Coast) 294.0 24.49 48.98 68.37 75.51 84.01 87.76 90.48 95.92 12.24 9.52 4.08 294.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2021202209 Apr 2021 to Mar 2022 (Period 09) Lumo (East Coast) 378.0 19.05 41.01 61.11 74.60 85.98 89.15 91.53 96.30 10.85 8.47 3.70 672.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2021202210 Apr 2021 to Mar 2022 (Period 10) Lumo (East Coast) 556.0 30.76 57.19 76.26 81.29 89.03 92.27 93.71 95.50 7.73 6.29 4.50 1228.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2021202211 Apr 2021 to Mar 2022 (Period 11) Lumo (East Coast) 608.0 30.76 62.17 79.93 86.18 92.11 94.57 95.72 97.53 5.43 4.28 2.47 1836.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2021202212 Apr 2021 to Mar 2022 (Period 12) Lumo (East Coast) 773.0 28.33 56.02 73.35 81.50 88.62 92.37 95.47 96.38 7.63 4.53 3.62 2609.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2021202213 Apr 2021 to Mar 2022 (Period 13) Lumo (East Coast) 815.0 38.16 67.12 84.17 89.08 94.48 96.69 97.55 99.14 3.31 2.45 0.86 3424.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202301 Apr 2022 to Mar 2023 (Period 01) Lumo (East Coast) 1198.0 36.64 65.28 80.72 85.31 90.48 93.16 94.32 96.83 6.84 5.68 3.17 4622.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202302 Apr 2022 to Mar 2023 (Period 02) Lumo (East Coast) 1141.0 33.13 59.25 74.41 80.28 87.99 92.11 93.87 96.06 7.89 6.13 3.94 5763.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202303 Apr 2022 to Mar 2023 (Period 03) Lumo (East Coast) 1143.0 33.25 57.92 73.58 80.14 87.58 90.99 92.91 95.45 9.01 7.09 4.55 6906.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202304 Apr 2022 to Mar 2023 (Period 04) Lumo (East Coast) 1155.0 33.16 59.13 75.41 82.68 90.30 93.25 94.37 96.19 6.75 5.63 3.81 8061.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202305 Apr 2022 to Mar 2023 (Period 05) Lumo (East Coast) 1132.0 29.06 53.00 67.49 74.56 82.42 86.75 88.87 92.49 13.25 11.13 7.51 9193.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202306 Apr 2022 to Mar 2023 (Period 06) Lumo (East Coast) 1188.0 31.40 54.88 71.89 78.62 86.28 88.97 90.82 93.69 11.03 9.18 6.31 10381.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
19 2022202307 Apr 2022 to Mar 2023 (Period 07) Lumo (East Coast) 764.0 32.98 60.21 75.65 83.51 92.02 95.29 96.47 98.69 4.71 3.53 1.31 11145.0 32.00 58.23 74.64 81.30 88.60 91.84 93.52 95.96 8.16 6.48 4.04
19 2022202308 Apr 2022 to Mar 2023 (Period 08) Lumo (East Coast) 1147.0 26.33 51.61 68.09 75.41 85.88 90.32 92.94 95.82 9.68 7.06 4.18 11998.0 31.64 57.83 74.17 80.88 88.46 91.80 93.54 95.95 8.20 6.46 4.05
19 2022202309 Apr 2022 to Mar 2023 (Period 09) Lumo (East Coast) 1104.0 22.37 45.74 59.33 68.30 80.16 86.05 89.22 92.48 13.95 10.78 7.52 12724.0 31.21 57.28 73.27 79.97 87.81 91.38 93.23 95.64 8.62 6.77 4.36
19 2022202310 Apr 2022 to Mar 2023 (Period 10) Lumo (East Coast) 902.0 26.72 49.67 65.96 73.50 84.59 89.47 91.57 94.57 10.53 8.43 5.43 13070.0 30.92 56.76 72.64 79.47 87.54 91.21 93.09 95.57 8.79 6.91 4.43
19 2022202311 Apr 2022 to Mar 2023 (Period 11) Lumo (East Coast) 1122.0 26.56 53.48 72.19 78.97 87.34 90.37 92.25 94.56 9.63 7.75 5.44 13584.0 30.57 56.24 72.28 79.13 87.32 90.99 92.90 95.40 9.01 7.10 4.60
19 2022202312 Apr 2022 to Mar 2023 (Period 12) Lumo (East Coast) 1073.0 32.71 57.04 71.39 79.50 88.91 92.73 94.32 96.55 7.27 5.68 3.45 13884.0 30.86 56.32 72.15 79.03 87.37 91.05 92.87 95.43 8.95 7.13 4.57
19 2022202313 Apr 2022 to Mar 2023 (Period 13) Lumo (East Coast) 1187.0 30.24 55.27 67.65 74.47 84.33 87.87 89.81 92.17 12.13 10.19 7.83 14256.0 30.39 55.61 71.09 78.07 86.71 90.46 92.35 94.95 9.54 7.65 5.05
19 2023202401 Apr 2023 to Mar 2024 (Period 01) Lumo (East Coast) 1286.0 32.19 58.86 73.41 81.49 91.60 93.93 94.95 96.58 6.07 5.05 3.42 14344.0 30.03 55.10 70.49 77.77 86.83 90.55 92.41 94.94 9.45 7.59 5.06
19 2023202402 Apr 2023 to Mar 2024 (Period 02) Lumo (East Coast) 1202.0 36.77 62.65 76.96 82.28 88.94 92.85 93.76 94.84 7.15 6.24 5.16 14405.0 30.34 55.40 70.72 77.95 86.91 90.61 92.41 94.84 9.39 7.59 5.16
19 2023202403 Apr 2023 to Mar 2024 (Period 03) Lumo (East Coast) 1204.0 32.97 55.90 68.19 75.58 83.72 87.71 90.12 92.94 12.29 9.88 7.06 14466.0 30.33 55.24 70.28 77.58 86.60 90.34 92.18 94.64 9.66 7.82 5.36
19 2023202404 Apr 2023 to Mar 2024 (Period 04) Lumo (East Coast) 1219.0 34.95 60.05 74.41 82.36 90.16 92.78 94.18 96.47 7.22 5.82 3.53 14530.0 30.50 55.33 70.22 77.58 86.60 90.32 92.17 94.67 9.68 7.83 5.33
19 2023202405 Apr 2023 to Mar 2024 (Period 05) Lumo (East Coast) 1251.0 38.45 61.95 75.62 81.53 90.49 93.61 95.04 96.56 6.39 4.96 3.44 14649.0 31.29 56.08 70.89 78.15 87.26 90.87 92.68 95.00 9.13 7.32 5.00
19 2023202406 Apr 2023 to Mar 2024 (Period 06) Lumo (East Coast) 1170.0 32.74 58.55 73.59 81.62 88.29 92.39 94.19 96.58 7.61 5.81 3.42 14631.0 31.39 56.37 71.03 78.39 87.42 91.15 92.95 95.23 8.85 7.05 4.77
19 2023202407 Apr 2023 to Mar 2024 (Period 07) Lumo (East Coast) 1090.0 30.64 55.32 65.87 72.94 83.67 88.62 91.93 94.50 11.38 8.07 5.50 14957.0 31.26 56.10 70.42 77.73 86.91 90.75 92.69 95.00 9.25 7.31 5.00
19 2023202408 Apr 2023 to Mar 2024 (Period 08) Lumo (East Coast) 1147.0 16.65 34.44 46.12 55.10 67.57 76.46 82.13 88.40 23.54 17.87 11.60 14957.0 30.51 54.78 68.73 76.17 85.51 89.69 91.86 94.43 10.31 8.14 5.57
19 2023202409 Apr 2023 to Mar 2024 (Period 09) Lumo (East Coast) 1150.0 25.30 48.52 65.13 74.26 84.87 89.13 91.91 95.83 10.87 8.09 4.17 15003.0 30.71 54.97 69.15 76.60 85.85 89.92 92.06 94.68 10.08 7.94 5.32
19 2023202410 Apr 2023 to Mar 2024 (Period 10) Lumo (East Coast) 1070.0 25.23 45.14 60.93 69.44 79.72 84.02 86.45 88.97 15.98 13.55 11.03 15171.0 30.56 54.59 68.76 76.28 85.49 89.53 91.69 94.29 10.47 8.31 5.71
19 2023202411 Apr 2023 to Mar 2024 (Period 11) Lumo (East Coast) 1165.0 31.24 57.51 71.85 79.23 86.61 90.47 92.27 96.39 9.53 7.73 3.61 15214.0 30.91 54.90 68.74 76.31 85.44 89.54 91.70 94.43 10.46 8.30 5.57
19 2023202412 Apr 2023 to Mar 2024 (Period 12) Lumo (East Coast) 1121.0 37.64 62.98 77.25 84.75 91.79 94.56 96.25 97.86 5.44 3.75 2.14 15262.0 31.28 55.34 69.18 76.71 85.66 89.68 91.85 94.53 10.32 8.15 5.47
19 2023202413 Apr 2023 to Mar 2024 (Period 13) Lumo (East Coast) 1250.0 34.16 63.20 78.40 85.12 93.12 95.44 96.80 97.68 4.56 3.20 2.32 15325.0 31.60 55.99 70.05 77.57 86.38 90.29 92.41 94.97 9.71 7.59 5.03
19 2024202501 Apr 2024 to Mar 2025 (Period 01) Lumo (East Coast) 1200.0 33.08 59.17 74.83 81.42 89.17 91.58 93.33 95.67 8.42 6.67 4.33 15239.0 31.66 55.99 70.14 77.54 86.15 90.08 92.27 94.89 9.92 7.73 5.11
19 2024202502 Apr 2024 to Mar 2025 (Period 02) Lumo (East Coast) 1240.0 37.58 59.03 70.81 76.69 85.40 89.03 90.56 92.42 10.97 9.44 7.58 15277.0 31.74 55.72 69.66 77.10 85.87 89.78 92.01 94.69 10.22 7.99 5.31
19 2024202503 Apr 2024 to Mar 2025 (Period 03) Lumo (East Coast) 1249.0 34.91 59.41 72.30 79.90 87.83 90.23 92.39 94.56 9.77 7.61 5.44 15322.0 31.90 56.00 69.99 77.44 86.20 89.98 92.19 94.82 10.02 7.81 5.18
19 2024202504 Apr 2024 to Mar 2025 (Period 04) Lumo (East Coast) 1240.0 35.81 58.95 72.42 79.11 87.50 91.21 92.58 95.00 8.79 7.42 5.00 15343.0 31.98 55.92 69.84 77.19 85.99 89.86 92.07 94.70 10.14 7.93 5.30
19 2024202505 Apr 2024 to Mar 2025 (Period 05) Lumo (East Coast) 1235.0 39.35 62.43 75.30 81.21 88.50 92.06 94.98 97.41 7.94 5.02 2.59 15327.0 32.04 55.95 69.80 77.16 85.83 89.73 92.06 94.77 10.27 7.94 5.23
19 2024202506 Apr 2024 to Mar 2025 (Period 06) Lumo (East Coast) 1186.0 37.69 59.27 71.75 78.75 87.69 90.89 92.50 94.60 9.11 7.50 5.40 15343.0 32.43 56.01 69.67 76.94 85.79 89.62 91.93 94.62 10.38 8.07 5.38
19 2024202507 Apr 2024 to Mar 2025 (Period 07) Lumo (East Coast) 1037.0 32.50 57.76 71.46 76.47 85.73 90.36 91.71 94.50 9.64 8.29 5.50 15290.0 32.56 56.18 70.06 77.19 85.93 89.74 91.92 94.62 10.26 8.08 5.38
19 2024202508 Apr 2024 to Mar 2025 (Period 08) Lumo (East Coast) 1149.0 34.38 57.62 71.98 80.07 90.17 93.30 94.95 96.78 6.70 5.05 3.22 15292.0 33.89 57.92 72.00 79.07 87.63 91.00 92.88 95.25 9.00 7.12 4.75
19 2024202509 Apr 2024 to Mar 2025 (Period 09) Lumo (East Coast) 1192.0 27.01 49.92 62.16 68.96 78.94 84.73 87.75 90.94 15.27 12.25 9.06 15334.0 34.00 58.00 71.75 78.64 87.16 90.65 92.55 94.87 9.35 7.45 5.13
19 2024202510 Apr 2024 to Mar 2025 (Period 10) Lumo (East Coast) 1158.0 31.61 51.64 64.85 71.76 81.69 86.61 88.77 91.97 13.39 11.23 8.03 15422.0 34.42 58.42 71.98 78.76 87.26 90.81 92.69 95.06 9.19 7.31 4.94
19 2024202511 Apr 2024 to Mar 2025 (Period 11) Lumo (East Coast) 1124.0 34.52 55.78 69.66 77.05 86.03 89.59 91.01 94.22 10.41 8.99 5.78 15381.0 34.67 58.29 71.82 78.60 87.22 90.75 92.60 94.90 9.25 7.40 5.10
19 2024202512 Apr 2024 to Mar 2025 (Period 12) Lumo (East Coast) 977.0 40.43 64.79 75.54 82.70 91.91 94.78 95.70 97.85 5.22 4.30 2.15 15237.0 34.82 58.36 71.66 78.41 87.19 90.73 92.53 94.87 9.27 7.47 5.13
19 2024202513 Apr 2024 to Mar 2025 (Period 13) Lumo (East Coast) 1107.0 37.04 59.26 72.18 79.04 87.80 91.96 93.86 95.48 8.04 6.14 4.52 15094.0 35.04 58.03 71.14 77.91 86.74 90.43 92.28 94.68 9.57 7.72 5.32
19 2025202601 Apr 2025 to Mar 2026 (Period 01) Lumo (East Coast) 1156.0 36.94 58.48 70.42 78.29 87.20 91.09 92.91 95.33 8.91 7.09 4.67 15050.0 35.34 57.97 70.79 77.65 86.58 90.39 92.24 94.65 9.61 7.76 5.35
19 2025202602 Apr 2025 to Mar 2026 (Period 02) Lumo (East Coast) 1161.0 35.14 56.85 70.54 77.09 86.13 90.78 92.68 95.00 9.22 7.32 5.00 14971.0 35.14 57.80 70.77 77.69 86.65 90.53 92.41 94.86 9.47 7.59 5.14
19 2025202603 Apr 2025 to Mar 2026 (Period 03) Lumo (East Coast) 1233.0 35.20 57.75 73.72 81.91 90.92 94.24 95.62 97.40 5.76 4.38 2.60 14955.0 35.17 57.66 70.89 77.85 86.90 90.86 92.68 95.10 9.14 7.32 4.90
19 2025202604 Apr 2025 to Mar 2026 (Period 04) Lumo (East Coast) 1241.0 35.94 59.31 72.68 78.49 87.11 91.62 93.31 96.21 8.38 6.69 3.79 14956.0 35.18 57.69 70.91 77.80 86.87 90.89 92.74 95.20 9.11 7.26 4.80
19 2025202605 Apr 2025 to Mar 2026 (Period 05) Lumo (East Coast) 1210.0 32.23 51.07 63.31 69.01 78.43 84.30 87.02 91.90 15.70 12.98 8.10 14931.0 34.59 56.76 69.93 76.81 86.05 90.26 92.09 94.75 9.74 7.91 5.25
19 2025202606 Apr 2025 to Mar 2026 (Period 06) Lumo (East Coast) 1192.0 36.49 59.14 73.99 81.04 89.93 93.62 95.55 97.23 6.38 4.45 2.77 14937.0 34.50 56.75 70.11 76.99 86.23 90.48 92.33 94.96 9.52 7.67 5.04
19 2025202607 Apr 2025 to Mar 2026 (Period 07) Lumo (East Coast) 1140.0 35.09 57.37 72.19 81.23 89.21 93.51 96.14 98.51 6.49 3.86 1.49 15040.0 34.68 56.73 70.17 77.35 86.49 90.72 92.67 95.26 9.28 7.33 4.74
19 2025202608 Apr 2025 to Mar 2026 (Period 08) Lumo (East Coast) 1067.0 28.40 49.30 63.54 72.07 82.19 87.63 90.91 94.47 12.37 9.09 5.53 14958.0 34.26 56.13 69.56 76.76 85.90 90.30 92.37 95.09 9.70 7.63 4.91
19 2025202609 Apr 2025 to Mar 2026 (Period 09) Lumo (East Coast) 1053.0 25.93 44.63 59.83 67.81 79.39 84.52 86.89 90.98 15.48 13.11 9.02 14819.0 34.25 55.81 69.46 76.75 86.00 90.34 92.35 95.13 9.66 7.65 4.87
19 2025202610 Apr 2025 to Mar 2026 (Period 10) Lumo (East Coast) 1338.0 26.38 50.30 67.56 76.46 86.55 91.26 94.17 95.52 8.74 5.83 4.48 14999.0 33.75 55.64 69.65 77.11 86.38 90.71 92.79 95.41 9.29 7.21 4.59
19 2025202611 Apr 2025 to Mar 2026 (Period 11) Lumo (East Coast) 1535.0 28.99 52.64 68.14 75.11 84.43 88.79 90.94 94.46 11.21 9.06 5.54 15410.0 33.22 55.33 69.50 76.92 86.21 90.60 92.73 95.40 9.40 7.27 4.60
19 2025202612 Apr 2025 to Mar 2026 (Period 12) Lumo (East Coast) 1415.0 30.67 58.37 75.41 82.97 91.45 93.99 95.76 97.53 6.01 4.24 2.47 15848.0 32.55 55.02 69.66 77.10 86.33 90.64 92.82 95.44 9.36 7.18 4.56
19 2025202613 Apr 2025 to Mar 2026 (Period 13) Lumo (East Coast) 1497.0 33.33 58.05 72.88 79.89 88.18 91.78 93.32 96.06 8.22 6.68 3.94 16238.0 32.31 55.01 69.78 77.23 86.40 90.66 92.79 95.49 9.34 7.21 4.51
19 2026202701 Apr 2026 to Mar 2027 (Period 01) Lumo (East Coast) 1820.0 30.27 52.36 67.14 75.05 84.34 89.73 93.13 95.71 10.27 6.87 4.29 16902.0 31.78 54.49 69.45 76.92 86.12 90.53 92.82 95.53 9.47 7.18 4.47
19 2026202702 Apr 2026 to Mar 2027 (Period 02) Lumo (East Coast) 1400.0 30.36 52.29 65.21 72.64 83.57 87.93 90.36 93.00 12.07 9.64 7.00 17141.0 31.43 54.15 69.03 76.56 85.91 90.30 92.63 95.36 9.70 7.37 4.64
20 2026202702 Apr 2026 to Mar 2027 (Period 02) Lumo (West Coast) 88.0 13.64 22.73 36.36 43.18 56.82 63.64 65.91 75.00 36.36 34.09 25.00 88.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201501 Apr 2014 to Mar 2015 (Period 01) Merseyrail 264057.0 37.26 75.36 95.61 98.71 99.80 99.93 99.97 99.99 0.07 0.03 0.01 264057.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201502 Apr 2014 to Mar 2015 (Period 02) Merseyrail 280878.0 35.73 73.76 94.57 98.17 99.61 99.82 99.89 99.96 0.18 0.11 0.04 544935.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201503 Apr 2014 to Mar 2015 (Period 03) Merseyrail 282299.0 33.97 72.52 94.66 98.48 99.78 99.91 99.95 99.99 0.09 0.05 0.01 827234.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201504 Apr 2014 to Mar 2015 (Period 04) Merseyrail 279971.0 30.63 67.35 92.17 97.33 99.37 99.72 99.87 99.95 0.28 0.13 0.05 1107205.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201505 Apr 2014 to Mar 2015 (Period 05) Merseyrail 282202.0 29.13 64.50 90.32 96.44 99.29 99.77 99.86 99.93 0.23 0.14 0.07 1389407.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201506 Apr 2014 to Mar 2015 (Period 06) Merseyrail 282453.0 32.08 68.39 92.78 97.84 99.75 99.92 99.96 99.98 0.08 0.04 0.02 1671860.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201507 Apr 2014 to Mar 2015 (Period 07) Merseyrail 270622.0 33.95 69.55 91.55 96.63 99.46 99.91 99.97 99.99 0.09 0.03 0.01 1942482.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201508 Apr 2014 to Mar 2015 (Period 08) Merseyrail 264432.0 34.39 66.54 89.04 95.18 98.97 99.70 99.90 99.99 0.30 0.10 0.01 2206914.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201509 Apr 2014 to Mar 2015 (Period 09) Merseyrail 266615.0 35.30 69.49 91.80 97.24 99.66 99.91 99.95 99.99 0.09 0.05 0.01 2473529.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201510 Apr 2014 to Mar 2015 (Period 10) Merseyrail 239478.0 38.81 72.50 92.92 97.61 99.76 99.93 99.98 99.98 0.07 0.02 0.02 2713007.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201511 Apr 2014 to Mar 2015 (Period 11) Merseyrail 265141.0 39.53 73.72 93.13 97.31 99.52 99.86 99.95 99.99 0.14 0.05 0.01 2978148.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201512 Apr 2014 to Mar 2015 (Period 12) Merseyrail 267358.0 40.76 76.18 95.21 98.59 99.72 99.90 99.94 99.96 0.10 0.06 0.04 3245506.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2014201513 Apr 2014 to Mar 2015 (Period 13) Merseyrail 289672.0 40.67 76.76 95.09 98.32 99.62 99.85 99.92 99.97 0.15 0.08 0.03 3535178.0 35.49 71.26 93.00 97.53 99.56 99.85 99.93 99.98 0.15 0.07 0.02
21 2015201601 Apr 2015 to Mar 2016 (Period 01) Merseyrail 318912.0 36.20 73.44 94.46 98.18 99.71 99.87 99.93 99.97 0.13 0.07 0.03 3590033.0 35.42 71.15 92.94 97.50 99.56 99.85 99.93 99.97 0.15 0.07 0.03
21 2015201602 Apr 2015 to Mar 2016 (Period 02) Merseyrail 272685.0 37.01 73.72 93.78 97.59 99.45 99.84 99.93 99.97 0.16 0.07 0.03 3581840.0 35.52 71.14 92.87 97.46 99.55 99.85 99.93 99.97 0.15 0.07 0.03
21 2015201603 Apr 2015 to Mar 2016 (Period 03) Merseyrail 277133.0 37.25 74.55 94.94 98.39 99.77 99.91 99.94 99.99 0.09 0.06 0.01 3576674.0 35.78 71.30 92.89 97.45 99.55 99.85 99.93 99.97 0.15 0.07 0.03
21 2015201604 Apr 2015 to Mar 2016 (Period 04) Merseyrail 275238.0 32.67 69.29 92.50 97.29 99.38 99.75 99.88 99.96 0.25 0.12 0.04 3571941.0 35.94 71.45 92.92 97.45 99.55 99.85 99.93 99.98 0.15 0.07 0.02
21 2015201605 Apr 2015 to Mar 2016 (Period 05) Merseyrail 276593.0 33.62 69.66 92.80 97.56 99.51 99.83 99.93 99.99 0.17 0.07 0.01 3566332.0 36.30 71.86 93.11 97.54 99.56 99.86 99.94 99.98 0.14 0.06 0.02
21 2015201606 Apr 2015 to Mar 2016 (Period 06) Merseyrail 282483.0 32.56 68.65 92.80 97.66 99.64 99.88 99.94 99.98 0.12 0.06 0.02 3566362.0 36.34 71.88 93.12 97.52 99.55 99.86 99.93 99.98 0.14 0.07 0.02
21 2015201607 Apr 2015 to Mar 2016 (Period 07) Merseyrail 275627.0 30.63 67.87 92.48 97.69 99.64 99.83 99.89 99.95 0.17 0.11 0.05 3571367.0 36.08 71.75 93.19 97.60 99.57 99.85 99.93 99.98 0.15 0.07 0.02
21 2015201608 Apr 2015 to Mar 2016 (Period 08) Merseyrail 277370.0 25.91 60.59 88.42 95.75 99.32 99.77 99.89 99.96 0.23 0.11 0.04 3584305.0 35.42 71.27 93.12 97.64 99.59 99.86 99.93 99.97 0.14 0.07 0.03
21 2015201609 Apr 2015 to Mar 2016 (Period 09) Merseyrail 277037.0 24.11 55.43 84.29 93.53 98.75 99.61 99.86 99.96 0.39 0.14 0.04 3594727.0 34.55 70.18 92.54 97.35 99.52 99.83 99.92 99.97 0.17 0.08 0.03
21 2015201610 Apr 2015 to Mar 2016 (Period 10) Merseyrail 250301.0 30.34 65.29 90.68 96.95 99.69 99.95 99.99 100.00 0.05 0.01 0.00 3605550.0 33.98 69.69 92.39 97.31 99.52 99.83 99.92 99.97 0.17 0.08 0.03
21 2015201611 Apr 2015 to Mar 2016 (Period 11) Merseyrail 270830.0 31.85 67.61 91.96 97.50 99.63 99.83 99.88 99.92 0.17 0.12 0.08 3611239.0 33.41 69.24 92.30 97.32 99.53 99.83 99.92 99.97 0.17 0.08 0.03
21 2015201612 Apr 2015 to Mar 2016 (Period 12) Merseyrail 267728.0 29.67 65.00 91.36 97.08 99.41 99.72 99.88 99.97 0.28 0.12 0.03 3611609.0 32.59 68.41 92.01 97.21 99.50 99.82 99.91 99.97 0.18 0.09 0.03
21 2015201613 Apr 2015 to Mar 2016 (Period 13) Merseyrail 253410.0 34.10 71.81 94.30 98.31 99.78 99.95 99.98 100.00 0.05 0.02 0.00 3575347.0 32.04 67.97 91.93 97.20 99.51 99.83 99.92 99.97 0.17 0.08 0.03
21 2016201701 Apr 2016 to Mar 2017 (Period 01) Merseyrail 296597.0 34.14 71.25 93.89 98.30 99.76 99.93 99.97 99.99 0.07 0.03 0.01 3553032.0 31.85 67.76 91.86 97.20 99.51 99.83 99.92 99.97 0.17 0.08 0.03
21 2016201702 Apr 2016 to Mar 2017 (Period 02) Merseyrail 277095.0 34.40 71.35 94.03 98.17 99.71 99.91 99.96 99.99 0.09 0.04 0.01 3557442.0 31.65 67.58 91.89 97.25 99.53 99.84 99.92 99.97 0.16 0.08 0.03
21 2016201703 Apr 2016 to Mar 2017 (Period 03) Merseyrail 277672.0 33.20 69.58 92.60 97.51 99.62 99.87 99.95 99.98 0.13 0.05 0.02 3557981.0 31.33 67.19 91.70 97.18 99.52 99.83 99.92 99.97 0.17 0.08 0.03
21 2016201704 Apr 2016 to Mar 2017 (Period 04) Merseyrail 276576.0 33.49 69.63 93.02 97.68 99.57 99.82 99.92 99.98 0.18 0.08 0.02 3559319.0 31.40 67.22 91.74 97.21 99.54 99.84 99.93 99.97 0.16 0.07 0.03
21 2016201705 Apr 2016 to Mar 2017 (Period 05) Merseyrail 283200.0 29.56 66.11 92.00 97.55 99.61 99.85 99.93 99.98 0.15 0.07 0.02 3565926.0 31.08 66.94 91.68 97.21 99.55 99.84 99.93 99.97 0.16 0.07 0.03
21 2016201706 Apr 2016 to Mar 2017 (Period 06) Merseyrail 282025.0 30.43 66.91 92.18 97.52 99.55 99.85 99.94 99.99 0.15 0.06 0.01 3565468.0 30.91 66.81 91.63 97.20 99.54 99.84 99.93 99.97 0.16 0.07 0.03
21 2016201707 Apr 2016 to Mar 2017 (Period 07) Merseyrail 277121.0 30.33 68.12 92.82 97.84 99.73 99.94 99.98 99.99 0.06 0.02 0.01 3566962.0 30.89 66.83 91.66 97.21 99.55 99.85 99.93 99.98 0.15 0.07 0.02
21 2016201708 Apr 2016 to Mar 2017 (Period 08) Merseyrail 276929.0 28.54 64.38 90.48 96.82 99.61 99.86 99.92 99.98 0.14 0.08 0.02 3566521.0 31.09 67.12 91.82 97.29 99.57 99.85 99.94 99.98 0.15 0.06 0.02
21 2016201709 Apr 2016 to Mar 2017 (Period 09) Merseyrail 274801.0 24.20 58.12 87.05 95.31 99.24 99.75 99.90 99.96 0.25 0.10 0.04 3564285.0 31.10 67.34 92.04 97.43 99.61 99.86 99.94 99.98 0.14 0.06 0.02
21 2016201710 Apr 2016 to Mar 2017 (Period 10) Merseyrail 245989.0 28.49 64.08 90.47 96.77 99.70 99.93 99.97 99.98 0.07 0.03 0.02 3559973.0 30.97 67.25 92.02 97.42 99.61 99.86 99.94 99.98 0.14 0.06 0.02
21 2016201711 Apr 2016 to Mar 2017 (Period 11) Merseyrail 205567.0 30.15 69.97 93.47 97.71 99.60 99.86 99.93 99.96 0.14 0.07 0.04 3494710.0 30.86 67.39 92.12 97.43 99.61 99.86 99.94 99.98 0.14 0.06 0.02
21 2016201712 Apr 2016 to Mar 2017 (Period 12) Merseyrail 215896.0 31.72 70.00 92.59 97.10 99.30 99.60 99.71 99.84 0.40 0.29 0.16 3442878.0 31.01 67.74 92.20 97.44 99.60 99.86 99.93 99.97 0.14 0.07 0.03
21 2016201713 Apr 2016 to Mar 2017 (Period 13) Merseyrail 207295.0 31.04 71.15 94.48 98.25 99.66 99.81 99.89 99.96 0.19 0.11 0.04 3396763.0 30.78 67.64 92.19 97.42 99.59 99.85 99.92 99.97 0.15 0.08 0.03
21 2017201801 Apr 2017 to Mar 2018 (Period 01) Merseyrail 228722.0 33.54 73.99 95.39 98.72 99.84 99.96 99.98 100.00 0.04 0.02 0.00 3328888.0 30.67 67.76 92.26 97.43 99.60 99.85 99.92 99.97 0.15 0.08 0.03
21 2017201802 Apr 2017 to Mar 2018 (Period 02) Merseyrail 226226.0 31.25 70.98 93.47 97.80 99.68 99.88 99.94 99.99 0.12 0.06 0.01 3278019.0 30.39 67.67 92.19 97.39 99.59 99.85 99.92 99.97 0.15 0.08 0.03
21 2017201803 Apr 2017 to Mar 2018 (Period 03) Merseyrail 224548.0 27.49 65.51 91.08 96.72 99.50 99.89 99.97 99.99 0.11 0.03 0.01 3224895.0 29.95 67.36 92.08 97.34 99.58 99.85 99.92 99.97 0.15 0.08 0.03
21 2017201804 Apr 2017 to Mar 2018 (Period 04) Merseyrail 257991.0 23.76 56.97 85.46 94.09 98.94 99.68 99.88 99.98 0.32 0.12 0.02 3206310.0 29.14 66.33 91.46 97.05 99.53 99.84 99.92 99.97 0.16 0.08 0.03
21 2017201805 Apr 2017 to Mar 2018 (Period 05) Merseyrail 271766.0 26.66 61.72 89.41 96.40 99.54 99.88 99.95 99.99 0.12 0.05 0.01 3194876.0 28.90 65.96 91.24 96.95 99.53 99.84 99.92 99.97 0.16 0.08 0.03
21 2017201806 Apr 2017 to Mar 2018 (Period 06) Merseyrail 254938.0 28.84 64.76 90.83 96.74 99.38 99.80 99.91 99.98 0.20 0.09 0.02 3167789.0 28.75 65.77 91.12 96.88 99.51 99.83 99.92 99.97 0.17 0.08 0.03
21 2017201807 Apr 2017 to Mar 2018 (Period 07) Merseyrail 243705.0 27.37 61.59 88.15 95.48 99.26 99.77 99.93 99.98 0.23 0.07 0.02 3134373.0 28.51 65.24 90.74 96.69 99.47 99.82 99.91 99.97 0.18 0.09 0.03
21 2017201808 Apr 2017 to Mar 2018 (Period 08) Merseyrail 261153.0 26.29 61.07 89.15 96.23 99.40 99.83 99.96 99.99 0.17 0.04 0.01 3118597.0 28.32 64.97 90.63 96.64 99.45 99.82 99.92 99.97 0.18 0.08 0.03
21 2017201809 Apr 2017 to Mar 2018 (Period 09) Merseyrail 279902.0 26.68 62.39 90.29 96.72 99.35 99.73 99.85 99.92 0.27 0.15 0.08 3123698.0 28.54 65.34 90.92 96.76 99.46 99.82 99.91 99.97 0.18 0.09 0.03
21 2017201810 Apr 2017 to Mar 2018 (Period 10) Merseyrail 237905.0 28.34 63.65 91.00 97.02 99.63 99.88 99.94 99.99 0.12 0.06 0.01 3115614.0 28.52 65.31 90.96 96.78 99.46 99.81 99.91 99.97 0.19 0.09 0.03
21 2017201811 Apr 2017 to Mar 2018 (Period 11) Merseyrail 248554.0 29.24 65.36 91.38 97.54 99.76 99.92 99.97 99.99 0.08 0.03 0.01 3158601.0 28.47 65.01 90.83 96.78 99.47 99.82 99.91 99.97 0.18 0.09 0.03
21 2017201812 Apr 2017 to Mar 2018 (Period 12) Merseyrail 263105.0 31.28 67.74 91.69 96.98 99.41 99.77 99.86 99.92 0.23 0.14 0.08 3205810.0 28.48 64.90 90.78 96.77 99.48 99.83 99.92 99.97 0.17 0.08 0.03
21 2017201813 Apr 2017 to Mar 2018 (Period 13) Merseyrail 276743.0 30.90 67.46 91.96 97.14 99.56 99.90 99.95 99.99 0.10 0.05 0.01 3275258.0 28.53 64.72 90.65 96.71 99.47 99.84 99.93 99.98 0.16 0.07 0.02
21 2018201901 Apr 2018 to Mar 2019 (Period 01) Merseyrail 279654.0 31.33 68.01 92.55 97.57 99.58 99.86 99.94 99.99 0.14 0.06 0.01 3326190.0 28.42 64.36 90.48 96.65 99.46 99.83 99.93 99.98 0.17 0.07 0.02
21 2018201902 Apr 2018 to Mar 2019 (Period 02) Merseyrail 278856.0 29.46 65.88 91.22 97.16 99.60 99.89 99.95 99.97 0.11 0.05 0.03 3378820.0 28.31 64.04 90.34 96.61 99.45 99.83 99.93 99.98 0.17 0.07 0.02
21 2018201903 Apr 2018 to Mar 2019 (Period 03) Merseyrail 276480.0 36.07 72.35 94.55 98.48 99.77 99.92 99.98 100.00 0.08 0.02 0.00 3430752.0 28.99 64.61 90.63 96.76 99.48 99.83 99.93 99.98 0.17 0.07 0.02
21 2018201904 Apr 2018 to Mar 2019 (Period 04) Merseyrail 275201.0 33.17 68.22 93.02 97.72 99.38 99.71 99.81 99.92 0.29 0.19 0.08 3447962.0 29.72 65.47 91.21 97.03 99.51 99.84 99.92 99.97 0.16 0.08 0.03
21 2018201905 Apr 2018 to Mar 2019 (Period 05) Merseyrail 279106.0 30.91 65.29 90.60 96.77 99.41 99.78 99.89 99.92 0.22 0.11 0.08 3455302.0 30.06 65.75 91.30 97.06 99.50 99.83 99.92 99.96 0.17 0.08 0.04
21 2018201906 Apr 2018 to Mar 2019 (Period 06) Merseyrail 281466.0 32.28 66.88 91.42 97.27 99.52 99.86 99.96 99.99 0.14 0.04 0.01 3481830.0 30.32 65.92 91.35 97.10 99.51 99.83 99.92 99.97 0.17 0.08 0.03
21 2018201907 Apr 2018 to Mar 2019 (Period 07) Merseyrail 268363.0 35.24 69.31 91.43 96.79 99.40 99.83 99.91 99.96 0.17 0.09 0.04 3506488.0 30.91 66.48 91.57 97.19 99.52 99.84 99.92 99.97 0.16 0.08 0.03
21 2018201908 Apr 2018 to Mar 2019 (Period 08) Merseyrail 262657.0 33.77 68.91 92.56 97.52 99.47 99.79 99.89 99.93 0.21 0.11 0.07 3507992.0 31.46 67.06 91.83 97.29 99.52 99.83 99.91 99.96 0.17 0.09 0.04
21 2018201909 Apr 2018 to Mar 2019 (Period 09) Merseyrail 278295.0 31.78 65.45 90.75 96.80 99.33 99.74 99.86 99.94 0.26 0.14 0.06 3506385.0 31.87 67.31 91.87 97.29 99.52 99.84 99.92 99.96 0.16 0.08 0.04
21 2018201910 Apr 2018 to Mar 2019 (Period 10) Merseyrail 234775.0 36.56 71.07 93.05 97.58 99.61 99.88 99.95 99.99 0.12 0.05 0.01 3503255.0 32.43 67.81 92.00 97.33 99.52 99.84 99.92 99.96 0.16 0.08 0.04
21 2018201911 Apr 2018 to Mar 2019 (Period 11) Merseyrail 253253.0 34.02 67.16 90.03 96.04 98.97 99.52 99.77 99.93 0.48 0.23 0.07 3507954.0 32.77 67.94 91.91 97.22 99.46 99.81 99.90 99.96 0.19 0.10 0.04
21 2018201912 Apr 2018 to Mar 2019 (Period 12) Merseyrail 252156.0 37.07 73.45 93.86 98.03 99.71 99.94 99.98 100.00 0.06 0.02 0.00 3497005.0 33.19 68.35 92.06 97.30 99.49 99.82 99.91 99.96 0.18 0.09 0.04
21 2018201913 Apr 2018 to Mar 2019 (Period 13) Merseyrail 258676.0 39.51 76.01 95.49 98.67 99.74 99.93 99.98 100.00 0.07 0.02 0.00 3478938.0 33.84 68.99 92.32 97.41 99.50 99.82 99.91 99.96 0.18 0.09 0.04
21 2019202001 Apr 2019 to Mar 2020 (Period 01) Merseyrail 260516.0 36.58 71.51 93.24 97.78 99.54 99.85 99.92 99.99 0.15 0.08 0.01 260516.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202002 Apr 2019 to Mar 2020 (Period 02) Merseyrail 278006.0 37.65 72.75 93.97 98.41 99.81 99.92 99.96 99.99 0.08 0.04 0.01 538522.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202003 Apr 2019 to Mar 2020 (Period 03) Merseyrail 279627.0 37.45 72.87 94.07 98.19 99.69 99.87 99.92 99.98 0.13 0.08 0.02 818149.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202004 Apr 2019 to Mar 2020 (Period 04) Merseyrail 281875.0 36.70 72.11 94.13 98.41 99.78 99.92 99.97 99.99 0.08 0.03 0.01 1100024.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202005 Apr 2019 to Mar 2020 (Period 05) Merseyrail 282998.0 34.94 69.49 92.14 97.45 99.52 99.82 99.93 99.98 0.18 0.07 0.02 1383022.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202006 Apr 2019 to Mar 2020 (Period 06) Merseyrail 277130.0 34.54 69.90 93.21 98.06 99.76 99.94 99.96 99.98 0.06 0.04 0.02 1660152.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202007 Apr 2019 to Mar 2020 (Period 07) Merseyrail 277361.0 38.94 74.37 94.90 98.61 99.88 99.97 100.00 100.00 0.03 0.00 0.00 1937513.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202008 Apr 2019 to Mar 2020 (Period 08) Merseyrail 276690.0 36.31 70.96 93.53 98.05 99.71 99.90 99.95 99.99 0.10 0.05 0.01 2214203.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202009 Apr 2019 to Mar 2020 (Period 09) Merseyrail 283095.0 34.85 69.83 93.34 98.06 99.75 99.91 99.96 99.99 0.09 0.04 0.01 2497298.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202010 Apr 2019 to Mar 2020 (Period 10) Merseyrail 252664.0 35.60 70.22 92.91 97.71 99.56 99.84 99.92 99.95 0.16 0.08 0.05 2749962.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202011 Apr 2019 to Mar 2020 (Period 11) Merseyrail 272538.0 39.21 74.45 94.60 98.47 99.86 99.96 99.97 99.99 0.04 0.03 0.01 3022500.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202012 Apr 2019 to Mar 2020 (Period 12) Merseyrail 279611.0 38.64 73.74 94.17 98.27 99.68 99.86 99.92 99.97 0.14 0.08 0.03 3302111.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
21 2019202013 Apr 2019 to Mar 2020 (Period 13) Merseyrail 254067.0 49.06 82.43 97.06 99.11 99.75 99.88 99.93 99.98 0.12 0.07 0.02 3556178.0 37.66 72.61 93.93 98.20 99.72 99.90 99.95 99.98 0.10 0.05 0.02
21 2020202101 Apr 2020 to Mar 2021 (Period 01) Merseyrail 141541.0 63.53 91.12 98.31 99.26 99.72 99.84 99.91 99.97 0.16 0.09 0.03 3437203.0 38.81 73.46 94.16 98.27 99.73 99.90 99.95 99.98 0.10 0.05 0.02
21 2020202102 Apr 2020 to Mar 2021 (Period 02) Merseyrail 137137.0 58.97 88.63 98.14 99.43 99.85 99.93 99.96 100.00 0.07 0.04 0.00 3296334.0 39.75 74.15 94.35 98.31 99.73 99.90 99.95 99.98 0.10 0.05 0.02
21 2020202103 Apr 2020 to Mar 2021 (Period 03) Merseyrail 153268.0 55.38 86.58 97.63 99.08 99.82 99.93 99.96 99.98 0.07 0.04 0.02 3169975.0 40.70 74.86 94.53 98.36 99.73 99.90 99.95 99.98 0.10 0.05 0.02
21 2020202104 Apr 2020 to Mar 2021 (Period 04) Merseyrail 196240.0 52.45 86.18 98.10 99.34 99.79 99.92 99.95 99.97 0.08 0.05 0.03 3084340.0 41.82 75.83 94.79 98.41 99.73 99.90 99.95 99.98 0.10 0.05 0.02
21 2020202105 Apr 2020 to Mar 2021 (Period 05) Merseyrail 211343.0 47.83 83.14 97.35 99.07 99.76 99.93 99.97 100.00 0.07 0.03 0.00 3012685.0 42.89 76.94 95.22 98.55 99.76 99.91 99.95 99.98 0.09 0.05 0.02
21 2020202106 Apr 2020 to Mar 2021 (Period 06) Merseyrail 225290.0 48.76 84.20 97.59 99.26 99.84 99.95 99.97 100.00 0.05 0.03 0.00 2960845.0 44.11 78.15 95.59 98.65 99.76 99.91 99.95 99.98 0.09 0.05 0.02
21 2020202107 Apr 2020 to Mar 2021 (Period 07) Merseyrail 238313.0 51.49 85.29 97.25 98.93 99.65 99.82 99.88 99.94 0.18 0.12 0.06 2921797.0 45.21 79.09 95.79 98.68 99.74 99.90 99.94 99.98 0.10 0.06 0.02
21 2020202108 Apr 2020 to Mar 2021 (Period 08) Merseyrail 209418.0 50.30 83.74 97.05 98.66 99.59 99.81 99.89 99.95 0.19 0.11 0.05 2854525.0 46.44 80.22 96.10 98.74 99.73 99.89 99.94 99.97 0.11 0.06 0.03
21 2020202109 Apr 2020 to Mar 2021 (Period 09) Merseyrail 190749.0 49.79 84.62 97.96 99.54 99.91 99.97 99.99 100.00 0.03 0.01 0.00 2762179.0 47.86 81.59 96.51 98.86 99.74 99.89 99.94 99.97 0.11 0.06 0.03
21 2020202110 Apr 2020 to Mar 2021 (Period 10) Merseyrail 181024.0 46.44 81.44 95.74 97.93 99.35 99.67 99.80 99.91 0.33 0.20 0.09 2690539.0 48.92 82.65 96.80 98.91 99.74 99.88 99.93 99.97 0.12 0.07 0.03
21 2020202111 Apr 2020 to Mar 2021 (Period 11) Merseyrail 156569.0 50.74 84.32 96.49 98.20 99.32 99.78 99.88 99.97 0.22 0.12 0.03 2574570.0 50.06 83.62 97.01 98.91 99.70 99.87 99.92 99.97 0.13 0.08 0.03
21 2020202112 Apr 2020 to Mar 2021 (Period 12) Merseyrail 172772.0 50.26 85.87 98.10 99.37 99.84 99.96 99.98 100.00 0.04 0.02 0.00 2467731.0 51.36 84.90 97.41 99.02 99.71 99.88 99.93 99.97 0.12 0.07 0.03
21 2020202113 Apr 2020 to Mar 2021 (Period 13) Merseyrail 190620.0 52.77 86.64 97.72 99.04 99.75 99.89 99.97 100.00 0.11 0.03 0.00 2404284.0 51.72 85.30 97.47 99.01 99.71 99.88 99.93 99.98 0.12 0.07 0.02
21 2021202201 Apr 2021 to Mar 2022 (Period 01) Merseyrail 257747.0 49.78 84.82 97.71 99.19 99.76 99.89 99.95 99.99 0.11 0.05 0.01 2520490.0 50.86 84.92 97.45 99.01 99.71 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202202 Apr 2021 to Mar 2022 (Period 02) Merseyrail 231835.0 46.84 81.99 96.92 99.00 99.82 99.94 99.97 99.99 0.06 0.03 0.01 2615188.0 50.07 84.47 97.37 98.99 99.72 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202203 Apr 2021 to Mar 2022 (Period 03) Merseyrail 232338.0 40.87 75.24 94.75 98.30 99.68 99.88 99.95 99.99 0.12 0.05 0.01 2694258.0 48.98 83.55 97.13 98.93 99.71 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202204 Apr 2021 to Mar 2022 (Period 04) Merseyrail 233358.0 41.25 76.34 95.23 98.45 99.69 99.91 99.97 100.00 0.09 0.03 0.00 2731376.0 48.07 82.75 96.89 98.85 99.70 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202205 Apr 2021 to Mar 2022 (Period 05) Merseyrail 232640.0 40.82 76.37 95.69 98.84 99.77 99.91 99.95 99.97 0.09 0.05 0.03 2752673.0 47.48 82.18 96.76 98.84 99.70 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202206 Apr 2021 to Mar 2022 (Period 06) Merseyrail 234431.0 41.90 76.39 94.77 98.39 99.66 99.84 99.91 99.98 0.16 0.09 0.02 2761814.0 46.90 81.52 96.52 98.76 99.69 99.87 99.93 99.98 0.13 0.07 0.02
21 2021202207 Apr 2021 to Mar 2022 (Period 07) Merseyrail 243080.0 46.90 81.56 95.86 98.43 99.51 99.74 99.84 99.94 0.26 0.16 0.06 2766581.0 46.50 81.20 96.40 98.72 99.67 99.86 99.93 99.98 0.14 0.07 0.02
21 2021202208 Apr 2021 to Mar 2022 (Period 08) Merseyrail 244333.0 43.10 77.96 94.44 97.92 99.65 99.89 99.94 99.97 0.11 0.06 0.03 2801496.0 45.92 80.73 96.18 98.66 99.68 99.87 99.93 99.98 0.13 0.07 0.02
21 2021202209 Apr 2021 to Mar 2022 (Period 09) Merseyrail 243925.0 41.09 75.54 93.35 97.28 99.48 99.82 99.90 99.98 0.18 0.10 0.02 2854672.0 45.25 80.02 95.82 98.48 99.64 99.86 99.93 99.98 0.14 0.07 0.02
21 2021202210 Apr 2021 to Mar 2022 (Period 10) Merseyrail 222077.0 50.90 84.70 96.75 98.91 99.85 99.93 99.97 99.99 0.07 0.03 0.01 2895725.0 45.61 80.29 95.89 98.55 99.68 99.87 99.94 99.98 0.13 0.06 0.02
21 2021202211 Apr 2021 to Mar 2022 (Period 11) Merseyrail 192726.0 41.79 76.88 95.15 98.48 99.70 99.86 99.91 99.99 0.14 0.09 0.01 2931882.0 45.09 79.85 95.81 98.56 99.70 99.88 99.94 99.98 0.12 0.06 0.02
21 2021202212 Apr 2021 to Mar 2022 (Period 12) Merseyrail 228680.0 41.83 78.40 96.02 98.78 99.75 99.90 99.93 99.96 0.10 0.07 0.04 2987790.0 44.54 79.39 95.70 98.53 99.70 99.88 99.93 99.98 0.12 0.07 0.02
21 2021202213 Apr 2021 to Mar 2022 (Period 13) Merseyrail 223119.0 41.46 78.38 95.80 98.63 99.73 99.91 99.94 99.98 0.09 0.06 0.02 3020289.0 43.79 78.86 95.58 98.50 99.69 99.88 99.93 99.98 0.12 0.07 0.02
21 2022202301 Apr 2022 to Mar 2023 (Period 01) Merseyrail 262436.0 40.17 76.93 95.40 98.69 99.86 99.97 99.98 100.00 0.03 0.02 0.00 3024978.0 42.97 78.19 95.38 98.46 99.70 99.88 99.94 99.98 0.12 0.06 0.02
21 2022202302 Apr 2022 to Mar 2023 (Period 02) Merseyrail 278974.0 34.36 68.97 91.40 96.97 99.56 99.84 99.93 99.99 0.16 0.07 0.01 3072117.0 41.89 77.06 94.90 98.29 99.68 99.87 99.93 99.98 0.13 0.07 0.02
21 2022202303 Apr 2022 to Mar 2023 (Period 03) Merseyrail 212747.0 36.48 69.35 90.68 96.54 99.46 99.82 99.89 99.95 0.18 0.11 0.05 3052526.0 41.59 76.66 94.62 98.16 99.67 99.87 99.93 99.98 0.13 0.07 0.02
21 2022202304 Apr 2022 to Mar 2023 (Period 04) Merseyrail 270716.0 37.49 71.69 91.86 96.53 98.97 99.51 99.69 99.85 0.49 0.31 0.15 3089884.0 41.26 76.25 94.33 98.00 99.60 99.84 99.90 99.96 0.16 0.10 0.04
21 2022202305 Apr 2022 to Mar 2023 (Period 05) Merseyrail 250193.0 34.45 67.19 90.52 96.84 99.53 99.84 99.92 99.98 0.16 0.08 0.02 3107437.0 40.74 75.51 93.92 97.84 99.58 99.83 99.90 99.96 0.17 0.10 0.04
21 2022202306 Apr 2022 to Mar 2023 (Period 06) Merseyrail 278399.0 42.06 76.84 95.08 98.33 99.71 99.90 99.95 99.96 0.10 0.05 0.04 3151405.0 40.77 75.56 93.96 97.84 99.59 99.84 99.91 99.96 0.16 0.09 0.04
21 2022202307 Apr 2022 to Mar 2023 (Period 07) Merseyrail 257271.0 42.08 76.88 95.03 98.24 99.64 99.85 99.91 99.97 0.15 0.09 0.03 3165596.0 40.41 75.21 93.90 97.83 99.60 99.85 99.91 99.97 0.15 0.09 0.03
21 2022202308 Apr 2022 to Mar 2023 (Period 08) Merseyrail 268318.0 40.54 75.12 94.29 97.89 99.62 99.90 99.96 99.99 0.10 0.04 0.01 3189581.0 40.21 74.99 93.90 97.83 99.60 99.85 99.91 99.97 0.15 0.09 0.03
21 2022202309 Apr 2022 to Mar 2023 (Period 09) Merseyrail 269279.0 38.47 73.52 93.88 97.74 99.47 99.77 99.90 99.96 0.23 0.10 0.04 3214935.0 40.00 74.83 93.94 97.86 99.60 99.84 99.91 99.97 0.16 0.09 0.03
21 2022202310 Apr 2022 to Mar 2023 (Period 10) Merseyrail 178203.0 42.24 76.50 94.48 97.90 99.53 99.84 99.93 99.97 0.16 0.07 0.03 3171061.0 39.36 74.23 93.77 97.79 99.57 99.84 99.91 99.97 0.16 0.09 0.03
21 2022202311 Apr 2022 to Mar 2023 (Period 11) Merseyrail 256226.0 38.74 73.31 93.31 97.76 99.59 99.87 99.93 99.98 0.13 0.07 0.02 3234561.0 39.17 74.00 93.65 97.75 99.57 99.84 99.91 99.96 0.16 0.09 0.04
21 2022202312 Apr 2022 to Mar 2023 (Period 12) Merseyrail 263208.0 41.59 76.91 95.45 98.69 99.80 99.94 99.97 99.99 0.06 0.03 0.01 3269089.0 39.18 73.93 93.63 97.75 99.57 99.84 99.92 99.97 0.16 0.08 0.03
21 2022202313 Apr 2022 to Mar 2023 (Period 13) Merseyrail 256366.0 41.70 76.12 94.22 97.96 99.63 99.89 99.96 99.99 0.11 0.04 0.01 3302336.0 39.22 73.80 93.53 97.71 99.57 99.84 99.92 99.97 0.16 0.08 0.03
21 2023202401 Apr 2023 to Mar 2024 (Period 01) Merseyrail 282144.0 40.88 75.33 93.83 97.95 99.63 99.90 99.94 99.96 0.10 0.06 0.04 3322044.0 39.29 73.68 93.41 97.65 99.55 99.84 99.91 99.96 0.16 0.09 0.04
21 2023202402 Apr 2023 to Mar 2024 (Period 02) Merseyrail 268046.0 39.21 73.27 93.40 97.61 99.63 99.89 99.95 99.99 0.11 0.05 0.01 3311116.0 39.69 74.04 93.58 97.71 99.56 99.84 99.92 99.96 0.16 0.08 0.04
21 2023202403 Apr 2023 to Mar 2024 (Period 03) Merseyrail 277103.0 40.29 73.66 93.36 97.59 99.53 99.85 99.94 99.98 0.15 0.06 0.02 3375472.0 39.95 74.31 93.74 97.77 99.56 99.84 99.92 99.97 0.16 0.08 0.03
21 2023202404 Apr 2023 to Mar 2024 (Period 04) Merseyrail 265497.0 40.69 73.92 93.87 97.75 99.49 99.86 99.95 99.99 0.14 0.05 0.01 3370253.0 40.20 74.49 93.90 97.87 99.60 99.87 99.94 99.98 0.13 0.06 0.02
21 2023202405 Apr 2023 to Mar 2024 (Period 05) Merseyrail 260333.0 38.41 71.52 92.30 97.05 99.42 99.73 99.84 99.90 0.27 0.16 0.10 3380393.0 40.49 74.80 94.03 97.88 99.59 99.86 99.93 99.97 0.14 0.07 0.03
21 2023202406 Apr 2023 to Mar 2024 (Period 06) Merseyrail 262329.0 37.72 70.75 92.12 97.20 99.59 99.88 99.94 99.98 0.12 0.06 0.02 3364323.0 40.14 74.31 93.79 97.79 99.58 99.86 99.93 99.97 0.14 0.07 0.03
21 2023202407 Apr 2023 to Mar 2024 (Period 07) Merseyrail 255339.0 36.15 68.71 90.46 96.01 99.02 99.58 99.83 99.95 0.42 0.17 0.05 3362391.0 39.69 73.69 93.45 97.62 99.54 99.84 99.93 99.97 0.16 0.07 0.03
21 2023202408 Apr 2023 to Mar 2024 (Period 08) Merseyrail 260360.0 37.96 70.79 92.12 96.66 99.12 99.65 99.85 99.98 0.35 0.15 0.02 3354433.0 39.49 73.35 93.28 97.53 99.50 99.82 99.92 99.97 0.18 0.08 0.03
21 2023202409 Apr 2023 to Mar 2024 (Period 09) Merseyrail 258133.0 34.61 66.58 89.47 95.08 98.58 99.46 99.76 99.93 0.54 0.24 0.07 3343287.0 39.20 72.82 92.93 97.32 99.43 99.80 99.91 99.97 0.20 0.09 0.03
21 2023202410 Apr 2023 to Mar 2024 (Period 10) Merseyrail 232764.0 37.32 68.79 89.85 95.12 98.49 99.40 99.66 99.89 0.60 0.34 0.11 3397848.0 38.91 72.35 92.64 97.14 99.36 99.77 99.89 99.96 0.23 0.11 0.04
21 2023202411 Apr 2023 to Mar 2024 (Period 11) Merseyrail 258892.0 37.65 68.08 89.61 95.40 98.78 99.56 99.83 99.96 0.44 0.17 0.04 3400514.0 38.82 71.95 92.36 96.96 99.30 99.74 99.88 99.96 0.26 0.12 0.04
21 2023202412 Apr 2023 to Mar 2024 (Period 12) Merseyrail 259996.0 35.09 65.54 88.70 95.18 98.72 99.52 99.77 99.93 0.48 0.23 0.07 3397302.0 38.32 71.07 91.84 96.69 99.22 99.71 99.87 99.96 0.29 0.13 0.04
21 2023202413 Apr 2023 to Mar 2024 (Period 13) Merseyrail 268304.0 40.04 71.21 91.29 96.33 99.19 99.68 99.88 99.99 0.32 0.12 0.01 3409240.0 38.20 70.71 91.62 96.56 99.18 99.70 99.86 99.96 0.30 0.14 0.04
21 2024202501 Apr 2024 to Mar 2025 (Period 01) Merseyrail 257217.0 42.38 72.90 91.83 96.43 99.05 99.68 99.87 99.96 0.32 0.13 0.04 3384313.0 38.30 70.49 91.45 96.44 99.14 99.68 99.85 99.96 0.32 0.15 0.04
21 2024202502 Apr 2024 to Mar 2025 (Period 02) Merseyrail 262353.0 41.16 70.69 90.07 95.36 98.76 99.46 99.74 99.91 0.54 0.26 0.09 3378620.0 38.45 70.28 91.19 96.26 99.07 99.64 99.84 99.95 0.36 0.16 0.05
21 2024202503 Apr 2024 to Mar 2025 (Period 03) Merseyrail 273956.0 41.09 71.32 91.27 96.21 99.18 99.79 99.92 99.97 0.21 0.08 0.03 3375473.0 38.51 70.09 91.01 96.15 99.04 99.64 99.84 99.95 0.36 0.16 0.05
21 2024202504 Apr 2024 to Mar 2025 (Period 04) Merseyrail 273943.0 38.25 68.90 90.33 95.93 99.02 99.67 99.83 99.91 0.33 0.17 0.09 3383919.0 38.32 69.69 90.73 96.01 99.00 99.62 99.83 99.94 0.38 0.17 0.06
21 2024202505 Apr 2024 to Mar 2025 (Period 05) Merseyrail 272798.0 35.05 65.83 88.96 95.30 98.67 99.50 99.72 99.88 0.50 0.28 0.12 3396384.0 38.05 69.24 90.47 95.87 98.94 99.60 99.82 99.94 0.40 0.18 0.06
21 2024202506 Apr 2024 to Mar 2025 (Period 06) Merseyrail 273122.0 43.11 73.96 92.44 96.89 99.22 99.72 99.90 99.98 0.28 0.10 0.02 3407177.0 38.48 69.51 90.50 95.85 98.91 99.59 99.81 99.94 0.41 0.19 0.06
21 2024202507 Apr 2024 to Mar 2025 (Period 07) Merseyrail 262572.0 43.70 75.58 93.62 97.45 99.40 99.78 99.90 99.96 0.22 0.10 0.04 3414410.0 39.06 70.03 90.75 95.96 98.94 99.61 99.82 99.94 0.39 0.18 0.06
21 2024202508 Apr 2024 to Mar 2025 (Period 08) Merseyrail 263717.0 37.50 69.60 90.17 95.49 98.76 99.55 99.78 99.95 0.45 0.22 0.05 3417767.0 39.02 69.94 90.60 95.87 98.92 99.60 99.81 99.94 0.40 0.19 0.06
21 2024202509 Apr 2024 to Mar 2025 (Period 09) Merseyrail 268771.0 37.60 69.12 89.25 94.65 98.22 99.22 99.59 99.89 0.78 0.41 0.11 3428405.0 39.24 70.13 90.58 95.83 98.89 99.58 99.80 99.94 0.42 0.20 0.06
21 2024202510 Apr 2024 to Mar 2025 (Period 10) Merseyrail 252287.0 40.85 73.13 92.24 96.60 99.03 99.62 99.80 99.92 0.38 0.20 0.08 3447928.0 39.49 70.44 90.75 95.94 98.93 99.60 99.81 99.94 0.40 0.19 0.06
21 2024202511 Apr 2024 to Mar 2025 (Period 11) Merseyrail 265958.0 41.00 69.80 89.16 95.14 98.58 99.43 99.72 99.87 0.57 0.28 0.13 3454994.0 39.74 70.57 90.71 95.92 98.91 99.59 99.80 99.93 0.41 0.20 0.07
21 2024202512 Apr 2024 to Mar 2025 (Period 12) Merseyrail 278675.0 37.09 69.17 90.39 96.13 98.96 99.64 99.85 99.97 0.36 0.15 0.03 3473673.0 39.88 70.83 90.83 95.99 98.93 99.59 99.81 99.94 0.41 0.19 0.06
21 2024202513 Apr 2024 to Mar 2025 (Period 13) Merseyrail 296590.0 37.30 69.46 91.43 96.65 99.17 99.63 99.78 99.92 0.37 0.22 0.08 3501959.0 39.65 70.69 90.85 96.02 98.93 99.59 99.80 99.93 0.41 0.20 0.07
21 2025202601 Apr 2025 to Mar 2026 (Period 01) Merseyrail 264412.0 37.06 68.04 89.75 95.66 98.73 99.49 99.75 99.91 0.51 0.25 0.09 3509154.0 39.25 70.32 90.70 95.96 98.90 99.58 99.79 99.93 0.42 0.21 0.07
21 2025202602 Apr 2025 to Mar 2026 (Period 02) Merseyrail 279420.0 36.02 66.55 89.61 95.94 99.08 99.66 99.83 99.92 0.34 0.17 0.08 3526221.0 38.86 70.00 90.66 96.01 98.93 99.59 99.80 99.93 0.41 0.20 0.07
21 2025202603 Apr 2025 to Mar 2026 (Period 03) Merseyrail 281483.0 37.67 68.54 90.54 96.32 99.17 99.66 99.79 99.91 0.34 0.21 0.09 3533748.0 38.59 69.78 90.60 96.02 98.93 99.58 99.79 99.92 0.42 0.21 0.08
21 2025202604 Apr 2025 to Mar 2026 (Period 04) Merseyrail 283113.0 38.27 69.58 90.96 96.30 99.10 99.63 99.82 99.92 0.37 0.18 0.08 3542918.0 38.59 69.83 90.65 96.04 98.93 99.58 99.79 99.92 0.42 0.21 0.08
21 2025202605 Apr 2025 to Mar 2026 (Period 05) Merseyrail 283364.0 37.91 68.30 90.11 96.16 99.13 99.65 99.80 99.94 0.35 0.20 0.06 3553484.0 38.81 70.02 90.74 96.11 98.97 99.59 99.79 99.93 0.41 0.21 0.07
21 2025202606 Apr 2025 to Mar 2026 (Period 06) Merseyrail 283556.0 39.45 69.87 91.20 96.74 99.31 99.78 99.91 99.96 0.22 0.09 0.04 3563918.0 38.53 69.70 90.64 96.10 98.98 99.60 99.79 99.93 0.40 0.21 0.07
21 2025202607 Apr 2025 to Mar 2026 (Period 07) Merseyrail 279094.0 39.38 70.70 91.48 96.61 99.16 99.73 99.86 99.94 0.27 0.14 0.06 3580440.0 38.21 69.35 90.49 96.04 98.96 99.59 99.79 99.92 0.41 0.21 0.08
21 2025202608 Apr 2025 to Mar 2026 (Period 08) Merseyrail 281323.0 37.11 70.16 90.69 95.98 98.76 99.46 99.67 99.83 0.54 0.33 0.17 3598046.0 38.18 69.39 90.53 96.08 98.96 99.59 99.78 99.91 0.41 0.22 0.09
21 2025202609 Apr 2025 to Mar 2026 (Period 09) Merseyrail 282988.0 35.27 67.18 89.48 95.42 98.84 99.58 99.81 99.94 0.42 0.19 0.06 3612263.0 37.99 69.24 90.54 96.13 99.00 99.61 99.80 99.92 0.39 0.20 0.08
21 2025202610 Apr 2025 to Mar 2026 (Period 10) Merseyrail 257813.0 37.50 70.73 91.68 96.58 99.23 99.82 99.94 99.99 0.18 0.06 0.01 3617789.0 37.76 69.07 90.50 96.13 99.02 99.63 99.81 99.92 0.37 0.19 0.08
21 2025202611 Apr 2025 to Mar 2026 (Period 11) Merseyrail 280486.0 37.82 68.73 90.78 96.51 99.22 99.66 99.78 99.95 0.34 0.22 0.05 3632317.0 37.53 68.99 90.62 96.23 99.07 99.64 99.81 99.93 0.36 0.19 0.07
21 2025202612 Apr 2025 to Mar 2026 (Period 12) Merseyrail 281846.0 37.30 67.72 90.08 96.40 99.19 99.70 99.84 99.94 0.30 0.16 0.06 3635488.0 37.54 68.88 90.60 96.25 99.08 99.65 99.81 99.93 0.35 0.19 0.07
21 2025202613 Apr 2025 to Mar 2026 (Period 13) Merseyrail 310791.0 39.72 70.67 91.82 97.00 99.41 99.76 99.86 99.95 0.24 0.14 0.05 3649689.0 37.75 68.99 90.63 96.28 99.11 99.66 99.82 99.93 0.34 0.18 0.07
21 2026202701 Apr 2026 to Mar 2027 (Period 01) Merseyrail 321884.0 40.31 70.21 91.28 96.71 99.25 99.68 99.83 99.93 0.32 0.17 0.07 3707161.0 38.02 69.16 90.75 96.37 99.15 99.67 99.83 99.93 0.33 0.17 0.07
21 2026202702 Apr 2026 to Mar 2027 (Period 02) Merseyrail 283872.0 40.36 71.05 92.24 97.26 99.36 99.73 99.87 99.93 0.27 0.13 0.07 3711613.0 38.35 69.50 90.95 96.47 99.17 99.68 99.83 99.93 0.32 0.17 0.07
22 2014201501 Apr 2014 to Mar 2015 (Period 01) Northern Trains 504822.0 32.99 64.64 87.43 94.36 98.49 99.30 99.64 99.88 0.70 0.36 0.12 504822.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201502 Apr 2014 to Mar 2015 (Period 02) Northern Trains 539672.0 30.50 60.93 84.35 92.33 97.80 99.02 99.47 99.83 0.98 0.53 0.17 1044494.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201503 Apr 2014 to Mar 2015 (Period 03) Northern Trains 542866.0 29.49 58.93 82.29 91.12 97.31 98.77 99.36 99.81 1.23 0.64 0.19 1587360.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201504 Apr 2014 to Mar 2015 (Period 04) Northern Trains 534413.0 29.52 58.88 82.53 91.30 97.26 98.69 99.28 99.75 1.31 0.72 0.25 2121773.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201505 Apr 2014 to Mar 2015 (Period 05) Northern Trains 535222.0 28.04 56.44 80.09 89.34 96.48 98.34 99.11 99.73 1.66 0.89 0.27 2656995.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201506 Apr 2014 to Mar 2015 (Period 06) Northern Trains 543986.0 29.91 59.53 83.17 91.72 97.60 98.87 99.38 99.76 1.13 0.62 0.24 3200981.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201507 Apr 2014 to Mar 2015 (Period 07) Northern Trains 555844.0 27.47 56.53 81.22 90.66 97.14 98.71 99.28 99.75 1.29 0.72 0.25 3756825.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201508 Apr 2014 to Mar 2015 (Period 08) Northern Trains 552161.0 20.62 45.14 70.13 82.57 94.17 97.43 98.69 99.63 2.57 1.31 0.37 4308986.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201509 Apr 2014 to Mar 2015 (Period 09) Northern Trains 553851.0 23.02 48.53 73.38 84.94 94.98 97.71 98.82 99.63 2.29 1.18 0.37 4862837.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201510 Apr 2014 to Mar 2015 (Period 10) Northern Trains 503511.0 27.54 54.97 78.55 88.34 96.20 98.12 98.92 99.65 1.88 1.08 0.35 5366348.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201511 Apr 2014 to Mar 2015 (Period 11) Northern Trains 553935.0 31.16 60.81 83.52 91.92 97.63 98.92 99.39 99.78 1.08 0.61 0.22 5920283.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201512 Apr 2014 to Mar 2015 (Period 12) Northern Trains 552097.0 31.41 61.31 84.07 92.10 97.55 98.83 99.35 99.77 1.17 0.65 0.23 6472380.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2014201513 Apr 2014 to Mar 2015 (Period 13) Northern Trains 607271.0 33.17 63.64 85.66 93.29 98.14 99.16 99.55 99.85 0.84 0.45 0.15 7079651.0 28.84 57.72 81.26 90.31 96.98 98.61 99.25 99.76 1.39 0.75 0.24
22 2015201601 Apr 2015 to Mar 2016 (Period 01) Northern Trains 635398.0 32.34 62.27 84.04 92.14 97.76 98.91 99.37 99.76 1.09 0.63 0.24 7210227.0 28.86 57.64 81.08 90.19 96.95 98.59 99.23 99.75 1.41 0.77 0.25
22 2015201602 Apr 2015 to Mar 2016 (Period 02) Northern Trains 550558.0 34.04 64.43 85.86 93.12 97.99 99.09 99.52 99.86 0.91 0.48 0.14 7221113.0 29.13 57.91 81.20 90.25 96.96 98.59 99.24 99.75 1.41 0.76 0.25
22 2015201603 Apr 2015 to Mar 2016 (Period 03) Northern Trains 552593.0 34.30 64.32 85.31 92.59 97.68 98.89 99.39 99.79 1.11 0.61 0.21 7230840.0 29.50 58.32 81.43 90.36 96.99 98.60 99.24 99.75 1.40 0.76 0.25
22 2015201604 Apr 2015 to Mar 2016 (Period 04) Northern Trains 552198.0 31.90 61.26 82.90 91.01 96.96 98.45 99.04 99.62 1.55 0.96 0.38 7248625.0 29.68 58.51 81.46 90.34 96.97 98.58 99.22 99.74 1.42 0.78 0.26
22 2015201605 Apr 2015 to Mar 2016 (Period 05) Northern Trains 553539.0 31.99 61.53 83.11 91.32 97.31 98.73 99.28 99.74 1.27 0.72 0.26 7266942.0 29.98 58.89 81.68 90.49 97.03 98.61 99.23 99.74 1.39 0.77 0.26
22 2015201606 Apr 2015 to Mar 2016 (Period 06) Northern Trains 560239.0 33.96 64.06 85.64 93.18 98.17 99.17 99.54 99.84 0.83 0.46 0.16 7283195.0 30.29 59.24 81.88 90.61 97.08 98.64 99.25 99.75 1.36 0.75 0.25
22 2015201607 Apr 2015 to Mar 2016 (Period 07) Northern Trains 563835.0 30.12 59.07 81.96 90.98 97.47 98.92 99.42 99.81 1.08 0.58 0.19 7291186.0 30.49 59.43 81.93 90.63 97.10 98.65 99.26 99.75 1.35 0.74 0.25
22 2015201608 Apr 2015 to Mar 2016 (Period 08) Northern Trains 563802.0 22.75 47.99 72.15 84.20 94.94 97.85 98.93 99.70 2.15 1.07 0.30 7302827.0 30.64 59.63 82.07 90.74 97.16 98.68 99.28 99.76 1.32 0.72 0.24
22 2015201609 Apr 2015 to Mar 2016 (Period 09) Northern Trains 567772.0 22.37 47.32 71.10 82.84 93.86 97.12 98.45 99.47 2.88 1.55 0.53 7316748.0 30.58 59.51 81.88 90.57 97.06 98.64 99.25 99.74 1.36 0.75 0.26
22 2015201610 Apr 2015 to Mar 2016 (Period 10) Northern Trains 527250.0 29.04 57.00 79.56 89.22 96.84 98.58 99.24 99.76 1.42 0.76 0.24 7340487.0 30.68 59.64 81.94 90.63 97.11 98.67 99.27 99.75 1.33 0.73 0.25
22 2015201611 Apr 2015 to Mar 2016 (Period 11) Northern Trains 569760.0 31.17 60.12 82.11 90.85 97.29 98.72 99.31 99.75 1.28 0.69 0.25 7356312.0 30.68 59.59 81.83 90.55 97.08 98.65 99.26 99.75 1.35 0.74 0.25
22 2015201612 Apr 2015 to Mar 2016 (Period 12) Northern Trains 589746.0 32.58 62.59 84.50 92.33 97.72 98.92 99.40 99.78 1.08 0.60 0.22 7393961.0 30.77 59.70 81.88 90.57 97.10 98.66 99.27 99.75 1.34 0.73 0.25
22 2015201613 Apr 2015 to Mar 2016 (Period 13) Northern Trains 556506.0 34.45 65.13 86.22 93.44 98.18 99.13 99.52 99.83 0.87 0.48 0.17 7343196.0 30.85 59.79 81.89 90.57 97.10 98.65 99.26 99.75 1.35 0.74 0.25
22 2016201701 Apr 2016 to Mar 2017 (Period 01) Northern Trains 653402.0 35.58 66.80 87.35 94.08 98.33 99.23 99.56 99.84 0.77 0.44 0.16 7361200.0 31.15 60.20 82.19 90.74 97.15 98.68 99.28 99.75 1.32 0.72 0.25
22 2016201702 Apr 2016 to Mar 2017 (Period 02) Northern Trains 614162.0 35.72 66.86 87.10 93.70 98.12 99.13 99.52 99.83 0.87 0.48 0.17 7424804.0 31.31 60.44 82.33 90.81 97.17 98.69 99.28 99.75 1.31 0.72 0.25
22 2016201703 Apr 2016 to Mar 2017 (Period 03) Northern Trains 615452.0 34.39 64.33 84.72 92.15 97.37 98.78 99.32 99.79 1.22 0.68 0.21 7487663.0 31.34 60.47 82.30 90.79 97.14 98.68 99.28 99.75 1.32 0.72 0.25
22 2016201704 Apr 2016 to Mar 2017 (Period 04) Northern Trains 620772.0 34.78 65.46 85.94 92.96 97.84 98.95 99.42 99.81 1.05 0.58 0.19 7556237.0 31.58 60.82 82.56 90.95 97.21 98.72 99.30 99.77 1.28 0.70 0.23
22 2016201705 Apr 2016 to Mar 2017 (Period 05) Northern Trains 623471.0 33.88 64.36 85.18 92.48 97.67 98.95 99.44 99.84 1.05 0.56 0.16 7626169.0 31.74 61.06 82.73 91.05 97.24 98.74 99.32 99.77 1.26 0.68 0.23
22 2016201706 Apr 2016 to Mar 2017 (Period 06) Northern Trains 620487.0 34.22 65.12 85.96 93.07 97.95 99.07 99.52 99.82 0.93 0.48 0.18 7686417.0 31.78 61.17 82.78 91.06 97.23 98.73 99.32 99.77 1.27 0.68 0.23
22 2016201707 Apr 2016 to Mar 2017 (Period 07) Northern Trains 627494.0 32.72 63.58 85.63 93.17 98.11 99.20 99.58 99.86 0.80 0.42 0.14 7750076.0 31.98 61.52 83.07 91.23 97.29 98.76 99.33 99.78 1.24 0.67 0.22
22 2016201708 Apr 2016 to Mar 2017 (Period 08) Northern Trains 631113.0 26.13 54.05 78.45 88.93 97.00 98.76 99.36 99.81 1.24 0.64 0.19 7817387.0 32.17 61.89 83.49 91.56 97.43 98.82 99.36 99.79 1.18 0.64 0.21
22 2016201709 Apr 2016 to Mar 2017 (Period 09) Northern Trains 624338.0 21.92 47.19 71.20 83.21 94.48 97.60 98.69 99.56 2.40 1.31 0.44 7873953.0 32.06 61.78 83.41 91.52 97.46 98.85 99.38 99.79 1.15 0.62 0.21
22 2016201710 Apr 2016 to Mar 2017 (Period 10) Northern Trains 573389.0 31.48 61.01 82.93 91.24 97.40 98.85 99.42 99.80 1.15 0.58 0.20 7920092.0 32.22 62.04 83.63 91.66 97.49 98.87 99.39 99.79 1.13 0.61 0.21
22 2016201711 Apr 2016 to Mar 2017 (Period 11) Northern Trains 618797.0 33.30 63.69 84.99 92.66 97.89 99.06 99.49 99.84 0.94 0.51 0.16 7969129.0 32.38 62.30 83.84 91.79 97.54 98.89 99.40 99.80 1.11 0.60 0.20
22 2016201712 Apr 2016 to Mar 2017 (Period 12) Northern Trains 609412.0 33.91 64.70 85.75 92.82 97.61 98.75 99.24 99.68 1.25 0.76 0.32 7988795.0 32.48 62.47 83.94 91.83 97.53 98.88 99.39 99.79 1.12 0.61 0.21
22 2016201713 Apr 2016 to Mar 2017 (Period 13) Northern Trains 582366.0 35.39 66.77 87.29 93.91 98.17 99.17 99.53 99.83 0.83 0.47 0.17 8014655.0 32.56 62.59 84.03 91.87 97.53 98.88 99.39 99.79 1.12 0.61 0.21
22 2017201801 Apr 2017 to Mar 2018 (Period 01) Northern Trains 619710.0 35.75 67.20 87.36 93.75 98.09 99.00 99.40 99.79 1.00 0.60 0.21 7980963.0 32.56 62.61 84.01 91.83 97.51 98.86 99.38 99.79 1.14 0.62 0.21
22 2017201802 Apr 2017 to Mar 2018 (Period 02) Northern Trains 630914.0 34.54 65.23 85.37 92.20 97.30 98.75 99.29 99.76 1.25 0.71 0.24 7997715.0 32.47 62.49 83.88 91.72 97.45 98.83 99.36 99.78 1.17 0.64 0.22
22 2017201803 Apr 2017 to Mar 2018 (Period 03) Northern Trains 638788.0 33.37 63.88 84.71 92.08 97.55 98.85 99.38 99.81 1.15 0.62 0.19 8021051.0 32.40 62.46 83.88 91.72 97.46 98.84 99.36 99.78 1.16 0.64 0.22
22 2017201804 Apr 2017 to Mar 2018 (Period 04) Northern Trains 610814.0 33.40 64.58 85.73 93.01 97.98 99.09 99.52 99.85 0.91 0.48 0.15 8011093.0 32.29 62.39 83.86 91.72 97.47 98.85 99.37 99.79 1.15 0.63 0.21
22 2017201805 Apr 2017 to Mar 2018 (Period 05) Northern Trains 636219.0 32.71 63.26 84.58 92.15 97.54 98.89 99.42 99.80 1.11 0.58 0.20 8023841.0 32.20 62.30 83.82 91.69 97.46 98.85 99.37 99.79 1.15 0.63 0.21
22 2017201806 Apr 2017 to Mar 2018 (Period 06) Northern Trains 596202.0 33.03 63.75 84.95 92.37 97.71 98.98 99.44 99.78 1.02 0.56 0.22 7999556.0 32.10 62.19 83.74 91.64 97.44 98.84 99.36 99.78 1.16 0.64 0.22
22 2017201807 Apr 2017 to Mar 2018 (Period 07) Northern Trains 597268.0 27.46 56.25 79.58 89.14 96.71 98.58 99.28 99.78 1.42 0.72 0.22 7969330.0 31.71 61.63 83.28 91.33 97.33 98.79 99.34 99.78 1.21 0.66 0.22
22 2017201808 Apr 2017 to Mar 2018 (Period 08) Northern Trains 615444.0 20.80 45.92 70.34 82.47 93.89 97.28 98.66 99.56 2.72 1.34 0.44 7953661.0 31.30 61.02 82.66 90.83 97.09 98.68 99.29 99.76 1.32 0.71 0.24
22 2017201809 Apr 2017 to Mar 2018 (Period 09) Northern Trains 633883.0 22.75 48.66 72.47 84.04 94.65 97.64 98.78 99.62 2.36 1.22 0.38 7963206.0 31.36 61.12 82.75 90.89 97.11 98.68 99.29 99.76 1.32 0.71 0.24
22 2017201810 Apr 2017 to Mar 2018 (Period 10) Northern Trains 572816.0 26.99 54.82 78.37 88.28 96.26 98.28 99.03 99.64 1.72 0.97 0.36 7962633.0 31.04 60.67 82.42 90.68 97.02 98.64 99.26 99.75 1.36 0.74 0.25
22 2017201811 Apr 2017 to Mar 2018 (Period 11) Northern Trains 575420.0 29.86 60.16 83.11 91.79 97.88 99.15 99.56 99.85 0.85 0.44 0.15 7919256.0 30.77 60.40 82.27 90.60 97.02 98.64 99.27 99.75 1.36 0.73 0.25
22 2017201812 Apr 2017 to Mar 2018 (Period 12) Northern Trains 598889.0 28.47 57.27 79.52 88.50 95.50 97.49 98.46 99.33 2.51 1.54 0.67 7908733.0 30.36 59.83 81.79 90.27 96.86 98.55 99.21 99.72 1.45 0.79 0.28
22 2017201813 Apr 2017 to Mar 2018 (Period 13) Northern Trains 586161.0 29.77 59.21 81.53 90.29 96.96 98.65 99.29 99.75 1.35 0.71 0.25 7912528.0 29.94 59.28 81.37 90.01 96.77 98.51 99.19 99.72 1.49 0.81 0.28
22 2018201901 Apr 2018 to Mar 2019 (Period 01) Northern Trains 622855.0 29.99 58.84 80.46 88.97 95.87 97.85 98.76 99.58 2.15 1.24 0.42 7915673.0 29.49 58.62 80.83 89.63 96.60 98.42 99.14 99.70 1.58 0.86 0.30
22 2018201902 Apr 2018 to Mar 2019 (Period 02) Northern Trains 577473.0 27.35 54.77 76.45 85.72 94.14 96.89 98.25 99.39 3.11 1.75 0.61 7862232.0 28.93 57.81 80.14 89.14 96.36 98.28 99.06 99.67 1.72 0.94 0.33
22 2018201903 Apr 2018 to Mar 2019 (Period 03) Northern Trains 569938.0 27.05 52.81 73.72 83.66 93.38 96.52 98.03 99.44 3.48 1.97 0.56 7793382.0 28.43 56.94 79.30 88.50 96.04 98.10 98.96 99.65 1.90 1.04 0.35
22 2018201904 Apr 2018 to Mar 2019 (Period 04) Northern Trains 628316.0 26.79 52.69 73.65 83.75 93.81 96.84 98.21 99.39 3.16 1.79 0.61 7810884.0 27.91 56.01 78.34 87.76 95.71 97.92 98.86 99.61 2.08 1.14 0.39
22 2018201905 Apr 2018 to Mar 2019 (Period 05) Northern Trains 652318.0 26.88 52.58 73.88 84.10 94.22 97.26 98.51 99.52 2.74 1.49 0.48 7826983.0 27.43 55.13 77.46 87.10 95.44 97.79 98.78 99.59 2.21 1.22 0.41
22 2018201906 Apr 2018 to Mar 2019 (Period 06) Northern Trains 590602.0 29.07 56.64 78.60 88.21 96.34 98.42 99.18 99.75 1.58 0.82 0.25 7821383.0 27.13 54.59 76.97 86.78 95.33 97.75 98.76 99.58 2.25 1.24 0.42
22 2018201907 Apr 2018 to Mar 2019 (Period 07) Northern Trains 582548.0 24.12 49.50 71.96 83.21 93.95 97.17 98.52 99.54 2.83 1.48 0.46 7806663.0 26.88 54.08 76.40 86.34 95.12 97.64 98.71 99.57 2.36 1.29 0.43
22 2018201908 Apr 2018 to Mar 2019 (Period 08) Northern Trains 599855.0 19.60 42.33 65.19 77.91 91.78 96.21 98.04 99.47 3.79 1.96 0.53 7791074.0 26.80 53.82 76.02 85.99 94.96 97.56 98.66 99.56 2.44 1.34 0.44
22 2018201909 Apr 2018 to Mar 2019 (Period 09) Northern Trains 602465.0 18.15 39.78 62.17 75.33 90.43 95.70 97.84 99.40 4.30 2.16 0.60 7759656.0 26.46 53.15 75.23 85.32 94.64 97.41 98.58 99.54 2.59 1.42 0.46
22 2018201910 Apr 2018 to Mar 2019 (Period 10) Northern Trains 543977.0 27.57 54.39 76.82 87.06 96.06 98.32 99.16 99.77 1.68 0.84 0.23 7730817.0 26.50 53.12 75.11 85.23 94.62 97.41 98.59 99.55 2.59 1.41 0.45
22 2018201911 Apr 2018 to Mar 2019 (Period 11) Northern Trains 631072.0 30.50 58.88 80.77 89.91 97.04 98.65 99.29 99.79 1.35 0.71 0.21 7786469.0 26.57 53.06 74.98 85.12 94.57 97.38 98.58 99.55 2.62 1.42 0.45
22 2018201912 Apr 2018 to Mar 2019 (Period 12) Northern Trains 689757.0 31.25 59.15 80.89 89.91 96.97 98.68 99.36 99.80 1.32 0.64 0.20 7877337.0 26.84 53.28 75.15 85.28 94.71 97.49 98.66 99.59 2.51 1.34 0.41
22 2018201913 Apr 2018 to Mar 2019 (Period 13) Northern Trains 721024.0 32.09 60.60 81.75 90.25 96.82 98.52 99.25 99.75 1.48 0.75 0.25 8012200.0 27.10 53.50 75.28 85.36 94.74 97.49 98.66 99.59 2.51 1.34 0.41
22 2019202001 Apr 2019 to Mar 2020 (Period 01) Northern Trains 700544.0 33.80 62.70 83.18 91.27 97.43 98.86 99.46 99.87 1.14 0.54 0.13 700544.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202002 Apr 2019 to Mar 2020 (Period 02) Northern Trains 715086.0 32.89 61.52 82.50 90.67 96.99 98.59 99.26 99.75 1.41 0.74 0.25 1415630.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202003 Apr 2019 to Mar 2020 (Period 03) Northern Trains 732333.0 31.81 60.62 81.85 90.48 97.06 98.71 99.37 99.79 1.29 0.63 0.21 2147963.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202004 Apr 2019 to Mar 2020 (Period 04) Northern Trains 731629.0 30.68 58.71 79.96 88.92 96.38 98.41 99.21 99.76 1.59 0.79 0.24 2879592.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202005 Apr 2019 to Mar 2020 (Period 05) Northern Trains 709192.0 27.17 53.11 74.23 84.29 93.90 97.08 98.49 99.55 2.92 1.51 0.45 3588784.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202006 Apr 2019 to Mar 2020 (Period 06) Northern Trains 721163.0 29.26 56.48 78.00 87.43 95.87 98.14 99.03 99.71 1.86 0.97 0.29 4309947.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202007 Apr 2019 to Mar 2020 (Period 07) Northern Trains 718911.0 26.63 52.93 75.39 85.78 95.18 97.86 98.94 99.70 2.14 1.06 0.30 5028858.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202008 Apr 2019 to Mar 2020 (Period 08) Northern Trains 705224.0 21.59 44.74 67.06 79.15 91.73 95.95 97.84 99.32 4.05 2.16 0.68 5734082.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202009 Apr 2019 to Mar 2020 (Period 09) Northern Trains 695854.0 18.74 39.86 61.52 74.24 89.32 94.77 97.21 99.10 5.23 2.79 0.90 6429936.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202010 Apr 2019 to Mar 2020 (Period 10) Northern Trains 596236.0 25.85 50.71 71.63 81.94 92.55 96.23 97.91 99.26 3.77 2.09 0.74 7026172.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202011 Apr 2019 to Mar 2020 (Period 11) Northern Trains 686259.0 29.00 55.91 77.64 87.40 95.88 98.11 99.00 99.71 1.89 1.00 0.29 7712431.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202012 Apr 2019 to Mar 2020 (Period 12) Northern Trains 688575.0 28.16 54.15 75.22 85.29 94.67 97.36 98.54 99.53 2.64 1.46 0.47 8401006.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
22 2019202013 Apr 2019 to Mar 2020 (Period 13) Northern Trains 672111.0 37.65 65.41 83.42 90.67 96.64 98.38 99.13 99.74 1.62 0.87 0.26 9073117.0 28.74 55.20 76.35 86.03 94.93 97.60 98.74 99.60 2.40 1.26 0.40
22 2020202101 Apr 2020 to Mar 2021 (Period 01) Northern Trains 410307.0 59.04 87.17 95.88 97.71 99.07 99.51 99.72 99.90 0.49 0.28 0.10 8782880.0 29.75 56.10 76.72 86.16 94.93 97.58 98.72 99.60 2.42 1.28 0.40
22 2020202102 Apr 2020 to Mar 2021 (Period 02) Northern Trains 421796.0 55.84 83.92 94.18 96.67 98.43 99.06 99.41 99.74 0.94 0.59 0.26 8489590.0 30.78 57.02 77.10 86.30 94.93 97.57 98.71 99.59 2.43 1.29 0.41
22 2020202103 Apr 2020 to Mar 2021 (Period 03) Northern Trains 483280.0 54.15 82.68 93.83 96.50 98.49 99.18 99.51 99.81 0.82 0.49 0.19 8240537.0 32.06 58.21 77.66 86.53 94.95 97.57 98.70 99.59 2.43 1.30 0.41
22 2020202104 Apr 2020 to Mar 2021 (Period 04) Northern Trains 509072.0 51.14 81.10 93.88 96.86 98.74 99.32 99.57 99.84 0.68 0.43 0.16 8017980.0 33.40 59.62 78.48 86.97 95.06 97.60 98.71 99.59 2.40 1.29 0.41
22 2020202105 Apr 2020 to Mar 2021 (Period 05) Northern Trains 523856.0 46.67 76.73 91.61 95.57 98.32 99.10 99.47 99.80 0.90 0.53 0.20 7832644.0 34.85 61.35 79.74 87.78 95.38 97.75 98.78 99.60 2.25 1.22 0.40
22 2020202106 Apr 2020 to Mar 2021 (Period 06) Northern Trains 553877.0 44.07 74.19 90.38 94.94 98.10 99.03 99.41 99.76 0.97 0.59 0.24 7665358.0 36.04 62.73 80.68 88.33 95.53 97.80 98.80 99.61 2.20 1.20 0.39
22 2020202107 Apr 2020 to Mar 2021 (Period 07) Northern Trains 659708.0 41.19 71.21 89.04 94.46 98.12 99.08 99.48 99.82 0.92 0.52 0.18 7606155.0 37.38 64.40 81.90 89.11 95.79 97.91 98.85 99.62 2.09 1.15 0.38
22 2020202108 Apr 2020 to Mar 2021 (Period 08) Northern Trains 645341.0 34.81 63.43 83.89 91.28 96.98 98.56 99.25 99.76 1.44 0.75 0.24 7546272.0 38.63 66.15 83.46 90.22 96.27 98.15 98.98 99.66 1.85 1.02 0.34
22 2020202109 Apr 2020 to Mar 2021 (Period 09) Northern Trains 653375.0 39.80 69.92 88.45 94.18 98.03 99.04 99.46 99.80 0.96 0.54 0.20 7503793.0 40.58 68.92 85.93 92.05 97.07 98.54 99.18 99.72 1.46 0.82 0.28
22 2020202110 Apr 2020 to Mar 2021 (Period 10) Northern Trains 643611.0 45.19 75.64 91.32 95.56 98.40 99.18 99.56 99.83 0.82 0.44 0.17 7551168.0 42.13 70.93 87.51 93.15 97.54 98.78 99.32 99.77 1.22 0.68 0.23
22 2020202111 Apr 2020 to Mar 2021 (Period 11) Northern Trains 553698.0 48.19 77.02 90.72 94.61 97.62 98.62 99.15 99.65 1.38 0.85 0.35 7418607.0 43.80 72.77 88.67 93.79 97.69 98.83 99.33 99.76 1.17 0.67 0.24
22 2020202112 Apr 2020 to Mar 2021 (Period 12) Northern Trains 529797.0 50.59 79.95 92.97 96.32 98.70 99.33 99.61 99.86 0.67 0.39 0.14 7259829.0 45.78 75.06 90.26 94.78 98.05 99.00 99.43 99.79 1.00 0.57 0.21
22 2020202113 Apr 2020 to Mar 2021 (Period 13) Northern Trains 470909.0 50.07 79.98 93.19 96.60 98.82 99.38 99.60 99.85 0.62 0.40 0.15 7058627.0 46.84 76.31 91.10 95.29 98.24 99.09 99.47 99.80 0.91 0.53 0.20
22 2021202201 Apr 2021 to Mar 2022 (Period 01) Northern Trains 596847.0 47.13 77.53 92.28 96.10 98.68 99.36 99.63 99.88 0.64 0.37 0.12 7245167.0 46.17 75.79 90.93 95.22 98.23 99.08 99.47 99.80 0.92 0.53 0.20
22 2021202202 Apr 2021 to Mar 2022 (Period 02) Northern Trains 602659.0 44.79 75.43 91.09 95.48 98.50 99.24 99.59 99.85 0.76 0.41 0.15 7426030.0 45.51 75.30 90.76 95.16 98.24 99.10 99.48 99.81 0.90 0.52 0.19
22 2021202203 Apr 2021 to Mar 2022 (Period 03) Northern Trains 682787.0 42.62 72.82 89.08 94.05 97.76 98.88 99.35 99.75 1.12 0.65 0.25 7625537.0 44.71 74.61 90.41 94.97 98.18 99.07 99.47 99.80 0.93 0.53 0.20
22 2021202204 Apr 2021 to Mar 2022 (Period 04) Northern Trains 674930.0 43.10 72.85 88.99 94.02 97.70 98.77 99.29 99.72 1.23 0.71 0.28 7791395.0 44.15 74.04 90.06 94.77 98.10 99.03 99.45 99.79 0.97 0.55 0.21
22 2021202205 Apr 2021 to Mar 2022 (Period 05) Northern Trains 655485.0 41.55 71.88 88.89 94.15 97.99 98.98 99.45 99.81 1.02 0.55 0.19 7923024.0 43.76 73.68 89.86 94.66 98.08 99.02 99.44 99.79 0.98 0.56 0.21
22 2021202206 Apr 2021 to Mar 2022 (Period 06) Northern Trains 666799.0 39.95 70.14 88.00 93.59 97.62 98.78 99.34 99.74 1.22 0.66 0.26 8035946.0 43.43 73.35 89.67 94.56 98.04 99.00 99.44 99.79 1.00 0.56 0.21
22 2021202207 Apr 2021 to Mar 2022 (Period 07) Northern Trains 696635.0 36.55 66.72 86.59 93.14 97.69 98.90 99.37 99.78 1.10 0.63 0.22 8072873.0 43.02 72.95 89.46 94.44 98.00 98.99 99.43 99.79 1.01 0.57 0.21
22 2021202208 Apr 2021 to Mar 2022 (Period 08) Northern Trains 645358.0 27.47 54.65 77.07 86.82 95.24 97.63 98.67 99.54 2.37 1.33 0.46 8072890.0 42.43 72.25 88.92 94.09 97.86 98.91 99.38 99.77 1.09 0.62 0.23
22 2021202209 Apr 2021 to Mar 2022 (Period 09) Northern Trains 665522.0 23.94 49.27 72.19 83.08 93.22 96.43 97.91 99.19 3.57 2.09 0.81 8085037.0 41.12 70.55 87.58 93.17 97.47 98.70 99.25 99.72 1.30 0.75 0.28
22 2021202210 Apr 2021 to Mar 2022 (Period 10) Northern Trains 588558.0 36.27 64.87 84.00 91.12 96.80 98.48 99.16 99.70 1.52 0.84 0.30 8029984.0 40.44 69.72 87.01 92.83 97.34 98.64 99.22 99.71 1.36 0.78 0.29
22 2021202211 Apr 2021 to Mar 2022 (Period 11) Northern Trains 630792.0 38.10 68.34 87.25 93.23 97.55 98.79 99.31 99.77 1.21 0.69 0.23 8107078.0 39.73 69.12 86.78 92.74 97.34 98.66 99.23 99.72 1.34 0.77 0.28
22 2021202212 Apr 2021 to Mar 2022 (Period 12) Northern Trains 587205.0 34.02 62.26 82.01 89.49 95.71 97.64 98.61 99.44 2.36 1.39 0.56 8164486.0 38.61 67.92 86.04 92.27 97.14 98.54 99.16 99.69 1.46 0.84 0.31
22 2021202213 Apr 2021 to Mar 2022 (Period 13) Northern Trains 581556.0 36.56 66.01 85.37 91.92 97.02 98.50 99.19 99.73 1.50 0.81 0.27 8275133.0 37.81 67.10 85.58 92.00 97.03 98.49 99.14 99.68 1.51 0.86 0.32
22 2022202301 Apr 2022 to Mar 2023 (Period 01) Northern Trains 674640.0 36.88 65.91 85.27 91.91 97.05 98.57 99.23 99.74 1.43 0.77 0.26 8352926.0 37.07 66.26 85.08 91.70 96.92 98.43 99.11 99.67 1.57 0.89 0.33
22 2022202302 Apr 2022 to Mar 2023 (Period 02) Northern Trains 623810.0 37.21 66.27 85.28 91.94 97.06 98.54 99.21 99.72 1.46 0.79 0.28 8374077.0 36.53 65.60 84.66 91.45 96.81 98.38 99.09 99.66 1.62 0.91 0.34
22 2022202303 Apr 2022 to Mar 2023 (Period 03) Northern Trains 536262.0 36.45 64.73 83.53 90.53 96.37 98.13 98.94 99.66 1.87 1.06 0.34 8227552.0 36.02 64.95 84.22 91.17 96.71 98.33 99.06 99.66 1.67 0.94 0.34
22 2022202304 Apr 2022 to Mar 2023 (Period 04) Northern Trains 601918.0 34.40 61.66 80.99 88.63 95.36 97.58 98.55 99.42 2.42 1.45 0.58 8154540.0 35.31 64.05 83.59 90.75 96.52 98.23 99.00 99.63 1.77 1.00 0.37
22 2022202305 Apr 2022 to Mar 2023 (Period 05) Northern Trains 538051.0 33.86 61.60 81.22 89.06 95.75 97.80 98.72 99.50 2.20 1.28 0.50 8037106.0 34.71 63.25 82.99 90.36 96.35 98.14 98.94 99.61 1.86 1.06 0.39
22 2022202306 Apr 2022 to Mar 2023 (Period 06) Northern Trains 607257.0 35.31 63.70 83.56 90.95 96.75 98.36 99.05 99.66 1.64 0.95 0.34 7977564.0 34.31 62.71 82.62 90.14 96.28 98.11 98.92 99.61 1.89 1.08 0.39
22 2022202307 Apr 2022 to Mar 2023 (Period 07) Northern Trains 529291.0 31.62 59.27 80.19 88.64 95.85 98.00 98.89 99.61 2.00 1.11 0.39 7810220.0 33.93 62.11 82.10 89.77 96.12 98.03 98.88 99.59 1.97 1.12 0.41
22 2022202308 Apr 2022 to Mar 2023 (Period 08) Northern Trains 552502.0 23.47 48.03 70.86 82.17 93.14 96.58 98.11 99.38 3.42 1.89 0.62 7717364.0 33.72 61.73 81.72 89.47 95.98 97.96 98.84 99.58 2.04 1.16 0.42
22 2022202309 Apr 2022 to Mar 2023 (Period 09) Northern Trains 588559.0 23.35 47.85 71.13 82.44 93.59 96.89 98.31 99.40 3.11 1.69 0.60 7640401.0 33.78 61.75 81.73 89.48 96.04 98.01 98.88 99.60 1.99 1.12 0.40
22 2022202310 Apr 2022 to Mar 2023 (Period 10) Northern Trains 286339.0 28.48 54.43 74.39 83.56 93.03 96.25 97.86 99.26 3.75 2.14 0.74 7338182.0 33.37 61.21 81.26 89.12 95.86 97.90 98.82 99.58 2.10 1.18 0.42
22 2022202311 Apr 2022 to Mar 2023 (Period 11) Northern Trains 656832.0 31.31 58.73 79.44 88.05 95.49 97.71 98.73 99.54 2.29 1.27 0.46 7364222.0 32.78 60.38 80.58 88.67 95.68 97.81 98.77 99.56 2.19 1.23 0.44
22 2022202312 Apr 2022 to Mar 2023 (Period 12) Northern Trains 698317.0 32.38 60.88 81.40 89.49 96.10 98.00 98.87 99.58 2.00 1.13 0.42 7475334.0 32.65 60.28 80.55 88.69 95.72 97.84 98.79 99.57 2.16 1.21 0.43
22 2022202313 Apr 2022 to Mar 2023 (Period 13) Northern Trains 629808.0 34.31 63.37 82.97 90.33 96.44 98.19 98.97 99.62 1.81 1.03 0.38 7523586.0 32.48 60.09 80.38 88.57 95.68 97.82 98.77 99.56 2.18 1.23 0.44
22 2023202401 Apr 2023 to Mar 2024 (Period 01) Northern Trains 743162.0 36.48 65.63 84.80 91.68 97.10 98.64 99.29 99.76 1.36 0.71 0.24 7592108.0 32.48 60.12 80.38 88.58 95.70 97.83 98.78 99.57 2.17 1.22 0.43
22 2023202402 Apr 2023 to Mar 2024 (Period 02) Northern Trains 658213.0 35.03 63.27 82.37 89.84 96.22 98.10 98.95 99.61 1.90 1.05 0.39 7626511.0 32.32 59.89 80.15 88.41 95.63 97.80 98.76 99.56 2.20 1.24 0.44
22 2023202403 Apr 2023 to Mar 2024 (Period 03) Northern Trains 612558.0 32.77 59.78 79.04 87.16 94.76 97.15 98.33 99.39 2.85 1.67 0.61 7702807.0 32.06 59.54 79.83 88.17 95.51 97.72 98.72 99.54 2.28 1.28 0.46
22 2023202404 Apr 2023 to Mar 2024 (Period 04) Northern Trains 643403.0 34.19 62.14 81.68 89.50 96.08 98.06 98.91 99.59 1.94 1.09 0.41 7744292.0 32.06 59.59 79.89 88.24 95.57 97.76 98.75 99.55 2.24 1.25 0.45
22 2023202405 Apr 2023 to Mar 2024 (Period 05) Northern Trains 656844.0 33.16 61.09 80.74 88.63 95.50 97.65 98.60 99.48 2.35 1.40 0.52 7863085.0 32.03 59.58 79.87 88.22 95.55 97.75 98.74 99.55 2.25 1.26 0.45
22 2023202406 Apr 2023 to Mar 2024 (Period 06) Northern Trains 615967.0 32.58 60.72 81.07 89.17 96.14 98.12 98.95 99.66 1.88 1.05 0.34 7871795.0 31.82 59.35 79.68 88.08 95.50 97.73 98.73 99.55 2.27 1.27 0.45
22 2023202407 Apr 2023 to Mar 2024 (Period 07) Northern Trains 642238.0 29.21 56.20 77.59 86.98 95.25 97.61 98.67 99.53 2.39 1.33 0.47 7984742.0 31.62 59.10 79.48 87.96 95.46 97.70 98.71 99.54 2.30 1.29 0.46
22 2023202408 Apr 2023 to Mar 2024 (Period 08) Northern Trains 668143.0 24.92 49.96 72.43 83.13 93.48 96.75 98.20 99.37 3.25 1.80 0.63 8100383.0 31.62 59.11 79.48 87.95 95.46 97.70 98.71 99.54 2.30 1.29 0.46
22 2023202409 Apr 2023 to Mar 2024 (Period 09) Northern Trains 646958.0 20.41 42.83 65.10 77.13 90.12 94.70 96.91 98.81 5.30 3.09 1.19 8158782.0 31.33 58.63 78.94 87.49 95.17 97.52 98.60 99.49 2.48 1.40 0.51
22 2023202410 Apr 2023 to Mar 2024 (Period 10) Northern Trains 608992.0 29.76 56.30 76.88 85.96 94.35 97.08 98.31 99.40 2.92 1.69 0.60 8481435.0 31.32 58.60 78.95 87.52 95.18 97.53 98.60 99.49 2.47 1.40 0.51
22 2023202411 Apr 2023 to Mar 2024 (Period 11) Northern Trains 677301.0 31.96 59.89 80.35 88.74 95.78 97.79 98.71 99.48 2.21 1.29 0.52 8501904.0 31.37 58.69 79.02 87.57 95.21 97.54 98.60 99.49 2.46 1.40 0.51
22 2023202412 Apr 2023 to Mar 2024 (Period 12) Northern Trains 672976.0 33.19 61.24 81.61 89.92 96.59 98.30 99.04 99.69 1.70 0.96 0.31 8476563.0 31.43 58.72 79.03 87.60 95.24 97.56 98.61 99.50 2.44 1.39 0.50
22 2023202413 Apr 2023 to Mar 2024 (Period 13) Northern Trains 712985.0 34.75 63.48 83.62 91.41 97.21 98.69 99.30 99.75 1.31 0.70 0.25 8559740.0 31.49 58.77 79.13 87.72 95.32 97.61 98.64 99.51 2.39 1.36 0.49
22 2024202501 Apr 2024 to Mar 2025 (Period 01) Northern Trains 659968.0 34.33 62.59 82.73 90.53 96.75 98.38 99.11 99.67 1.62 0.89 0.33 8476546.0 31.28 58.47 78.91 87.59 95.27 97.58 98.62 99.50 2.42 1.38 0.50
22 2024202502 Apr 2024 to Mar 2025 (Period 02) Northern Trains 658697.0 34.18 61.74 81.35 89.38 96.16 98.10 98.96 99.64 1.90 1.04 0.36 8477030.0 31.21 58.35 78.83 87.55 95.27 97.58 98.63 99.50 2.42 1.37 0.50
22 2024202503 Apr 2024 to Mar 2025 (Period 03) Northern Trains 677686.0 34.12 61.70 81.23 89.26 96.13 98.12 98.98 99.66 1.88 1.02 0.34 8542158.0 31.33 58.51 79.01 87.72 95.37 97.65 98.67 99.52 2.35 1.33 0.48
22 2024202504 Apr 2024 to Mar 2025 (Period 04) Northern Trains 664751.0 33.34 60.89 80.58 88.73 95.81 97.91 98.81 99.58 2.09 1.19 0.42 8563506.0 31.27 58.42 78.93 87.66 95.35 97.64 98.67 99.52 2.36 1.33 0.48
22 2024202505 Apr 2024 to Mar 2025 (Period 05) Northern Trains 700587.0 33.08 60.28 80.07 88.50 95.97 97.98 98.85 99.56 2.02 1.15 0.44 8607249.0 31.28 58.37 78.88 87.66 95.39 97.67 98.69 99.53 2.33 1.31 0.47
22 2024202506 Apr 2024 to Mar 2025 (Period 06) Northern Trains 669361.0 31.22 58.08 78.20 86.91 94.87 97.32 98.43 99.38 2.68 1.57 0.62 8660643.0 31.18 58.18 78.67 87.49 95.30 97.61 98.65 99.51 2.39 1.35 0.49
22 2024202507 Apr 2024 to Mar 2025 (Period 07) Northern Trains 675476.0 27.84 54.25 75.68 85.46 94.47 97.18 98.40 99.44 2.82 1.60 0.56 8693881.0 31.07 58.02 78.52 87.37 95.24 97.58 98.63 99.50 2.42 1.37 0.50
22 2024202508 Apr 2024 to Mar 2025 (Period 08) Northern Trains 668802.0 23.85 48.49 70.98 82.28 93.35 96.73 98.17 99.37 3.27 1.83 0.63 8694540.0 30.98 57.91 78.41 87.30 95.23 97.58 98.62 99.50 2.42 1.38 0.50
22 2024202509 Apr 2024 to Mar 2025 (Period 09) Northern Trains 676616.0 23.37 47.71 69.55 80.64 92.23 96.02 97.69 99.18 3.98 2.31 0.82 8724198.0 31.18 58.23 78.71 87.54 95.37 97.67 98.68 99.53 2.33 1.32 0.47
22 2024202510 Apr 2024 to Mar 2025 (Period 10) Northern Trains 551726.0 29.12 55.68 76.36 85.68 94.69 97.36 98.53 99.49 2.64 1.47 0.51 8666932.0 31.14 58.21 78.69 87.54 95.40 97.69 98.69 99.53 2.31 1.31 0.47
22 2024202511 Apr 2024 to Mar 2025 (Period 11) Northern Trains 707857.0 30.48 57.43 78.10 87.13 95.27 97.57 98.58 99.45 2.43 1.42 0.55 8697488.0 31.03 58.01 78.51 87.41 95.36 97.67 98.68 99.53 2.33 1.32 0.47
22 2024202512 Apr 2024 to Mar 2025 (Period 12) Northern Trains 730828.0 32.74 61.24 81.46 89.65 96.51 98.36 99.12 99.74 1.64 0.88 0.26 8755340.0 31.00 58.04 78.52 87.40 95.36 97.68 98.69 99.53 2.32 1.31 0.47
22 2024202513 Apr 2024 to Mar 2025 (Period 13) Northern Trains 764478.0 35.63 65.46 84.90 91.88 97.23 98.72 99.33 99.79 1.28 0.67 0.21 8806833.0 31.10 58.24 78.66 87.47 95.38 97.69 98.70 99.54 2.31 1.30 0.46
22 2025202601 Apr 2025 to Mar 2026 (Period 01) Northern Trains 692884.0 34.81 63.46 82.63 90.19 96.65 98.46 99.17 99.73 1.54 0.83 0.27 8839749.0 31.15 58.32 78.67 87.45 95.37 97.70 98.71 99.54 2.30 1.29 0.46
22 2025202602 Apr 2025 to Mar 2026 (Period 02) Northern Trains 740173.0 33.02 60.92 80.59 88.74 95.95 98.05 98.93 99.63 1.95 1.07 0.37 8921225.0 31.08 58.29 78.63 87.42 95.36 97.70 98.71 99.54 2.30 1.29 0.46
22 2025202603 Apr 2025 to Mar 2026 (Period 03) Northern Trains 738699.0 33.12 60.75 80.13 88.33 95.54 97.74 98.71 99.51 2.26 1.29 0.49 8982238.0 31.02 58.23 78.55 87.35 95.32 97.67 98.68 99.53 2.33 1.32 0.47
22 2025202604 Apr 2025 to Mar 2026 (Period 04) Northern Trains 728354.0 31.63 58.99 78.99 87.73 95.68 97.89 98.80 99.59 2.11 1.20 0.41 9045841.0 30.90 58.10 78.44 87.28 95.31 97.67 98.69 99.53 2.33 1.31 0.47
22 2025202605 Apr 2025 to Mar 2026 (Period 05) Northern Trains 701059.0 31.19 58.25 78.34 87.29 95.52 97.87 98.81 99.55 2.13 1.19 0.45 9046313.0 30.75 57.94 78.31 87.19 95.28 97.66 98.68 99.53 2.34 1.32 0.47
22 2025202606 Apr 2025 to Mar 2026 (Period 06) Northern Trains 722570.0 32.09 59.78 79.58 88.13 95.77 98.00 98.93 99.63 2.00 1.07 0.37 9099522.0 30.83 58.08 78.42 87.28 95.35 97.71 98.72 99.55 2.29 1.28 0.45
22 2025202607 Apr 2025 to Mar 2026 (Period 07) Northern Trains 727457.0 29.14 56.22 77.27 86.62 95.25 97.68 98.71 99.54 2.32 1.29 0.46 9151503.0 30.91 58.21 78.53 87.36 95.40 97.75 98.74 99.56 2.25 1.26 0.44
22 2025202608 Apr 2025 to Mar 2026 (Period 08) Northern Trains 736437.0 24.93 50.68 73.01 83.77 94.31 97.37 98.61 99.59 2.63 1.39 0.41 9219138.0 30.95 58.32 78.63 87.45 95.47 97.79 98.78 99.57 2.21 1.22 0.43
22 2025202609 Apr 2025 to Mar 2026 (Period 09) Northern Trains 728988.0 22.25 46.15 67.98 79.63 92.15 96.26 97.99 99.38 3.74 2.01 0.62 9271510.0 30.82 58.13 78.46 87.33 95.44 97.80 98.79 99.59 2.20 1.21 0.41
22 2025202610 Apr 2025 to Mar 2026 (Period 10) Northern Trains 659452.0 29.35 56.23 76.87 86.25 95.01 97.55 98.62 99.51 2.45 1.38 0.49 9379236.0 30.81 58.14 78.47 87.35 95.46 97.81 98.80 99.59 2.19 1.20 0.41
22 2025202611 Apr 2025 to Mar 2026 (Period 11) Northern Trains 748715.0 32.45 60.68 80.78 88.93 96.09 98.12 98.94 99.64 1.88 1.06 0.36 9420094.0 30.97 58.40 78.68 87.49 95.52 97.85 98.82 99.60 2.15 1.18 0.40
22 2025202612 Apr 2025 to Mar 2026 (Period 12) Northern Trains 730611.0 32.80 61.08 81.19 89.50 96.52 98.33 99.11 99.73 1.67 0.89 0.27 9419877.0 30.97 58.39 78.66 87.48 95.52 97.85 98.82 99.60 2.15 1.18 0.40
22 2025202613 Apr 2025 to Mar 2026 (Period 13) Northern Trains 825464.0 34.27 62.88 82.56 90.29 96.72 98.40 99.12 99.68 1.60 0.88 0.32 9480863.0 30.88 58.21 78.50 87.37 95.49 97.83 98.81 99.59 2.17 1.19 0.41
22 2026202701 Apr 2026 to Mar 2027 (Period 01) Northern Trains 813031.0 34.15 62.86 82.02 89.67 96.37 98.16 98.98 99.64 1.84 1.02 0.36 9601010.0 30.88 58.22 78.50 87.36 95.48 97.81 98.80 99.59 2.19 1.20 0.41
22 2026202702 Apr 2026 to Mar 2027 (Period 02) Northern Trains 740292.0 32.74 60.20 78.90 87.06 95.02 97.55 98.71 99.60 2.45 1.29 0.40 9601129.0 30.85 58.17 78.37 87.23 95.41 97.77 98.78 99.58 2.23 1.22 0.42
23 2014201501 Apr 2014 to Mar 2015 (Period 01) ScotRail 431681.0 31.42 69.86 92.08 97.01 99.33 99.74 99.86 99.95 0.26 0.14 0.05 431681.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201502 Apr 2014 to Mar 2015 (Period 02) ScotRail 460808.0 31.38 69.82 91.90 96.99 99.40 99.79 99.90 99.97 0.21 0.10 0.03 892489.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201503 Apr 2014 to Mar 2015 (Period 03) ScotRail 461029.0 31.18 68.78 90.83 96.10 99.03 99.61 99.80 99.93 0.39 0.20 0.07 1353518.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201504 Apr 2014 to Mar 2015 (Period 04) ScotRail 459538.0 30.38 67.02 89.50 95.58 98.94 99.60 99.81 99.93 0.40 0.19 0.07 1813056.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201505 Apr 2014 to Mar 2015 (Period 05) ScotRail 490120.0 23.29 53.87 78.07 88.11 96.68 98.83 99.49 99.84 1.17 0.51 0.16 2303176.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201506 Apr 2014 to Mar 2015 (Period 06) ScotRail 463181.0 30.66 67.91 90.23 95.93 98.98 99.59 99.80 99.91 0.41 0.20 0.09 2766357.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201507 Apr 2014 to Mar 2015 (Period 07) ScotRail 458155.0 27.10 62.38 86.43 93.88 98.48 99.37 99.67 99.88 0.63 0.33 0.12 3224512.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201508 Apr 2014 to Mar 2015 (Period 08) ScotRail 459131.0 21.60 53.15 79.76 90.06 97.60 99.24 99.66 99.88 0.76 0.34 0.12 3683643.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201509 Apr 2014 to Mar 2015 (Period 09) ScotRail 460962.0 24.20 57.95 84.23 93.08 98.50 99.45 99.71 99.86 0.55 0.29 0.14 4144605.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201510 Apr 2014 to Mar 2015 (Period 10) ScotRail 405408.0 23.63 56.10 82.28 91.77 97.98 99.16 99.58 99.85 0.84 0.42 0.15 4550013.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201511 Apr 2014 to Mar 2015 (Period 11) ScotRail 452498.0 26.60 60.06 84.26 92.61 98.06 99.20 99.57 99.82 0.80 0.43 0.18 5002511.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201512 Apr 2014 to Mar 2015 (Period 12) ScotRail 471314.0 28.33 64.34 88.49 95.42 99.07 99.63 99.80 99.90 0.37 0.20 0.10 5473825.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2014201513 Apr 2014 to Mar 2015 (Period 13) ScotRail 511490.0 28.70 64.66 88.35 95.21 98.92 99.57 99.76 99.90 0.43 0.24 0.10 5985315.0 27.59 62.77 86.64 93.97 98.53 99.44 99.72 99.89 0.56 0.28 0.11
23 2015201601 Apr 2015 to Mar 2016 (Period 01) ScotRail 539366.0 30.56 67.78 90.74 96.52 99.32 99.76 99.87 99.96 0.24 0.13 0.04 6093000.0 27.58 62.71 86.62 93.98 98.55 99.45 99.73 99.89 0.55 0.27 0.11
23 2015201602 Apr 2015 to Mar 2016 (Period 02) ScotRail 463032.0 30.89 68.60 91.30 96.70 99.27 99.71 99.86 99.96 0.29 0.14 0.04 6095224.0 27.54 62.62 86.58 93.96 98.54 99.44 99.72 99.89 0.56 0.28 0.11
23 2015201603 Apr 2015 to Mar 2016 (Period 03) ScotRail 460792.0 30.95 67.36 90.66 96.47 99.21 99.68 99.84 99.95 0.32 0.16 0.05 6094987.0 27.52 62.52 86.56 93.99 98.55 99.45 99.73 99.90 0.55 0.27 0.10
23 2015201604 Apr 2015 to Mar 2016 (Period 04) ScotRail 450031.0 30.77 66.82 89.82 95.80 98.96 99.56 99.76 99.92 0.44 0.24 0.08 6085480.0 27.55 62.49 86.58 94.00 98.55 99.45 99.72 99.90 0.55 0.28 0.10
23 2015201605 Apr 2015 to Mar 2016 (Period 05) ScotRail 471116.0 28.23 64.15 88.44 95.37 99.03 99.65 99.84 99.95 0.35 0.16 0.05 6066476.0 27.95 63.32 87.42 94.59 98.74 99.51 99.75 99.90 0.49 0.25 0.10
23 2015201606 Apr 2015 to Mar 2016 (Period 06) ScotRail 472185.0 29.66 64.98 89.11 95.76 99.13 99.69 99.85 99.96 0.31 0.15 0.04 6075480.0 27.87 63.10 87.33 94.58 98.75 99.52 99.75 99.91 0.48 0.25 0.09
23 2015201607 Apr 2015 to Mar 2016 (Period 07) ScotRail 471709.0 26.61 60.78 86.30 94.36 98.88 99.57 99.80 99.93 0.43 0.20 0.07 6089034.0 27.83 62.97 87.32 94.61 98.78 99.54 99.76 99.91 0.46 0.24 0.09
23 2015201608 Apr 2015 to Mar 2016 (Period 08) ScotRail 457875.0 20.63 50.35 77.48 88.90 97.51 99.10 99.56 99.85 0.90 0.44 0.15 6087778.0 27.76 62.76 87.15 94.53 98.78 99.53 99.76 99.91 0.47 0.24 0.09
23 2015201609 Apr 2015 to Mar 2016 (Period 09) ScotRail 470403.0 21.50 51.53 78.28 89.29 97.29 98.92 99.48 99.83 1.08 0.52 0.17 6097219.0 27.55 62.26 86.69 94.23 98.68 99.48 99.74 99.91 0.52 0.26 0.09
23 2015201610 Apr 2015 to Mar 2016 (Period 10) ScotRail 413139.0 25.85 58.13 82.92 92.02 98.04 99.23 99.60 99.83 0.77 0.40 0.17 6104950.0 27.69 62.39 86.72 94.25 98.68 99.49 99.74 99.91 0.51 0.26 0.09
23 2015201611 Apr 2015 to Mar 2016 (Period 11) ScotRail 478395.0 28.02 62.45 86.54 93.96 98.51 99.40 99.69 99.89 0.60 0.31 0.11 6130847.0 27.80 62.57 86.89 94.34 98.72 99.50 99.75 99.91 0.50 0.25 0.09
23 2015201612 Apr 2015 to Mar 2016 (Period 12) ScotRail 480634.0 27.77 63.42 88.18 95.38 99.12 99.68 99.84 99.94 0.32 0.16 0.06 6140167.0 27.76 62.50 86.87 94.34 98.72 99.51 99.75 99.91 0.49 0.25 0.09
23 2015201613 Apr 2015 to Mar 2016 (Period 13) ScotRail 440875.0 29.60 65.53 89.01 95.79 99.18 99.72 99.86 99.95 0.28 0.14 0.05 6069552.0 27.81 62.54 86.90 94.37 98.74 99.52 99.76 99.92 0.48 0.24 0.08
23 2016201701 Apr 2016 to Mar 2017 (Period 01) ScotRail 501111.0 31.53 67.73 89.37 95.68 99.06 99.63 99.82 99.94 0.37 0.18 0.06 6031297.0 27.87 62.50 86.76 94.29 98.71 99.51 99.75 99.92 0.49 0.25 0.08
23 2016201702 Apr 2016 to Mar 2017 (Period 02) ScotRail 469637.0 30.72 66.22 88.44 95.20 98.91 99.55 99.76 99.89 0.45 0.24 0.11 6037902.0 27.86 62.32 86.54 94.18 98.68 99.49 99.75 99.91 0.51 0.25 0.09
23 2016201703 Apr 2016 to Mar 2017 (Period 03) ScotRail 452282.0 28.57 62.30 85.11 93.17 98.45 99.43 99.72 99.89 0.57 0.28 0.11 6029392.0 27.68 61.93 86.12 93.93 98.63 99.47 99.74 99.91 0.53 0.26 0.09
23 2016201704 Apr 2016 to Mar 2017 (Period 04) ScotRail 449665.0 29.05 63.35 86.54 94.22 98.78 99.54 99.78 99.92 0.46 0.22 0.08 6029026.0 27.55 61.67 85.88 93.81 98.61 99.47 99.74 99.91 0.53 0.26 0.09
23 2016201705 Apr 2016 to Mar 2017 (Period 05) ScotRail 473063.0 26.92 59.44 83.55 92.48 98.21 99.34 99.68 99.90 0.66 0.32 0.10 6030973.0 27.45 61.31 85.49 93.58 98.55 99.45 99.73 99.90 0.55 0.27 0.10
23 2016201706 Apr 2016 to Mar 2017 (Period 06) ScotRail 487023.0 27.30 60.43 84.88 93.84 98.85 99.60 99.80 99.93 0.40 0.20 0.07 6045811.0 27.26 60.95 85.16 93.43 98.53 99.44 99.72 99.90 0.56 0.28 0.10
23 2016201707 Apr 2016 to Mar 2017 (Period 07) ScotRail 483937.0 26.62 59.28 84.29 93.60 98.86 99.61 99.80 99.93 0.39 0.20 0.07 6058039.0 27.26 60.83 85.01 93.37 98.53 99.45 99.72 99.90 0.55 0.28 0.10
23 2016201708 Apr 2016 to Mar 2017 (Period 08) ScotRail 480028.0 23.59 53.76 79.26 90.37 98.14 99.41 99.75 99.91 0.59 0.25 0.09 6080192.0 27.47 61.06 85.12 93.47 98.57 99.47 99.74 99.90 0.53 0.26 0.10
23 2016201709 Apr 2016 to Mar 2017 (Period 09) ScotRail 480537.0 22.25 51.66 76.96 88.50 97.45 99.09 99.57 99.85 0.91 0.43 0.15 6090326.0 27.52 61.05 85.00 93.40 98.58 99.48 99.74 99.91 0.52 0.26 0.09
23 2016201710 Apr 2016 to Mar 2017 (Period 10) ScotRail 446818.0 27.09 60.14 84.86 93.64 98.86 99.59 99.77 99.89 0.41 0.23 0.11 6124005.0 27.60 61.18 85.13 93.51 98.64 99.51 99.76 99.91 0.49 0.24 0.09
23 2016201711 Apr 2016 to Mar 2017 (Period 11) ScotRail 483983.0 29.79 64.20 87.47 94.95 99.12 99.69 99.83 99.95 0.31 0.17 0.05 6129593.0 27.74 61.32 85.21 93.59 98.69 99.53 99.77 99.91 0.47 0.23 0.09
23 2016201712 Apr 2016 to Mar 2017 (Period 12) ScotRail 490810.0 30.36 65.66 88.64 95.76 99.32 99.78 99.90 99.97 0.22 0.10 0.03 6139769.0 27.95 61.51 85.25 93.63 98.71 99.54 99.77 99.92 0.46 0.23 0.08
23 2016201713 Apr 2016 to Mar 2017 (Period 13) ScotRail 474300.0 31.15 66.46 89.21 95.97 99.25 99.70 99.85 99.92 0.30 0.15 0.08 6173194.0 28.08 61.60 85.29 93.65 98.71 99.54 99.77 99.92 0.46 0.23 0.08
23 2017201801 Apr 2017 to Mar 2018 (Period 01) ScotRail 507982.0 32.94 68.12 89.61 95.86 99.21 99.70 99.84 99.94 0.30 0.16 0.06 6180065.0 28.20 61.64 85.31 93.67 98.73 99.54 99.77 99.92 0.46 0.23 0.08
23 2017201802 Apr 2017 to Mar 2018 (Period 02) ScotRail 492183.0 31.59 65.70 87.64 94.80 98.95 99.58 99.79 99.92 0.42 0.21 0.08 6202611.0 28.28 61.61 85.26 93.64 98.73 99.54 99.78 99.92 0.46 0.22 0.08
23 2017201803 Apr 2017 to Mar 2018 (Period 03) ScotRail 493533.0 32.63 67.37 88.80 95.50 99.09 99.63 99.81 99.92 0.37 0.19 0.08 6243862.0 28.60 62.02 85.55 93.82 98.78 99.56 99.78 99.92 0.44 0.22 0.08
23 2017201804 Apr 2017 to Mar 2018 (Period 04) ScotRail 496887.0 34.22 69.77 90.73 96.45 99.29 99.72 99.87 99.96 0.28 0.13 0.04 6291084.0 29.01 62.54 85.89 94.00 98.82 99.57 99.79 99.92 0.43 0.21 0.08
23 2017201805 Apr 2017 to Mar 2018 (Period 05) ScotRail 495264.0 32.71 67.14 88.52 95.22 99.06 99.68 99.85 99.94 0.32 0.15 0.06 6313285.0 29.46 63.13 86.27 94.21 98.88 99.60 99.80 99.93 0.40 0.20 0.07
23 2017201806 Apr 2017 to Mar 2018 (Period 06) ScotRail 495110.0 33.50 68.85 90.39 96.48 99.43 99.81 99.91 99.97 0.19 0.09 0.03 6321372.0 29.94 63.79 86.70 94.42 98.93 99.62 99.81 99.93 0.38 0.19 0.07
23 2017201807 Apr 2017 to Mar 2018 (Period 07) ScotRail 476328.0 28.58 60.93 83.85 92.60 98.53 99.44 99.71 99.90 0.56 0.29 0.10 6313763.0 30.09 63.92 86.67 94.34 98.90 99.60 99.81 99.93 0.40 0.19 0.07
23 2017201808 Apr 2017 to Mar 2018 (Period 08) ScotRail 488622.0 22.56 50.92 75.71 87.72 97.42 99.14 99.63 99.87 0.86 0.37 0.13 6322357.0 30.00 63.68 86.38 94.13 98.85 99.58 99.80 99.92 0.42 0.20 0.08
23 2017201809 Apr 2017 to Mar 2018 (Period 09) ScotRail 483966.0 23.66 52.70 76.93 88.22 97.47 99.15 99.60 99.88 0.85 0.40 0.12 6325786.0 30.11 63.76 86.37 94.11 98.85 99.59 99.80 99.93 0.41 0.20 0.07
23 2017201810 Apr 2017 to Mar 2018 (Period 10) ScotRail 418624.0 26.51 56.49 79.72 89.84 97.64 99.15 99.58 99.85 0.85 0.42 0.15 6297592.0 30.08 63.53 86.04 93.86 98.77 99.56 99.79 99.92 0.44 0.21 0.08
23 2017201811 Apr 2017 to Mar 2018 (Period 11) ScotRail 492698.0 30.09 61.64 84.10 92.63 98.52 99.45 99.71 99.90 0.55 0.29 0.10 6306307.0 30.11 63.33 85.78 93.68 98.72 99.54 99.78 99.92 0.46 0.22 0.08
23 2017201812 Apr 2017 to Mar 2018 (Period 12) ScotRail 431688.0 31.26 63.83 85.97 93.44 98.08 99.07 99.45 99.78 0.93 0.55 0.22 6247185.0 30.17 63.18 85.57 93.50 98.63 99.49 99.74 99.91 0.51 0.26 0.09
23 2017201813 Apr 2017 to Mar 2018 (Period 13) ScotRail 490581.0 31.36 65.13 87.20 94.61 98.89 99.57 99.79 99.93 0.43 0.21 0.07 6263466.0 30.18 63.09 85.42 93.40 98.60 99.48 99.74 99.91 0.52 0.26 0.09
23 2018201901 Apr 2018 to Mar 2019 (Period 01) ScotRail 485269.0 33.24 67.00 88.14 94.94 99.05 99.67 99.86 99.95 0.33 0.14 0.05 6240753.0 30.20 62.98 85.29 93.32 98.59 99.48 99.74 99.91 0.52 0.26 0.09
23 2018201902 Apr 2018 to Mar 2019 (Period 02) ScotRail 487078.0 33.16 66.56 87.64 94.73 98.91 99.60 99.80 99.93 0.40 0.20 0.07 6235648.0 30.32 63.04 85.29 93.31 98.59 99.48 99.74 99.91 0.52 0.26 0.09
23 2018201903 Apr 2018 to Mar 2019 (Period 03) ScotRail 480669.0 32.33 65.05 86.32 93.58 98.34 99.30 99.62 99.85 0.70 0.38 0.15 6222784.0 30.29 62.86 85.09 93.16 98.53 99.45 99.73 99.90 0.55 0.27 0.10
23 2018201904 Apr 2018 to Mar 2019 (Period 04) ScotRail 473320.0 30.58 62.29 83.46 91.41 97.42 98.85 99.39 99.76 1.15 0.61 0.24 6199217.0 30.00 62.26 84.51 92.76 98.38 99.38 99.69 99.89 0.62 0.31 0.11
23 2018201905 Apr 2018 to Mar 2019 (Period 05) ScotRail 483450.0 31.42 63.55 85.11 93.10 98.43 99.41 99.74 99.91 0.59 0.26 0.09 6187403.0 29.89 61.97 84.24 92.59 98.33 99.36 99.68 99.88 0.64 0.32 0.12
23 2018201906 Apr 2018 to Mar 2019 (Period 06) ScotRail 497705.0 33.44 66.33 87.52 94.64 98.91 99.67 99.85 99.96 0.33 0.15 0.04 6189998.0 29.89 61.77 84.01 92.45 98.29 99.35 99.68 99.88 0.65 0.32 0.12
23 2018201907 Apr 2018 to Mar 2019 (Period 07) ScotRail 484574.0 26.46 55.35 78.61 88.76 97.19 98.98 99.48 99.78 1.02 0.52 0.22 6198244.0 29.72 61.33 83.60 92.15 98.18 99.31 99.66 99.87 0.69 0.34 0.13
23 2018201908 Apr 2018 to Mar 2019 (Period 08) ScotRail 491718.0 23.65 51.44 75.47 86.93 96.70 98.80 99.43 99.81 1.20 0.57 0.19 6201340.0 29.81 61.37 83.58 92.08 98.13 99.29 99.64 99.87 0.71 0.36 0.13
23 2018201909 Apr 2018 to Mar 2019 (Period 09) ScotRail 499963.0 24.98 53.37 77.37 88.58 97.47 99.20 99.67 99.91 0.80 0.33 0.09 6217337.0 29.90 61.40 83.60 92.10 98.13 99.29 99.65 99.87 0.71 0.35 0.13
23 2018201910 Apr 2018 to Mar 2019 (Period 10) ScotRail 465125.0 29.17 59.91 82.54 91.52 98.25 99.47 99.78 99.92 0.53 0.22 0.08 6263838.0 30.07 61.62 83.78 92.21 98.17 99.31 99.66 99.88 0.69 0.34 0.12
23 2018201911 Apr 2018 to Mar 2019 (Period 11) ScotRail 573577.0 31.85 64.45 86.44 93.87 98.63 99.50 99.76 99.92 0.50 0.24 0.08 6344717.0 30.23 61.87 83.99 92.33 98.18 99.32 99.67 99.88 0.68 0.33 0.12
23 2018201912 Apr 2018 to Mar 2019 (Period 12) ScotRail 623184.0 33.68 66.93 88.15 94.85 98.99 99.68 99.86 99.96 0.32 0.14 0.04 6536213.0 30.49 62.22 84.26 92.49 98.26 99.37 99.70 99.89 0.63 0.30 0.11
23 2018201913 Apr 2018 to Mar 2019 (Period 13) ScotRail 682050.0 34.22 67.82 88.28 94.56 98.73 99.54 99.77 99.92 0.46 0.23 0.08 6727682.0 30.80 62.58 84.45 92.55 98.27 99.37 99.70 99.89 0.63 0.30 0.11
23 2019202001 Apr 2019 to Mar 2020 (Period 01) ScotRail 668624.0 36.29 71.12 90.46 95.73 99.06 99.66 99.83 99.93 0.34 0.17 0.07 668624.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202002 Apr 2019 to Mar 2020 (Period 02) ScotRail 693077.0 35.67 70.29 90.03 95.56 99.04 99.64 99.84 99.95 0.36 0.16 0.05 1361701.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202003 Apr 2019 to Mar 2020 (Period 03) ScotRail 695236.0 34.13 69.09 89.73 95.43 98.98 99.62 99.81 99.93 0.38 0.19 0.07 2056937.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202004 Apr 2019 to Mar 2020 (Period 04) ScotRail 683048.0 36.01 71.13 90.32 95.58 98.91 99.56 99.80 99.93 0.44 0.20 0.07 2739985.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202005 Apr 2019 to Mar 2020 (Period 05) ScotRail 687717.0 33.35 67.19 87.88 94.23 98.56 99.43 99.70 99.89 0.57 0.30 0.11 3427702.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202006 Apr 2019 to Mar 2020 (Period 06) ScotRail 700270.0 32.90 67.28 88.61 94.86 98.77 99.51 99.77 99.93 0.49 0.23 0.07 4127972.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202007 Apr 2019 to Mar 2020 (Period 07) ScotRail 691079.0 32.17 66.03 87.76 94.48 98.76 99.56 99.79 99.95 0.44 0.21 0.05 4819051.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202008 Apr 2019 to Mar 2020 (Period 08) ScotRail 691651.0 27.93 59.51 83.01 91.81 98.13 99.40 99.74 99.93 0.60 0.26 0.07 5510702.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202009 Apr 2019 to Mar 2020 (Period 09) ScotRail 692323.0 26.05 56.73 81.26 91.12 98.25 99.46 99.75 99.92 0.54 0.25 0.08 6203025.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202010 Apr 2019 to Mar 2020 (Period 10) ScotRail 602799.0 30.39 62.28 84.82 92.65 98.22 99.35 99.70 99.89 0.65 0.30 0.11 6805824.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202011 Apr 2019 to Mar 2020 (Period 11) ScotRail 696302.0 32.00 65.00 87.14 94.35 98.84 99.55 99.78 99.92 0.45 0.22 0.08 7502126.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202012 Apr 2019 to Mar 2020 (Period 12) ScotRail 688605.0 31.89 64.19 86.01 93.43 98.50 99.47 99.74 99.92 0.53 0.26 0.08 8190731.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
23 2019202013 Apr 2019 to Mar 2020 (Period 13) ScotRail 668178.0 38.81 72.65 91.31 96.23 99.20 99.66 99.83 99.94 0.34 0.17 0.06 8858909.0 32.89 66.35 87.57 94.27 98.71 99.53 99.78 99.92 0.47 0.22 0.08
23 2020202101 Apr 2020 to Mar 2021 (Period 01) ScotRail 402836.0 55.55 87.81 97.35 98.87 99.66 99.85 99.91 99.96 0.15 0.09 0.04 8593121.0 33.69 66.99 87.81 94.38 98.73 99.53 99.78 99.93 0.47 0.22 0.07
23 2020202102 Apr 2020 to Mar 2021 (Period 02) ScotRail 342553.0 51.43 83.88 95.56 97.84 99.41 99.75 99.86 99.93 0.25 0.14 0.07 8242597.0 34.26 67.41 87.94 94.42 98.73 99.53 99.78 99.92 0.47 0.22 0.08
23 2020202103 Apr 2020 to Mar 2021 (Period 03) ScotRail 428793.0 48.36 82.00 95.44 98.00 99.51 99.80 99.89 99.96 0.20 0.11 0.04 7976154.0 35.03 68.05 88.19 94.52 98.75 99.54 99.78 99.93 0.46 0.22 0.07
23 2020202104 Apr 2020 to Mar 2021 (Period 04) ScotRail 485764.0 44.85 79.91 94.93 97.92 99.57 99.83 99.92 99.98 0.17 0.08 0.02 7778870.0 35.55 68.52 88.43 94.64 98.79 99.56 99.79 99.93 0.44 0.21 0.07
23 2020202105 Apr 2020 to Mar 2021 (Period 05) ScotRail 578594.0 42.22 76.78 92.66 96.45 98.94 99.50 99.71 99.86 0.50 0.29 0.14 7669747.0 36.25 69.26 88.79 94.82 98.82 99.56 99.79 99.93 0.44 0.21 0.07
23 2020202106 Apr 2020 to Mar 2021 (Period 06) ScotRail 607645.0 41.67 77.34 93.26 96.78 99.13 99.61 99.79 99.92 0.39 0.21 0.08 7577122.0 37.00 70.09 89.17 94.97 98.85 99.57 99.79 99.93 0.43 0.21 0.07
23 2020202107 Apr 2020 to Mar 2021 (Period 07) ScotRail 638523.0 39.14 74.29 92.14 96.36 99.00 99.56 99.75 99.89 0.44 0.25 0.11 7524566.0 37.62 70.82 89.55 95.13 98.87 99.57 99.79 99.92 0.43 0.21 0.08
23 2020202108 Apr 2020 to Mar 2021 (Period 08) ScotRail 645769.0 33.65 67.15 87.88 94.00 98.41 99.39 99.71 99.92 0.61 0.29 0.08 7478684.0 38.18 71.55 90.01 95.34 98.90 99.57 99.78 99.92 0.43 0.22 0.08
23 2020202109 Apr 2020 to Mar 2021 (Period 09) ScotRail 650222.0 39.13 73.86 91.74 96.27 99.00 99.55 99.75 99.89 0.45 0.25 0.11 7436583.0 39.39 73.13 90.98 95.82 98.97 99.58 99.78 99.92 0.42 0.22 0.08
23 2020202110 Apr 2020 to Mar 2021 (Period 10) ScotRail 527465.0 42.97 76.72 92.81 96.64 99.10 99.62 99.79 99.93 0.38 0.21 0.07 7361249.0 40.38 74.28 91.61 96.14 99.04 99.60 99.79 99.92 0.40 0.21 0.08
23 2020202111 Apr 2020 to Mar 2021 (Period 11) ScotRail 580218.0 45.79 80.30 94.81 97.68 99.36 99.71 99.82 99.91 0.29 0.18 0.09 7245165.0 41.62 75.66 92.30 96.43 99.09 99.62 99.80 99.92 0.38 0.20 0.08
23 2020202112 Apr 2020 to Mar 2021 (Period 12) ScotRail 497994.0 44.03 77.38 91.82 95.37 98.19 99.04 99.47 99.81 0.96 0.53 0.19 7054554.0 42.74 76.90 92.88 96.65 99.08 99.59 99.78 99.91 0.41 0.22 0.09
23 2020202113 Apr 2020 to Mar 2021 (Period 13) ScotRail 457990.0 47.48 82.73 95.97 98.28 99.58 99.84 99.92 99.97 0.16 0.08 0.03 6844366.0 43.44 77.70 93.24 96.80 99.10 99.60 99.78 99.91 0.40 0.22 0.09
23 2021202201 Apr 2021 to Mar 2022 (Period 01) ScotRail 567455.0 44.90 80.01 94.74 97.75 99.45 99.81 99.89 99.96 0.19 0.11 0.04 7008985.0 42.87 77.31 93.12 96.76 99.10 99.60 99.78 99.91 0.40 0.22 0.09
23 2021202202 Apr 2021 to Mar 2022 (Period 02) ScotRail 524173.0 41.26 75.96 92.82 96.71 99.01 99.51 99.71 99.87 0.49 0.29 0.13 7190605.0 42.34 76.90 92.98 96.70 99.08 99.59 99.77 99.91 0.41 0.23 0.09
23 2021202203 Apr 2021 to Mar 2022 (Period 03) ScotRail 567151.0 41.55 76.01 92.76 96.81 99.19 99.67 99.83 99.94 0.33 0.17 0.06 7328963.0 41.93 76.53 92.82 96.63 99.06 99.58 99.77 99.91 0.42 0.23 0.09
23 2021202204 Apr 2021 to Mar 2022 (Period 04) ScotRail 557962.0 39.63 73.33 90.86 95.53 98.78 99.52 99.76 99.91 0.48 0.24 0.09 7401161.0 41.56 76.06 92.54 96.47 99.00 99.56 99.76 99.90 0.44 0.24 0.10
23 2021202205 Apr 2021 to Mar 2022 (Period 05) ScotRail 563156.0 38.96 72.98 91.00 95.56 98.64 99.37 99.64 99.83 0.63 0.36 0.17 7385723.0 41.31 75.77 92.41 96.40 98.98 99.55 99.75 99.90 0.45 0.25 0.10
23 2021202206 Apr 2021 to Mar 2022 (Period 06) ScotRail 565500.0 39.03 73.58 91.92 96.49 99.18 99.71 99.87 99.95 0.29 0.13 0.05 7343578.0 41.11 75.48 92.30 96.37 98.98 99.56 99.76 99.90 0.44 0.24 0.10
23 2021202207 Apr 2021 to Mar 2022 (Period 07) ScotRail 559040.0 35.92 70.27 90.44 95.72 98.92 99.59 99.79 99.92 0.41 0.21 0.08 7264095.0 40.88 75.18 92.17 96.33 98.98 99.56 99.76 99.91 0.44 0.24 0.09
23 2021202208 Apr 2021 to Mar 2022 (Period 08) ScotRail 586969.0 28.25 58.60 81.95 90.55 97.22 98.93 99.51 99.84 1.07 0.49 0.16 7205295.0 40.50 74.55 91.72 96.06 98.89 99.53 99.75 99.90 0.47 0.25 0.10
23 2021202209 Apr 2021 to Mar 2022 (Period 09) ScotRail 593702.0 29.01 60.09 83.84 92.05 97.79 99.21 99.63 99.89 0.79 0.37 0.11 7148775.0 39.67 73.41 91.07 95.71 98.79 99.50 99.74 99.90 0.50 0.26 0.10
23 2021202210 Apr 2021 to Mar 2022 (Period 10) ScotRail 503032.0 35.89 68.87 88.93 94.82 98.68 99.53 99.77 99.92 0.47 0.23 0.08 7124342.0 39.16 72.84 90.79 95.58 98.75 99.49 99.74 99.90 0.51 0.26 0.10
23 2021202211 Apr 2021 to Mar 2022 (Period 11) ScotRail 568011.0 37.69 70.90 89.92 95.11 98.57 99.37 99.67 99.87 0.63 0.33 0.13 7112135.0 38.50 72.08 90.39 95.37 98.69 99.46 99.73 99.90 0.54 0.27 0.10
23 2021202212 Apr 2021 to Mar 2022 (Period 12) ScotRail 574234.0 37.09 70.52 89.44 94.84 98.64 99.47 99.74 99.92 0.53 0.26 0.08 7188375.0 38.00 71.59 90.22 95.33 98.72 99.50 99.75 99.90 0.50 0.25 0.10
23 2021202213 Apr 2021 to Mar 2022 (Period 13) ScotRail 516698.0 41.07 76.09 92.79 96.70 99.10 99.63 99.81 99.93 0.37 0.19 0.07 7247083.0 37.62 71.21 90.04 95.24 98.69 99.48 99.74 99.90 0.52 0.26 0.10
23 2022202301 Apr 2022 to Mar 2023 (Period 01) ScotRail 587722.0 40.57 76.02 92.62 96.56 99.02 99.55 99.74 99.88 0.45 0.26 0.12 7267350.0 37.29 70.91 89.88 95.15 98.66 99.46 99.73 99.90 0.54 0.27 0.10
23 2022202302 Apr 2022 to Mar 2023 (Period 02) ScotRail 523799.0 38.94 73.35 91.03 95.70 98.86 99.57 99.80 99.91 0.43 0.20 0.09 7266976.0 37.12 70.72 89.75 95.08 98.65 99.47 99.73 99.90 0.53 0.27 0.10
23 2022202303 Apr 2022 to Mar 2023 (Period 03) ScotRail 390446.0 38.10 72.65 91.05 95.80 98.87 99.56 99.76 99.89 0.44 0.24 0.11 7090271.0 36.82 70.40 89.58 94.98 98.62 99.46 99.73 99.89 0.54 0.27 0.11
23 2022202304 Apr 2022 to Mar 2023 (Period 04) ScotRail 471567.0 36.65 70.61 89.69 95.13 98.66 99.49 99.76 99.91 0.51 0.24 0.09 7003876.0 36.59 70.18 89.49 94.94 98.61 99.45 99.73 99.89 0.55 0.27 0.11
23 2022202305 Apr 2022 to Mar 2023 (Period 05) ScotRail 546179.0 37.35 70.97 89.24 94.53 98.21 99.17 99.53 99.77 0.83 0.47 0.23 6986899.0 36.46 70.02 89.35 94.86 98.58 99.44 99.72 99.89 0.56 0.28 0.11
23 2022202306 Apr 2022 to Mar 2023 (Period 06) ScotRail 624402.0 37.14 71.27 90.43 95.70 98.83 99.54 99.76 99.91 0.46 0.24 0.09 7045801.0 36.31 69.84 89.23 94.81 98.55 99.42 99.71 99.89 0.58 0.29 0.11
23 2022202307 Apr 2022 to Mar 2023 (Period 07) ScotRail 559190.0 34.49 67.69 87.67 93.84 98.25 99.28 99.63 99.84 0.72 0.37 0.16 7045951.0 36.20 69.64 89.01 94.66 98.50 99.40 99.70 99.88 0.60 0.30 0.12
23 2022202308 Apr 2022 to Mar 2023 (Period 08) ScotRail 542620.0 27.96 58.59 81.69 90.37 97.15 98.99 99.55 99.85 1.01 0.45 0.15 7001602.0 36.23 69.71 89.04 94.67 98.50 99.41 99.70 99.88 0.59 0.30 0.12
23 2022202309 Apr 2022 to Mar 2023 (Period 09) ScotRail 615975.0 30.51 63.04 85.53 93.02 97.96 99.17 99.52 99.81 0.83 0.48 0.19 7023875.0 36.34 69.94 89.17 94.75 98.51 99.40 99.69 99.87 0.60 0.31 0.13
23 2022202310 Apr 2022 to Mar 2023 (Period 10) ScotRail 329390.0 31.32 62.78 84.01 91.20 96.98 98.68 99.25 99.67 1.32 0.75 0.33 6850233.0 36.13 69.67 88.94 94.57 98.42 99.36 99.66 99.86 0.64 0.34 0.14
23 2022202311 Apr 2022 to Mar 2023 (Period 11) ScotRail 623053.0 34.55 68.10 88.79 94.96 98.73 99.50 99.75 99.90 0.50 0.25 0.10 6905275.0 35.86 69.43 88.85 94.56 98.44 99.37 99.67 99.86 0.63 0.33 0.14
23 2022202312 Apr 2022 to Mar 2023 (Period 12) ScotRail 626084.0 36.48 71.01 90.60 95.89 98.94 99.60 99.79 99.93 0.40 0.21 0.07 6957125.0 35.81 69.48 88.95 94.66 98.47 99.38 99.68 99.87 0.62 0.32 0.13
23 2022202313 Apr 2022 to Mar 2023 (Period 13) ScotRail 602816.0 38.14 72.80 90.92 95.84 98.91 99.56 99.76 99.91 0.44 0.24 0.09 7043243.0 35.63 69.28 88.84 94.61 98.46 99.38 99.67 99.87 0.62 0.33 0.13
23 2023202401 Apr 2023 to Mar 2024 (Period 01) ScotRail 647635.0 39.82 74.41 91.84 96.22 99.04 99.62 99.80 99.93 0.38 0.20 0.07 7103156.0 35.60 69.19 88.80 94.60 98.47 99.39 99.68 99.87 0.61 0.32 0.13
23 2023202402 Apr 2023 to Mar 2024 (Period 02) ScotRail 622330.0 40.56 75.05 92.23 96.42 99.01 99.55 99.74 99.89 0.45 0.26 0.11 7201687.0 35.78 69.39 88.94 94.67 98.49 99.39 99.68 99.87 0.61 0.32 0.13
23 2023202403 Apr 2023 to Mar 2024 (Period 03) ScotRail 622093.0 38.44 71.60 89.88 95.00 98.53 99.37 99.67 99.88 0.63 0.33 0.12 7433334.0 35.88 69.41 88.90 94.64 98.47 99.38 99.67 99.87 0.62 0.33 0.13
23 2023202404 Apr 2023 to Mar 2024 (Period 04) ScotRail 617917.0 39.89 74.11 91.79 96.24 99.00 99.62 99.80 99.93 0.38 0.20 0.07 7579684.0 36.16 69.72 89.09 94.74 98.50 99.39 99.68 99.87 0.61 0.32 0.13
23 2023202405 Apr 2023 to Mar 2024 (Period 05) ScotRail 623591.0 38.07 72.20 90.64 95.68 98.91 99.58 99.79 99.94 0.42 0.21 0.06 7657096.0 36.23 69.83 89.21 94.83 98.55 99.42 99.70 99.88 0.58 0.30 0.12
23 2023202406 Apr 2023 to Mar 2024 (Period 06) ScotRail 623844.0 38.28 72.71 90.97 95.70 98.84 99.53 99.78 99.93 0.47 0.22 0.07 7656538.0 36.33 69.94 89.25 94.83 98.55 99.42 99.70 99.89 0.58 0.30 0.11
23 2023202407 Apr 2023 to Mar 2024 (Period 07) ScotRail 591387.0 34.43 67.03 87.11 93.18 97.70 98.84 99.33 99.72 1.16 0.67 0.28 7688735.0 36.31 69.88 89.20 94.78 98.51 99.39 99.67 99.88 0.61 0.33 0.12
23 2023202408 Apr 2023 to Mar 2024 (Period 08) ScotRail 596607.0 29.47 60.23 82.93 91.14 97.41 98.94 99.41 99.76 1.06 0.59 0.24 7742722.0 36.37 69.93 89.24 94.81 98.52 99.38 99.66 99.87 0.62 0.34 0.13
23 2023202409 Apr 2023 to Mar 2024 (Period 09) ScotRail 620307.0 30.17 62.00 85.05 93.01 98.29 99.38 99.70 99.90 0.62 0.30 0.10 7747054.0 36.34 69.85 89.20 94.80 98.55 99.40 99.68 99.88 0.60 0.32 0.12
23 2023202410 Apr 2023 to Mar 2024 (Period 10) ScotRail 543771.0 33.39 65.28 86.04 92.88 97.79 98.99 99.44 99.75 1.01 0.56 0.25 7961435.0 36.35 69.83 89.20 94.82 98.56 99.40 99.68 99.88 0.60 0.32 0.12
23 2023202411 Apr 2023 to Mar 2024 (Period 11) ScotRail 560546.0 34.88 67.86 88.26 94.28 98.29 99.24 99.59 99.84 0.76 0.41 0.16 7898928.0 36.39 69.82 89.17 94.77 98.53 99.38 99.67 99.87 0.62 0.33 0.13
23 2023202412 Apr 2023 to Mar 2024 (Period 12) ScotRail 635182.0 37.01 70.40 89.96 95.48 98.95 99.64 99.84 99.95 0.36 0.16 0.05 7908026.0 36.43 69.78 89.12 94.74 98.53 99.38 99.67 99.87 0.62 0.33 0.13
23 2023202413 Apr 2023 to Mar 2024 (Period 13) ScotRail 652185.0 38.72 72.76 91.23 96.07 99.06 99.65 99.85 99.96 0.35 0.15 0.04 7957395.0 36.49 69.79 89.15 94.77 98.54 99.39 99.68 99.88 0.61 0.32 0.12
23 2024202501 Apr 2024 to Mar 2025 (Period 01) ScotRail 611313.0 38.59 72.49 90.59 95.45 98.77 99.50 99.76 99.92 0.50 0.24 0.08 7921073.0 36.38 69.62 89.05 94.70 98.52 99.38 99.67 99.88 0.62 0.33 0.12
23 2024202502 Apr 2024 to Mar 2025 (Period 02) ScotRail 637759.0 38.21 71.92 90.67 95.82 99.01 99.62 99.83 99.94 0.38 0.17 0.06 7936502.0 36.20 69.38 88.93 94.65 98.52 99.39 99.68 99.88 0.61 0.32 0.12
23 2024202503 Apr 2024 to Mar 2025 (Period 03) ScotRail 648352.0 38.40 72.54 90.75 95.74 98.91 99.56 99.79 99.91 0.44 0.21 0.09 7962761.0 36.20 69.46 89.00 94.72 98.55 99.40 99.69 99.88 0.60 0.31 0.12
23 2024202504 Apr 2024 to Mar 2025 (Period 04) ScotRail 563990.0 37.70 71.76 90.15 95.15 98.63 99.51 99.77 99.93 0.49 0.23 0.07 7908834.0 36.02 69.27 88.86 94.63 98.52 99.39 99.69 99.88 0.61 0.31 0.12
23 2024202505 Apr 2024 to Mar 2025 (Period 05) ScotRail 491593.0 34.98 68.53 88.41 94.30 98.48 99.46 99.78 99.95 0.54 0.22 0.05 7776836.0 35.79 68.98 88.69 94.52 98.49 99.38 99.69 99.88 0.62 0.31 0.12
23 2024202506 Apr 2024 to Mar 2025 (Period 06) ScotRail 500947.0 37.21 71.23 90.54 95.71 98.93 99.60 99.82 99.94 0.40 0.18 0.06 7653939.0 35.68 68.83 88.63 94.50 98.49 99.39 99.69 99.88 0.61 0.31 0.12
23 2024202507 Apr 2024 to Mar 2025 (Period 07) ScotRail 536440.0 35.31 69.11 89.42 95.06 98.73 99.53 99.76 99.91 0.47 0.24 0.09 7598992.0 35.75 68.99 88.80 94.65 98.57 99.44 99.72 99.90 0.56 0.28 0.10
23 2024202508 Apr 2024 to Mar 2025 (Period 08) ScotRail 647444.0 27.96 58.63 81.68 90.31 97.22 98.93 99.52 99.86 1.07 0.48 0.14 7649829.0 35.58 68.79 88.66 94.55 98.55 99.43 99.73 99.90 0.57 0.27 0.10
23 2024202509 Apr 2024 to Mar 2025 (Period 09) ScotRail 652599.0 29.69 61.58 84.45 92.31 97.87 99.09 99.54 99.83 0.91 0.46 0.17 7682121.0 35.52 68.73 88.59 94.49 98.51 99.41 99.71 99.90 0.59 0.29 0.10
23 2024202510 Apr 2024 to Mar 2025 (Period 10) ScotRail 575852.0 33.07 65.78 86.57 93.32 98.05 99.21 99.61 99.85 0.79 0.39 0.15 7714202.0 35.48 68.75 88.62 94.51 98.53 99.42 99.72 99.91 0.58 0.28 0.09
23 2024202511 Apr 2024 to Mar 2025 (Period 11) ScotRail 591244.0 36.17 69.41 88.96 94.56 98.43 99.40 99.70 99.90 0.60 0.30 0.10 7744900.0 35.58 68.87 88.67 94.53 98.54 99.43 99.73 99.91 0.57 0.27 0.09
23 2024202512 Apr 2024 to Mar 2025 (Period 12) ScotRail 666840.0 37.54 71.63 90.84 96.03 99.10 99.68 99.85 99.93 0.32 0.15 0.07 7776558.0 35.63 68.98 88.75 94.59 98.55 99.44 99.73 99.91 0.56 0.27 0.09
23 2024202513 Apr 2024 to Mar 2025 (Period 13) ScotRail 697682.0 40.22 74.67 92.12 96.49 99.09 99.64 99.83 99.95 0.36 0.17 0.05 7822055.0 35.78 69.17 88.85 94.63 98.56 99.44 99.73 99.91 0.56 0.27 0.09
23 2025202601 Apr 2025 to Mar 2026 (Period 01) ScotRail 625993.0 39.69 74.00 91.52 96.03 98.89 99.54 99.75 99.90 0.46 0.25 0.10 7836735.0 35.88 69.30 88.92 94.68 98.57 99.44 99.73 99.91 0.56 0.27 0.09
23 2025202602 Apr 2025 to Mar 2026 (Period 02) ScotRail 663479.0 38.82 72.89 90.82 95.62 98.82 99.52 99.75 99.89 0.48 0.25 0.11 7862455.0 35.94 69.39 88.94 94.67 98.55 99.44 99.73 99.90 0.56 0.27 0.10
23 2025202603 Apr 2025 to Mar 2026 (Period 03) ScotRail 680510.0 39.51 73.22 90.89 95.68 98.80 99.54 99.77 99.90 0.46 0.23 0.10 7894613.0 36.04 69.46 88.96 94.66 98.54 99.43 99.73 99.90 0.57 0.27 0.10
23 2025202604 Apr 2025 to Mar 2026 (Period 04) ScotRail 678062.0 38.59 71.45 89.34 94.61 98.30 99.28 99.63 99.88 0.72 0.37 0.12 8008685.0 36.14 69.47 88.91 94.63 98.52 99.42 99.71 99.90 0.58 0.29 0.10
23 2025202605 Apr 2025 to Mar 2026 (Period 05) ScotRail 652618.0 37.11 69.95 88.40 93.77 97.81 99.00 99.43 99.77 1.00 0.57 0.23 8169710.0 36.29 69.56 88.90 94.58 98.46 99.38 99.69 99.88 0.62 0.31 0.12
23 2025202606 Apr 2025 to Mar 2026 (Period 06) ScotRail 678406.0 37.35 70.63 89.72 95.03 98.55 99.39 99.69 99.92 0.61 0.31 0.08 8347169.0 36.32 69.55 88.87 94.55 98.44 99.37 99.68 99.88 0.63 0.32 0.12
23 2025202607 Apr 2025 to Mar 2026 (Period 07) ScotRail 645982.0 33.95 66.28 87.05 93.45 97.98 99.12 99.53 99.82 0.88 0.47 0.18 8456711.0 36.20 69.33 88.69 94.43 98.39 99.34 99.66 99.88 0.66 0.34 0.12
23 2025202608 Apr 2025 to Mar 2026 (Period 08) ScotRail 683549.0 30.68 62.03 84.24 92.05 97.84 99.19 99.60 99.87 0.81 0.40 0.13 8492816.0 36.39 69.55 88.87 94.55 98.43 99.36 99.67 99.88 0.64 0.33 0.12
23 2025202609 Apr 2025 to Mar 2026 (Period 09) ScotRail 678421.0 29.69 60.54 83.35 91.43 97.53 99.04 99.47 99.78 0.96 0.53 0.22 8518638.0 36.37 69.45 88.77 94.47 98.40 99.35 99.66 99.87 0.65 0.34 0.13
23 2025202610 Apr 2025 to Mar 2026 (Period 10) ScotRail 593428.0 32.99 65.33 86.41 93.21 98.15 99.27 99.65 99.88 0.73 0.35 0.12 8536214.0 36.35 69.41 88.75 94.46 98.41 99.36 99.67 99.88 0.64 0.33 0.12
23 2025202611 Apr 2025 to Mar 2026 (Period 11) ScotRail 680997.0 35.38 68.58 88.64 94.54 98.44 99.32 99.64 99.85 0.68 0.36 0.15 8625967.0 36.29 69.34 88.73 94.46 98.41 99.35 99.66 99.87 0.65 0.34 0.13
23 2025202612 Apr 2025 to Mar 2026 (Period 12) ScotRail 681827.0 36.18 70.03 89.68 95.16 98.74 99.54 99.79 99.93 0.46 0.21 0.07 8640954.0 36.18 69.22 88.64 94.40 98.38 99.34 99.66 99.87 0.66 0.34 0.13
23 2025202613 Apr 2025 to Mar 2026 (Period 13) ScotRail 663476.0 37.52 70.82 89.67 95.23 98.83 99.55 99.76 99.90 0.45 0.24 0.10 8606748.0 35.96 68.90 88.44 94.29 98.36 99.33 99.65 99.87 0.67 0.35 0.13
23 2026202701 Apr 2026 to Mar 2027 (Period 01) ScotRail 796603.0 37.45 70.97 89.70 95.35 98.84 99.53 99.76 99.91 0.47 0.24 0.09 8777358.0 35.83 68.73 88.34 94.27 98.37 99.33 99.65 99.87 0.67 0.35 0.13
23 2026202702 Apr 2026 to Mar 2027 (Period 02) ScotRail 692472.0 36.66 69.80 89.09 95.00 98.76 99.53 99.77 99.93 0.47 0.23 0.07 8806351.0 35.67 68.50 88.21 94.22 98.36 99.33 99.65 99.87 0.67 0.35 0.13
24 2014201501 Apr 2014 to Mar 2015 (Period 01) South Western Railway 410703.0 47.65 77.84 92.38 96.18 98.65 99.31 99.65 99.87 0.69 0.35 0.13 410703.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201502 Apr 2014 to Mar 2015 (Period 02) South Western Railway 442658.0 45.26 75.26 91.19 95.67 98.48 99.22 99.54 99.81 0.78 0.46 0.19 853361.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201503 Apr 2014 to Mar 2015 (Period 03) South Western Railway 443773.0 42.71 72.08 89.53 94.79 98.13 99.10 99.51 99.83 0.90 0.49 0.17 1297134.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201504 Apr 2014 to Mar 2015 (Period 04) South Western Railway 444543.0 43.49 72.31 89.10 94.04 97.38 98.42 99.01 99.55 1.58 0.99 0.45 1741677.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201505 Apr 2014 to Mar 2015 (Period 05) South Western Railway 438447.0 42.51 71.43 88.10 93.34 97.02 98.21 98.83 99.40 1.79 1.17 0.60 2180124.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201506 Apr 2014 to Mar 2015 (Period 06) South Western Railway 445851.0 46.68 75.98 92.04 96.38 98.97 99.58 99.80 99.94 0.42 0.20 0.06 2625975.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201507 Apr 2014 to Mar 2015 (Period 07) South Western Railway 444366.0 42.44 72.09 89.72 95.19 98.63 99.35 99.64 99.83 0.65 0.36 0.17 3070341.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201508 Apr 2014 to Mar 2015 (Period 08) South Western Railway 436072.0 32.98 59.76 80.53 89.04 96.29 98.19 98.96 99.58 1.81 1.04 0.42 3506413.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201509 Apr 2014 to Mar 2015 (Period 09) South Western Railway 438313.0 32.95 60.11 81.52 90.37 97.34 98.88 99.37 99.73 1.12 0.63 0.27 3944726.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201510 Apr 2014 to Mar 2015 (Period 10) South Western Railway 391033.0 38.94 67.47 86.25 92.82 97.64 98.87 99.36 99.71 1.13 0.64 0.29 4335759.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201511 Apr 2014 to Mar 2015 (Period 11) South Western Railway 409444.0 37.11 63.65 82.82 90.39 96.67 98.48 99.22 99.76 1.52 0.78 0.24 4745203.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201512 Apr 2014 to Mar 2015 (Period 12) South Western Railway 436194.0 41.59 70.20 88.30 94.51 98.31 99.09 99.43 99.73 0.91 0.57 0.27 5181397.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2014201513 Apr 2014 to Mar 2015 (Period 13) South Western Railway 483230.0 45.86 74.34 90.44 95.49 98.61 99.33 99.65 99.85 0.67 0.35 0.15 5664627.0 41.62 70.27 87.89 93.75 97.87 98.93 99.38 99.74 1.07 0.62 0.26
24 2015201601 Apr 2015 to Mar 2016 (Period 01) South Western Railway 506013.0 48.28 76.46 91.42 95.87 98.52 99.20 99.50 99.77 0.80 0.50 0.23 5759937.0 41.77 70.27 87.88 93.76 97.87 98.93 99.38 99.73 1.07 0.62 0.27
24 2015201602 Apr 2015 to Mar 2016 (Period 02) South Western Railway 437494.0 46.80 74.96 90.79 95.44 98.47 99.28 99.61 99.85 0.72 0.39 0.15 5754773.0 41.89 70.24 87.85 93.74 97.87 98.93 99.38 99.74 1.07 0.62 0.26
24 2015201603 Apr 2015 to Mar 2016 (Period 03) South Western Railway 444662.0 46.63 74.54 90.77 95.72 98.68 99.40 99.68 99.87 0.60 0.32 0.13 5755662.0 42.19 70.43 87.95 93.81 97.91 98.96 99.39 99.74 1.04 0.61 0.26
24 2015201604 Apr 2015 to Mar 2016 (Period 04) South Western Railway 443789.0 44.40 72.13 89.08 94.56 98.16 99.02 99.42 99.76 0.98 0.58 0.24 5754908.0 42.26 70.42 87.95 93.85 97.97 99.00 99.43 99.75 1.00 0.57 0.25
24 2015201605 Apr 2015 to Mar 2016 (Period 05) South Western Railway 441455.0 44.89 73.28 89.54 94.30 97.58 98.58 99.06 99.51 1.42 0.94 0.49 5757916.0 42.44 70.56 88.06 93.92 98.01 99.03 99.44 99.76 0.97 0.56 0.24
24 2015201606 Apr 2015 to Mar 2016 (Period 06) South Western Railway 442026.0 45.61 74.20 90.64 95.52 98.36 99.07 99.40 99.72 0.93 0.60 0.28 5754091.0 42.36 70.42 87.95 93.86 97.96 98.99 99.41 99.75 1.01 0.59 0.25
24 2015201607 Apr 2015 to Mar 2016 (Period 07) South Western Railway 443049.0 41.95 69.81 87.89 94.04 98.23 99.16 99.50 99.79 0.84 0.50 0.21 5752774.0 42.32 70.25 87.80 93.77 97.93 98.98 99.40 99.74 1.02 0.60 0.26
24 2015201608 Apr 2015 to Mar 2016 (Period 08) South Western Railway 440917.0 33.86 60.83 81.98 90.61 97.26 98.81 99.40 99.81 1.19 0.60 0.19 5757619.0 42.38 70.32 87.91 93.88 98.01 99.02 99.43 99.76 0.98 0.57 0.24
24 2015201609 Apr 2015 to Mar 2016 (Period 09) South Western Railway 437391.0 31.04 56.98 78.45 88.08 96.24 98.38 99.15 99.69 1.62 0.85 0.31 5756697.0 42.24 70.08 87.68 93.71 97.92 98.98 99.42 99.76 1.02 0.58 0.24
24 2015201610 Apr 2015 to Mar 2016 (Period 10) South Western Railway 398446.0 41.03 69.52 87.61 93.77 98.01 99.05 99.49 99.80 0.95 0.51 0.20 5764110.0 42.38 70.22 87.77 93.77 97.95 99.00 99.43 99.76 1.00 0.57 0.24
24 2015201611 Apr 2015 to Mar 2016 (Period 11) South Western Railway 436712.0 36.99 64.47 84.75 92.35 97.61 98.87 99.35 99.76 1.13 0.65 0.24 5791378.0 42.34 70.25 87.89 93.90 98.01 99.02 99.44 99.76 0.98 0.56 0.24
24 2015201612 Apr 2015 to Mar 2016 (Period 12) South Western Railway 431509.0 38.66 66.62 86.04 92.60 96.99 98.31 98.91 99.45 1.69 1.09 0.55 5786693.0 42.13 69.99 87.72 93.76 97.91 98.96 99.40 99.74 1.04 0.60 0.26
24 2015201613 Apr 2015 to Mar 2016 (Period 13) South Western Railway 391575.0 40.45 68.17 87.08 93.46 97.65 98.77 99.29 99.68 1.23 0.71 0.32 5695038.0 41.69 69.49 87.45 93.59 97.84 98.92 99.37 99.73 1.08 0.63 0.27
24 2016201701 Apr 2016 to Mar 2017 (Period 01) South Western Railway 477740.0 45.13 73.41 90.35 95.40 98.57 99.34 99.65 99.86 0.66 0.35 0.14 5666765.0 41.40 69.20 87.34 93.54 97.84 98.93 99.38 99.74 1.07 0.62 0.26
24 2016201702 Apr 2016 to Mar 2017 (Period 02) South Western Railway 439087.0 41.13 68.55 86.79 93.09 97.63 98.76 99.25 99.70 1.24 0.75 0.30 5668358.0 40.96 68.71 87.03 93.36 97.77 98.89 99.35 99.72 1.11 0.65 0.28
24 2016201703 Apr 2016 to Mar 2017 (Period 03) South Western Railway 440041.0 41.97 70.03 87.94 93.76 97.39 98.36 98.86 99.33 1.64 1.14 0.67 5663737.0 40.59 68.35 86.80 93.21 97.67 98.81 99.29 99.68 1.19 0.71 0.32
24 2016201704 Apr 2016 to Mar 2017 (Period 04) South Western Railway 441725.0 37.19 63.77 82.61 89.76 95.27 97.17 98.15 99.08 2.83 1.85 0.92 5661673.0 40.03 67.70 86.30 92.83 97.45 98.66 99.19 99.63 1.34 0.81 0.37
24 2016201705 Apr 2016 to Mar 2017 (Period 05) South Western Railway 448402.0 40.60 68.56 87.65 94.06 98.15 99.13 99.53 99.83 0.87 0.47 0.17 5668620.0 39.69 67.33 86.15 92.82 97.49 98.71 99.23 99.65 1.29 0.77 0.35
24 2016201706 Apr 2016 to Mar 2017 (Period 06) South Western Railway 445705.0 38.83 66.31 86.02 92.82 97.40 98.55 99.08 99.58 1.45 0.92 0.42 5672299.0 39.17 66.71 85.79 92.61 97.42 98.67 99.20 99.64 1.33 0.80 0.36
24 2016201707 Apr 2016 to Mar 2017 (Period 07) South Western Railway 448502.0 37.28 63.86 83.73 91.46 97.22 98.61 99.16 99.59 1.39 0.84 0.41 5677752.0 38.80 66.25 85.47 92.40 97.34 98.62 99.17 99.63 1.38 0.83 0.37
24 2016201708 Apr 2016 to Mar 2017 (Period 08) South Western Railway 447885.0 33.78 60.12 81.26 89.96 96.83 98.60 99.26 99.70 1.40 0.74 0.30 5684720.0 38.79 66.18 85.41 92.35 97.31 98.61 99.16 99.62 1.39 0.84 0.38
24 2016201709 Apr 2016 to Mar 2017 (Period 09) South Western Railway 463034.0 24.08 46.81 69.60 81.49 92.93 96.47 97.96 99.18 3.53 2.04 0.82 5710363.0 38.19 65.32 84.66 91.80 97.03 98.45 99.07 99.58 1.55 0.93 0.42
24 2016201710 Apr 2016 to Mar 2017 (Period 10) South Western Railway 432762.0 36.71 64.53 84.99 92.60 98.03 99.16 99.62 99.89 0.84 0.38 0.11 5744679.0 37.88 64.97 84.48 91.72 97.04 98.46 99.08 99.59 1.54 0.92 0.41
24 2016201711 Apr 2016 to Mar 2017 (Period 11) South Western Railway 451804.0 34.69 61.13 81.48 89.64 96.00 97.90 98.78 99.45 2.10 1.22 0.55 5759771.0 37.70 64.70 84.22 91.51 96.92 98.39 99.04 99.56 1.61 0.96 0.44
24 2016201712 Apr 2016 to Mar 2017 (Period 12) South Western Railway 463883.0 38.00 65.16 84.82 92.19 97.46 98.86 99.37 99.77 1.14 0.63 0.23 5792145.0 37.65 64.60 84.13 91.48 96.95 98.43 99.07 99.59 1.57 0.93 0.41
24 2016201713 Apr 2016 to Mar 2017 (Period 13) South Western Railway 449409.0 41.90 69.77 88.09 94.04 97.98 98.89 99.27 99.57 1.11 0.73 0.43 5849979.0 37.79 64.76 84.24 91.55 96.99 98.45 99.07 99.58 1.55 0.93 0.42
24 2017201801 Apr 2017 to Mar 2018 (Period 01) South Western Railway 482705.0 45.57 73.67 89.51 94.40 97.78 98.76 99.28 99.74 1.24 0.72 0.26 5854944.0 37.83 64.78 84.18 91.47 96.92 98.40 99.04 99.57 1.60 0.96 0.43
24 2017201802 Apr 2017 to Mar 2018 (Period 02) South Western Railway 487899.0 44.04 72.36 89.25 94.59 98.16 99.06 99.45 99.77 0.94 0.55 0.23 5903756.0 38.10 65.13 84.40 91.61 96.97 98.43 99.06 99.58 1.57 0.94 0.42
24 2017201803 Apr 2017 to Mar 2018 (Period 03) South Western Railway 475023.0 40.22 67.06 84.69 91.08 96.26 97.93 98.74 99.48 2.07 1.26 0.52 5938738.0 37.98 64.92 84.16 91.40 96.88 98.39 99.05 99.59 1.61 0.95 0.41
24 2017201804 Apr 2017 to Mar 2018 (Period 04) South Western Railway 484777.0 40.58 68.02 86.55 92.88 97.41 98.67 99.23 99.70 1.33 0.77 0.30 5981790.0 38.25 65.26 84.47 91.64 97.04 98.50 99.13 99.63 1.50 0.87 0.37
24 2017201805 Apr 2017 to Mar 2018 (Period 05) South Western Railway 456065.0 36.41 61.72 80.23 87.71 94.23 96.74 98.03 99.14 3.26 1.97 0.86 5989453.0 37.93 64.74 83.91 91.16 96.75 98.32 99.02 99.58 1.68 0.98 0.42
24 2017201806 Apr 2017 to Mar 2018 (Period 06) South Western Railway 495685.0 35.12 60.32 78.96 86.83 94.14 96.78 98.21 99.38 3.22 1.79 0.62 6039433.0 37.63 64.26 83.35 90.69 96.48 98.18 98.95 99.57 1.82 1.05 0.43
24 2017201807 Apr 2017 to Mar 2018 (Period 07) South Western Railway 529336.0 35.93 62.65 82.68 90.58 96.77 98.48 99.15 99.70 1.52 0.85 0.30 6120267.0 37.51 64.15 83.26 90.62 96.46 98.17 98.95 99.58 1.83 1.05 0.42
24 2017201808 Apr 2017 to Mar 2018 (Period 08) South Western Railway 535271.0 32.47 58.56 80.52 89.82 97.22 98.80 99.38 99.81 1.20 0.62 0.19 6207653.0 37.35 63.96 83.17 90.60 96.49 98.20 98.96 99.59 1.80 1.04 0.41
24 2017201809 Apr 2017 to Mar 2018 (Period 09) South Western Railway 546035.0 33.00 58.84 80.87 90.07 97.07 98.74 99.39 99.82 1.26 0.61 0.18 6290654.0 37.95 64.78 83.97 91.22 96.81 98.37 99.07 99.64 1.63 0.93 0.36
24 2017201810 Apr 2017 to Mar 2018 (Period 10) South Western Railway 476335.0 34.18 59.76 79.75 88.07 95.19 97.35 98.35 99.30 2.65 1.65 0.70 6334227.0 37.75 64.42 83.58 90.89 96.60 98.24 98.98 99.59 1.76 1.02 0.41
24 2017201811 Apr 2017 to Mar 2018 (Period 11) South Western Railway 526778.0 36.59 62.85 83.15 91.09 97.23 98.85 99.41 99.79 1.15 0.59 0.21 6409201.0 37.87 64.52 83.69 91.00 96.70 98.32 99.03 99.62 1.68 0.97 0.38
24 2017201812 Apr 2017 to Mar 2018 (Period 12) South Western Railway 516209.0 34.27 58.64 77.88 86.34 94.21 96.70 97.86 99.05 3.30 2.14 0.95 6461527.0 37.57 64.01 83.15 90.54 96.44 98.15 98.91 99.56 1.85 1.09 0.44
24 2017201813 Apr 2017 to Mar 2018 (Period 13) South Western Railway 526358.0 34.79 59.89 80.29 88.79 95.85 97.92 98.81 99.51 2.08 1.19 0.49 6538476.0 37.05 63.28 82.58 90.16 96.29 98.08 98.88 99.56 1.92 1.12 0.44
24 2018201901 Apr 2018 to Mar 2019 (Period 01) South Western Railway 541341.0 42.02 69.17 87.53 93.84 98.20 99.22 99.61 99.87 0.78 0.39 0.13 6597112.0 36.83 63.00 82.48 90.15 96.34 98.12 98.91 99.57 1.88 1.09 0.43
24 2018201902 Apr 2018 to Mar 2019 (Period 02) South Western Railway 569539.0 40.69 67.73 86.82 93.51 98.05 99.13 99.54 99.81 0.87 0.46 0.19 6678752.0 36.64 62.72 82.35 90.11 96.35 98.14 98.93 99.58 1.86 1.07 0.42
24 2018201903 Apr 2018 to Mar 2019 (Period 03) South Western Railway 575483.0 38.91 65.24 84.69 91.91 97.31 98.79 99.34 99.72 1.21 0.66 0.28 6779212.0 36.58 62.63 82.39 90.20 96.44 98.21 98.97 99.59 1.79 1.03 0.41
24 2018201904 Apr 2018 to Mar 2019 (Period 04) South Western Railway 569837.0 32.38 56.55 76.95 85.77 93.63 96.19 97.42 98.65 3.81 2.58 1.35 6864272.0 35.95 61.74 81.64 89.64 96.14 98.01 98.83 99.51 1.99 1.17 0.49
24 2018201905 Apr 2018 to Mar 2019 (Period 05) South Western Railway 522796.0 31.58 55.86 77.56 87.37 95.65 98.06 99.05 99.71 1.94 0.95 0.29 6931003.0 35.59 61.30 81.43 89.60 96.23 98.10 98.90 99.55 1.90 1.10 0.45
24 2018201906 Apr 2018 to Mar 2019 (Period 06) South Western Railway 530320.0 35.29 60.64 81.86 90.54 96.95 98.53 99.22 99.73 1.47 0.78 0.27 6965638.0 35.60 61.32 81.64 89.86 96.43 98.22 98.97 99.57 1.78 1.03 0.43
24 2018201907 Apr 2018 to Mar 2019 (Period 07) South Western Railway 543184.0 31.01 54.83 76.90 87.19 95.80 97.93 98.80 99.51 2.07 1.20 0.49 6979486.0 35.22 60.72 81.19 89.60 96.35 98.18 98.94 99.56 1.82 1.06 0.44
24 2018201908 Apr 2018 to Mar 2019 (Period 08) South Western Railway 505990.0 27.48 49.87 71.64 82.67 93.43 96.95 98.41 99.50 3.05 1.59 0.50 6950205.0 34.86 60.09 80.54 89.08 96.07 98.04 98.87 99.54 1.96 1.13 0.46
24 2018201909 Apr 2018 to Mar 2019 (Period 09) South Western Railway 526625.0 25.13 46.31 68.34 80.23 92.66 96.45 98.12 99.37 3.55 1.88 0.63 6930795.0 34.27 59.14 79.59 88.33 95.74 97.87 98.77 99.50 2.13 1.23 0.50
24 2018201910 Apr 2018 to Mar 2019 (Period 10) South Western Railway 465053.0 35.48 61.15 81.23 89.41 96.29 98.23 99.01 99.61 1.77 0.99 0.39 6919513.0 34.36 59.24 79.69 88.42 95.81 97.93 98.82 99.52 2.07 1.18 0.48
24 2018201911 Apr 2018 to Mar 2019 (Period 11) South Western Railway 568720.0 38.79 65.10 84.70 92.28 97.90 99.11 99.51 99.79 0.89 0.49 0.21 6961455.0 34.55 59.44 79.84 88.53 95.87 97.95 98.83 99.52 2.05 1.17 0.48
24 2018201912 Apr 2018 to Mar 2019 (Period 12) South Western Railway 562135.0 36.54 61.68 81.22 89.04 95.64 97.57 98.49 99.35 2.43 1.51 0.65 7007381.0 34.73 59.68 80.09 88.74 95.98 98.02 98.87 99.54 1.98 1.13 0.46
24 2018201913 Apr 2018 to Mar 2019 (Period 13) South Western Railway 568416.0 37.42 62.92 82.13 89.96 96.12 97.84 98.59 99.36 2.16 1.41 0.64 7049439.0 34.95 59.93 80.24 88.83 96.00 98.01 98.86 99.53 1.99 1.14 0.47
24 2019202001 Apr 2019 to Mar 2020 (Period 01) South Western Railway 539216.0 42.31 69.23 87.62 93.71 97.75 98.74 99.20 99.64 1.26 0.80 0.36 539216.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202002 Apr 2019 to Mar 2020 (Period 02) South Western Railway 571404.0 40.78 67.37 85.60 92.37 97.34 98.69 99.26 99.68 1.31 0.74 0.32 1110620.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202003 Apr 2019 to Mar 2020 (Period 03) South Western Railway 533738.0 39.64 65.83 84.68 91.96 97.53 98.88 99.41 99.78 1.12 0.59 0.22 1644358.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202004 Apr 2019 to Mar 2020 (Period 04) South Western Railway 579138.0 35.18 59.67 79.81 88.42 95.28 97.47 98.42 99.25 2.53 1.58 0.75 2223496.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202005 Apr 2019 to Mar 2020 (Period 05) South Western Railway 586093.0 36.36 61.59 81.18 89.34 95.81 97.84 98.76 99.42 2.16 1.24 0.58 2809589.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202006 Apr 2019 to Mar 2020 (Period 06) South Western Railway 541829.0 35.33 60.84 81.18 89.74 96.65 98.39 99.04 99.57 1.61 0.96 0.43 3351418.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202007 Apr 2019 to Mar 2020 (Period 07) South Western Railway 559975.0 31.15 54.45 75.71 85.75 95.13 97.60 98.53 99.35 2.40 1.47 0.65 3911393.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202008 Apr 2019 to Mar 2020 (Period 08) South Western Railway 565734.0 29.36 51.70 73.24 84.12 94.64 97.59 98.71 99.46 2.41 1.29 0.54 4477127.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202009 Apr 2019 to Mar 2020 (Period 09) South Western Railway 508443.0 26.97 49.21 71.24 82.63 94.13 97.50 98.68 99.56 2.50 1.32 0.44 4985570.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202010 Apr 2019 to Mar 2020 (Period 10) South Western Railway 274116.0 30.07 55.14 76.71 86.27 94.89 97.54 98.70 99.51 2.46 1.30 0.49 5259686.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202011 Apr 2019 to Mar 2020 (Period 11) South Western Railway 535061.0 29.32 52.17 73.90 84.66 94.49 97.21 98.30 99.21 2.79 1.70 0.79 5794747.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202012 Apr 2019 to Mar 2020 (Period 12) South Western Railway 563951.0 34.52 59.54 80.89 89.97 97.09 98.76 99.32 99.71 1.24 0.68 0.29 6358698.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
24 2019202013 Apr 2019 to Mar 2020 (Period 13) South Western Railway 523281.0 44.70 69.27 85.89 92.11 96.92 98.40 99.06 99.57 1.60 0.94 0.43 6881979.0 35.26 59.90 79.97 88.65 96.02 98.07 98.88 99.51 1.93 1.12 0.49
24 2020202101 Apr 2020 to Mar 2021 (Period 01) South Western Railway 351409.0 70.27 91.49 97.49 98.74 99.49 99.75 99.89 99.96 0.25 0.11 0.04 6694172.0 36.53 60.80 80.27 88.77 96.06 98.10 98.91 99.53 1.90 1.09 0.47
24 2020202102 Apr 2020 to Mar 2021 (Period 02) South Western Railway 342427.0 69.41 90.61 96.82 98.25 99.30 99.66 99.79 99.92 0.34 0.21 0.08 6465195.0 37.89 61.80 80.68 88.96 96.12 98.13 98.93 99.54 1.87 1.07 0.46
24 2020202103 Apr 2020 to Mar 2021 (Period 03) South Western Railway 404771.0 65.44 88.70 96.29 98.06 99.30 99.70 99.86 99.95 0.30 0.14 0.05 6336228.0 39.51 63.18 81.34 89.28 96.20 98.17 98.94 99.54 1.83 1.06 0.46
24 2020202104 Apr 2020 to Mar 2021 (Period 04) South Western Railway 457251.0 62.24 86.92 96.08 98.10 99.34 99.64 99.80 99.92 0.36 0.20 0.08 6214341.0 41.58 65.25 82.56 90.01 96.52 98.34 99.06 99.60 1.66 0.94 0.40
24 2020202105 Apr 2020 to Mar 2021 (Period 05) South Western Railway 465510.0 53.97 80.65 93.27 96.52 98.74 99.34 99.63 99.85 0.66 0.37 0.15 6093758.0 43.03 66.78 83.51 90.58 96.76 98.47 99.13 99.63 1.53 0.87 0.37
24 2020202106 Apr 2020 to Mar 2021 (Period 06) South Western Railway 480581.0 53.16 80.17 93.53 96.89 98.96 99.49 99.71 99.89 0.51 0.29 0.11 6032510.0 44.53 68.38 84.52 91.15 96.94 98.56 99.18 99.66 1.44 0.82 0.34
24 2020202107 Apr 2020 to Mar 2021 (Period 07) South Western Railway 508487.0 50.82 78.44 93.21 96.91 99.02 99.49 99.72 99.87 0.51 0.28 0.13 5981022.0 46.32 70.54 86.09 92.15 97.29 98.72 99.29 99.71 1.28 0.71 0.29
24 2020202108 Apr 2020 to Mar 2021 (Period 08) South Western Railway 505600.0 45.44 72.57 90.18 95.31 98.64 99.42 99.71 99.89 0.58 0.29 0.11 5920888.0 47.86 72.51 87.66 93.19 97.66 98.89 99.38 99.74 1.11 0.62 0.26
24 2020202109 Apr 2020 to Mar 2021 (Period 09) South Western Railway 502658.0 47.00 74.37 91.18 95.85 98.70 99.34 99.59 99.80 0.66 0.41 0.20 5915103.0 49.59 74.67 89.37 94.32 98.05 99.05 99.46 99.77 0.95 0.54 0.23
24 2020202110 Apr 2020 to Mar 2021 (Period 10) South Western Railway 413524.0 53.97 80.26 93.58 96.84 98.89 99.48 99.73 99.93 0.52 0.27 0.07 6054511.0 50.77 75.94 90.23 94.86 98.25 99.15 99.51 99.79 0.85 0.49 0.21
24 2020202111 Apr 2020 to Mar 2021 (Period 11) South Western Railway 417939.0 55.47 81.50 93.67 96.77 98.71 99.22 99.49 99.78 0.78 0.51 0.22 5937389.0 53.03 78.47 91.95 95.91 98.62 99.33 99.62 99.84 0.67 0.38 0.16
24 2020202112 Apr 2020 to Mar 2021 (Period 12) South Western Railway 456919.0 60.69 85.71 95.58 97.80 99.23 99.63 99.78 99.92 0.37 0.22 0.08 5830357.0 55.42 80.87 93.30 96.63 98.82 99.40 99.66 99.86 0.60 0.34 0.14
24 2020202113 Apr 2020 to Mar 2021 (Period 13) South Western Railway 405549.0 58.69 84.45 95.35 97.64 99.07 99.52 99.74 99.89 0.48 0.26 0.11 5712625.0 56.64 82.19 94.12 97.12 99.01 99.50 99.72 99.89 0.50 0.28 0.11
24 2021202201 Apr 2021 to Mar 2022 (Period 01) South Western Railway 508497.0 57.97 84.38 95.77 98.15 99.46 99.76 99.86 99.94 0.24 0.14 0.06 5869713.0 55.94 81.82 94.07 97.11 99.02 99.51 99.72 99.89 0.49 0.28 0.11
24 2021202202 Apr 2021 to Mar 2022 (Period 02) South Western Railway 498635.0 54.17 80.60 93.37 96.59 98.65 99.29 99.55 99.78 0.71 0.45 0.22 6025921.0 55.03 81.22 93.85 97.00 98.97 99.49 99.71 99.88 0.51 0.29 0.12
24 2021202203 Apr 2021 to Mar 2022 (Period 03) South Western Railway 527058.0 49.74 75.78 89.82 93.92 97.17 98.32 98.88 99.41 1.68 1.12 0.59 6148208.0 53.89 80.26 93.35 96.67 98.80 99.37 99.62 99.83 0.63 0.38 0.17
24 2021202204 Apr 2021 to Mar 2022 (Period 04) South Western Railway 534185.0 49.61 76.08 90.30 94.44 97.67 98.71 99.15 99.59 1.29 0.85 0.41 6225142.0 52.91 79.42 92.88 96.37 98.66 99.30 99.57 99.80 0.70 0.43 0.20
24 2021202205 Apr 2021 to Mar 2022 (Period 05) South Western Railway 532260.0 51.14 78.13 92.63 96.47 98.90 99.49 99.72 99.92 0.51 0.28 0.08 6291892.0 52.68 79.22 92.83 96.37 98.68 99.31 99.58 99.81 0.69 0.42 0.19
24 2021202206 Apr 2021 to Mar 2022 (Period 06) South Western Railway 534199.0 47.64 75.22 91.00 95.45 98.44 99.20 99.53 99.84 0.80 0.47 0.16 6345510.0 52.22 78.81 92.63 96.25 98.63 99.28 99.57 99.81 0.72 0.43 0.19
24 2021202207 Apr 2021 to Mar 2022 (Period 07) South Western Railway 534666.0 45.68 73.38 90.31 95.13 98.24 99.04 99.38 99.67 0.96 0.62 0.33 6371689.0 51.78 78.38 92.39 96.11 98.57 99.25 99.54 99.79 0.75 0.46 0.21
24 2021202208 Apr 2021 to Mar 2022 (Period 08) South Western Railway 514806.0 38.65 65.30 85.16 91.93 97.12 98.54 99.17 99.65 1.46 0.83 0.35 6380895.0 51.22 77.79 91.98 95.83 98.45 99.18 99.49 99.77 0.82 0.51 0.23
24 2021202209 Apr 2021 to Mar 2022 (Period 09) South Western Railway 532294.0 37.59 64.65 85.41 92.65 97.60 98.86 99.38 99.78 1.14 0.62 0.22 6410531.0 50.42 76.96 91.49 95.57 98.36 99.14 99.48 99.77 0.86 0.52 0.23
24 2021202210 Apr 2021 to Mar 2022 (Period 10) South Western Railway 475372.0 47.86 75.36 91.44 95.83 98.62 99.35 99.67 99.89 0.65 0.33 0.11 6472379.0 50.01 76.64 91.36 95.51 98.34 99.13 99.48 99.77 0.87 0.52 0.23
24 2021202211 Apr 2021 to Mar 2022 (Period 11) South Western Railway 467719.0 45.25 73.27 90.49 95.33 98.47 99.21 99.52 99.77 0.79 0.48 0.23 6522159.0 49.32 76.08 91.15 95.41 98.33 99.13 99.48 99.77 0.87 0.52 0.23
24 2021202212 Apr 2021 to Mar 2022 (Period 12) South Western Railway 468067.0 43.86 70.85 87.81 93.16 96.86 98.04 98.69 99.30 1.96 1.31 0.70 6533307.0 48.13 75.03 90.60 95.08 98.16 99.02 99.40 99.72 0.98 0.60 0.28
24 2021202213 Apr 2021 to Mar 2022 (Period 13) South Western Railway 498542.0 50.08 77.48 92.63 96.68 99.00 99.57 99.81 99.93 0.43 0.19 0.07 6626300.0 47.63 74.64 90.46 95.05 98.17 99.03 99.41 99.73 0.97 0.59 0.27
24 2022202301 Apr 2022 to Mar 2023 (Period 01) South Western Railway 551625.0 49.45 76.16 91.24 95.58 98.34 99.05 99.40 99.72 0.95 0.60 0.28 6669428.0 46.99 74.03 90.12 94.85 98.08 98.98 99.37 99.71 1.02 0.63 0.29
24 2022202302 Apr 2022 to Mar 2023 (Period 02) South Western Railway 541300.0 47.67 75.54 91.87 96.45 99.03 99.50 99.72 99.89 0.50 0.28 0.11 6712093.0 46.51 73.66 90.02 94.85 98.12 98.99 99.39 99.72 1.01 0.61 0.28
24 2022202303 Apr 2022 to Mar 2023 (Period 03) South Western Railway 487152.0 43.73 69.33 85.81 91.71 96.71 98.36 99.06 99.62 1.64 0.94 0.38 6672187.0 46.06 73.18 89.73 94.70 98.09 99.00 99.41 99.74 1.00 0.59 0.26
24 2022202304 Apr 2022 to Mar 2023 (Period 04) South Western Railway 539788.0 41.64 68.07 86.14 92.39 96.98 98.31 98.95 99.51 1.69 1.05 0.49 6677790.0 45.41 72.53 89.39 94.53 98.03 98.97 99.39 99.73 1.03 0.61 0.27
24 2022202305 Apr 2022 to Mar 2023 (Period 05) South Western Railway 485838.0 43.38 69.84 86.80 92.46 96.70 98.05 98.75 99.41 1.95 1.25 0.59 6631368.0 44.81 71.88 88.94 94.22 97.87 98.86 99.32 99.69 1.14 0.68 0.31
24 2022202306 Apr 2022 to Mar 2023 (Period 06) South Western Railway 548692.0 43.13 70.25 88.17 93.72 97.63 98.74 99.27 99.69 1.26 0.73 0.31 6645861.0 44.44 71.48 88.71 94.08 97.80 98.82 99.29 99.68 1.18 0.71 0.32
24 2022202307 Apr 2022 to Mar 2023 (Period 07) South Western Railway 511533.0 43.21 70.89 89.57 95.12 98.68 99.41 99.70 99.89 0.59 0.30 0.11 6622728.0 44.24 71.28 88.65 94.08 97.83 98.85 99.32 99.70 1.15 0.68 0.30
24 2022202308 Apr 2022 to Mar 2023 (Period 08) South Western Railway 494693.0 33.35 59.05 80.79 89.51 96.44 98.38 99.13 99.72 1.62 0.87 0.28 6602615.0 43.86 70.83 88.33 93.90 97.78 98.84 99.32 99.70 1.16 0.68 0.30
24 2022202309 Apr 2022 to Mar 2023 (Period 09) South Western Railway 519194.0 29.72 53.72 75.62 85.35 94.32 97.17 98.44 99.41 2.83 1.56 0.59 6589515.0 43.26 69.98 87.57 93.33 97.53 98.71 99.24 99.67 1.29 0.76 0.33
24 2022202310 Apr 2022 to Mar 2023 (Period 10) South Western Railway 185665.0 42.62 66.23 82.35 89.03 95.26 97.53 98.76 99.66 2.47 1.24 0.34 6299808.0 42.89 69.46 87.12 93.02 97.38 98.62 99.19 99.66 1.38 0.81 0.34
24 2022202311 Apr 2022 to Mar 2023 (Period 11) South Western Railway 510518.0 34.36 59.47 79.46 87.77 95.06 97.28 98.33 99.32 2.72 1.67 0.68 6342607.0 42.03 68.38 86.26 92.42 97.11 98.47 99.10 99.62 1.53 0.90 0.38
24 2022202312 Apr 2022 to Mar 2023 (Period 12) South Western Railway 530939.0 42.14 69.50 87.01 93.05 97.56 98.79 99.31 99.69 1.21 0.69 0.31 6405479.0 41.91 68.29 86.21 92.42 97.17 98.53 99.15 99.65 1.47 0.85 0.35
24 2022202313 Apr 2022 to Mar 2023 (Period 13) South Western Railway 488405.0 43.52 71.03 88.05 93.77 98.00 99.04 99.52 99.83 0.96 0.48 0.17 6395342.0 41.39 67.78 85.85 92.19 97.09 98.49 99.13 99.64 1.51 0.87 0.36
24 2023202401 Apr 2023 to Mar 2024 (Period 01) South Western Railway 561625.0 47.11 74.45 89.69 94.21 97.47 98.52 99.08 99.55 1.48 0.92 0.45 6405342.0 41.20 67.65 85.72 92.08 97.01 98.44 99.10 99.63 1.56 0.90 0.37
24 2023202402 Apr 2023 to Mar 2024 (Period 02) South Western Railway 539096.0 46.56 74.28 90.38 95.19 98.27 99.10 99.45 99.73 0.90 0.55 0.27 6403138.0 41.10 67.54 85.59 91.97 96.95 98.41 99.07 99.62 1.59 0.93 0.38
24 2023202403 Apr 2023 to Mar 2024 (Period 03) South Western Railway 527112.0 44.45 70.42 87.04 92.80 97.07 98.30 98.85 99.39 1.70 1.15 0.61 6443098.0 41.18 67.64 85.69 92.06 96.98 98.40 99.06 99.60 1.60 0.94 0.40
24 2023202404 Apr 2023 to Mar 2024 (Period 04) South Western Railway 463061.0 42.99 69.74 87.11 92.89 97.23 98.46 99.03 99.51 1.54 0.97 0.49 6366371.0 41.27 67.76 85.76 92.09 96.99 98.41 99.06 99.60 1.59 0.94 0.40
24 2023202405 Apr 2023 to Mar 2024 (Period 05) South Western Railway 480209.0 45.55 73.42 89.95 95.06 98.51 99.37 99.68 99.89 0.63 0.32 0.11 6360742.0 41.43 68.03 85.99 92.29 97.13 98.51 99.13 99.63 1.49 0.87 0.37
24 2023202406 Apr 2023 to Mar 2024 (Period 06) South Western Railway 486752.0 42.86 69.86 87.49 93.44 97.79 98.99 99.52 99.85 1.01 0.48 0.15 6298802.0 41.39 67.97 85.92 92.25 97.14 98.53 99.15 99.65 1.47 0.85 0.35
24 2023202407 Apr 2023 to Mar 2024 (Period 07) South Western Railway 510833.0 38.30 64.63 83.89 91.18 96.95 98.60 99.23 99.75 1.40 0.77 0.25 6298102.0 41.00 67.47 85.46 91.93 97.00 98.46 99.12 99.63 1.54 0.88 0.37
24 2023202408 Apr 2023 to Mar 2024 (Period 08) South Western Railway 543410.0 33.30 58.48 79.33 88.23 95.57 97.65 98.57 99.38 2.35 1.43 0.62 6346819.0 40.93 67.35 85.30 91.80 96.92 98.40 99.07 99.61 1.60 0.93 0.39
24 2023202409 Apr 2023 to Mar 2024 (Period 09) South Western Railway 502605.0 26.64 49.63 72.32 83.80 94.16 97.09 98.35 99.36 2.91 1.65 0.64 6330230.0 40.72 67.06 85.06 91.70 96.91 98.40 99.06 99.60 1.60 0.94 0.40
24 2023202410 Apr 2023 to Mar 2024 (Period 10) South Western Railway 482197.0 36.14 62.88 83.07 90.64 96.65 98.35 99.03 99.57 1.65 0.97 0.43 6626762.0 40.33 66.78 84.99 91.70 96.94 98.42 99.07 99.60 1.58 0.93 0.40
24 2023202411 Apr 2023 to Mar 2024 (Period 11) South Western Railway 512299.0 41.13 67.99 86.45 92.69 97.27 98.60 99.19 99.66 1.40 0.81 0.34 6628543.0 40.85 67.44 85.53 92.07 97.11 98.52 99.13 99.62 1.48 0.87 0.38
24 2023202412 Apr 2023 to Mar 2024 (Period 12) South Western Railway 523306.0 41.19 68.20 86.71 92.99 97.55 98.75 99.24 99.68 1.25 0.76 0.32 6620910.0 40.78 67.33 85.51 92.07 97.11 98.52 99.13 99.62 1.48 0.87 0.38
24 2023202413 Apr 2023 to Mar 2024 (Period 13) South Western Railway 553177.0 43.48 71.12 88.66 94.00 97.63 98.68 99.20 99.63 1.32 0.80 0.37 6685682.0 40.80 67.38 85.58 92.10 97.09 98.49 99.11 99.61 1.51 0.89 0.39
24 2024202501 Apr 2024 to Mar 2025 (Period 01) South Western Railway 490744.0 44.68 72.40 88.97 93.88 97.38 98.41 98.97 99.51 1.59 1.03 0.49 6614801.0 40.55 67.15 85.48 92.06 97.08 98.49 99.10 99.61 1.51 0.90 0.39
24 2024202502 Apr 2024 to Mar 2025 (Period 02) South Western Railway 520167.0 43.84 71.11 88.43 93.89 97.70 98.71 99.16 99.60 1.29 0.84 0.40 6595872.0 40.32 66.88 85.32 91.95 97.03 98.45 99.07 99.60 1.55 0.93 0.40
24 2024202503 Apr 2024 to Mar 2025 (Period 03) South Western Railway 568267.0 42.88 69.45 86.84 92.78 97.31 98.63 99.20 99.65 1.37 0.80 0.35 6637027.0 40.21 66.82 85.31 91.95 97.05 98.48 99.10 99.62 1.52 0.90 0.38
24 2024202504 Apr 2024 to Mar 2025 (Period 04) South Western Railway 564761.0 41.22 67.90 85.78 92.17 97.33 98.77 99.35 99.76 1.23 0.65 0.24 6738727.0 40.11 66.71 85.23 91.90 97.06 98.51 99.13 99.64 1.49 0.87 0.36
24 2024202505 Apr 2024 to Mar 2025 (Period 05) South Western Railway 552850.0 43.84 70.79 87.15 92.50 96.93 98.39 99.00 99.58 1.61 1.00 0.42 6811368.0 40.03 66.56 85.05 91.73 96.95 98.44 99.08 99.61 1.56 0.92 0.39
24 2024202506 Apr 2024 to Mar 2025 (Period 06) South Western Railway 541948.0 43.45 70.14 87.29 93.07 97.43 98.62 99.13 99.59 1.38 0.87 0.41 6866564.0 40.10 66.61 85.05 91.71 96.92 98.41 99.05 99.59 1.59 0.95 0.41
24 2024202507 Apr 2024 to Mar 2025 (Period 07) South Western Railway 533586.0 38.81 64.20 83.08 90.13 96.26 98.14 98.91 99.53 1.86 1.09 0.47 6889317.0 40.13 66.57 84.99 91.63 96.87 98.38 99.03 99.58 1.62 0.97 0.42
24 2024202508 Apr 2024 to Mar 2025 (Period 08) South Western Railway 550120.0 35.14 60.51 80.87 89.18 96.28 98.31 99.13 99.66 1.69 0.87 0.34 6896027.0 40.27 66.73 85.10 91.70 96.93 98.43 99.07 99.60 1.57 0.93 0.40
24 2024202509 Apr 2024 to Mar 2025 (Period 09) South Western Railway 536772.0 25.13 45.67 66.72 78.28 90.82 95.08 97.05 98.67 4.92 2.95 1.33 6930194.0 40.08 66.34 84.61 91.24 96.65 98.26 98.97 99.55 1.74 1.03 0.45
24 2024202510 Apr 2024 to Mar 2025 (Period 10) South Western Railway 485820.0 34.61 59.71 80.52 89.23 96.42 98.31 99.05 99.63 1.69 0.95 0.37 6933817.0 39.98 66.11 84.43 91.14 96.64 98.26 98.97 99.55 1.74 1.03 0.45
24 2024202511 Apr 2024 to Mar 2025 (Period 11) South Western Railway 537953.0 37.10 62.64 82.64 90.45 96.66 98.37 99.09 99.63 1.63 0.91 0.37 6959471.0 39.67 65.71 84.14 90.97 96.59 98.25 98.96 99.55 1.75 1.04 0.45
24 2024202512 Apr 2024 to Mar 2025 (Period 12) South Western Railway 546101.0 40.41 67.83 86.94 93.38 97.87 99.00 99.43 99.78 1.00 0.57 0.22 6982266.0 39.61 65.68 84.17 91.01 96.62 98.27 98.98 99.56 1.73 1.02 0.44
24 2024202513 Apr 2024 to Mar 2025 (Period 13) South Western Railway 586114.0 43.86 70.95 88.41 93.91 97.82 98.84 99.26 99.66 1.16 0.74 0.34 7015203.0 39.66 65.70 84.17 91.01 96.64 98.28 98.98 99.56 1.72 1.02 0.44
24 2025202601 Apr 2025 to Mar 2026 (Period 01) South Western Railway 504107.0 44.76 71.53 88.23 93.69 97.77 98.91 99.38 99.77 1.09 0.62 0.23 7028566.0 39.68 65.65 84.12 91.01 96.67 98.32 99.01 99.58 1.68 0.99 0.42
24 2025202602 Apr 2025 to Mar 2026 (Period 02) South Western Railway 558075.0 41.90 68.51 86.98 93.19 97.80 99.02 99.51 99.84 0.98 0.49 0.16 7066474.0 39.55 65.47 84.03 90.97 96.68 98.35 99.04 99.60 1.65 0.96 0.40
24 2025202603 Apr 2025 to Mar 2026 (Period 03) South Western Railway 551157.0 39.56 65.51 83.83 90.50 96.08 97.79 98.59 99.37 2.21 1.41 0.63 7049364.0 39.28 65.15 83.79 90.78 96.59 98.28 98.99 99.58 1.72 1.01 0.42
24 2025202604 Apr 2025 to Mar 2026 (Period 04) South Western Railway 550628.0 36.57 61.90 80.52 88.26 94.91 97.02 98.03 99.03 2.98 1.97 0.97 7035231.0 38.91 64.68 83.37 90.47 96.40 98.14 98.89 99.52 1.86 1.11 0.48
24 2025202605 Apr 2025 to Mar 2026 (Period 05) South Western Railway 538707.0 41.29 67.43 85.26 91.60 96.70 98.30 98.95 99.54 1.70 1.05 0.46 7021088.0 38.71 64.41 83.22 90.40 96.38 98.13 98.89 99.51 1.87 1.11 0.49
24 2025202606 Apr 2025 to Mar 2026 (Period 06) South Western Railway 530882.0 40.65 66.63 85.45 92.36 97.40 98.76 99.31 99.74 1.24 0.69 0.26 7010022.0 38.49 64.13 83.08 90.34 96.37 98.14 98.90 99.53 1.86 1.10 0.47
24 2025202607 Apr 2025 to Mar 2026 (Period 07) South Western Railway 549119.0 40.35 66.13 84.79 91.68 96.96 98.47 99.10 99.60 1.53 0.90 0.40 7025555.0 38.61 64.28 83.21 90.46 96.43 98.17 98.91 99.53 1.83 1.09 0.47
24 2025202608 Apr 2025 to Mar 2026 (Period 08) South Western Railway 527234.0 32.94 56.91 77.73 86.96 95.09 97.37 98.32 99.11 2.63 1.68 0.89 7002669.0 38.45 64.02 82.98 90.30 96.34 98.10 98.85 99.49 1.90 1.15 0.51
24 2025202609 Apr 2025 to Mar 2026 (Period 09) South Western Railway 540011.0 30.84 53.98 75.30 85.71 95.09 97.89 98.98 99.67 2.11 1.02 0.33 7005908.0 38.89 64.66 83.63 90.87 96.67 98.31 99.00 99.57 1.69 1.00 0.43
24 2025202610 Apr 2025 to Mar 2026 (Period 10) South Western Railway 473214.0 36.48 61.70 81.38 89.19 95.87 97.77 98.62 99.32 2.23 1.38 0.68 6993302.0 39.02 64.80 83.70 90.87 96.63 98.28 98.97 99.55 1.72 1.03 0.45
24 2025202611 Apr 2025 to Mar 2026 (Period 11) South Western Railway 552356.0 40.23 65.90 84.52 91.45 97.01 98.49 99.17 99.65 1.51 0.83 0.35 7007705.0 39.26 65.05 83.84 90.95 96.66 98.29 98.98 99.55 1.71 1.02 0.45
24 2025202612 Apr 2025 to Mar 2026 (Period 12) South Western Railway 539859.0 41.70 67.12 84.59 91.00 96.45 98.07 98.75 99.35 1.93 1.25 0.65 7001463.0 39.36 64.99 83.66 90.76 96.55 98.21 98.93 99.51 1.79 1.07 0.49
24 2025202613 Apr 2025 to Mar 2026 (Period 13) South Western Railway 594907.0 45.91 71.29 87.72 93.25 97.51 98.73 99.25 99.70 1.27 0.75 0.30 7010256.0 39.54 65.03 83.61 90.71 96.52 98.21 98.92 99.52 1.79 1.08 0.48
24 2026202701 Apr 2026 to Mar 2027 (Period 01) South Western Railway 629025.0 45.99 71.17 87.11 92.59 97.21 98.58 99.13 99.61 1.42 0.87 0.39 7135174.0 39.74 65.11 83.59 90.66 96.49 98.19 98.91 99.51 1.81 1.09 0.49
24 2026202702 Apr 2026 to Mar 2027 (Period 02) South Western Railway 525859.0 41.61 64.65 80.24 86.48 92.66 95.15 96.58 98.11 4.85 3.42 1.89 7102958.0 39.71 64.81 83.07 90.15 96.11 97.90 98.69 99.38 2.10 1.31 0.62
25 2014201501 Apr 2014 to Mar 2015 (Period 01) Southeastern 423104.0 36.20 67.19 86.51 93.23 97.80 98.96 99.42 99.78 1.04 0.58 0.22 423104.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201502 Apr 2014 to Mar 2015 (Period 02) Southeastern 473758.0 39.49 72.13 89.62 94.98 98.62 99.47 99.76 99.92 0.53 0.24 0.08 896862.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201503 Apr 2014 to Mar 2015 (Period 03) Southeastern 467686.0 40.84 73.68 90.54 95.39 98.37 99.25 99.61 99.83 0.75 0.39 0.17 1364548.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201504 Apr 2014 to Mar 2015 (Period 04) Southeastern 479360.0 41.47 73.83 90.62 95.66 98.73 99.50 99.77 99.94 0.50 0.23 0.06 1843908.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201505 Apr 2014 to Mar 2015 (Period 05) Southeastern 481287.0 40.75 72.62 89.31 94.59 98.15 99.20 99.63 99.91 0.80 0.37 0.09 2325195.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201506 Apr 2014 to Mar 2015 (Period 06) Southeastern 473521.0 43.30 75.52 90.99 95.26 97.94 98.81 99.23 99.57 1.19 0.77 0.43 2798716.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201507 Apr 2014 to Mar 2015 (Period 07) Southeastern 473222.0 37.84 69.55 87.57 93.71 97.83 98.88 99.28 99.57 1.12 0.72 0.43 3271938.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201508 Apr 2014 to Mar 2015 (Period 08) Southeastern 473956.0 29.01 58.84 80.33 89.36 96.77 98.85 99.51 99.87 1.15 0.49 0.13 3745894.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201509 Apr 2014 to Mar 2015 (Period 09) Southeastern 476560.0 29.54 59.53 80.93 89.73 96.68 98.67 99.37 99.84 1.33 0.63 0.16 4222454.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201510 Apr 2014 to Mar 2015 (Period 10) Southeastern 402549.0 34.45 66.40 85.60 92.37 97.31 98.62 99.19 99.66 1.38 0.81 0.34 4625003.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201511 Apr 2014 to Mar 2015 (Period 11) Southeastern 455539.0 39.67 70.84 88.83 94.53 98.36 99.34 99.64 99.90 0.66 0.36 0.10 5080542.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201512 Apr 2014 to Mar 2015 (Period 12) Southeastern 460250.0 40.20 70.94 88.59 94.05 98.01 99.20 99.64 99.88 0.80 0.36 0.12 5540792.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2014201513 Apr 2014 to Mar 2015 (Period 13) Southeastern 496170.0 43.86 75.09 91.27 95.84 98.67 99.39 99.67 99.89 0.61 0.33 0.11 6036962.0 38.27 69.77 87.79 93.77 97.95 99.09 99.52 99.81 0.91 0.48 0.19
25 2015201601 Apr 2015 to Mar 2016 (Period 01) Southeastern 505512.0 37.96 68.08 87.27 93.48 97.75 98.82 99.27 99.65 1.18 0.73 0.35 6119370.0 38.39 69.81 87.83 93.78 97.95 99.08 99.51 99.80 0.92 0.49 0.20
25 2015201602 Apr 2015 to Mar 2016 (Period 02) Southeastern 435827.0 39.43 70.02 88.21 93.83 97.82 98.98 99.46 99.82 1.02 0.54 0.18 6081439.0 38.38 69.65 87.72 93.69 97.88 99.04 99.48 99.79 0.96 0.52 0.21
25 2015201603 Apr 2015 to Mar 2016 (Period 03) Southeastern 460278.0 41.22 72.67 89.79 94.72 98.06 99.02 99.42 99.76 0.98 0.58 0.24 6074031.0 38.41 69.57 87.66 93.64 97.86 99.03 99.47 99.79 0.97 0.53 0.21
25 2015201604 Apr 2015 to Mar 2016 (Period 04) Southeastern 460832.0 36.54 66.89 85.68 92.02 96.78 98.37 99.14 99.71 1.63 0.86 0.29 6055503.0 38.02 69.03 87.28 93.36 97.71 98.94 99.42 99.77 1.06 0.58 0.23
25 2015201605 Apr 2015 to Mar 2016 (Period 05) Southeastern 459391.0 37.70 68.87 88.07 93.89 97.78 98.88 99.34 99.70 1.12 0.66 0.30 6033607.0 37.78 68.73 87.18 93.30 97.68 98.91 99.40 99.76 1.09 0.60 0.24
25 2015201606 Apr 2015 to Mar 2016 (Period 06) Southeastern 443500.0 36.39 66.38 86.13 92.84 97.59 98.99 99.55 99.88 1.01 0.45 0.12 6003586.0 37.24 68.02 86.80 93.11 97.65 98.93 99.42 99.78 1.07 0.58 0.22
25 2015201607 Apr 2015 to Mar 2016 (Period 07) Southeastern 454795.0 34.81 65.62 86.41 93.19 97.87 99.06 99.50 99.83 0.94 0.50 0.17 5985159.0 37.01 67.72 86.71 93.07 97.65 98.94 99.44 99.80 1.06 0.56 0.20
25 2015201608 Apr 2015 to Mar 2016 (Period 08) Southeastern 456373.0 27.78 56.13 78.66 88.24 96.25 98.53 99.35 99.84 1.47 0.65 0.16 5967576.0 36.94 67.53 86.60 92.99 97.62 98.92 99.43 99.80 1.08 0.57 0.20
25 2015201609 Apr 2015 to Mar 2016 (Period 09) Southeastern 452554.0 26.23 54.25 77.46 87.48 95.94 98.30 99.21 99.77 1.70 0.79 0.23 5943570.0 36.72 67.17 86.36 92.84 97.56 98.89 99.42 99.79 1.11 0.58 0.21
25 2015201610 Apr 2015 to Mar 2016 (Period 10) Southeastern 382227.0 29.06 56.59 78.64 87.61 95.20 97.51 98.57 99.40 2.49 1.43 0.60 5923248.0 36.38 66.53 85.91 92.53 97.43 98.82 99.38 99.78 1.18 0.62 0.22
25 2015201611 Apr 2015 to Mar 2016 (Period 11) Southeastern 437883.0 31.50 59.73 79.98 88.16 95.48 97.76 98.73 99.46 2.24 1.27 0.54 5905592.0 35.76 65.70 85.24 92.05 97.21 98.70 99.31 99.74 1.30 0.69 0.26
25 2015201612 Apr 2015 to Mar 2016 (Period 12) Southeastern 450258.0 34.43 63.87 83.10 90.11 95.77 97.67 98.53 99.31 2.33 1.47 0.69 5895600.0 35.31 65.15 84.82 91.75 97.04 98.58 99.22 99.70 1.42 0.78 0.30
25 2015201613 Apr 2015 to Mar 2016 (Period 13) Southeastern 400752.0 36.21 66.96 86.84 93.27 97.91 99.21 99.64 99.87 0.79 0.36 0.13 5800182.0 34.64 64.42 84.41 91.50 96.96 98.56 99.21 99.70 1.44 0.79 0.30
25 2016201701 Apr 2016 to Mar 2017 (Period 01) Southeastern 487984.0 37.39 68.03 87.62 93.77 97.86 98.91 99.42 99.82 1.09 0.58 0.18 5782654.0 34.59 64.41 84.43 91.52 96.97 98.56 99.23 99.71 1.44 0.77 0.29
25 2016201702 Apr 2016 to Mar 2017 (Period 02) Southeastern 452316.0 35.96 64.82 84.58 91.82 97.38 98.84 99.37 99.74 1.16 0.63 0.26 5799143.0 34.33 64.02 84.16 91.37 96.94 98.55 99.22 99.70 1.45 0.78 0.30
25 2016201703 Apr 2016 to Mar 2017 (Period 03) Southeastern 442631.0 36.34 65.41 85.05 91.80 96.88 98.24 98.83 99.35 1.76 1.17 0.65 5781496.0 33.93 63.44 83.78 91.14 96.84 98.49 99.17 99.67 1.51 0.83 0.33
25 2016201704 Apr 2016 to Mar 2017 (Period 04) Southeastern 486459.0 37.35 67.29 86.97 93.44 97.66 98.78 99.24 99.63 1.22 0.76 0.37 5807123.0 34.01 63.49 83.89 91.26 96.92 98.53 99.18 99.67 1.47 0.82 0.33
25 2016201705 Apr 2016 to Mar 2017 (Period 05) Southeastern 502024.0 38.01 67.91 87.55 93.93 98.07 99.08 99.48 99.75 0.92 0.52 0.25 5849756.0 34.07 63.44 83.88 91.28 96.95 98.55 99.19 99.67 1.45 0.81 0.33
25 2016201706 Apr 2016 to Mar 2017 (Period 06) Southeastern 491215.0 34.52 61.53 80.25 87.60 94.07 96.56 97.85 99.07 3.44 2.15 0.93 5897471.0 33.93 63.06 83.41 90.86 96.66 98.35 99.06 99.60 1.65 0.94 0.40
25 2016201707 Apr 2016 to Mar 2017 (Period 07) Southeastern 525319.0 37.88 67.14 87.01 93.77 98.18 99.27 99.65 99.90 0.73 0.35 0.10 5967995.0 34.21 63.23 83.50 90.94 96.70 98.37 99.07 99.61 1.63 0.93 0.39
25 2016201708 Apr 2016 to Mar 2017 (Period 08) Southeastern 528817.0 31.79 58.94 80.04 88.88 96.10 98.27 99.11 99.66 1.73 0.89 0.34 6040439.0 34.48 63.39 83.56 90.96 96.68 98.35 99.06 99.60 1.65 0.94 0.40
25 2016201709 Apr 2016 to Mar 2017 (Period 09) Southeastern 528754.0 24.36 47.98 69.77 80.74 92.04 96.04 97.90 99.27 3.96 2.10 0.73 6116639.0 34.22 62.73 82.82 90.34 96.34 98.16 98.95 99.56 1.84 1.05 0.44
25 2016201710 Apr 2016 to Mar 2017 (Period 10) Southeastern 509440.0 31.92 59.34 80.67 89.43 96.47 98.35 99.10 99.73 1.65 0.90 0.27 6243852.0 34.35 62.83 82.90 90.43 96.42 98.21 98.98 99.58 1.79 1.02 0.42
25 2016201711 Apr 2016 to Mar 2017 (Period 11) Southeastern 560439.0 32.04 58.57 78.21 86.22 93.38 95.97 97.42 98.72 4.03 2.58 1.28 6366408.0 34.34 62.67 82.69 90.22 96.21 98.05 98.86 99.51 1.95 1.14 0.49
25 2016201712 Apr 2016 to Mar 2017 (Period 12) Southeastern 584848.0 37.69 66.05 84.81 91.38 96.32 97.85 98.64 99.37 2.15 1.36 0.63 6500998.0 34.64 62.89 82.85 90.33 96.25 98.05 98.86 99.52 1.95 1.14 0.48
25 2016201713 Apr 2016 to Mar 2017 (Period 13) Southeastern 558163.0 39.82 69.02 88.11 94.20 98.11 99.04 99.46 99.72 0.96 0.54 0.28 6658409.0 34.98 63.16 83.05 90.47 96.31 98.07 98.87 99.51 1.93 1.13 0.49
25 2017201801 Apr 2017 to Mar 2018 (Period 01) Southeastern 595017.0 43.64 73.87 91.43 96.31 99.07 99.64 99.82 99.93 0.36 0.18 0.07 6765442.0 35.56 63.75 83.46 90.75 96.44 98.15 98.91 99.53 1.85 1.09 0.47
25 2017201802 Apr 2017 to Mar 2018 (Period 02) Southeastern 582226.0 43.00 73.15 90.84 95.87 98.79 99.45 99.72 99.90 0.55 0.28 0.10 6895352.0 36.16 64.47 84.01 91.11 96.58 98.21 98.95 99.54 1.79 1.05 0.46
25 2017201803 Apr 2017 to Mar 2018 (Period 03) Southeastern 572066.0 43.16 72.39 89.06 93.90 97.33 98.41 98.97 99.50 1.59 1.03 0.50 7024787.0 36.72 65.06 84.35 91.30 96.62 98.22 98.96 99.55 1.78 1.04 0.45
25 2017201804 Apr 2017 to Mar 2018 (Period 04) Southeastern 587129.0 39.16 68.30 86.74 92.83 97.39 98.80 99.40 99.84 1.20 0.60 0.16 7125457.0 36.88 65.17 84.37 91.28 96.61 98.23 98.98 99.57 1.77 1.02 0.43
25 2017201805 Apr 2017 to Mar 2018 (Period 05) Southeastern 587939.0 40.83 70.21 88.80 94.59 98.09 99.01 99.44 99.77 0.99 0.56 0.23 7211372.0 37.12 65.39 84.51 91.36 96.63 98.24 98.98 99.57 1.76 1.02 0.43
25 2017201806 Apr 2017 to Mar 2018 (Period 06) Southeastern 558595.0 40.65 69.59 88.21 94.18 98.12 99.09 99.48 99.80 0.91 0.52 0.20 7278752.0 37.57 65.98 85.08 91.83 96.92 98.42 99.09 99.63 1.58 0.91 0.37
25 2017201807 Apr 2017 to Mar 2018 (Period 07) Southeastern 586590.0 38.42 67.78 87.41 93.90 98.16 99.16 99.59 99.88 0.84 0.41 0.12 7340023.0 37.62 66.04 85.13 91.86 96.93 98.41 99.09 99.63 1.59 0.91 0.37
25 2017201808 Apr 2017 to Mar 2018 (Period 08) Southeastern 570053.0 34.25 61.57 82.04 90.05 96.31 98.01 98.75 99.49 1.99 1.25 0.51 7381259.0 37.77 66.20 85.26 91.93 96.94 98.39 99.07 99.61 1.61 0.93 0.39
25 2017201809 Apr 2017 to Mar 2018 (Period 09) Southeastern 570104.0 31.79 58.31 79.81 88.86 96.38 98.51 99.31 99.82 1.49 0.69 0.18 7422609.0 38.27 66.89 85.94 92.49 97.24 98.57 99.17 99.65 1.43 0.83 0.35
25 2017201810 Apr 2017 to Mar 2018 (Period 10) Southeastern 483452.0 31.94 57.64 78.37 87.55 95.70 98.10 99.04 99.71 1.90 0.96 0.29 7396621.0 38.29 66.81 85.81 92.38 97.20 98.55 99.16 99.65 1.45 0.84 0.35
25 2017201811 Apr 2017 to Mar 2018 (Period 11) Southeastern 584111.0 34.62 61.27 81.76 90.06 96.86 98.71 99.42 99.88 1.29 0.58 0.12 7420293.0 38.48 66.99 86.06 92.66 97.46 98.76 99.32 99.74 1.24 0.68 0.26
25 2017201812 Apr 2017 to Mar 2018 (Period 12) Southeastern 542604.0 36.17 62.40 81.56 89.06 95.13 96.95 97.83 98.76 3.05 2.17 1.24 7378049.0 38.37 66.73 85.83 92.50 97.38 98.70 99.26 99.70 1.30 0.74 0.30
25 2017201813 Apr 2017 to Mar 2018 (Period 13) Southeastern 606741.0 38.83 66.37 85.74 92.75 97.63 98.87 99.37 99.79 1.13 0.63 0.21 7426627.0 38.30 66.53 85.65 92.39 97.34 98.69 99.25 99.70 1.31 0.75 0.30
25 2018201901 Apr 2018 to Mar 2019 (Period 01) Southeastern 608368.0 41.53 68.58 86.43 92.60 96.86 98.17 98.83 99.43 1.83 1.17 0.57 7439978.0 38.14 66.11 85.26 92.10 97.17 98.57 99.17 99.66 1.43 0.83 0.34
25 2018201902 Apr 2018 to Mar 2019 (Period 02) Southeastern 589322.0 39.91 67.11 85.86 92.70 97.67 98.90 99.44 99.82 1.10 0.56 0.18 7447074.0 37.90 65.64 84.87 91.85 97.08 98.53 99.15 99.66 1.47 0.85 0.34
25 2018201903 Apr 2018 to Mar 2019 (Period 03) Southeastern 578587.0 41.31 68.60 85.08 91.16 95.98 97.68 98.49 99.22 2.32 1.51 0.78 7453595.0 37.76 65.35 84.56 91.64 96.97 98.47 99.11 99.63 1.53 0.89 0.37
25 2018201904 Apr 2018 to Mar 2019 (Period 04) Southeastern 593386.0 39.55 66.51 83.94 90.74 96.24 97.97 98.87 99.64 2.03 1.13 0.36 7459852.0 37.79 65.21 84.34 91.47 96.88 98.41 99.07 99.62 1.59 0.93 0.38
25 2018201905 Apr 2018 to Mar 2019 (Period 05) Southeastern 600730.0 42.15 70.55 87.95 93.72 97.90 99.10 99.55 99.86 0.90 0.45 0.14 7472643.0 37.90 65.24 84.28 91.41 96.87 98.41 99.08 99.63 1.59 0.92 0.37
25 2018201906 Apr 2018 to Mar 2019 (Period 06) Southeastern 594502.0 44.73 73.53 90.37 95.45 98.64 99.42 99.71 99.91 0.58 0.29 0.09 7508550.0 38.24 65.58 84.47 91.52 96.92 98.44 99.10 99.64 1.56 0.90 0.36
25 2018201907 Apr 2018 to Mar 2019 (Period 07) Southeastern 592868.0 39.03 67.60 86.96 93.76 98.18 99.22 99.64 99.89 0.78 0.36 0.11 7514828.0 38.29 65.57 84.44 91.51 96.92 98.45 99.11 99.64 1.55 0.89 0.36
25 2018201908 Apr 2018 to Mar 2019 (Period 08) Southeastern 584995.0 35.42 63.40 83.68 91.46 97.13 98.64 99.23 99.66 1.36 0.77 0.34 7529770.0 38.37 65.70 84.56 91.62 96.98 98.50 99.14 99.65 1.50 0.86 0.35
25 2018201909 Apr 2018 to Mar 2019 (Period 09) Southeastern 578738.0 30.96 57.26 78.24 87.45 95.37 97.75 98.81 99.59 2.25 1.19 0.41 7538404.0 38.30 65.61 84.43 91.51 96.90 98.44 99.11 99.63 1.56 0.89 0.37
25 2018201910 Apr 2018 to Mar 2019 (Period 10) Southeastern 517777.0 38.18 66.38 84.66 91.25 96.44 98.14 98.89 99.50 1.86 1.11 0.50 7572729.0 38.69 66.17 84.84 91.74 96.95 98.44 99.09 99.62 1.56 0.91 0.38
25 2018201911 Apr 2018 to Mar 2019 (Period 11) Southeastern 588702.0 38.20 65.99 84.63 91.76 97.07 98.54 99.22 99.76 1.46 0.78 0.24 7577320.0 38.97 66.54 85.06 91.87 96.96 98.43 99.08 99.61 1.57 0.92 0.39
25 2018201912 Apr 2018 to Mar 2019 (Period 12) Southeastern 570502.0 38.95 66.77 84.71 91.29 96.43 98.08 98.89 99.54 1.92 1.11 0.46 7605218.0 39.17 66.85 85.28 92.03 97.06 98.51 99.15 99.67 1.49 0.85 0.33
25 2018201913 Apr 2018 to Mar 2019 (Period 13) Southeastern 604507.0 41.77 70.68 88.55 94.28 98.05 99.07 99.49 99.85 0.93 0.51 0.15 7602984.0 39.40 67.19 85.50 92.15 97.09 98.52 99.16 99.67 1.48 0.84 0.33
25 2019202001 Apr 2019 to Mar 2020 (Period 01) Southeastern 571334.0 46.65 76.18 91.45 95.76 98.43 99.18 99.53 99.81 0.82 0.47 0.19 571334.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202002 Apr 2019 to Mar 2020 (Period 02) Southeastern 583111.0 45.16 74.08 90.45 95.24 98.24 99.08 99.46 99.73 0.92 0.54 0.27 1154445.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202003 Apr 2019 to Mar 2020 (Period 03) Southeastern 589997.0 45.62 75.15 91.06 95.48 98.29 99.13 99.48 99.75 0.87 0.52 0.25 1744442.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202004 Apr 2019 to Mar 2020 (Period 04) Southeastern 598784.0 44.72 73.83 90.32 95.14 98.33 99.14 99.53 99.81 0.86 0.47 0.19 2343226.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202005 Apr 2019 to Mar 2020 (Period 05) Southeastern 572104.0 41.29 69.84 87.51 93.61 97.64 98.84 99.33 99.73 1.16 0.67 0.27 2915330.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202006 Apr 2019 to Mar 2020 (Period 06) Southeastern 595970.0 45.11 74.34 90.91 95.74 98.61 99.39 99.68 99.88 0.61 0.32 0.12 3511300.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202007 Apr 2019 to Mar 2020 (Period 07) Southeastern 581487.0 38.97 66.98 86.05 92.86 97.58 98.84 99.36 99.77 1.16 0.64 0.23 4092787.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202008 Apr 2019 to Mar 2020 (Period 08) Southeastern 571727.0 36.48 64.49 84.95 92.58 97.81 99.13 99.58 99.89 0.87 0.42 0.11 4664514.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202009 Apr 2019 to Mar 2020 (Period 09) Southeastern 571626.0 31.18 57.38 78.91 88.45 96.28 98.49 99.29 99.80 1.51 0.71 0.20 5236140.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202010 Apr 2019 to Mar 2020 (Period 10) Southeastern 520208.0 34.54 62.06 82.35 90.29 96.81 98.67 99.35 99.81 1.33 0.65 0.19 5756348.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202011 Apr 2019 to Mar 2020 (Period 11) Southeastern 581580.0 35.90 64.22 84.40 91.90 97.40 98.79 99.32 99.73 1.21 0.68 0.27 6337928.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202012 Apr 2019 to Mar 2020 (Period 12) Southeastern 564964.0 35.47 63.21 82.65 90.18 96.16 98.05 98.85 99.55 1.95 1.15 0.45 6902892.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
25 2019202013 Apr 2019 to Mar 2020 (Period 13) Southeastern 573545.0 47.23 74.77 89.68 94.39 97.73 98.74 99.16 99.59 1.26 0.84 0.41 7476437.0 40.73 69.07 87.05 93.25 97.66 98.89 99.38 99.76 1.11 0.62 0.24
25 2020202101 Apr 2020 to Mar 2021 (Period 01) Southeastern 439746.0 68.14 91.05 97.44 98.64 99.44 99.71 99.83 99.92 0.29 0.17 0.08 7344849.0 41.91 69.83 87.33 93.37 97.70 98.91 99.40 99.76 1.09 0.60 0.24
25 2020202102 Apr 2020 to Mar 2021 (Period 02) Southeastern 402423.0 64.48 88.83 96.98 98.52 99.52 99.78 99.88 99.95 0.22 0.12 0.05 7164161.0 42.91 70.55 87.62 93.51 97.76 98.95 99.42 99.78 1.05 0.58 0.22
25 2020202103 Apr 2020 to Mar 2021 (Period 03) Southeastern 432855.0 60.59 86.49 96.12 98.09 99.30 99.65 99.80 99.92 0.35 0.20 0.08 7007019.0 43.78 71.15 87.85 93.63 97.81 98.98 99.44 99.79 1.02 0.56 0.21
25 2020202104 Apr 2020 to Mar 2021 (Period 04) Southeastern 495071.0 52.90 81.72 94.18 97.14 99.03 99.57 99.78 99.90 0.43 0.22 0.10 6903306.0 44.35 71.68 88.09 93.75 97.85 99.00 99.45 99.79 1.00 0.55 0.21
25 2020202105 Apr 2020 to Mar 2021 (Period 05) Southeastern 513956.0 46.89 75.60 90.89 95.25 98.34 99.16 99.52 99.83 0.84 0.48 0.17 6845158.0 44.80 72.12 88.35 93.87 97.91 99.03 99.47 99.80 0.97 0.53 0.20
25 2020202106 Apr 2020 to Mar 2021 (Period 06) Southeastern 546869.0 48.05 77.48 92.26 96.12 98.55 99.28 99.59 99.82 0.72 0.41 0.18 6796057.0 45.03 72.36 88.44 93.89 97.90 99.02 99.46 99.80 0.98 0.54 0.20
25 2020202107 Apr 2020 to Mar 2021 (Period 07) Southeastern 581708.0 44.85 74.12 90.89 95.63 98.61 99.41 99.73 99.91 0.59 0.27 0.09 6796278.0 45.53 72.97 88.85 94.13 97.98 99.07 99.49 99.81 0.93 0.51 0.19
25 2020202108 Apr 2020 to Mar 2021 (Period 08) Southeastern 569884.0 41.51 69.84 88.23 94.20 98.17 99.18 99.57 99.85 0.82 0.43 0.15 6794435.0 45.96 73.42 89.13 94.26 98.01 99.07 99.49 99.81 0.93 0.51 0.19
25 2020202109 Apr 2020 to Mar 2021 (Period 09) Southeastern 501669.0 39.71 69.11 88.13 94.36 98.42 99.45 99.77 99.94 0.55 0.23 0.06 6724478.0 46.75 74.46 89.92 94.77 98.19 99.15 99.53 99.82 0.85 0.47 0.18
25 2020202110 Apr 2020 to Mar 2021 (Period 10) Southeastern 447055.0 44.93 74.08 90.51 95.17 98.24 99.12 99.52 99.81 0.88 0.48 0.19 6651325.0 47.58 75.41 90.56 95.14 98.30 99.19 99.54 99.82 0.81 0.46 0.18
25 2020202111 Apr 2020 to Mar 2021 (Period 11) Southeastern 494379.0 47.64 76.81 91.92 96.05 98.68 99.36 99.67 99.89 0.64 0.33 0.11 6564124.0 48.62 76.51 91.20 95.50 98.41 99.23 99.57 99.83 0.77 0.43 0.17
25 2020202112 Apr 2020 to Mar 2021 (Period 12) Southeastern 466845.0 49.21 77.83 91.95 95.65 98.30 99.13 99.55 99.85 0.87 0.45 0.15 6466005.0 49.81 77.76 92.01 95.97 98.60 99.33 99.63 99.86 0.67 0.37 0.14
25 2020202113 Apr 2020 to Mar 2021 (Period 13) Southeastern 417230.0 52.02 81.30 94.57 97.50 99.13 99.56 99.78 99.91 0.44 0.22 0.09 6309690.0 50.19 78.27 92.39 96.22 98.71 99.40 99.69 99.88 0.60 0.31 0.12
25 2021202201 Apr 2021 to Mar 2022 (Period 01) Southeastern 508995.0 48.14 78.22 93.08 96.66 98.81 99.39 99.66 99.87 0.61 0.34 0.13 6378939.0 48.79 77.38 92.09 96.09 98.67 99.38 99.67 99.88 0.62 0.33 0.12
25 2021202202 Apr 2021 to Mar 2022 (Period 02) Southeastern 480926.0 45.67 76.21 92.78 96.89 99.19 99.68 99.86 99.96 0.32 0.14 0.04 6457442.0 47.58 76.58 91.84 96.00 98.66 99.37 99.67 99.88 0.63 0.33 0.12
25 2021202203 Apr 2021 to Mar 2022 (Period 03) Southeastern 485571.0 43.33 73.20 90.73 95.49 98.51 99.34 99.70 99.89 0.66 0.30 0.11 6510158.0 46.40 75.67 91.47 95.82 98.60 99.35 99.67 99.88 0.65 0.33 0.12
25 2021202204 Apr 2021 to Mar 2022 (Period 04) Southeastern 495143.0 44.30 73.53 90.27 95.19 98.43 99.31 99.65 99.87 0.69 0.35 0.13 6510230.0 45.74 75.05 91.18 95.67 98.56 99.33 99.66 99.88 0.67 0.34 0.12
25 2021202205 Apr 2021 to Mar 2022 (Period 05) Southeastern 496554.0 45.65 76.00 92.24 96.18 98.47 99.08 99.36 99.61 0.92 0.64 0.39 6492828.0 45.65 75.08 91.28 95.74 98.57 99.33 99.65 99.86 0.67 0.35 0.14
25 2021202206 Apr 2021 to Mar 2022 (Period 06) Southeastern 494162.0 45.61 75.78 92.04 96.17 98.65 99.28 99.55 99.80 0.72 0.45 0.20 6440121.0 45.44 74.93 91.26 95.74 98.58 99.33 99.64 99.86 0.67 0.36 0.14
25 2021202207 Apr 2021 to Mar 2022 (Period 07) Southeastern 519265.0 38.78 68.60 88.34 94.33 98.18 99.21 99.63 99.87 0.79 0.37 0.13 6377678.0 44.95 74.49 91.05 95.64 98.54 99.31 99.63 99.86 0.69 0.37 0.14
25 2021202208 Apr 2021 to Mar 2022 (Period 08) Southeastern 511702.0 35.07 64.07 84.82 92.19 97.50 98.98 99.51 99.88 1.02 0.49 0.12 6319496.0 44.46 74.06 90.80 95.49 98.49 99.30 99.63 99.86 0.70 0.37 0.14
25 2021202209 Apr 2021 to Mar 2022 (Period 09) Southeastern 514120.0 32.65 61.07 83.36 91.71 97.47 98.93 99.42 99.73 1.07 0.58 0.27 6331947.0 43.88 73.40 90.41 95.27 98.41 99.26 99.60 99.84 0.74 0.40 0.16
25 2021202210 Apr 2021 to Mar 2022 (Period 10) Southeastern 437296.0 39.59 68.63 87.89 94.03 98.05 99.11 99.54 99.81 0.89 0.46 0.19 6322188.0 43.51 73.02 90.23 95.19 98.40 99.25 99.60 99.84 0.75 0.40 0.16
25 2021202211 Apr 2021 to Mar 2022 (Period 11) Southeastern 499785.0 41.29 71.16 89.94 95.44 98.63 99.40 99.69 99.87 0.60 0.31 0.13 6327594.0 43.01 72.58 90.07 95.14 98.40 99.26 99.61 99.84 0.74 0.39 0.16
25 2021202212 Apr 2021 to Mar 2022 (Period 12) Southeastern 503473.0 40.90 70.70 89.10 94.35 97.77 98.82 99.30 99.71 1.18 0.70 0.29 6364222.0 42.39 72.04 89.86 95.04 98.36 99.23 99.59 99.83 0.77 0.41 0.17
25 2021202213 Apr 2021 to Mar 2022 (Period 13) Southeastern 485906.0 42.49 72.07 89.73 94.79 97.96 98.95 99.35 99.71 1.05 0.65 0.29 6432898.0 41.77 71.44 89.54 94.87 98.27 99.19 99.56 99.81 0.81 0.44 0.19
25 2022202301 Apr 2022 to Mar 2023 (Period 01) Southeastern 558639.0 45.99 76.06 92.35 96.38 98.70 99.35 99.64 99.84 0.65 0.36 0.16 6482542.0 41.63 71.31 89.51 94.86 98.27 99.19 99.55 99.81 0.81 0.45 0.19
25 2022202302 Apr 2022 to Mar 2023 (Period 02) Southeastern 523630.0 43.35 72.72 90.23 95.26 98.51 99.32 99.63 99.87 0.68 0.37 0.13 6525246.0 41.47 71.06 89.32 94.74 98.22 99.16 99.54 99.81 0.84 0.46 0.19
25 2022202303 Apr 2022 to Mar 2023 (Period 03) Southeastern 457791.0 41.18 70.22 89.06 94.40 97.78 98.77 99.21 99.63 1.23 0.79 0.37 6497466.0 41.32 70.84 89.20 94.66 98.17 99.12 99.50 99.79 0.88 0.50 0.21
25 2022202304 Apr 2022 to Mar 2023 (Period 04) Southeastern 519869.0 39.18 67.14 86.19 92.42 97.09 98.47 99.03 99.57 1.53 0.97 0.43 6522192.0 40.92 70.34 88.88 94.44 98.06 99.05 99.45 99.76 0.95 0.55 0.24
25 2022202305 Apr 2022 to Mar 2023 (Period 05) Southeastern 430015.0 35.80 63.00 83.76 91.19 96.65 98.33 99.04 99.58 1.67 0.96 0.42 6455653.0 40.21 69.42 88.28 94.09 97.94 99.00 99.43 99.76 1.00 0.57 0.24
25 2022202306 Apr 2022 to Mar 2023 (Period 06) Southeastern 514726.0 36.94 64.88 85.43 92.34 97.21 98.68 99.28 99.67 1.32 0.72 0.33 6476217.0 39.54 68.57 87.76 93.79 97.82 98.96 99.41 99.75 1.04 0.59 0.25
25 2022202307 Apr 2022 to Mar 2023 (Period 07) Southeastern 482433.0 38.70 68.07 88.07 94.31 98.23 99.26 99.64 99.89 0.74 0.36 0.11 6439385.0 39.54 68.53 87.74 93.79 97.83 98.96 99.41 99.75 1.04 0.59 0.25
25 2022202308 Apr 2022 to Mar 2023 (Period 08) Southeastern 501610.0 30.85 57.59 79.53 88.59 95.84 98.09 99.04 99.67 1.91 0.96 0.33 6429293.0 39.22 68.04 87.33 93.51 97.70 98.89 99.37 99.74 1.11 0.63 0.26
25 2022202309 Apr 2022 to Mar 2023 (Period 09) Southeastern 517882.0 28.08 53.95 76.76 86.81 95.50 97.94 98.94 99.58 2.06 1.06 0.42 6433055.0 38.85 67.46 86.80 93.11 97.54 98.81 99.34 99.73 1.19 0.66 0.27
25 2022202310 Apr 2022 to Mar 2023 (Period 10) Southeastern 262530.0 29.45 52.46 70.85 79.71 89.85 94.14 96.41 98.62 5.86 3.59 1.38 6258289.0 38.40 66.75 86.06 92.49 97.18 98.59 99.20 99.67 1.41 0.80 0.33
25 2022202311 Apr 2022 to Mar 2023 (Period 11) Southeastern 484244.0 35.12 60.91 80.43 88.94 96.13 98.35 99.16 99.74 1.65 0.84 0.26 6242748.0 37.91 65.94 85.31 91.98 96.98 98.51 99.16 99.66 1.49 0.84 0.34
25 2022202312 Apr 2022 to Mar 2023 (Period 12) Southeastern 529910.0 39.35 66.29 84.99 91.90 96.87 98.33 99.03 99.55 1.67 0.97 0.45 6269185.0 37.79 65.59 84.98 91.78 96.91 98.47 99.14 99.65 1.53 0.86 0.35
25 2022202313 Apr 2022 to Mar 2023 (Period 13) Southeastern 483241.0 40.75 68.19 86.53 92.90 97.58 98.88 99.36 99.69 1.12 0.64 0.31 6266520.0 37.66 65.29 84.73 91.63 96.88 98.47 99.14 99.65 1.53 0.86 0.35
25 2023202401 Apr 2023 to Mar 2024 (Period 01) Southeastern 544000.0 44.97 73.24 89.77 95.09 98.54 99.35 99.65 99.89 0.65 0.35 0.11 6251881.0 37.55 65.02 84.49 91.51 96.86 98.46 99.14 99.65 1.54 0.86 0.35
25 2023202402 Apr 2023 to Mar 2024 (Period 02) Southeastern 499277.0 44.36 72.55 89.74 95.08 98.40 99.20 99.53 99.82 0.80 0.47 0.18 6227528.0 37.61 64.97 84.42 91.48 96.85 98.45 99.13 99.65 1.55 0.87 0.35
25 2023202403 Apr 2023 to Mar 2024 (Period 03) Southeastern 482192.0 40.94 67.84 85.91 92.37 96.95 98.30 98.98 99.54 1.70 1.02 0.46 6251929.0 37.60 64.81 84.20 91.33 96.79 98.42 99.11 99.64 1.58 0.89 0.36
25 2023202404 Apr 2023 to Mar 2024 (Period 04) Southeastern 507689.0 42.62 70.35 87.92 93.72 97.82 98.91 99.33 99.69 1.09 0.67 0.31 6239749.0 37.88 65.07 84.34 91.44 96.85 98.45 99.13 99.65 1.55 0.87 0.35
25 2023202405 Apr 2023 to Mar 2024 (Period 05) Southeastern 526604.0 43.08 71.95 89.00 94.44 98.27 99.24 99.57 99.80 0.76 0.43 0.20 6336338.0 38.45 65.78 84.76 91.70 96.98 98.52 99.18 99.67 1.48 0.82 0.33
25 2023202406 Apr 2023 to Mar 2024 (Period 06) Southeastern 488538.0 40.12 69.05 87.35 93.37 97.43 98.53 99.01 99.44 1.47 0.99 0.56 6310150.0 38.71 66.10 84.91 91.78 96.99 98.51 99.15 99.65 1.49 0.85 0.35
25 2023202407 Apr 2023 to Mar 2024 (Period 07) Southeastern 508491.0 37.03 65.41 84.81 91.98 97.30 98.74 99.34 99.81 1.26 0.66 0.19 6336208.0 38.57 65.90 84.66 91.60 96.92 98.47 99.13 99.64 1.53 0.87 0.36
25 2023202408 Apr 2023 to Mar 2024 (Period 08) Southeastern 546248.0 36.29 64.08 83.56 91.17 97.08 98.55 99.09 99.56 1.45 0.91 0.44 6380846.0 38.98 66.40 84.97 91.80 97.02 98.51 99.14 99.63 1.49 0.86 0.37
25 2023202409 Apr 2023 to Mar 2024 (Period 09) Southeastern 524359.0 32.37 59.59 80.52 89.36 96.59 98.55 99.27 99.75 1.45 0.73 0.25 6387323.0 39.33 66.85 85.27 92.01 97.11 98.56 99.16 99.65 1.44 0.84 0.35
25 2023202410 Apr 2023 to Mar 2024 (Period 10) Southeastern 483462.0 34.51 61.59 80.55 88.33 95.30 97.51 98.62 99.44 2.49 1.38 0.56 6608255.0 39.37 67.03 85.50 92.23 97.27 98.66 99.23 99.67 1.34 0.77 0.33
25 2023202411 Apr 2023 to Mar 2024 (Period 11) Southeastern 529246.0 36.47 64.15 82.99 90.55 96.86 98.60 99.26 99.72 1.40 0.74 0.28 6653257.0 39.45 67.25 85.67 92.33 97.32 98.68 99.24 99.67 1.32 0.76 0.33
25 2023202412 Apr 2023 to Mar 2024 (Period 12) Southeastern 542388.0 39.59 68.53 86.42 92.67 97.27 98.59 99.11 99.55 1.41 0.89 0.45 6665735.0 39.46 67.43 85.78 92.40 97.35 98.70 99.25 99.67 1.30 0.75 0.33
25 2023202413 Apr 2023 to Mar 2024 (Period 13) Southeastern 552372.0 41.71 70.80 88.43 94.26 98.03 98.98 99.37 99.71 1.02 0.63 0.29 6734866.0 39.56 67.65 85.94 92.51 97.39 98.71 99.25 99.67 1.29 0.75 0.33
25 2024202501 Apr 2024 to Mar 2025 (Period 01) Southeastern 522440.0 42.54 71.58 88.38 93.83 97.77 98.96 99.44 99.73 1.04 0.56 0.27 6713306.0 39.35 67.50 85.82 92.41 97.32 98.68 99.23 99.66 1.32 0.77 0.34
25 2024202502 Apr 2024 to Mar 2025 (Period 02) Southeastern 531261.0 42.45 71.37 88.63 94.31 98.38 99.29 99.61 99.84 0.71 0.39 0.16 6745290.0 39.22 67.44 85.75 92.36 97.33 98.69 99.24 99.66 1.31 0.76 0.34
25 2024202503 Apr 2024 to Mar 2025 (Period 03) Southeastern 554546.0 43.64 72.18 88.69 94.14 97.87 98.98 99.47 99.78 1.02 0.53 0.22 6817644.0 39.46 67.79 85.98 92.50 97.40 98.74 99.27 99.68 1.26 0.73 0.32
25 2024202504 Apr 2024 to Mar 2025 (Period 04) Southeastern 552229.0 40.95 68.83 86.20 92.48 97.35 98.74 99.26 99.67 1.26 0.74 0.33 6862184.0 39.35 67.69 85.86 92.41 97.36 98.72 99.27 99.68 1.28 0.73 0.32
25 2024202505 Apr 2024 to Mar 2025 (Period 05) Southeastern 557466.0 41.55 69.65 86.73 92.66 97.23 98.67 99.32 99.74 1.33 0.68 0.26 6893046.0 39.24 67.52 85.69 92.28 97.28 98.68 99.25 99.68 1.32 0.75 0.32
25 2024202506 Apr 2024 to Mar 2025 (Period 06) Southeastern 555182.0 40.49 69.47 87.07 93.24 97.63 98.91 99.39 99.77 1.09 0.61 0.23 6959690.0 39.28 67.57 85.68 92.28 97.30 98.71 99.28 99.70 1.29 0.72 0.30
25 2024202507 Apr 2024 to Mar 2025 (Period 07) Southeastern 552837.0 36.32 64.28 83.32 90.69 96.67 98.47 99.20 99.69 1.53 0.80 0.31 7004036.0 39.21 67.47 85.56 92.17 97.25 98.69 99.27 99.69 1.31 0.73 0.31
25 2024202508 Apr 2024 to Mar 2025 (Period 08) Southeastern 549456.0 33.05 60.43 80.68 89.22 96.30 98.31 99.07 99.61 1.69 0.93 0.39 7007244.0 38.95 67.18 85.33 92.02 97.19 98.67 99.27 99.69 1.33 0.73 0.31
25 2024202509 Apr 2024 to Mar 2025 (Period 09) Southeastern 548074.0 26.74 51.99 73.46 84.07 94.43 97.70 98.95 99.70 2.30 1.05 0.30 7030959.0 38.49 66.56 84.76 91.60 97.02 98.60 99.24 99.69 1.40 0.76 0.31
25 2024202510 Apr 2024 to Mar 2025 (Period 10) Southeastern 480206.0 34.27 61.82 81.31 89.25 96.03 98.16 98.97 99.61 1.84 1.03 0.39 7027703.0 38.48 66.58 84.82 91.66 97.07 98.65 99.26 99.70 1.35 0.74 0.30
25 2024202511 Apr 2024 to Mar 2025 (Period 11) Southeastern 559420.0 34.51 61.86 81.44 89.71 96.61 98.55 99.28 99.78 1.45 0.72 0.22 7057877.0 38.31 66.39 84.69 91.59 97.05 98.64 99.27 99.71 1.36 0.73 0.29
25 2024202512 Apr 2024 to Mar 2025 (Period 12) Southeastern 569137.0 37.19 65.93 85.13 92.23 97.60 98.97 99.45 99.78 1.03 0.55 0.22 7084626.0 38.12 66.19 84.59 91.56 97.08 98.67 99.29 99.73 1.33 0.71 0.27
25 2024202513 Apr 2024 to Mar 2025 (Period 13) Southeastern 604728.0 39.56 68.29 86.39 92.66 97.40 98.77 99.35 99.76 1.23 0.65 0.24 7136982.0 37.97 66.01 84.45 91.44 97.03 98.66 99.29 99.73 1.34 0.71 0.27
25 2025202601 Apr 2025 to Mar 2026 (Period 01) Southeastern 520753.0 41.28 70.67 88.68 94.39 98.32 99.29 99.65 99.87 0.71 0.35 0.13 7135295.0 37.87 65.94 84.47 91.48 97.07 98.68 99.31 99.74 1.32 0.69 0.26
25 2025202602 Apr 2025 to Mar 2026 (Period 02) Southeastern 559886.0 39.82 68.10 85.41 91.59 96.54 98.28 99.06 99.65 1.72 0.94 0.35 7163920.0 37.69 65.71 84.23 91.28 96.93 98.60 99.26 99.72 1.40 0.74 0.28
25 2025202603 Apr 2025 to Mar 2026 (Period 03) Southeastern 569436.0 43.00 71.60 88.55 94.26 98.12 99.15 99.51 99.80 0.85 0.49 0.20 7178810.0 37.65 65.67 84.23 91.30 96.95 98.62 99.27 99.73 1.38 0.73 0.27
25 2025202604 Apr 2025 to Mar 2026 (Period 04) Southeastern 569194.0 39.90 67.80 85.44 91.92 96.92 98.46 99.11 99.65 1.54 0.89 0.35 7195775.0 37.57 65.60 84.17 91.26 96.92 98.60 99.26 99.73 1.40 0.74 0.27
25 2025202605 Apr 2025 to Mar 2026 (Period 05) Southeastern 576438.0 41.56 69.45 86.63 92.63 97.27 98.63 99.19 99.65 1.37 0.81 0.35 7214747.0 37.58 65.59 84.17 91.26 96.92 98.59 99.25 99.72 1.41 0.75 0.28
25 2025202606 Apr 2025 to Mar 2026 (Period 06) Southeastern 565565.0 40.12 68.56 86.78 93.06 97.53 98.69 99.21 99.65 1.31 0.79 0.35 7225130.0 37.56 65.53 84.15 91.25 96.92 98.58 99.23 99.71 1.42 0.77 0.29
25 2025202607 Apr 2025 to Mar 2026 (Period 07) Southeastern 565833.0 35.70 63.86 83.73 91.30 97.07 98.75 99.31 99.74 1.25 0.69 0.26 7238126.0 37.51 65.49 84.18 91.29 96.95 98.60 99.24 99.71 1.40 0.76 0.29
25 2025202608 Apr 2025 to Mar 2026 (Period 08) Southeastern 565013.0 34.83 61.78 81.84 90.39 97.17 98.91 99.50 99.83 1.09 0.50 0.17 7253683.0 37.64 65.59 84.27 91.38 97.01 98.65 99.27 99.73 1.35 0.73 0.27
25 2025202609 Apr 2025 to Mar 2026 (Period 09) Southeastern 568292.0 34.34 61.03 80.74 89.32 96.41 98.50 99.27 99.77 1.50 0.73 0.23 7273901.0 38.20 66.25 84.81 91.77 97.16 98.71 99.30 99.73 1.29 0.70 0.27
25 2025202610 Apr 2025 to Mar 2026 (Period 10) Southeastern 471051.0 37.98 66.23 84.60 91.72 97.35 98.88 99.49 99.86 1.12 0.51 0.14 7264746.0 38.45 66.55 85.02 91.93 97.25 98.75 99.33 99.75 1.25 0.67 0.25
25 2025202611 Apr 2025 to Mar 2026 (Period 11) Southeastern 570494.0 39.08 67.60 86.46 93.12 97.80 99.07 99.53 99.80 0.93 0.47 0.20 7275820.0 38.80 66.99 85.41 92.20 97.34 98.79 99.35 99.75 1.21 0.65 0.25
25 2025202612 Apr 2025 to Mar 2026 (Period 12) Southeastern 575269.0 39.86 68.42 86.98 93.33 97.95 99.18 99.61 99.85 0.82 0.39 0.15 7281952.0 39.01 67.19 85.56 92.28 97.37 98.81 99.36 99.76 1.19 0.64 0.24
25 2025202613 Apr 2025 to Mar 2026 (Period 13) Southeastern 630001.0 41.04 69.58 87.57 93.47 97.46 98.50 98.96 99.44 1.50 1.04 0.56 7307225.0 39.14 67.30 85.66 92.35 97.38 98.79 99.33 99.73 1.21 0.67 0.27
25 2026202701 Apr 2026 to Mar 2027 (Period 01) Southeastern 653328.0 43.39 72.38 89.13 94.40 97.90 98.96 99.40 99.74 1.04 0.60 0.26 7439800.0 39.36 67.51 85.76 92.39 97.35 98.77 99.31 99.72 1.23 0.69 0.28
25 2026202702 Apr 2026 to Mar 2027 (Period 02) Southeastern 547418.0 39.67 67.03 84.51 90.82 96.14 97.83 98.64 99.32 2.17 1.36 0.68 7427332.0 39.35 67.43 85.69 92.34 97.33 98.73 99.28 99.70 1.27 0.72 0.30
26 2014201501 Apr 2014 to Mar 2015 (Period 01) TfW Rail 178360.0 34.48 60.84 81.45 90.15 97.11 98.88 99.45 99.82 1.12 0.55 0.18 178360.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201502 Apr 2014 to Mar 2015 (Period 02) TfW Rail 187718.0 33.42 59.73 80.72 89.79 96.62 98.42 99.09 99.64 1.58 0.91 0.36 366078.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201503 Apr 2014 to Mar 2015 (Period 03) TfW Rail 190561.0 34.37 62.10 83.51 91.86 97.76 99.13 99.56 99.84 0.87 0.44 0.16 556639.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201504 Apr 2014 to Mar 2015 (Period 04) TfW Rail 185965.0 30.93 56.55 78.39 88.50 96.72 98.67 99.36 99.77 1.33 0.64 0.23 742604.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201505 Apr 2014 to Mar 2015 (Period 05) TfW Rail 190007.0 30.53 55.81 76.70 85.94 94.45 97.30 98.56 99.48 2.70 1.44 0.52 932611.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201506 Apr 2014 to Mar 2015 (Period 06) TfW Rail 190596.0 33.76 60.66 81.65 90.24 96.91 98.72 99.37 99.77 1.28 0.63 0.23 1123207.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201507 Apr 2014 to Mar 2015 (Period 07) TfW Rail 187406.0 33.07 60.47 81.91 90.78 97.28 98.78 99.34 99.76 1.22 0.66 0.24 1310613.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201508 Apr 2014 to Mar 2015 (Period 08) TfW Rail 189873.0 27.85 52.00 73.60 84.60 94.86 97.73 98.88 99.60 2.27 1.12 0.40 1500486.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201509 Apr 2014 to Mar 2015 (Period 09) TfW Rail 191473.0 30.10 55.35 77.19 87.92 96.53 98.61 99.33 99.71 1.39 0.67 0.29 1691959.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201510 Apr 2014 to Mar 2015 (Period 10) TfW Rail 170022.0 33.48 60.14 81.41 90.29 97.00 98.68 99.26 99.73 1.32 0.74 0.27 1861981.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201511 Apr 2014 to Mar 2015 (Period 11) TfW Rail 191477.0 37.56 65.77 85.67 92.91 97.84 99.02 99.50 99.85 0.98 0.50 0.15 2053458.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201512 Apr 2014 to Mar 2015 (Period 12) TfW Rail 190684.0 37.72 66.01 86.16 93.41 98.17 99.16 99.54 99.80 0.84 0.46 0.20 2244142.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2014201513 Apr 2014 to Mar 2015 (Period 13) TfW Rail 205955.0 37.42 65.66 85.84 93.18 98.02 99.10 99.46 99.78 0.90 0.54 0.22 2450097.0 33.46 60.13 81.13 89.99 96.87 98.63 99.29 99.73 1.37 0.71 0.27
26 2015201601 Apr 2015 to Mar 2016 (Period 01) TfW Rail 217600.0 37.03 65.51 85.54 92.54 97.55 98.75 99.24 99.72 1.25 0.76 0.28 2489337.0 33.70 60.55 81.49 90.20 96.91 98.62 99.27 99.73 1.38 0.73 0.27
26 2015201602 Apr 2015 to Mar 2016 (Period 02) TfW Rail 192204.0 37.23 65.98 86.35 93.39 98.04 99.15 99.56 99.83 0.85 0.44 0.17 2493823.0 34.00 61.03 81.92 90.48 97.02 98.68 99.31 99.74 1.32 0.69 0.26
26 2015201603 Apr 2015 to Mar 2016 (Period 03) TfW Rail 193101.0 34.51 63.68 84.80 92.00 97.24 98.68 99.27 99.69 1.32 0.73 0.31 2496363.0 34.01 61.15 82.02 90.49 96.98 98.65 99.28 99.73 1.35 0.72 0.27
26 2015201604 Apr 2015 to Mar 2016 (Period 04) TfW Rail 195365.0 33.53 61.98 83.37 91.40 97.12 98.67 99.26 99.68 1.33 0.74 0.32 2505763.0 34.20 61.56 82.40 90.71 97.01 98.65 99.28 99.72 1.35 0.72 0.28
26 2015201605 Apr 2015 to Mar 2016 (Period 05) TfW Rail 194055.0 32.69 60.20 81.44 89.80 96.56 98.39 99.20 99.77 1.61 0.80 0.23 2509811.0 34.36 61.89 82.75 91.00 97.17 98.73 99.33 99.75 1.27 0.67 0.25
26 2015201606 Apr 2015 to Mar 2016 (Period 06) TfW Rail 193584.0 34.73 62.47 83.63 91.45 97.08 98.60 99.20 99.65 1.40 0.80 0.35 2512799.0 34.43 62.02 82.91 91.09 97.19 98.72 99.31 99.74 1.28 0.69 0.26
26 2015201607 Apr 2015 to Mar 2016 (Period 07) TfW Rail 193316.0 32.78 60.15 81.79 90.38 96.81 98.45 99.10 99.63 1.55 0.90 0.37 2518709.0 34.41 62.00 82.89 91.06 97.15 98.69 99.29 99.73 1.31 0.71 0.27
26 2015201608 Apr 2015 to Mar 2016 (Period 08) TfW Rail 191321.0 29.26 55.64 77.62 87.22 95.48 97.92 98.88 99.62 2.08 1.12 0.38 2520157.0 34.51 62.27 83.19 91.25 97.20 98.71 99.29 99.73 1.29 0.71 0.27
26 2015201609 Apr 2015 to Mar 2016 (Period 09) TfW Rail 190415.0 28.16 53.50 75.40 85.33 94.43 97.30 98.49 99.41 2.70 1.51 0.59 2519099.0 34.37 62.13 83.06 91.06 97.04 98.61 99.23 99.70 1.39 0.77 0.30
26 2015201610 Apr 2015 to Mar 2016 (Period 10) TfW Rail 161672.0 32.00 60.43 81.39 89.84 96.51 98.27 99.06 99.65 1.73 0.94 0.35 2510749.0 34.27 62.15 83.07 91.03 97.01 98.58 99.22 99.70 1.42 0.78 0.30
26 2015201611 Apr 2015 to Mar 2016 (Period 11) TfW Rail 190256.0 33.96 63.67 84.39 92.18 97.71 98.91 99.41 99.79 1.09 0.59 0.21 2509528.0 34.00 61.99 82.97 90.98 97.00 98.57 99.21 99.70 1.43 0.79 0.30
26 2015201612 Apr 2015 to Mar 2016 (Period 12) TfW Rail 191057.0 33.11 62.14 83.08 91.16 97.30 98.77 99.29 99.72 1.23 0.71 0.28 2509901.0 33.65 61.70 82.73 90.81 96.93 98.54 99.19 99.69 1.46 0.81 0.31
26 2015201613 Apr 2015 to Mar 2016 (Period 13) TfW Rail 173065.0 33.92 63.91 84.24 91.82 97.55 99.02 99.51 99.83 0.98 0.49 0.17 2477011.0 33.36 61.52 82.58 90.68 96.88 98.53 99.19 99.69 1.47 0.81 0.31
26 2016201701 Apr 2016 to Mar 2017 (Period 01) TfW Rail 208672.0 35.35 65.64 86.39 93.51 98.31 99.33 99.67 99.90 0.67 0.33 0.10 2468083.0 33.20 61.52 82.64 90.75 96.95 98.58 99.23 99.71 1.42 0.77 0.29
26 2016201702 Apr 2016 to Mar 2017 (Period 02) TfW Rail 193619.0 33.81 63.08 84.45 92.42 97.58 98.84 99.35 99.80 1.16 0.65 0.20 2469498.0 32.93 61.30 82.49 90.68 96.91 98.56 99.21 99.70 1.44 0.79 0.30
26 2016201703 Apr 2016 to Mar 2017 (Period 03) TfW Rail 193533.0 31.65 58.84 80.68 89.74 96.75 98.57 99.28 99.75 1.43 0.72 0.25 2469930.0 32.71 60.92 82.17 90.50 96.87 98.55 99.21 99.71 1.45 0.79 0.29
26 2016201704 Apr 2016 to Mar 2017 (Period 04) TfW Rail 193387.0 31.12 58.43 80.08 88.99 96.18 98.28 99.17 99.69 1.72 0.83 0.31 2467952.0 32.52 60.64 81.91 90.31 96.80 98.52 99.20 99.71 1.48 0.80 0.29
26 2016201705 Apr 2016 to Mar 2017 (Period 05) TfW Rail 193295.0 31.89 58.06 79.39 88.18 95.53 97.76 98.83 99.60 2.24 1.17 0.40 2467192.0 32.46 60.47 81.75 90.19 96.72 98.47 99.17 99.70 1.53 0.83 0.30
26 2016201706 Apr 2016 to Mar 2017 (Period 06) TfW Rail 194384.0 32.55 59.69 81.43 89.99 96.75 98.64 99.35 99.82 1.36 0.65 0.18 2467992.0 32.29 60.25 81.58 90.07 96.69 98.47 99.19 99.71 1.53 0.81 0.29
26 2016201707 Apr 2016 to Mar 2017 (Period 07) TfW Rail 191274.0 33.23 61.42 83.19 91.75 97.84 99.09 99.54 99.82 0.91 0.46 0.18 2465950.0 32.32 60.35 81.69 90.18 96.77 98.52 99.22 99.72 1.48 0.78 0.28
26 2016201708 Apr 2016 to Mar 2017 (Period 08) TfW Rail 186231.0 28.28 53.22 74.61 85.23 94.82 97.64 98.76 99.54 2.36 1.24 0.46 2460860.0 32.26 60.18 81.47 90.04 96.72 98.50 99.21 99.72 1.50 0.79 0.28
26 2016201709 Apr 2016 to Mar 2017 (Period 09) TfW Rail 191221.0 27.15 51.12 71.53 82.48 94.07 97.47 98.71 99.54 2.53 1.29 0.46 2461666.0 32.18 59.99 81.17 89.81 96.70 98.51 99.23 99.73 1.49 0.77 0.27
26 2016201710 Apr 2016 to Mar 2017 (Period 10) TfW Rail 165095.0 31.86 58.74 79.40 88.12 95.47 97.75 98.73 99.53 2.25 1.27 0.47 2465089.0 32.17 59.88 81.03 89.70 96.63 98.48 99.21 99.72 1.52 0.79 0.28
26 2016201711 Apr 2016 to Mar 2017 (Period 11) TfW Rail 192391.0 36.84 65.02 84.94 92.19 97.57 98.91 99.37 99.72 1.09 0.63 0.28 2467224.0 32.39 59.98 81.08 89.70 96.62 98.48 99.20 99.72 1.52 0.80 0.28
26 2016201712 Apr 2016 to Mar 2017 (Period 12) TfW Rail 192632.0 37.21 65.96 85.64 92.54 97.43 98.66 99.20 99.64 1.34 0.80 0.36 2468799.0 32.71 60.28 81.28 89.81 96.63 98.47 99.20 99.71 1.53 0.80 0.29
26 2016201713 Apr 2016 to Mar 2017 (Period 13) TfW Rail 185589.0 38.34 67.77 87.19 93.75 98.05 99.10 99.50 99.78 0.90 0.50 0.22 2481323.0 33.05 60.59 81.52 89.96 96.67 98.48 99.20 99.71 1.52 0.80 0.29
26 2017201801 Apr 2017 to Mar 2018 (Period 01) TfW Rail 199160.0 38.26 67.63 87.23 93.76 98.03 99.09 99.49 99.81 0.91 0.51 0.19 2471811.0 33.27 60.73 81.56 89.97 96.64 98.45 99.18 99.70 1.55 0.82 0.30
26 2017201802 Apr 2017 to Mar 2018 (Period 02) TfW Rail 194121.0 37.28 66.00 85.64 92.66 97.48 98.78 99.33 99.74 1.22 0.67 0.26 2472313.0 33.55 60.96 81.66 89.99 96.63 98.45 99.18 99.69 1.55 0.82 0.31
26 2017201803 Apr 2017 to Mar 2018 (Period 03) TfW Rail 195295.0 35.23 62.67 82.86 90.66 97.02 98.63 99.29 99.73 1.37 0.71 0.27 2474075.0 33.83 61.26 81.83 90.06 96.65 98.45 99.18 99.69 1.55 0.82 0.31
26 2017201804 Apr 2017 to Mar 2018 (Period 04) TfW Rail 195794.0 35.71 64.07 84.12 91.49 97.03 98.56 99.17 99.71 1.44 0.83 0.29 2476482.0 34.19 61.71 82.15 90.26 96.72 98.48 99.18 99.69 1.52 0.82 0.31
26 2017201805 Apr 2017 to Mar 2018 (Period 05) TfW Rail 195955.0 36.70 64.92 84.63 91.99 97.36 98.83 99.36 99.77 1.17 0.64 0.23 2479142.0 34.56 62.24 82.56 90.56 96.86 98.56 99.22 99.71 1.44 0.78 0.29
26 2017201806 Apr 2017 to Mar 2018 (Period 06) TfW Rail 194109.0 35.24 62.48 82.38 90.17 96.59 98.52 99.25 99.73 1.48 0.75 0.27 2478867.0 34.78 62.46 82.63 90.57 96.85 98.55 99.21 99.70 1.45 0.79 0.30
26 2017201807 Apr 2017 to Mar 2018 (Period 07) TfW Rail 192323.0 34.10 61.28 81.70 90.17 96.99 98.67 99.28 99.72 1.33 0.72 0.28 2479916.0 34.84 62.45 82.52 90.45 96.78 98.52 99.19 99.69 1.48 0.81 0.31
26 2017201808 Apr 2017 to Mar 2018 (Period 08) TfW Rail 187572.0 30.60 56.12 76.45 86.16 94.89 97.43 98.52 99.49 2.57 1.48 0.51 2481257.0 35.02 62.67 82.65 90.52 96.79 98.50 99.18 99.69 1.50 0.82 0.31
26 2017201809 Apr 2017 to Mar 2018 (Period 09) TfW Rail 192086.0 31.73 57.51 77.99 87.44 95.60 97.91 98.81 99.56 2.09 1.19 0.44 2482122.0 35.37 63.16 83.15 90.90 96.91 98.54 99.18 99.69 1.46 0.82 0.31
26 2017201810 Apr 2017 to Mar 2018 (Period 10) TfW Rail 171057.0 34.71 61.72 81.25 89.02 95.53 97.54 98.45 99.23 2.46 1.55 0.77 2488084.0 35.55 63.35 83.27 90.95 96.91 98.52 99.16 99.67 1.48 0.84 0.33
26 2017201811 Apr 2017 to Mar 2018 (Period 11) TfW Rail 194449.0 39.50 68.12 86.72 93.48 98.13 99.20 99.64 99.86 0.80 0.36 0.14 2490142.0 35.76 63.59 83.41 91.05 96.95 98.54 99.18 99.68 1.46 0.82 0.32
26 2017201812 Apr 2017 to Mar 2018 (Period 12) TfW Rail 173724.0 38.99 68.22 86.69 93.13 97.64 98.81 99.34 99.73 1.19 0.66 0.27 2471234.0 35.88 63.73 83.46 91.08 96.96 98.55 99.19 99.68 1.45 0.81 0.32
26 2017201813 Apr 2017 to Mar 2018 (Period 13) TfW Rail 191819.0 39.80 68.75 86.86 93.29 97.76 99.00 99.51 99.81 1.00 0.49 0.19 2477464.0 36.00 63.82 83.45 91.06 96.94 98.55 99.19 99.69 1.45 0.81 0.31
26 2018201901 Apr 2018 to Mar 2019 (Period 01) TfW Rail 192528.0 39.18 68.06 86.80 93.37 97.82 98.94 99.38 99.74 1.06 0.62 0.26 2470832.0 36.06 63.84 83.40 91.02 96.92 98.53 99.19 99.68 1.47 0.81 0.32
26 2018201902 Apr 2018 to Mar 2019 (Period 02) TfW Rail 191476.0 35.29 62.74 82.62 90.51 96.81 98.52 99.21 99.73 1.48 0.79 0.27 2468187.0 35.91 63.59 83.17 90.85 96.87 98.51 99.18 99.68 1.49 0.82 0.32
26 2018201903 Apr 2018 to Mar 2019 (Period 03) TfW Rail 194699.0 35.94 63.76 83.25 90.76 96.72 98.40 99.11 99.68 1.60 0.89 0.32 2467591.0 35.96 63.68 83.20 90.86 96.85 98.50 99.16 99.68 1.50 0.84 0.32
26 2018201904 Apr 2018 to Mar 2019 (Period 04) TfW Rail 192811.0 31.55 57.05 76.76 86.17 94.86 97.50 98.60 99.52 2.50 1.40 0.48 2464608.0 35.64 63.13 82.62 90.44 96.68 98.41 99.12 99.66 1.59 0.88 0.34
26 2018201905 Apr 2018 to Mar 2019 (Period 05) TfW Rail 195093.0 34.15 60.95 80.85 88.78 95.77 97.98 98.88 99.55 2.02 1.12 0.45 2463746.0 35.43 62.81 82.32 90.19 96.55 98.34 99.08 99.65 1.66 0.92 0.35
26 2018201906 Apr 2018 to Mar 2019 (Period 06) TfW Rail 193977.0 37.27 65.40 84.31 91.45 97.08 98.62 99.21 99.67 1.38 0.79 0.33 2463614.0 35.59 63.04 82.47 90.29 96.59 98.35 99.08 99.64 1.65 0.92 0.36
26 2018201907 Apr 2018 to Mar 2019 (Period 07) TfW Rail 188362.0 33.77 60.32 79.79 88.20 95.50 97.73 98.65 99.44 2.27 1.35 0.56 2459653.0 35.57 62.97 82.33 90.14 96.47 98.28 99.03 99.62 1.72 0.97 0.38
26 2018201908 Apr 2018 to Mar 2019 (Period 08) TfW Rail 189490.0 31.84 57.63 77.81 86.94 95.22 97.62 98.70 99.50 2.38 1.30 0.50 2461571.0 35.66 63.08 82.43 90.19 96.50 98.29 99.04 99.62 1.71 0.96 0.38
26 2018201909 Apr 2018 to Mar 2019 (Period 09) TfW Rail 184384.0 29.57 53.88 73.99 84.23 94.58 97.60 98.72 99.60 2.40 1.28 0.40 2453869.0 35.51 62.83 82.14 89.96 96.42 98.27 99.04 99.62 1.73 0.96 0.38
26 2018201910 Apr 2018 to Mar 2019 (Period 10) TfW Rail 169792.0 35.58 63.06 82.85 90.78 97.06 98.71 99.36 99.82 1.29 0.64 0.18 2452604.0 35.57 62.92 82.25 90.08 96.53 98.35 99.10 99.66 1.65 0.90 0.34
26 2018201911 Apr 2018 to Mar 2019 (Period 11) TfW Rail 194617.0 40.04 68.92 87.08 93.93 98.32 99.23 99.58 99.84 0.77 0.42 0.16 2452772.0 35.62 62.98 82.28 90.12 96.55 98.36 99.09 99.66 1.64 0.91 0.34
26 2018201912 Apr 2018 to Mar 2019 (Period 12) TfW Rail 194760.0 37.57 65.69 84.82 92.04 97.44 98.81 99.37 99.78 1.19 0.63 0.22 2473808.0 35.53 62.83 82.17 90.06 96.54 98.36 99.10 99.67 1.64 0.90 0.33
26 2018201913 Apr 2018 to Mar 2019 (Period 13) TfW Rail 199084.0 39.16 67.42 86.09 92.86 97.60 98.83 99.33 99.72 1.17 0.67 0.28 2481073.0 35.50 62.74 82.13 90.03 96.53 98.35 99.09 99.66 1.65 0.91 0.34
26 2019202001 Apr 2019 to Mar 2020 (Period 01) TfW Rail 191555.0 39.66 67.07 85.20 91.79 96.91 98.37 99.03 99.57 1.63 0.97 0.43 191555.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202002 Apr 2019 to Mar 2020 (Period 02) TfW Rail 199720.0 38.53 65.97 84.75 91.88 97.26 98.74 99.35 99.80 1.26 0.65 0.20 391275.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202003 Apr 2019 to Mar 2020 (Period 03) TfW Rail 202086.0 38.01 64.64 83.39 90.79 96.65 98.35 99.10 99.74 1.65 0.90 0.26 593361.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202004 Apr 2019 to Mar 2020 (Period 04) TfW Rail 200251.0 30.30 55.72 76.93 86.40 95.17 97.64 98.69 99.50 2.36 1.31 0.50 793612.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202005 Apr 2019 to Mar 2020 (Period 05) TfW Rail 195772.0 31.62 55.93 75.44 84.62 93.62 96.81 98.23 99.43 3.19 1.77 0.57 989384.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202006 Apr 2019 to Mar 2020 (Period 06) TfW Rail 200784.0 33.95 59.65 79.43 87.89 95.44 97.72 98.72 99.57 2.28 1.28 0.43 1190168.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202007 Apr 2019 to Mar 2020 (Period 07) TfW Rail 198743.0 32.60 58.07 77.58 86.69 95.47 97.93 98.94 99.67 2.07 1.06 0.33 1388911.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202008 Apr 2019 to Mar 2020 (Period 08) TfW Rail 195429.0 29.00 52.98 73.09 83.31 94.01 97.23 98.54 99.45 2.77 1.46 0.55 1584340.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202009 Apr 2019 to Mar 2020 (Period 09) TfW Rail 196367.0 27.38 50.03 69.39 80.08 92.37 96.60 98.30 99.45 3.40 1.70 0.55 1780707.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202010 Apr 2019 to Mar 2020 (Period 10) TfW Rail 173925.0 35.11 58.36 76.21 85.16 94.31 97.23 98.45 99.45 2.77 1.55 0.55 1954632.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202011 Apr 2019 to Mar 2020 (Period 11) TfW Rail 208615.0 39.99 63.82 80.98 88.95 96.29 98.32 99.14 99.70 1.68 0.86 0.30 2163247.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202012 Apr 2019 to Mar 2020 (Period 12) TfW Rail 211487.0 36.95 60.84 78.54 86.84 94.77 97.23 98.35 99.30 2.77 1.65 0.70 2374734.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
26 2019202013 Apr 2019 to Mar 2020 (Period 13) TfW Rail 248414.0 45.88 70.48 86.15 92.16 97.14 98.67 99.31 99.77 1.33 0.69 0.23 2623148.0 35.54 60.51 79.18 87.55 95.39 97.78 98.79 99.57 2.22 1.21 0.43
26 2020202101 Apr 2020 to Mar 2021 (Period 01) TfW Rail 144136.0 61.06 85.14 95.40 97.61 99.05 99.56 99.73 99.89 0.44 0.27 0.11 2575729.0 36.66 61.40 79.64 87.80 95.48 97.83 98.83 99.59 2.17 1.17 0.41
26 2020202102 Apr 2020 to Mar 2021 (Period 02) TfW Rail 128134.0 58.41 82.68 94.08 96.70 98.61 99.25 99.52 99.78 0.75 0.48 0.22 2504143.0 37.63 62.13 79.98 87.93 95.50 97.83 98.82 99.58 2.17 1.18 0.42
26 2020202103 Apr 2020 to Mar 2021 (Period 03) TfW Rail 134859.0 58.69 83.01 94.32 96.96 98.86 99.37 99.65 99.82 0.63 0.35 0.18 2436916.0 38.76 63.07 80.49 88.19 95.59 97.88 98.85 99.58 2.12 1.15 0.42
26 2020202104 Apr 2020 to Mar 2021 (Period 04) TfW Rail 161872.0 57.18 83.08 93.96 96.77 98.76 99.43 99.66 99.86 0.57 0.34 0.14 2398537.0 40.71 65.04 81.69 88.92 95.84 98.00 98.91 99.61 2.00 1.09 0.39
26 2020202105 Apr 2020 to Mar 2021 (Period 05) TfW Rail 173155.0 50.49 77.07 89.93 93.95 97.33 98.56 99.16 99.67 1.44 0.84 0.33 2375920.0 42.17 66.66 82.81 89.64 96.13 98.14 98.99 99.63 1.86 1.01 0.37
26 2020202106 Apr 2020 to Mar 2021 (Period 06) TfW Rail 188203.0 50.86 77.86 90.20 93.95 97.22 98.46 99.06 99.61 1.54 0.94 0.39 2363339.0 43.56 68.15 83.68 90.13 96.27 98.20 99.02 99.63 1.80 0.98 0.37
26 2020202107 Apr 2020 to Mar 2021 (Period 07) TfW Rail 190576.0 52.44 80.14 91.80 95.07 97.79 98.69 99.16 99.64 1.31 0.84 0.36 2355172.0 45.20 69.97 84.85 90.82 96.46 98.27 99.03 99.63 1.73 0.97 0.37
26 2020202108 Apr 2020 to Mar 2021 (Period 08) TfW Rail 179619.0 50.12 78.14 90.66 94.50 97.75 98.88 99.39 99.79 1.12 0.61 0.21 2339362.0 46.94 72.02 86.28 91.73 96.77 98.40 99.10 99.66 1.60 0.90 0.34
26 2020202109 Apr 2020 to Mar 2021 (Period 09) TfW Rail 191590.0 48.84 77.01 89.97 94.09 97.56 98.75 99.31 99.76 1.25 0.69 0.24 2334585.0 48.74 74.28 88.01 92.90 97.20 98.58 99.19 99.68 1.42 0.81 0.32
26 2020202110 Apr 2020 to Mar 2021 (Period 10) TfW Rail 161194.0 52.45 79.33 91.39 94.73 97.75 98.89 99.34 99.79 1.11 0.66 0.21 2321854.0 50.02 75.82 89.12 93.61 97.46 98.70 99.25 99.71 1.30 0.75 0.29
26 2020202111 Apr 2020 to Mar 2021 (Period 11) TfW Rail 165198.0 56.47 81.48 91.64 94.73 97.52 98.61 99.16 99.69 1.39 0.84 0.31 2278437.0 51.40 77.33 90.05 94.12 97.57 98.73 99.26 99.71 1.27 0.74 0.29
26 2020202112 Apr 2020 to Mar 2021 (Period 12) TfW Rail 165813.0 58.39 83.50 93.22 96.17 98.39 99.16 99.46 99.81 0.84 0.54 0.19 2232763.0 53.29 79.35 91.38 94.96 97.90 98.91 99.36 99.75 1.09 0.64 0.25
26 2020202113 Apr 2020 to Mar 2021 (Period 13) TfW Rail 162299.0 57.63 83.47 93.37 96.23 98.41 99.15 99.48 99.83 0.85 0.52 0.17 2146648.0 54.48 80.69 92.13 95.38 98.02 98.95 99.37 99.76 1.05 0.63 0.24
26 2021202201 Apr 2021 to Mar 2022 (Period 01) TfW Rail 226090.0 53.36 81.10 92.80 95.94 98.37 99.13 99.49 99.80 0.87 0.51 0.20 2228602.0 53.94 80.44 91.99 95.29 97.99 98.93 99.36 99.75 1.07 0.64 0.25
26 2021202202 Apr 2021 to Mar 2022 (Period 02) TfW Rail 199328.0 53.30 79.10 90.98 94.64 97.72 98.77 99.28 99.71 1.23 0.72 0.29 2299796.0 53.63 80.20 91.79 95.16 97.93 98.90 99.35 99.75 1.10 0.65 0.25
26 2021202203 Apr 2021 to Mar 2022 (Period 03) TfW Rail 192605.0 50.05 74.55 87.97 92.63 96.61 98.11 98.82 99.52 1.89 1.18 0.48 2357542.0 53.05 79.58 91.33 94.85 97.77 98.81 99.29 99.73 1.19 0.71 0.27
26 2021202204 Apr 2021 to Mar 2022 (Period 04) TfW Rail 195860.0 48.99 72.89 86.18 90.97 95.71 97.61 98.55 99.41 2.39 1.45 0.59 2391530.0 52.44 78.79 90.73 94.40 97.54 98.67 99.20 99.69 1.33 0.80 0.31
26 2021202205 Apr 2021 to Mar 2022 (Period 05) TfW Rail 195893.0 49.65 73.57 86.92 91.77 96.39 98.14 98.94 99.63 1.86 1.06 0.37 2414268.0 52.35 78.49 90.48 94.22 97.46 98.63 99.18 99.69 1.37 0.82 0.31
26 2021202206 Apr 2021 to Mar 2022 (Period 06) TfW Rail 204811.0 43.66 68.29 83.89 89.85 95.65 97.84 98.87 99.62 2.16 1.13 0.38 2430876.0 51.74 77.68 89.94 93.87 97.32 98.58 99.17 99.69 1.42 0.83 0.31
26 2021202207 Apr 2021 to Mar 2022 (Period 07) TfW Rail 223310.0 38.76 64.32 83.43 90.74 96.80 98.41 99.08 99.66 1.59 0.92 0.34 2463610.0 50.51 76.28 89.21 93.50 97.24 98.55 99.16 99.69 1.45 0.84 0.31
26 2021202208 Apr 2021 to Mar 2022 (Period 08) TfW Rail 211953.0 32.79 56.24 75.35 83.97 93.11 96.33 97.75 99.03 3.67 2.25 0.97 2495944.0 49.03 74.45 87.93 92.62 96.85 98.34 99.02 99.63 1.66 0.98 0.37
26 2021202209 Apr 2021 to Mar 2022 (Period 09) TfW Rail 205452.0 29.60 50.82 69.63 79.21 89.85 94.40 96.58 98.55 5.60 3.42 1.45 2509806.0 47.45 72.32 86.28 91.41 96.23 97.99 98.80 99.53 2.01 1.20 0.47
26 2021202210 Apr 2021 to Mar 2022 (Period 10) TfW Rail 186312.0 37.43 61.13 78.98 86.87 94.93 97.63 98.75 99.60 2.37 1.25 0.40 2534924.0 46.40 71.05 85.41 90.86 96.03 97.90 98.76 99.52 2.10 1.24 0.48
26 2021202211 Apr 2021 to Mar 2022 (Period 11) TfW Rail 224442.0 41.50 65.94 83.48 90.71 96.98 98.72 99.36 99.80 1.28 0.64 0.20 2594168.0 45.33 69.94 84.85 90.60 96.02 97.93 98.79 99.53 2.07 1.21 0.47
26 2021202212 Apr 2021 to Mar 2022 (Period 12) TfW Rail 203254.0 39.53 63.70 81.58 88.94 95.66 97.78 98.64 99.42 2.22 1.36 0.58 2631609.0 44.06 68.61 84.07 90.12 95.84 97.84 98.73 99.50 2.16 1.27 0.50
26 2021202213 Apr 2021 to Mar 2022 (Period 13) TfW Rail 205251.0 36.71 60.21 78.52 86.59 94.74 97.51 98.63 99.46 2.49 1.37 0.54 2674561.0 42.67 67.06 83.08 89.48 95.60 97.74 98.68 99.48 2.26 1.32 0.52
26 2022202301 Apr 2022 to Mar 2023 (Period 01) TfW Rail 253141.0 37.41 61.30 80.12 88.09 95.36 97.66 98.69 99.52 2.34 1.31 0.48 2701612.0 41.29 65.34 81.99 88.81 95.35 97.61 98.61 99.46 2.39 1.39 0.54
26 2022202302 Apr 2022 to Mar 2023 (Period 02) TfW Rail 242538.0 37.86 62.32 80.95 88.87 96.04 98.22 99.05 99.65 1.78 0.95 0.35 2744822.0 40.11 64.08 81.24 88.39 95.24 97.58 98.60 99.46 2.42 1.40 0.54
26 2022202303 Apr 2022 to Mar 2023 (Period 03) TfW Rail 221938.0 37.18 60.64 78.87 86.77 94.73 97.23 98.38 99.37 2.77 1.62 0.63 2774155.0 39.19 63.08 80.59 87.97 95.10 97.52 98.57 99.44 2.48 1.43 0.56
26 2022202304 Apr 2022 to Mar 2023 (Period 04) TfW Rail 242151.0 35.34 58.44 75.60 83.54 92.58 96.12 97.78 99.04 3.88 2.22 0.96 2820446.0 38.18 62.00 79.77 87.38 94.84 97.39 98.50 99.41 2.61 1.50 0.59
26 2022202305 Apr 2022 to Mar 2023 (Period 05) TfW Rail 217880.0 35.57 58.26 75.46 83.46 92.32 95.84 97.60 99.13 4.16 2.40 0.87 2842433.0 37.19 60.91 78.95 86.78 94.54 97.22 98.40 99.38 2.78 1.60 0.62
26 2022202306 Apr 2022 to Mar 2023 (Period 06) TfW Rail 249938.0 38.36 62.24 79.70 87.53 95.01 97.45 98.55 99.46 2.55 1.45 0.54 2887560.0 36.83 60.50 78.66 86.62 94.51 97.20 98.38 99.37 2.80 1.62 0.63
26 2022202307 Apr 2022 to Mar 2023 (Period 07) TfW Rail 219362.0 37.53 61.50 79.26 86.91 94.63 97.15 98.32 99.35 2.85 1.68 0.65 2883612.0 36.73 60.28 78.34 86.33 94.34 97.10 98.33 99.34 2.90 1.67 0.66
26 2022202308 Apr 2022 to Mar 2023 (Period 08) TfW Rail 224728.0 32.78 55.24 73.34 82.20 92.02 95.98 97.75 99.15 4.02 2.25 0.85 2896387.0 36.71 60.19 78.17 86.18 94.25 97.07 98.32 99.35 2.93 1.68 0.65
26 2022202309 Apr 2022 to Mar 2023 (Period 09) TfW Rail 233275.0 31.16 52.54 70.72 80.46 91.55 95.69 97.56 99.08 4.31 2.44 0.92 2924210.0 36.77 60.24 78.17 86.21 94.34 97.15 98.38 99.38 2.85 1.62 0.62
26 2022202310 Apr 2022 to Mar 2023 (Period 10) TfW Rail 148205.0 39.61 63.00 78.36 84.94 92.54 95.73 97.33 98.85 4.27 2.67 1.15 2886103.0 36.87 60.32 78.13 86.10 94.21 97.04 98.31 99.34 2.96 1.69 0.66
26 2022202311 Apr 2022 to Mar 2023 (Period 11) TfW Rail 222049.0 36.18 58.67 75.19 83.32 92.62 96.10 97.71 99.14 3.90 2.29 0.86 2883710.0 36.46 59.76 77.49 85.53 93.87 96.84 98.18 99.29 3.16 1.82 0.71
26 2022202312 Apr 2022 to Mar 2023 (Period 12) TfW Rail 226506.0 37.27 60.16 77.05 84.72 93.04 96.27 97.95 99.27 3.73 2.05 0.73 2906962.0 36.31 59.51 77.17 85.23 93.68 96.73 98.13 99.28 3.27 1.87 0.72
26 2022202313 Apr 2022 to Mar 2023 (Period 13) TfW Rail 187610.0 40.55 64.00 79.87 86.55 93.78 96.60 97.98 99.21 3.40 2.02 0.79 2889321.0 36.56 59.75 77.25 85.22 93.61 96.67 98.08 99.26 3.33 1.92 0.74
26 2023202401 Apr 2023 to Mar 2024 (Period 01) TfW Rail 207656.0 37.39 59.99 77.30 85.15 93.48 96.65 98.09 99.23 3.35 1.91 0.77 2843836.0 36.54 59.63 77.00 84.96 93.45 96.58 98.03 99.24 3.42 1.97 0.76
26 2023202402 Apr 2023 to Mar 2024 (Period 02) TfW Rail 193984.0 35.33 57.38 74.75 82.42 91.22 95.11 97.28 99.01 4.89 2.72 0.99 2795282.0 36.34 59.25 76.50 84.44 93.07 96.33 97.89 99.19 3.67 2.11 0.81
26 2023202403 Apr 2023 to Mar 2024 (Period 03) TfW Rail 200658.0 32.68 53.07 70.53 79.22 89.71 94.34 96.66 98.70 5.66 3.34 1.30 2774002.0 36.01 58.69 75.88 83.88 92.69 96.12 97.76 99.14 3.88 2.24 0.86
26 2023202404 Apr 2023 to Mar 2024 (Period 04) TfW Rail 223262.0 37.24 59.02 76.39 84.18 92.28 95.50 97.18 98.77 4.50 2.82 1.23 2755113.0 36.17 58.74 75.94 83.93 92.67 96.06 97.71 99.12 3.94 2.29 0.88
26 2023202405 Apr 2023 to Mar 2024 (Period 05) TfW Rail 230291.0 37.83 59.66 76.52 84.23 92.62 96.01 97.80 99.24 3.99 2.20 0.76 2767524.0 36.35 58.85 76.03 83.99 92.69 96.08 97.73 99.12 3.92 2.27 0.88
26 2023202406 Apr 2023 to Mar 2024 (Period 06) TfW Rail 233977.0 39.06 61.17 77.68 84.84 92.71 96.01 97.67 99.15 3.99 2.33 0.85 2751563.0 36.40 58.74 75.84 83.74 92.48 95.95 97.65 99.10 4.05 2.35 0.90
26 2023202407 Apr 2023 to Mar 2024 (Period 07) TfW Rail 234185.0 38.69 61.43 78.42 85.80 93.17 96.19 97.74 99.10 3.81 2.26 0.90 2766386.0 36.51 58.75 75.78 83.67 92.37 95.87 97.60 99.08 4.13 2.40 0.92
26 2023202408 Apr 2023 to Mar 2024 (Period 08) TfW Rail 234563.0 35.63 56.94 74.17 82.43 91.51 95.17 97.05 98.83 4.83 2.95 1.17 2776221.0 36.73 58.88 75.85 83.68 92.33 95.80 97.55 99.05 4.20 2.45 0.95
26 2023202409 Apr 2023 to Mar 2024 (Period 09) TfW Rail 241508.0 29.92 49.54 67.16 76.82 88.51 93.25 95.77 98.32 6.75 4.23 1.68 2784454.0 36.61 58.60 75.52 83.36 92.06 95.59 97.39 98.98 4.41 2.61 1.02
26 2023202410 Apr 2023 to Mar 2024 (Period 10) TfW Rail 232720.0 38.75 60.73 77.50 85.00 92.95 96.11 97.57 98.94 3.89 2.43 1.06 2868969.0 36.63 58.55 75.54 83.41 92.11 95.63 97.41 98.99 4.37 2.59 1.01
26 2023202411 Apr 2023 to Mar 2024 (Period 11) TfW Rail 269861.0 41.96 65.31 82.49 89.31 95.55 97.61 98.60 99.44 2.39 1.40 0.56 2916781.0 37.16 59.16 76.21 83.96 92.39 95.77 97.50 99.02 4.23 2.50 0.98
26 2023202412 Apr 2023 to Mar 2024 (Period 12) TfW Rail 272986.0 42.46 65.88 82.90 89.76 95.97 97.95 98.83 99.58 2.05 1.17 0.42 2963261.0 37.64 59.71 76.76 84.44 92.67 95.94 97.58 99.05 4.06 2.42 0.95
26 2023202413 Apr 2023 to Mar 2024 (Period 13) TfW Rail 291702.0 44.69 68.26 84.68 90.99 96.55 98.28 99.08 99.68 1.72 0.92 0.32 3067353.0 38.13 60.26 77.32 84.93 92.97 96.12 97.70 99.10 3.88 2.30 0.90
26 2024202501 Apr 2024 to Mar 2025 (Period 01) TfW Rail 288809.0 44.07 67.67 83.96 90.12 95.86 97.77 98.66 99.47 2.23 1.34 0.53 3148506.0 38.72 60.95 77.93 85.39 93.20 96.24 97.76 99.13 3.76 2.24 0.87
26 2024202502 Apr 2024 to Mar 2025 (Period 02) TfW Rail 297771.0 43.43 67.02 83.45 89.58 95.46 97.54 98.52 99.46 2.46 1.48 0.54 3252293.0 39.36 61.72 78.63 85.95 93.53 96.42 97.86 99.16 3.58 2.14 0.84
26 2024202503 Apr 2024 to Mar 2025 (Period 03) TfW Rail 316290.0 38.35 61.50 79.92 88.12 95.65 97.87 98.79 99.54 2.13 1.21 0.46 3367925.0 39.66 62.22 79.23 86.56 93.95 96.68 98.02 99.23 3.32 1.98 0.77
26 2024202504 Apr 2024 to Mar 2025 (Period 04) TfW Rail 327940.0 39.25 63.12 80.51 88.03 95.20 97.51 98.60 99.44 2.49 1.40 0.56 3472603.0 39.78 62.51 79.53 86.85 94.18 96.84 98.13 99.28 3.16 1.87 0.72
26 2024202505 Apr 2024 to Mar 2025 (Period 05) TfW Rail 331552.0 36.67 60.10 79.04 87.66 95.41 97.70 98.74 99.52 2.30 1.26 0.48 3573864.0 39.61 62.47 79.68 87.09 94.39 96.97 98.21 99.30 3.03 1.79 0.70
26 2024202506 Apr 2024 to Mar 2025 (Period 06) TfW Rail 325027.0 37.15 60.58 78.73 86.87 94.52 97.20 98.42 99.40 2.80 1.58 0.60 3664914.0 39.43 62.38 79.72 87.22 94.51 97.05 98.26 99.32 2.95 1.74 0.68
26 2024202507 Apr 2024 to Mar 2025 (Period 07) TfW Rail 299821.0 36.60 60.40 78.94 87.10 94.69 97.25 98.37 99.28 2.75 1.63 0.72 3730550.0 39.25 62.28 79.74 87.30 94.61 97.12 98.30 99.33 2.88 1.70 0.67
26 2024202508 Apr 2024 to Mar 2025 (Period 08) TfW Rail 302508.0 33.90 56.95 76.08 84.81 93.23 96.20 97.74 99.14 3.80 2.26 0.86 3798495.0 39.05 62.19 79.79 87.40 94.69 97.17 98.34 99.35 2.83 1.66 0.65
26 2024202509 Apr 2024 to Mar 2025 (Period 09) TfW Rail 308833.0 31.13 53.01 72.79 83.01 93.04 96.37 97.90 99.17 3.63 2.10 0.83 3865820.0 38.98 62.25 80.02 87.71 94.95 97.35 98.46 99.40 2.65 1.54 0.60
26 2024202510 Apr 2024 to Mar 2025 (Period 10) TfW Rail 286574.0 37.81 60.61 78.89 87.07 94.40 96.94 98.14 99.30 3.06 1.86 0.70 3919674.0 38.91 62.22 80.09 87.83 95.02 97.39 98.49 99.42 2.61 1.51 0.58
26 2024202511 Apr 2024 to Mar 2025 (Period 11) TfW Rail 322187.0 40.70 63.58 81.02 88.23 94.99 97.40 98.50 99.42 2.60 1.50 0.58 3972000.0 38.85 62.12 80.00 87.76 94.99 97.38 98.48 99.42 2.62 1.52 0.58
26 2024202512 Apr 2024 to Mar 2025 (Period 12) TfW Rail 327267.0 42.42 66.15 83.54 90.42 96.47 98.32 99.11 99.70 1.68 0.89 0.30 4026281.0 38.89 62.19 80.10 87.84 95.04 97.42 98.51 99.43 2.58 1.49 0.57
26 2024202513 Apr 2024 to Mar 2025 (Period 13) TfW Rail 342148.0 43.96 67.90 84.12 90.43 96.25 98.04 98.87 99.55 1.96 1.13 0.45 4076727.0 38.91 62.23 80.11 87.83 95.03 97.41 98.50 99.42 2.59 1.50 0.58
26 2025202601 Apr 2025 to Mar 2026 (Period 01) TfW Rail 273219.0 45.33 69.13 84.47 90.37 95.99 97.97 98.87 99.52 2.03 1.13 0.48 4061137.0 38.97 62.31 80.12 87.84 95.04 97.42 98.51 99.42 2.58 1.49 0.58
26 2025202602 Apr 2025 to Mar 2026 (Period 02) TfW Rail 298740.0 44.60 67.70 82.53 88.39 94.50 96.93 98.15 99.21 3.07 1.85 0.79 4062106.0 39.06 62.36 80.06 87.75 94.97 97.37 98.49 99.40 2.63 1.51 0.60
26 2025202603 Apr 2025 to Mar 2026 (Period 03) TfW Rail 328450.0 47.21 70.75 84.98 90.50 95.93 97.93 98.90 99.58 2.07 1.10 0.42 4074266.0 39.77 63.11 80.47 87.94 94.99 97.38 98.50 99.41 2.62 1.50 0.59
26 2025202604 Apr 2025 to Mar 2026 (Period 04) TfW Rail 335909.0 43.20 65.87 81.36 87.94 94.81 97.39 98.56 99.44 2.61 1.44 0.56 4082235.0 40.09 63.33 80.54 87.94 94.96 97.37 98.49 99.41 2.63 1.51 0.59
26 2025202605 Apr 2025 to Mar 2026 (Period 05) TfW Rail 315812.0 46.57 70.03 84.46 89.96 95.49 97.67 98.68 99.49 2.33 1.32 0.51 4066495.0 40.88 64.11 80.96 88.12 94.97 97.37 98.49 99.40 2.63 1.51 0.60
26 2025202606 Apr 2025 to Mar 2026 (Period 06) TfW Rail 324143.0 47.49 71.40 85.97 91.36 96.53 98.26 99.04 99.63 1.74 0.96 0.37 4065611.0 41.70 64.98 81.54 88.47 95.13 97.45 98.54 99.42 2.55 1.46 0.58
26 2025202607 Apr 2025 to Mar 2026 (Period 07) TfW Rail 308579.0 44.79 68.36 83.83 89.70 95.33 97.31 98.31 99.17 2.69 1.69 0.83 4074369.0 42.31 65.57 81.91 88.67 95.17 97.46 98.53 99.41 2.54 1.47 0.59
26 2025202608 Apr 2025 to Mar 2026 (Period 08) TfW Rail 331250.0 43.33 66.28 82.15 88.55 95.06 97.53 98.60 99.50 2.47 1.40 0.50 4103111.0 43.01 66.26 82.35 88.94 95.31 97.55 98.60 99.44 2.45 1.40 0.56
26 2025202609 Apr 2025 to Mar 2026 (Period 09) TfW Rail 327402.0 39.42 61.83 78.54 85.62 93.44 96.37 97.86 99.12 3.63 2.14 0.88 4121680.0 43.62 66.91 82.77 89.12 95.33 97.55 98.59 99.44 2.45 1.41 0.56
26 2025202610 Apr 2025 to Mar 2026 (Period 10) TfW Rail 306581.0 43.38 67.94 83.80 89.89 95.63 97.69 98.72 99.55 2.31 1.28 0.45 4141687.0 44.00 67.42 83.11 89.32 95.42 97.60 98.63 99.45 2.40 1.37 0.55
26 2025202611 Apr 2025 to Mar 2026 (Period 11) TfW Rail 327766.0 48.97 74.32 88.90 93.38 97.12 98.44 99.09 99.58 1.56 0.91 0.42 4147266.0 44.65 68.26 83.73 89.73 95.58 97.68 98.68 99.47 2.32 1.32 0.53
26 2025202612 Apr 2025 to Mar 2026 (Period 12) TfW Rail 336600.0 49.10 75.00 89.35 93.81 97.43 98.62 99.15 99.64 1.38 0.85 0.36 4156599.0 45.19 68.97 84.20 90.00 95.66 97.71 98.68 99.46 2.29 1.32 0.54
26 2025202613 Apr 2025 to Mar 2026 (Period 13) TfW Rail 379529.0 51.83 75.97 89.44 93.81 97.44 98.74 99.31 99.73 1.26 0.69 0.27 4193980.0 45.89 69.69 84.68 90.31 95.78 97.78 98.72 99.48 2.22 1.28 0.52
26 2026202701 Apr 2026 to Mar 2027 (Period 01) TfW Rail 399847.0 50.51 74.28 87.97 92.52 96.80 98.32 99.07 99.62 1.68 0.93 0.38 4320608.0 46.35 70.15 85.00 90.51 95.86 97.81 98.75 99.49 2.19 1.25 0.51
26 2026202702 Apr 2026 to Mar 2027 (Period 02) TfW Rail 338862.0 48.10 71.79 85.58 90.55 95.28 97.19 98.29 99.30 2.81 1.71 0.70 4360730.0 46.61 70.45 85.22 90.66 95.91 97.83 98.75 99.49 2.17 1.25 0.51
27 2014201501 Apr 2014 to Mar 2015 (Period 01) TransPennine Express 46402.0 30.67 58.27 81.77 90.29 96.21 97.95 98.75 99.44 2.05 1.25 0.56 46402.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201502 Apr 2014 to Mar 2015 (Period 02) TransPennine Express 50505.0 24.93 49.85 74.05 84.70 93.58 96.34 97.69 98.87 3.66 2.31 1.13 96907.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201503 Apr 2014 to Mar 2015 (Period 03) TransPennine Express 56466.0 19.93 42.84 66.96 79.05 91.01 95.02 97.02 98.76 4.98 2.98 1.24 153373.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201504 Apr 2014 to Mar 2015 (Period 04) TransPennine Express 56284.0 19.89 43.65 68.61 80.51 92.06 95.76 97.31 98.73 4.24 2.69 1.27 209657.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201505 Apr 2014 to Mar 2015 (Period 05) TransPennine Express 55077.0 17.90 39.24 62.43 75.00 88.00 92.96 95.52 97.85 7.04 4.48 2.15 264734.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201506 Apr 2014 to Mar 2015 (Period 06) TransPennine Express 54968.0 20.84 45.15 70.68 82.77 93.73 96.85 98.32 99.33 3.15 1.68 0.67 319702.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201507 Apr 2014 to Mar 2015 (Period 07) TransPennine Express 56167.0 18.35 41.27 67.41 80.84 92.95 96.51 97.89 99.16 3.49 2.11 0.84 375869.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201508 Apr 2014 to Mar 2015 (Period 08) TransPennine Express 56240.0 13.41 30.79 52.73 67.57 85.83 92.69 95.78 98.28 7.31 4.22 1.72 432109.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201509 Apr 2014 to Mar 2015 (Period 09) TransPennine Express 56822.0 16.46 36.70 60.50 74.76 90.22 95.13 97.18 98.86 4.87 2.82 1.14 488931.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201510 Apr 2014 to Mar 2015 (Period 10) TransPennine Express 51675.0 17.65 38.83 62.23 74.85 89.24 94.19 96.59 98.43 5.81 3.41 1.57 540606.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201511 Apr 2014 to Mar 2015 (Period 11) TransPennine Express 55192.0 21.06 45.14 70.70 82.90 93.50 96.57 97.92 99.01 3.43 2.08 0.99 595798.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201512 Apr 2014 to Mar 2015 (Period 12) TransPennine Express 54810.0 22.29 47.36 73.09 84.45 94.09 96.84 98.02 99.12 3.16 1.98 0.88 650608.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2014201513 Apr 2014 to Mar 2015 (Period 13) TransPennine Express 62656.0 23.72 48.65 74.39 86.04 95.11 97.57 98.60 99.39 2.43 1.40 0.61 713264.0 20.42 43.49 67.96 80.19 91.93 95.71 97.42 98.86 4.29 2.58 1.14
27 2015201601 Apr 2015 to Mar 2016 (Period 01) TransPennine Express 64612.0 23.81 48.87 73.49 84.61 94.25 96.89 98.01 99.02 3.11 1.99 0.98 731474.0 20.06 43.02 67.58 79.94 91.87 95.67 97.39 98.84 4.33 2.61 1.16
27 2015201602 Apr 2015 to Mar 2016 (Period 02) TransPennine Express 56438.0 24.36 49.84 74.63 85.42 94.14 96.75 97.93 99.17 3.25 2.07 0.83 737407.0 20.06 43.08 67.67 80.03 91.92 95.71 97.41 98.86 4.29 2.59 1.14
27 2015201603 Apr 2015 to Mar 2016 (Period 03) TransPennine Express 56703.0 25.26 50.66 75.07 85.46 94.28 96.96 98.11 99.10 3.04 1.89 0.90 737644.0 20.47 43.68 68.29 80.52 92.17 95.86 97.50 98.89 4.14 2.50 1.11
27 2015201604 Apr 2015 to Mar 2016 (Period 04) TransPennine Express 56718.0 23.84 47.63 71.61 82.87 93.42 96.60 97.92 98.98 3.40 2.08 1.02 738078.0 20.77 43.99 68.53 80.70 92.28 95.92 97.54 98.91 4.08 2.46 1.09
27 2015201605 Apr 2015 to Mar 2016 (Period 05) TransPennine Express 56800.0 22.43 46.11 70.58 82.58 93.61 96.80 98.11 99.14 3.20 1.89 0.86 739801.0 21.11 44.50 69.14 81.27 92.70 96.21 97.74 99.01 3.79 2.26 0.99
27 2015201606 Apr 2015 to Mar 2016 (Period 06) TransPennine Express 56676.0 23.18 46.73 71.74 84.05 94.56 97.37 98.41 99.28 2.63 1.59 0.72 741509.0 21.29 44.62 69.22 81.37 92.76 96.25 97.75 99.00 3.75 2.25 1.00
27 2015201607 Apr 2015 to Mar 2016 (Period 07) TransPennine Express 56274.0 20.07 42.05 67.20 80.37 93.04 96.63 98.06 99.23 3.37 1.94 0.77 741616.0 21.42 44.68 69.21 81.34 92.77 96.26 97.76 99.01 3.74 2.24 0.99
27 2015201608 Apr 2015 to Mar 2016 (Period 08) TransPennine Express 56129.0 13.77 30.92 53.00 66.94 84.61 91.76 95.06 97.84 8.24 4.94 2.16 741505.0 21.45 44.69 69.23 81.29 92.68 96.19 97.71 98.97 3.81 2.29 1.03
27 2015201609 Apr 2015 to Mar 2016 (Period 09) TransPennine Express 53513.0 12.96 29.59 50.71 65.23 82.98 90.25 93.91 97.17 9.75 6.09 2.83 738196.0 21.22 44.22 68.56 80.63 92.17 95.84 97.47 98.85 4.16 2.53 1.15
27 2015201610 Apr 2015 to Mar 2016 (Period 10) TransPennine Express 49482.0 17.63 37.90 62.48 76.03 90.22 94.76 96.81 98.68 5.24 3.19 1.32 736003.0 21.23 44.17 68.59 80.73 92.24 95.89 97.49 98.87 4.11 2.51 1.13
27 2015201611 Apr 2015 to Mar 2016 (Period 11) TransPennine Express 54313.0 21.06 43.80 69.17 81.98 93.45 96.46 98.01 99.06 3.54 1.99 0.94 735124.0 21.23 44.07 68.48 80.66 92.24 95.88 97.49 98.87 4.12 2.51 1.13
27 2015201612 Apr 2015 to Mar 2016 (Period 12) TransPennine Express 56206.0 22.90 46.49 71.58 83.29 93.92 96.94 98.21 99.14 3.06 1.79 0.86 736520.0 21.28 44.01 68.37 80.58 92.23 95.89 97.51 98.88 4.11 2.49 1.12
27 2015201613 Apr 2015 to Mar 2016 (Period 13) TransPennine Express 52404.0 24.34 49.12 74.21 85.35 94.71 97.29 98.31 99.16 2.71 1.69 0.84 726268.0 21.29 43.98 68.27 80.45 92.16 95.84 97.47 98.85 4.16 2.53 1.15
27 2016201701 Apr 2016 to Mar 2017 (Period 01) TransPennine Express 61105.0 25.69 50.31 75.08 86.25 95.26 97.51 98.36 99.23 2.49 1.64 0.77 722761.0 21.43 44.07 68.38 80.57 92.23 95.89 97.50 98.87 4.11 2.50 1.13
27 2016201702 Apr 2016 to Mar 2017 (Period 02) TransPennine Express 57360.0 26.30 52.13 76.61 86.96 95.56 97.78 98.88 99.58 2.22 1.12 0.42 723683.0 21.59 44.26 68.55 80.70 92.35 95.97 97.58 98.90 4.03 2.42 1.10
27 2016201703 Apr 2016 to Mar 2017 (Period 03) TransPennine Express 57590.0 23.74 47.74 72.24 83.38 93.46 96.76 98.13 99.17 3.24 1.87 0.83 724570.0 21.47 44.04 68.33 80.54 92.28 95.96 97.58 98.91 4.04 2.42 1.09
27 2016201704 Apr 2016 to Mar 2017 (Period 04) TransPennine Express 56766.0 24.67 48.98 73.04 84.10 93.73 96.55 97.75 98.93 3.45 2.25 1.07 724618.0 21.54 44.15 68.44 80.63 92.31 95.95 97.57 98.90 4.05 2.43 1.10
27 2016201705 Apr 2016 to Mar 2017 (Period 05) TransPennine Express 57360.0 24.71 48.77 73.00 83.99 93.82 96.88 98.18 99.29 3.12 1.82 0.71 725178.0 21.72 44.36 68.64 80.75 92.33 95.96 97.57 98.92 4.04 2.43 1.08
27 2016201706 Apr 2016 to Mar 2017 (Period 06) TransPennine Express 58077.0 25.24 49.32 73.87 84.95 94.76 97.48 98.58 99.39 2.52 1.42 0.61 726579.0 21.89 44.57 68.81 80.82 92.35 95.97 97.59 98.93 4.03 2.41 1.07
27 2016201707 Apr 2016 to Mar 2017 (Period 07) TransPennine Express 58569.0 23.98 48.27 73.79 85.55 95.16 97.70 98.74 99.46 2.30 1.26 0.54 728874.0 22.20 45.06 69.34 81.24 92.52 96.06 97.64 98.94 3.94 2.36 1.06
27 2016201708 Apr 2016 to Mar 2017 (Period 08) TransPennine Express 57365.0 19.08 40.37 65.18 79.02 92.31 96.58 98.16 99.25 3.42 1.84 0.75 730110.0 22.60 45.78 70.27 82.16 93.11 96.43 97.88 99.05 3.57 2.12 0.95
27 2016201709 Apr 2016 to Mar 2017 (Period 09) TransPennine Express 57082.0 15.46 33.08 54.31 68.00 85.41 92.38 95.52 97.76 7.62 4.48 2.24 733679.0 22.75 45.97 70.45 82.30 93.25 96.57 97.99 99.09 3.43 2.01 0.91
27 2016201710 Apr 2016 to Mar 2017 (Period 10) TransPennine Express 51174.0 22.51 45.21 68.78 80.70 92.76 96.27 97.75 99.13 3.73 2.25 0.87 735371.0 23.08 46.46 70.87 82.61 93.42 96.67 98.05 99.12 3.33 1.95 0.88
27 2016201711 Apr 2016 to Mar 2017 (Period 11) TransPennine Express 58267.0 24.71 48.29 73.37 84.80 94.45 97.17 98.36 99.30 2.83 1.64 0.70 739325.0 23.35 46.80 71.19 82.83 93.50 96.72 98.08 99.14 3.28 1.92 0.86
27 2016201712 Apr 2016 to Mar 2017 (Period 12) TransPennine Express 57889.0 25.74 50.07 74.77 85.67 94.47 96.83 98.02 99.07 3.17 1.98 0.93 741008.0 23.57 47.08 71.44 83.01 93.55 96.71 98.06 99.14 3.29 1.94 0.86
27 2016201713 Apr 2016 to Mar 2017 (Period 13) TransPennine Express 56010.0 28.16 53.87 77.69 87.85 95.75 97.75 98.63 99.36 2.25 1.37 0.64 744614.0 23.86 47.45 71.72 83.21 93.63 96.75 98.09 99.15 3.25 1.91 0.85
27 2017201801 Apr 2017 to Mar 2018 (Period 01) TransPennine Express 58869.0 27.58 53.00 77.83 87.96 95.36 97.40 98.24 99.11 2.60 1.76 0.89 742378.0 24.01 47.65 71.92 83.34 93.63 96.74 98.08 99.14 3.26 1.92 0.86
27 2017201802 Apr 2017 to Mar 2018 (Period 02) TransPennine Express 58138.0 25.74 49.90 73.40 84.09 93.51 96.74 98.12 99.19 3.26 1.88 0.81 743156.0 23.97 47.48 71.68 83.12 93.47 96.66 98.02 99.11 3.34 1.98 0.89
27 2017201803 Apr 2017 to Mar 2018 (Period 03) TransPennine Express 59040.0 26.65 51.14 74.79 85.73 95.09 97.61 98.63 99.46 2.39 1.37 0.54 744606.0 24.20 47.75 71.88 83.30 93.60 96.73 98.06 99.13 3.27 1.94 0.87
27 2017201804 Apr 2017 to Mar 2018 (Period 04) TransPennine Express 57885.0 26.60 51.92 76.06 86.80 95.59 97.86 98.83 99.58 2.14 1.17 0.42 745725.0 24.35 47.98 72.12 83.52 93.75 96.83 98.14 99.18 3.17 1.86 0.82
27 2017201805 Apr 2017 to Mar 2018 (Period 05) TransPennine Express 57742.0 25.45 50.11 74.55 85.67 94.82 97.43 98.38 99.30 2.57 1.62 0.70 746107.0 24.41 48.09 72.24 83.65 93.82 96.87 98.16 99.18 3.13 1.84 0.82
27 2017201806 Apr 2017 to Mar 2018 (Period 06) TransPennine Express 58583.0 27.03 51.58 75.33 85.54 94.61 97.25 98.33 99.27 2.75 1.67 0.73 746613.0 24.55 48.27 72.35 83.69 93.81 96.85 98.14 99.17 3.15 1.86 0.83
27 2017201807 Apr 2017 to Mar 2018 (Period 07) TransPennine Express 57045.0 21.94 44.50 68.51 80.89 92.48 96.08 97.68 99.05 3.92 2.32 0.95 745089.0 24.39 47.98 71.95 83.33 93.61 96.73 98.05 99.14 3.27 1.95 0.86
27 2017201808 Apr 2017 to Mar 2018 (Period 08) TransPennine Express 57017.0 16.59 35.98 58.48 72.13 88.32 94.26 96.79 98.79 5.74 3.21 1.21 744741.0 24.20 47.64 71.44 82.81 93.30 96.55 97.95 99.11 3.45 2.05 0.89
27 2017201809 Apr 2017 to Mar 2018 (Period 09) TransPennine Express 58430.0 16.40 34.89 56.59 70.17 86.43 93.04 95.85 98.38 6.96 4.15 1.62 746089.0 24.26 47.76 71.58 82.95 93.37 96.60 97.97 99.15 3.40 2.03 0.85
27 2017201810 Apr 2017 to Mar 2018 (Period 10) TransPennine Express 53611.0 20.63 41.94 64.33 76.38 89.92 94.76 97.05 98.77 5.24 2.95 1.23 748526.0 24.12 47.52 71.26 82.63 93.16 96.49 97.92 99.13 3.51 2.08 0.87
27 2017201811 Apr 2017 to Mar 2018 (Period 11) TransPennine Express 57685.0 25.28 48.44 71.94 83.35 93.74 97.02 98.32 99.27 2.98 1.68 0.73 747944.0 24.16 47.53 71.15 82.52 93.10 96.48 97.92 99.12 3.52 2.08 0.88
27 2017201812 Apr 2017 to Mar 2018 (Period 12) TransPennine Express 55868.0 22.61 43.97 66.24 77.96 89.67 93.75 95.74 97.94 6.25 4.26 2.06 745923.0 23.93 47.06 70.50 81.93 92.74 96.24 97.75 99.04 3.76 2.25 0.96
27 2017201813 Apr 2017 to Mar 2018 (Period 13) TransPennine Express 58468.0 23.51 45.89 69.27 80.70 91.82 95.50 97.26 98.80 4.50 2.74 1.20 748381.0 23.58 46.46 69.86 81.39 92.44 96.07 97.64 99.00 3.93 2.36 1.00
27 2018201901 Apr 2018 to Mar 2019 (Period 01) TransPennine Express 57413.0 23.05 45.74 69.22 80.68 91.95 95.74 97.62 99.05 4.26 2.38 0.95 746925.0 23.22 45.89 69.18 80.82 92.17 95.94 97.59 98.99 4.06 2.41 1.01
27 2018201902 Apr 2018 to Mar 2019 (Period 02) TransPennine Express 63595.0 21.79 42.22 63.39 74.92 88.13 93.36 96.09 98.51 6.64 3.91 1.49 752382.0 22.90 45.27 68.37 80.07 91.73 95.66 97.43 98.94 4.34 2.57 1.06
27 2018201903 Apr 2018 to Mar 2019 (Period 03) TransPennine Express 72099.0 16.97 34.08 54.43 67.79 85.28 92.69 96.20 98.80 7.31 3.80 1.20 765441.0 22.06 43.77 66.56 78.48 90.86 95.23 97.22 98.88 4.77 2.78 1.12
27 2018201904 Apr 2018 to Mar 2019 (Period 04) TransPennine Express 72067.0 14.39 30.17 49.17 62.29 81.10 89.41 93.67 97.86 10.59 6.33 2.14 779623.0 21.01 41.90 64.25 76.36 89.61 94.50 96.77 98.74 5.50 3.23 1.26
27 2018201905 Apr 2018 to Mar 2019 (Period 05) TransPennine Express 75398.0 15.81 32.56 53.24 67.19 85.29 92.31 95.73 98.67 7.69 4.27 1.33 797279.0 20.20 40.43 62.46 74.82 88.82 94.08 96.56 98.69 5.92 3.44 1.31
27 2018201906 Apr 2018 to Mar 2019 (Period 06) TransPennine Express 75403.0 18.45 36.86 58.83 72.90 89.73 95.14 97.64 99.39 4.86 2.36 0.61 814099.0 19.54 39.29 61.20 73.87 88.49 93.95 96.53 98.71 6.05 3.47 1.29
27 2018201907 Apr 2018 to Mar 2019 (Period 07) TransPennine Express 74217.0 15.26 32.31 52.00 65.86 84.15 91.22 94.91 98.01 8.78 5.09 1.99 831271.0 19.00 38.31 59.88 72.68 87.83 93.56 96.30 98.63 6.44 3.70 1.37
27 2018201908 Apr 2018 to Mar 2019 (Period 08) TransPennine Express 73871.0 14.11 29.51 48.58 62.35 82.59 91.31 95.34 98.70 8.69 4.66 1.30 848125.0 18.73 37.70 58.99 71.81 87.34 93.32 96.19 98.62 6.68 3.81 1.38
27 2018201909 Apr 2018 to Mar 2019 (Period 09) TransPennine Express 75033.0 13.04 27.67 45.42 58.80 80.15 89.86 94.67 98.42 10.14 5.33 1.58 864728.0 18.40 37.02 57.97 70.80 86.78 93.04 96.08 98.62 6.96 3.92 1.38
27 2018201910 Apr 2018 to Mar 2019 (Period 10) TransPennine Express 70274.0 20.01 40.70 62.94 75.93 90.56 95.36 97.75 99.36 4.64 2.25 0.64 881391.0 18.39 37.02 57.98 70.87 86.89 93.12 96.15 98.67 6.88 3.85 1.33
27 2018201911 Apr 2018 to Mar 2019 (Period 11) TransPennine Express 79696.0 21.75 43.55 66.15 79.11 92.34 96.38 98.11 99.43 3.62 1.89 0.57 903402.0 18.25 36.86 57.81 70.80 86.93 93.15 96.19 98.70 6.85 3.81 1.30
27 2018201912 Apr 2018 to Mar 2019 (Period 12) TransPennine Express 78803.0 21.48 43.25 66.56 79.68 92.12 95.95 97.81 99.19 4.05 2.19 0.81 926337.0 18.26 36.98 58.04 71.12 87.21 93.36 96.35 98.79 6.64 3.65 1.21
27 2018201913 Apr 2018 to Mar 2019 (Period 13) TransPennine Express 80250.0 22.04 44.20 67.07 79.32 91.47 95.43 97.44 99.08 4.57 2.56 0.92 948119.0 18.25 37.04 58.12 71.22 87.29 93.40 96.39 98.81 6.60 3.61 1.19
27 2019202001 Apr 2019 to Mar 2020 (Period 01) TransPennine Express 77312.0 23.26 46.68 70.40 82.27 93.32 96.66 98.25 99.43 3.34 1.75 0.57 77312.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202002 Apr 2019 to Mar 2020 (Period 02) TransPennine Express 79609.0 22.84 45.19 68.26 80.71 92.74 96.18 97.87 99.22 3.82 2.13 0.78 156921.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202003 Apr 2019 to Mar 2020 (Period 03) TransPennine Express 79921.0 21.88 44.90 68.30 80.93 92.45 96.08 97.72 99.09 3.92 2.28 0.91 236842.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202004 Apr 2019 to Mar 2020 (Period 04) TransPennine Express 81782.0 21.56 44.15 67.48 80.52 92.71 96.45 98.19 99.37 3.55 1.81 0.63 318624.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202005 Apr 2019 to Mar 2020 (Period 05) TransPennine Express 77914.0 18.22 38.04 58.79 71.66 86.01 91.42 94.92 98.06 8.58 5.08 1.94 396538.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202006 Apr 2019 to Mar 2020 (Period 06) TransPennine Express 79018.0 20.20 41.65 64.08 77.11 90.16 94.34 96.69 98.71 5.66 3.31 1.29 475556.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202007 Apr 2019 to Mar 2020 (Period 07) TransPennine Express 81020.0 18.79 39.48 61.94 75.97 90.14 94.88 97.22 99.11 5.12 2.78 0.89 556576.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202008 Apr 2019 to Mar 2020 (Period 08) TransPennine Express 77495.0 15.35 33.49 54.24 68.25 85.52 91.91 95.09 98.14 8.09 4.91 1.86 634071.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202009 Apr 2019 to Mar 2020 (Period 09) TransPennine Express 73835.0 12.18 28.08 46.45 59.87 79.73 88.04 92.95 97.48 11.96 7.05 2.52 707906.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202010 Apr 2019 to Mar 2020 (Period 10) TransPennine Express 65582.0 20.32 38.70 57.37 69.19 85.35 91.87 95.20 98.21 8.13 4.80 1.79 773488.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202011 Apr 2019 to Mar 2020 (Period 11) TransPennine Express 80117.0 23.61 43.88 64.00 76.37 90.21 95.10 97.17 98.97 4.90 2.83 1.03 853605.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202012 Apr 2019 to Mar 2020 (Period 12) TransPennine Express 82496.0 19.83 37.45 55.99 68.07 84.74 91.60 95.02 97.83 8.40 4.98 2.17 936101.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
27 2019202013 Apr 2019 to Mar 2020 (Period 13) TransPennine Express 76209.0 28.99 50.41 70.28 81.18 92.30 95.95 97.70 99.10 4.05 2.30 0.90 1012310.0 20.57 41.01 62.25 74.91 88.97 93.94 96.50 98.68 6.06 3.50 1.32
27 2020202101 Apr 2020 to Mar 2021 (Period 01) TransPennine Express 45003.0 48.88 78.83 93.50 96.52 98.65 99.27 99.57 99.81 0.73 0.43 0.19 980001.0 21.66 42.30 63.04 75.33 89.07 93.97 96.50 98.68 6.03 3.50 1.32
27 2020202102 Apr 2020 to Mar 2021 (Period 02) TransPennine Express 47507.0 49.05 76.28 90.90 94.76 97.64 98.61 99.01 99.52 1.39 0.99 0.48 947899.0 22.93 43.76 64.00 75.85 89.19 94.02 96.51 98.67 5.98 3.49 1.33
27 2020202103 Apr 2020 to Mar 2021 (Period 03) TransPennine Express 57372.0 52.87 79.66 92.42 96.01 98.49 99.13 99.48 99.77 0.87 0.52 0.23 925350.0 24.88 45.88 65.39 76.66 89.48 94.16 96.59 98.70 5.84 3.41 1.30
27 2020202104 Apr 2020 to Mar 2021 (Period 04) TransPennine Express 60963.0 47.03 72.88 88.79 93.93 97.80 98.94 99.36 99.69 1.06 0.64 0.31 904531.0 26.67 47.86 66.78 77.48 89.75 94.27 96.63 98.71 5.73 3.37 1.29
27 2020202105 Apr 2020 to Mar 2021 (Period 05) TransPennine Express 62612.0 43.98 69.07 86.30 92.30 97.06 98.46 99.04 99.51 1.54 0.96 0.49 889229.0 28.63 50.21 68.85 79.03 90.59 94.82 96.95 98.82 5.18 3.05 1.18
27 2020202106 Apr 2020 to Mar 2021 (Period 06) TransPennine Express 63107.0 44.02 70.35 87.82 93.37 97.52 98.81 99.25 99.71 1.19 0.75 0.29 873318.0 30.51 52.44 70.65 80.24 91.13 95.15 97.14 98.90 4.85 2.86 1.10
27 2020202107 Apr 2020 to Mar 2021 (Period 07) TransPennine Express 62580.0 42.32 68.34 86.52 92.68 96.98 98.36 98.98 99.65 1.64 1.02 0.35 854878.0 32.48 54.84 72.64 81.55 91.66 95.41 97.27 98.93 4.59 2.73 1.07
27 2020202108 Apr 2020 to Mar 2021 (Period 08) TransPennine Express 62761.0 37.08 61.75 81.48 89.57 96.19 98.00 98.74 99.45 2.00 1.26 0.55 840144.0 34.40 57.32 75.00 83.38 92.56 95.92 97.58 99.04 4.08 2.42 0.96
27 2020202109 Apr 2020 to Mar 2021 (Period 09) TransPennine Express 62984.0 40.02 65.27 84.41 91.57 96.99 98.24 98.89 99.58 1.76 1.11 0.42 829293.0 36.81 60.53 78.26 86.10 94.04 96.80 98.09 99.22 3.20 1.91 0.78
27 2020202110 Apr 2020 to Mar 2021 (Period 10) TransPennine Express 59426.0 45.15 71.69 87.96 93.35 97.07 98.28 98.89 99.61 1.72 1.11 0.39 823137.0 38.73 63.07 80.62 87.97 94.95 97.30 98.38 99.33 2.70 1.62 0.67
27 2020202111 Apr 2020 to Mar 2021 (Period 11) TransPennine Express 57523.0 43.75 68.77 84.32 89.64 94.76 96.72 97.83 98.95 3.28 2.17 1.05 800543.0 40.60 65.40 82.55 89.25 95.41 97.48 98.46 99.34 2.52 1.54 0.66
27 2020202112 Apr 2020 to Mar 2021 (Period 12) TransPennine Express 44520.0 43.26 68.80 86.00 92.03 96.62 97.96 98.72 99.48 2.04 1.28 0.52 762567.0 43.00 68.63 85.62 91.70 96.64 98.14 98.85 99.51 1.86 1.15 0.49
27 2020202113 Apr 2020 to Mar 2021 (Period 13) TransPennine Express 43828.0 46.67 73.88 89.85 94.68 97.90 98.80 99.19 99.66 1.20 0.81 0.34 730186.0 44.69 70.84 87.48 92.98 97.16 98.41 98.99 99.57 1.59 1.01 0.43
27 2021202201 Apr 2021 to Mar 2022 (Period 01) TransPennine Express 75450.0 49.44 76.58 90.61 94.79 97.89 98.77 99.22 99.67 1.23 0.78 0.33 760633.0 44.91 70.94 87.43 92.95 97.15 98.40 98.98 99.56 1.60 1.02 0.44
27 2021202202 Apr 2021 to Mar 2022 (Period 02) TransPennine Express 67813.0 43.17 69.48 86.75 92.39 96.61 98.10 98.79 99.50 1.90 1.21 0.50 780939.0 44.51 70.49 87.16 92.79 97.07 98.36 98.96 99.56 1.64 1.04 0.44
27 2021202203 Apr 2021 to Mar 2022 (Period 03) TransPennine Express 68963.0 43.52 70.23 87.27 92.89 97.18 98.61 99.19 99.68 1.39 0.81 0.32 792530.0 43.81 69.80 86.79 92.56 96.98 98.33 98.94 99.55 1.67 1.06 0.45
27 2021202204 Apr 2021 to Mar 2022 (Period 04) TransPennine Express 68527.0 42.72 69.21 86.25 92.07 96.67 98.08 98.73 99.35 1.92 1.27 0.65 800094.0 43.48 69.52 86.59 92.42 96.89 98.26 98.89 99.53 1.74 1.11 0.47
27 2021202205 Apr 2021 to Mar 2022 (Period 05) TransPennine Express 66855.0 39.08 65.50 84.13 91.34 96.49 98.23 99.02 99.69 1.77 0.98 0.31 804337.0 43.07 69.22 86.41 92.34 96.84 98.24 98.89 99.54 1.76 1.11 0.46
27 2021202206 Apr 2021 to Mar 2022 (Period 06) TransPennine Express 69300.0 39.16 65.35 84.29 91.56 96.77 98.26 98.89 99.54 1.74 1.11 0.46 810530.0 42.66 68.80 86.12 92.19 96.78 98.20 98.86 99.53 1.80 1.14 0.47
27 2021202207 Apr 2021 to Mar 2022 (Period 07) TransPennine Express 69735.0 35.90 62.20 82.80 90.81 96.85 98.37 99.09 99.67 1.63 0.91 0.33 817685.0 42.11 68.27 85.81 92.04 96.78 98.20 98.87 99.53 1.80 1.13 0.47
27 2021202208 Apr 2021 to Mar 2022 (Period 08) TransPennine Express 68995.0 28.57 51.38 72.17 83.09 93.35 96.68 98.06 99.25 3.32 1.94 0.75 823919.0 41.36 67.35 84.99 91.47 96.53 98.09 98.81 99.51 1.91 1.19 0.49
27 2021202209 Apr 2021 to Mar 2022 (Period 09) TransPennine Express 68432.0 26.86 48.18 68.85 80.24 91.26 95.07 96.86 98.58 4.93 3.14 1.42 829367.0 40.27 65.93 83.71 90.54 96.06 97.83 98.65 99.43 2.17 1.35 0.57
27 2021202210 Apr 2021 to Mar 2022 (Period 10) TransPennine Express 57945.0 32.10 54.93 75.28 84.60 93.04 95.98 97.45 98.83 4.02 2.55 1.17 827886.0 39.35 64.75 82.81 89.92 95.78 97.66 98.55 99.38 2.34 1.45 0.62
27 2021202211 Apr 2021 to Mar 2022 (Period 11) TransPennine Express 62259.0 37.58 63.39 82.47 89.76 95.56 97.35 98.37 99.26 2.65 1.63 0.74 832622.0 38.91 64.37 82.68 89.93 95.83 97.71 98.58 99.40 2.29 1.42 0.60
27 2021202212 Apr 2021 to Mar 2022 (Period 12) TransPennine Express 54541.0 32.52 56.27 75.63 84.76 93.56 96.25 97.73 98.96 3.75 2.27 1.04 842643.0 38.27 63.61 82.05 89.48 95.64 97.60 98.52 99.36 2.40 1.48 0.64
27 2021202213 Apr 2021 to Mar 2022 (Period 13) TransPennine Express 49800.0 35.88 61.79 81.61 89.54 95.82 97.86 98.84 99.55 2.14 1.16 0.45 848615.0 37.69 62.97 81.62 89.22 95.54 97.55 98.50 99.36 2.45 1.50 0.64
27 2022202301 Apr 2022 to Mar 2023 (Period 01) TransPennine Express 55708.0 34.40 59.39 79.06 87.46 94.68 97.05 98.29 99.20 2.95 1.71 0.80 828873.0 36.40 61.49 80.63 88.59 95.27 97.41 98.42 99.32 2.59 1.58 0.68
27 2022202302 Apr 2022 to Mar 2023 (Period 02) TransPennine Express 56063.0 34.53 58.82 78.16 87.04 94.54 97.07 98.23 99.28 2.93 1.77 0.72 817123.0 35.71 60.65 79.95 88.17 95.10 97.33 98.38 99.30 2.67 1.62 0.70
27 2022202303 Apr 2022 to Mar 2023 (Period 03) TransPennine Express 45917.0 32.33 57.47 77.22 85.57 93.34 96.15 97.57 98.86 3.85 2.43 1.14 794077.0 34.84 59.63 79.16 87.61 94.82 97.15 98.26 99.24 2.85 1.74 0.76
27 2022202304 Apr 2022 to Mar 2023 (Period 04) TransPennine Express 54798.0 30.32 53.99 72.29 81.13 90.51 94.04 95.90 97.82 5.96 4.10 2.18 780348.0 33.83 58.39 78.05 86.77 94.36 96.85 98.06 99.14 3.15 1.94 0.86
27 2022202305 Apr 2022 to Mar 2023 (Period 05) TransPennine Express 47606.0 32.06 56.76 75.49 83.95 92.71 95.80 97.42 98.90 4.20 2.58 1.10 761099.0 33.26 57.67 77.36 86.19 94.07 96.66 97.93 99.07 3.34 2.07 0.93
27 2022202306 Apr 2022 to Mar 2023 (Period 06) TransPennine Express 59709.0 32.06 57.36 77.55 86.09 94.06 96.67 97.87 99.02 3.33 2.13 0.98 751508.0 32.62 56.93 76.74 85.68 93.82 96.51 97.84 99.03 3.49 2.16 0.97
27 2022202307 Apr 2022 to Mar 2023 (Period 07) TransPennine Express 50013.0 29.24 53.24 73.63 83.13 92.56 95.73 97.39 98.77 4.27 2.61 1.23 731786.0 32.07 56.18 75.95 85.02 93.44 96.28 97.69 98.95 3.72 2.31 1.05
27 2022202308 Apr 2022 to Mar 2023 (Period 08) TransPennine Express 48522.0 23.90 45.80 66.15 77.07 89.85 94.34 96.44 98.34 5.66 3.56 1.66 711313.0 31.86 55.94 75.64 84.67 93.21 96.11 97.57 98.87 3.89 2.43 1.13
27 2022202309 Apr 2022 to Mar 2023 (Period 09) TransPennine Express 55625.0 23.14 44.70 65.99 77.42 89.75 94.29 96.63 98.58 5.71 3.37 1.42 698506.0 31.65 55.80 75.54 84.52 93.12 96.07 97.56 98.88 3.93 2.44 1.12
27 2022202310 Apr 2022 to Mar 2023 (Period 10) TransPennine Express 25212.0 24.12 43.78 62.11 72.38 85.15 90.79 94.12 97.26 9.21 5.88 2.74 665773.0 31.33 55.42 75.05 84.06 92.83 95.88 97.44 98.82 4.12 2.56 1.18
27 2022202311 Apr 2022 to Mar 2023 (Period 11) TransPennine Express 53275.0 22.99 43.67 64.08 75.96 88.87 93.48 95.94 98.52 6.52 4.06 1.48 656789.0 30.06 53.71 73.46 82.86 92.25 95.54 97.23 98.76 4.46 2.77 1.24
27 2022202312 Apr 2022 to Mar 2023 (Period 12) TransPennine Express 55257.0 27.09 49.45 70.65 80.88 90.69 94.27 96.43 98.50 5.73 3.57 1.50 657505.0 29.60 53.14 73.04 82.53 92.01 95.38 97.12 98.72 4.62 2.88 1.28
27 2022202313 Apr 2022 to Mar 2023 (Period 13) TransPennine Express 49207.0 26.16 49.76 70.69 80.34 90.52 94.26 96.53 98.59 5.74 3.47 1.41 656912.0 28.87 52.23 72.22 81.84 91.61 95.11 96.95 98.65 4.89 3.05 1.35
27 2023202401 Apr 2023 to Mar 2024 (Period 01) TransPennine Express 65578.0 27.95 51.32 72.22 81.95 91.34 95.02 96.99 98.91 4.98 3.01 1.09 666782.0 28.32 51.55 71.65 81.38 91.32 94.94 96.84 98.63 5.06 3.16 1.37
27 2023202402 Apr 2023 to Mar 2024 (Period 02) TransPennine Express 60735.0 28.10 50.65 69.78 79.40 90.17 94.10 96.28 98.44 5.90 3.72 1.56 671454.0 27.78 50.86 70.94 80.73 90.95 94.68 96.67 98.56 5.32 3.33 1.44
27 2023202403 Apr 2023 to Mar 2024 (Period 03) TransPennine Express 52069.0 27.56 49.87 68.53 77.97 88.56 93.18 95.70 98.26 6.82 4.30 1.74 677606.0 27.45 50.33 70.33 80.19 90.61 94.47 96.54 98.51 5.53 3.46 1.49
27 2023202404 Apr 2023 to Mar 2024 (Period 04) TransPennine Express 68964.0 27.86 49.88 69.47 79.91 90.63 94.34 96.46 98.62 5.66 3.54 1.38 691772.0 27.27 50.00 70.08 80.09 90.62 94.49 96.58 98.58 5.51 3.42 1.42
27 2023202405 Apr 2023 to Mar 2024 (Period 05) TransPennine Express 64691.0 26.46 48.51 68.08 78.13 89.28 93.69 96.10 98.35 6.31 3.90 1.65 708857.0 26.87 49.41 69.54 79.65 90.35 94.33 96.48 98.54 5.67 3.52 1.46
27 2023202406 Apr 2023 to Mar 2024 (Period 06) TransPennine Express 67986.0 26.54 49.20 70.26 81.31 92.20 95.74 97.57 99.10 4.26 2.43 0.90 717134.0 26.41 48.73 68.94 79.27 90.22 94.27 96.47 98.55 5.73 3.53 1.45
27 2023202407 Apr 2023 to Mar 2024 (Period 07) TransPennine Express 67834.0 23.48 44.17 64.69 76.24 89.41 94.31 96.86 98.87 5.69 3.14 1.13 734955.0 25.95 48.00 68.23 78.73 89.99 94.17 96.44 98.56 5.83 3.56 1.44
27 2023202408 Apr 2023 to Mar 2024 (Period 08) TransPennine Express 74245.0 20.95 40.61 60.71 72.48 87.05 92.70 95.68 98.44 7.30 4.32 1.56 760678.0 25.59 47.42 67.63 78.22 89.71 94.02 96.37 98.57 5.98 3.63 1.43
27 2023202409 Apr 2023 to Mar 2024 (Period 09) TransPennine Express 72051.0 16.50 33.35 51.81 63.99 81.45 89.08 93.38 97.45 10.92 6.62 2.55 777104.0 24.92 46.31 66.28 76.96 88.94 93.54 96.07 98.46 6.46 3.93 1.54
27 2023202410 Apr 2023 to Mar 2024 (Period 10) TransPennine Express 72087.0 23.95 45.21 65.57 76.73 89.07 93.89 96.45 98.66 6.11 3.55 1.34 823979.0 24.86 46.29 66.34 77.08 89.07 93.65 96.16 98.51 6.35 3.84 1.49
27 2023202411 Apr 2023 to Mar 2024 (Period 11) TransPennine Express 76495.0 26.30 48.96 69.62 80.48 91.73 95.25 97.00 98.76 4.75 3.00 1.24 847199.0 25.11 46.69 66.78 77.46 89.32 93.81 96.25 98.54 6.19 3.75 1.46
27 2023202412 Apr 2023 to Mar 2024 (Period 12) TransPennine Express 75356.0 29.16 53.77 74.58 84.74 94.28 96.99 98.21 99.35 3.01 1.79 0.65 867298.0 25.33 47.13 67.21 77.87 89.66 94.05 96.41 98.61 5.95 3.59 1.39
27 2023202413 Apr 2023 to Mar 2024 (Period 13) TransPennine Express 81501.0 29.62 54.71 76.16 86.16 94.85 97.18 98.38 99.40 2.82 1.62 0.60 899592.0 25.68 47.68 67.83 78.49 90.09 94.33 96.59 98.68 5.67 3.41 1.32
27 2024202501 Apr 2024 to Mar 2025 (Period 01) TransPennine Express 70715.0 27.82 52.26 72.97 82.90 92.79 96.11 97.71 98.93 3.89 2.29 1.07 904729.0 25.68 47.77 67.92 78.58 90.21 94.42 96.64 98.68 5.58 3.36 1.32
27 2024202502 Apr 2024 to Mar 2025 (Period 02) TransPennine Express 68433.0 29.89 53.76 73.99 83.51 92.90 96.11 97.49 98.84 3.89 2.51 1.16 912427.0 25.83 48.03 68.25 78.90 90.41 94.56 96.73 98.71 5.44 3.27 1.29
27 2024202503 Apr 2024 to Mar 2025 (Period 03) TransPennine Express 82505.0 29.16 52.88 73.24 83.32 93.26 96.44 97.95 99.27 3.56 2.05 0.73 942863.0 26.03 48.35 68.67 79.33 90.76 94.80 96.89 98.79 5.20 3.11 1.21
27 2024202504 Apr 2024 to Mar 2025 (Period 04) TransPennine Express 77096.0 29.81 53.73 73.09 82.59 92.24 95.74 97.40 98.89 4.26 2.60 1.11 950995.0 26.20 48.68 68.97 79.56 90.89 94.91 96.97 98.81 5.09 3.03 1.19
27 2024202505 Apr 2024 to Mar 2025 (Period 05) TransPennine Express 82819.0 27.45 50.77 71.42 81.76 92.23 95.55 97.15 98.60 4.45 2.85 1.40 969123.0 26.29 48.87 69.24 79.84 91.11 95.05 97.04 98.82 4.95 2.96 1.18
27 2024202506 Apr 2024 to Mar 2025 (Period 06) TransPennine Express 83990.0 25.75 48.07 68.59 79.22 90.22 94.36 96.51 98.40 5.64 3.49 1.60 985127.0 26.23 48.78 69.11 79.69 90.96 94.94 96.96 98.76 5.06 3.04 1.24
27 2024202507 Apr 2024 to Mar 2025 (Period 07) TransPennine Express 85039.0 23.42 45.41 66.71 78.36 91.07 95.00 96.82 98.50 5.00 3.18 1.50 1002332.0 26.18 48.80 69.21 79.81 91.08 94.99 96.95 98.74 5.01 3.05 1.26
27 2024202508 Apr 2024 to Mar 2025 (Period 08) TransPennine Express 79207.0 22.89 44.69 65.57 77.23 90.42 94.80 96.85 98.85 5.20 3.15 1.15 1007294.0 26.30 49.08 69.55 80.14 91.32 95.15 97.04 98.77 4.85 2.96 1.23
27 2024202509 Apr 2024 to Mar 2025 (Period 09) TransPennine Express 80597.0 20.78 40.87 60.83 72.64 87.59 93.12 95.86 98.36 6.88 4.14 1.64 1015840.0 26.56 49.55 70.12 80.69 91.73 95.41 97.21 98.83 4.59 2.79 1.17
27 2024202510 Apr 2024 to Mar 2025 (Period 10) TransPennine Express 75762.0 22.96 43.44 63.59 75.07 88.62 93.95 96.29 98.43 6.05 3.71 1.57 1019515.0 26.48 49.40 69.95 80.56 91.68 95.41 97.19 98.81 4.59 2.81 1.19
27 2024202511 Apr 2024 to Mar 2025 (Period 11) TransPennine Express 80929.0 23.02 44.12 64.33 76.15 89.33 93.84 96.33 98.41 6.16 3.67 1.59 1023949.0 26.22 49.01 69.53 80.21 91.49 95.30 97.14 98.78 4.70 2.86 1.22
27 2024202512 Apr 2024 to Mar 2025 (Period 12) TransPennine Express 87419.0 23.59 45.27 66.59 78.40 90.89 95.04 97.25 98.96 4.96 2.75 1.04 1036012.0 25.78 48.35 68.92 79.73 91.24 95.16 97.07 98.76 4.84 2.93 1.24
27 2024202513 Apr 2024 to Mar 2025 (Period 13) TransPennine Express 86059.0 28.33 53.32 74.70 84.51 93.68 96.63 98.00 99.30 3.37 2.00 0.70 1040570.0 25.69 48.27 68.83 79.62 91.16 95.12 97.04 98.75 4.88 2.96 1.25
27 2025202601 Apr 2025 to Mar 2026 (Period 01) TransPennine Express 79984.0 25.66 48.67 69.44 80.08 91.50 95.44 97.43 99.03 4.56 2.57 0.97 1049839.0 25.55 48.03 68.60 79.44 91.07 95.08 97.03 98.76 4.92 2.97 1.24
27 2025202602 Apr 2025 to Mar 2026 (Period 02) TransPennine Express 86454.0 25.52 47.80 68.00 78.92 90.52 94.69 96.88 98.76 5.31 3.12 1.24 1067860.0 25.27 47.64 68.20 79.14 90.91 94.98 96.99 98.75 5.02 3.01 1.25
27 2025202603 Apr 2025 to Mar 2026 (Period 03) TransPennine Express 79792.0 29.57 54.46 74.18 83.26 92.12 95.64 97.31 98.97 4.36 2.69 1.03 1065147.0 25.29 47.75 68.26 79.12 90.82 94.92 96.94 98.73 5.08 3.06 1.27
27 2025202604 Apr 2025 to Mar 2026 (Period 04) TransPennine Express 85016.0 25.15 46.65 66.69 78.21 90.33 94.34 96.43 98.59 5.66 3.57 1.41 1073067.0 24.95 47.23 67.79 78.80 90.68 94.81 96.86 98.71 5.19 3.14 1.29
27 2025202605 Apr 2025 to Mar 2026 (Period 05) TransPennine Express 86421.0 25.42 47.75 67.95 79.10 91.18 95.15 97.18 98.97 4.85 2.82 1.03 1076669.0 24.80 47.00 67.52 78.60 90.60 94.78 96.87 98.74 5.22 3.13 1.26
27 2025202606 Apr 2025 to Mar 2026 (Period 06) TransPennine Express 80709.0 27.63 50.84 71.06 81.32 91.99 95.50 97.35 99.01 4.50 2.65 0.99 1073388.0 24.93 47.21 67.70 78.75 90.74 94.87 96.93 98.78 5.13 3.07 1.22
27 2025202607 Apr 2025 to Mar 2026 (Period 07) TransPennine Express 76289.0 25.41 47.61 68.39 78.60 89.89 94.27 96.80 98.88 5.73 3.20 1.12 1064638.0 25.09 47.38 67.83 78.77 90.65 94.82 96.93 98.81 5.18 3.07 1.19
27 2025202608 Apr 2025 to Mar 2026 (Period 08) TransPennine Express 77914.0 21.31 42.51 63.44 75.53 88.95 93.87 96.48 98.54 6.13 3.52 1.46 1063345.0 24.98 47.22 67.68 78.65 90.54 94.75 96.90 98.79 5.25 3.10 1.21
27 2025202609 Apr 2025 to Mar 2026 (Period 09) TransPennine Express 82479.0 17.58 36.10 55.38 68.21 84.96 91.47 95.08 98.09 8.53 4.92 1.91 1065227.0 24.72 46.84 67.24 78.30 90.33 94.62 96.84 98.77 5.38 3.16 1.23
27 2025202610 Apr 2025 to Mar 2026 (Period 10) TransPennine Express 75305.0 23.90 46.61 67.07 78.08 90.10 94.52 96.85 98.78 5.48 3.15 1.22 1064770.0 24.79 47.07 67.49 78.51 90.44 94.66 96.88 98.79 5.34 3.12 1.21
27 2025202611 Apr 2025 to Mar 2026 (Period 11) TransPennine Express 79275.0 26.74 51.07 72.19 81.31 90.88 94.30 96.20 98.35 5.70 3.80 1.65 1063116.0 25.07 47.59 68.08 78.90 90.56 94.69 96.87 98.79 5.31 3.13 1.21
27 2025202612 Apr 2025 to Mar 2026 (Period 12) TransPennine Express 82436.0 26.69 50.82 72.87 83.16 93.13 96.43 98.03 99.35 3.57 1.97 0.65 1058133.0 25.32 48.03 68.58 79.27 90.73 94.80 96.93 98.82 5.20 3.07 1.18
27 2025202613 Apr 2025 to Mar 2026 (Period 13) TransPennine Express 91373.0 28.44 52.86 74.10 83.98 93.17 96.17 97.86 99.12 3.83 2.14 0.88 1063447.0 25.34 48.02 68.56 79.25 90.70 94.77 96.92 98.81 5.23 3.08 1.19
27 2026202701 Apr 2026 to Mar 2027 (Period 01) TransPennine Express 96431.0 27.64 51.38 72.51 82.58 92.11 95.43 97.27 99.00 4.57 2.73 1.00 1079894.0 25.52 48.27 68.85 79.49 90.77 94.78 96.92 98.81 5.22 3.08 1.19
27 2026202702 Apr 2026 to Mar 2027 (Period 02) TransPennine Express 81248.0 27.13 51.23 70.33 79.15 88.96 93.16 95.57 98.16 6.84 4.43 1.84 1074688.0 25.65 48.53 69.03 79.51 90.65 94.66 96.82 98.76 5.34 3.18 1.24
28 2014201501 Apr 2014 to Mar 2015 (Period 01) West Midlands Trains 323113.0 32.53 65.98 86.65 93.87 98.41 99.34 99.64 99.85 0.66 0.36 0.15 323113.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201502 Apr 2014 to Mar 2015 (Period 02) West Midlands Trains 343042.0 30.74 63.19 84.05 91.82 97.42 98.68 99.19 99.66 1.32 0.81 0.34 666155.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201503 Apr 2014 to Mar 2015 (Period 03) West Midlands Trains 343793.0 31.33 64.65 85.49 93.10 98.33 99.37 99.70 99.92 0.63 0.30 0.08 1009948.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201504 Apr 2014 to Mar 2015 (Period 04) West Midlands Trains 344232.0 29.62 61.98 83.61 91.66 97.44 98.83 99.38 99.80 1.17 0.62 0.20 1354180.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201505 Apr 2014 to Mar 2015 (Period 05) West Midlands Trains 340290.0 30.19 62.07 83.48 91.68 97.72 98.99 99.47 99.80 1.01 0.53 0.20 1694470.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201506 Apr 2014 to Mar 2015 (Period 06) West Midlands Trains 337692.0 31.19 63.59 84.78 92.49 97.84 99.00 99.47 99.81 1.00 0.53 0.19 2032162.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201507 Apr 2014 to Mar 2015 (Period 07) West Midlands Trains 347360.0 27.62 58.65 80.92 90.16 97.30 98.88 99.37 99.78 1.12 0.63 0.22 2379522.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201508 Apr 2014 to Mar 2015 (Period 08) West Midlands Trains 340823.0 22.35 50.40 73.20 84.59 95.14 98.05 99.08 99.72 1.95 0.92 0.28 2720345.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201509 Apr 2014 to Mar 2015 (Period 09) West Midlands Trains 329655.0 23.00 51.64 74.55 85.48 95.27 97.75 98.76 99.55 2.25 1.24 0.45 3050000.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201510 Apr 2014 to Mar 2015 (Period 10) West Midlands Trains 294330.0 27.68 59.07 80.72 89.75 97.06 98.80 99.42 99.84 1.20 0.58 0.16 3344330.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201511 Apr 2014 to Mar 2015 (Period 11) West Midlands Trains 350240.0 28.43 60.17 81.23 89.72 96.68 98.37 99.19 99.76 1.63 0.81 0.24 3694570.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201512 Apr 2014 to Mar 2015 (Period 12) West Midlands Trains 351290.0 30.87 64.23 85.21 92.58 97.91 99.11 99.53 99.85 0.89 0.47 0.15 4045860.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2014201513 Apr 2014 to Mar 2015 (Period 13) West Midlands Trains 381451.0 30.56 63.64 84.15 91.70 97.52 98.79 99.33 99.77 1.21 0.67 0.23 4427311.0 28.96 60.76 82.20 90.68 97.24 98.77 99.35 99.78 1.23 0.65 0.22
28 2015201601 Apr 2015 to Mar 2016 (Period 01) West Midlands Trains 394788.0 31.63 64.61 84.55 91.70 97.27 98.64 99.24 99.71 1.36 0.76 0.29 4498986.0 28.94 60.73 82.08 90.54 97.16 98.72 99.32 99.77 1.28 0.68 0.23
28 2015201602 Apr 2015 to Mar 2016 (Period 02) West Midlands Trains 345386.0 30.38 63.12 84.16 92.15 97.91 99.09 99.54 99.86 0.91 0.46 0.14 4501330.0 28.91 60.72 82.09 90.57 97.20 98.75 99.34 99.78 1.25 0.66 0.22
28 2015201603 Apr 2015 to Mar 2016 (Period 03) West Midlands Trains 351309.0 29.68 62.41 83.30 91.21 97.35 98.80 99.41 99.78 1.20 0.59 0.22 4508846.0 28.79 60.56 81.93 90.43 97.12 98.70 99.32 99.77 1.30 0.68 0.23
28 2015201604 Apr 2015 to Mar 2016 (Period 04) West Midlands Trains 350255.0 29.68 61.54 82.42 90.63 96.99 98.63 99.25 99.76 1.37 0.75 0.24 4514869.0 28.80 60.52 81.84 90.35 97.09 98.69 99.31 99.77 1.31 0.69 0.23
28 2015201605 Apr 2015 to Mar 2016 (Period 05) West Midlands Trains 350076.0 31.03 64.12 84.77 92.11 97.46 98.80 99.35 99.78 1.20 0.65 0.22 4524655.0 28.86 60.69 81.94 90.39 97.07 98.67 99.30 99.77 1.33 0.70 0.23
28 2015201606 Apr 2015 to Mar 2016 (Period 06) West Midlands Trains 346911.0 31.34 63.78 84.42 92.03 97.63 98.92 99.44 99.82 1.08 0.56 0.18 4533874.0 28.88 60.71 81.92 90.36 97.05 98.67 99.30 99.77 1.33 0.70 0.23
28 2015201607 Apr 2015 to Mar 2016 (Period 07) West Midlands Trains 353849.0 27.61 59.33 81.69 90.76 97.84 99.12 99.53 99.81 0.88 0.47 0.19 4540363.0 28.88 60.76 81.98 90.40 97.10 98.69 99.31 99.77 1.31 0.69 0.23
28 2015201608 Apr 2015 to Mar 2016 (Period 08) West Midlands Trains 338522.0 23.88 53.35 76.24 87.10 96.49 98.63 99.36 99.83 1.37 0.64 0.17 4538062.0 28.99 60.98 82.21 90.59 97.20 98.73 99.34 99.78 1.27 0.66 0.22
28 2015201609 Apr 2015 to Mar 2016 (Period 09) West Midlands Trains 335638.0 22.68 50.82 72.87 83.96 94.47 97.42 98.65 99.59 2.58 1.35 0.41 4544045.0 28.96 60.91 82.07 90.47 97.14 98.70 99.33 99.78 1.30 0.67 0.22
28 2015201610 Apr 2015 to Mar 2016 (Period 10) West Midlands Trains 307477.0 30.14 62.21 82.96 91.27 97.75 99.17 99.67 99.90 0.83 0.33 0.10 4557192.0 29.13 61.11 82.22 90.57 97.18 98.73 99.34 99.79 1.27 0.66 0.21
28 2015201611 Apr 2015 to Mar 2016 (Period 11) West Midlands Trains 352718.0 29.12 61.54 83.05 91.51 97.73 99.04 99.50 99.82 0.96 0.50 0.18 4559670.0 29.18 61.22 82.36 90.71 97.26 98.78 99.37 99.79 1.22 0.63 0.21
28 2015201612 Apr 2015 to Mar 2016 (Period 12) West Midlands Trains 352569.0 30.21 62.77 83.58 91.46 97.23 98.61 99.22 99.71 1.39 0.78 0.29 4560949.0 29.13 61.11 82.24 90.62 97.21 98.74 99.34 99.78 1.26 0.66 0.22
28 2015201613 Apr 2015 to Mar 2016 (Period 13) West Midlands Trains 311294.0 32.14 65.84 85.93 92.91 98.06 99.12 99.52 99.83 0.88 0.48 0.17 4490792.0 29.22 61.22 82.33 90.69 97.24 98.76 99.36 99.78 1.24 0.64 0.22
28 2016201701 Apr 2016 to Mar 2017 (Period 01) West Midlands Trains 377599.0 32.48 66.36 86.38 93.14 97.87 98.95 99.40 99.77 1.05 0.60 0.23 4473603.0 29.28 61.36 82.48 90.81 97.29 98.79 99.37 99.79 1.21 0.63 0.21
28 2016201702 Apr 2016 to Mar 2017 (Period 02) West Midlands Trains 350599.0 32.14 65.80 86.10 93.07 98.05 99.13 99.57 99.85 0.87 0.43 0.15 4478816.0 29.42 61.57 82.63 90.88 97.31 98.79 99.37 99.79 1.21 0.63 0.21
28 2016201703 Apr 2016 to Mar 2017 (Period 03) West Midlands Trains 350892.0 29.68 62.73 83.85 91.62 97.48 98.84 99.37 99.77 1.16 0.63 0.23 4478399.0 29.42 61.59 82.67 90.92 97.32 98.80 99.37 99.79 1.20 0.63 0.21
28 2016201704 Apr 2016 to Mar 2017 (Period 04) West Midlands Trains 353510.0 29.59 63.26 84.73 92.37 98.00 99.18 99.58 99.85 0.82 0.42 0.15 4481654.0 29.41 61.73 82.86 91.05 97.40 98.84 99.40 99.79 1.16 0.60 0.21
28 2016201705 Apr 2016 to Mar 2017 (Period 05) West Midlands Trains 353400.0 30.81 64.11 85.22 93.08 98.42 99.45 99.76 99.93 0.55 0.24 0.07 4484978.0 29.39 61.73 82.89 91.13 97.47 98.89 99.43 99.80 1.11 0.57 0.20
28 2016201706 Apr 2016 to Mar 2017 (Period 06) West Midlands Trains 352258.0 28.77 61.05 82.85 91.26 97.48 98.78 99.35 99.78 1.22 0.65 0.22 4490325.0 29.19 61.52 82.77 91.07 97.46 98.88 99.42 99.80 1.12 0.58 0.20
28 2016201707 Apr 2016 to Mar 2017 (Period 07) West Midlands Trains 356352.0 29.13 62.01 83.89 92.23 98.03 99.20 99.64 99.90 0.80 0.36 0.10 4492828.0 29.31 61.73 82.95 91.19 97.47 98.89 99.43 99.81 1.11 0.57 0.19
28 2016201708 Apr 2016 to Mar 2017 (Period 08) West Midlands Trains 340309.0 25.56 56.14 78.53 88.41 96.36 98.33 99.09 99.73 1.67 0.91 0.27 4494615.0 29.44 61.94 83.12 91.28 97.46 98.87 99.41 99.80 1.13 0.59 0.20
28 2016201709 Apr 2016 to Mar 2017 (Period 09) West Midlands Trains 336000.0 21.59 49.76 72.58 83.86 94.66 97.45 98.59 99.50 2.55 1.41 0.50 4494977.0 29.36 61.86 83.09 91.28 97.48 98.87 99.41 99.79 1.13 0.59 0.21
28 2016201710 Apr 2016 to Mar 2017 (Period 10) West Midlands Trains 318457.0 27.50 59.13 81.35 90.12 97.04 98.78 99.41 99.85 1.22 0.59 0.15 4505957.0 29.17 61.64 82.98 91.20 97.43 98.84 99.39 99.79 1.16 0.61 0.21
28 2016201711 Apr 2016 to Mar 2017 (Period 11) West Midlands Trains 357496.0 29.53 61.80 83.36 91.78 97.88 99.21 99.63 99.87 0.79 0.37 0.13 4510735.0 29.20 61.66 83.01 91.22 97.44 98.85 99.40 99.79 1.15 0.60 0.21
28 2016201712 Apr 2016 to Mar 2017 (Period 12) West Midlands Trains 344134.0 29.73 62.36 83.36 91.26 97.20 98.58 99.16 99.62 1.42 0.84 0.38 4502300.0 29.17 61.63 82.99 91.20 97.44 98.85 99.39 99.79 1.15 0.61 0.21
28 2016201713 Apr 2016 to Mar 2017 (Period 13) West Midlands Trains 343676.0 31.90 65.76 86.32 93.34 98.15 99.20 99.61 99.89 0.80 0.39 0.11 4534682.0 29.17 61.65 83.04 91.25 97.45 98.86 99.40 99.79 1.14 0.60 0.21
28 2017201801 Apr 2017 to Mar 2018 (Period 01) West Midlands Trains 365038.0 35.00 69.61 88.86 94.80 98.54 99.36 99.66 99.87 0.64 0.34 0.13 4522121.0 29.36 61.90 83.23 91.37 97.50 98.89 99.42 99.80 1.11 0.58 0.20
28 2017201802 Apr 2017 to Mar 2018 (Period 02) West Midlands Trains 350895.0 32.92 66.61 86.69 93.53 98.26 99.21 99.54 99.85 0.79 0.46 0.15 4522417.0 29.42 61.96 83.27 91.41 97.52 98.90 99.42 99.80 1.10 0.58 0.20
28 2017201803 Apr 2017 to Mar 2018 (Period 03) West Midlands Trains 353644.0 30.37 63.36 83.89 91.58 97.30 98.74 99.34 99.78 1.26 0.66 0.22 4525169.0 29.48 62.01 83.28 91.41 97.51 98.89 99.42 99.80 1.11 0.58 0.20
28 2017201804 Apr 2017 to Mar 2018 (Period 04) West Midlands Trains 354354.0 30.67 64.06 85.17 92.59 97.88 99.01 99.46 99.82 0.99 0.54 0.18 4526013.0 29.56 62.08 83.31 91.42 97.50 98.88 99.41 99.80 1.12 0.59 0.20
28 2017201805 Apr 2017 to Mar 2018 (Period 05) West Midlands Trains 353002.0 33.26 67.25 87.37 93.94 98.34 99.28 99.63 99.88 0.72 0.37 0.12 4525615.0 29.75 62.32 83.48 91.49 97.49 98.87 99.40 99.80 1.13 0.60 0.20
28 2017201806 Apr 2017 to Mar 2018 (Period 06) West Midlands Trains 351302.0 31.82 65.07 85.85 93.13 98.07 99.13 99.56 99.86 0.87 0.44 0.14 4524659.0 29.99 62.63 83.71 91.64 97.54 98.89 99.41 99.80 1.11 0.59 0.20
28 2017201807 Apr 2017 to Mar 2018 (Period 07) West Midlands Trains 354188.0 26.78 57.51 79.32 88.63 96.39 98.47 99.24 99.71 1.53 0.76 0.29 4522495.0 29.81 62.28 83.35 91.35 97.41 98.84 99.38 99.79 1.16 0.62 0.21
28 2017201808 Apr 2017 to Mar 2018 (Period 08) West Midlands Trains 343156.0 23.93 53.04 75.11 85.52 95.25 97.91 98.86 99.58 2.09 1.14 0.42 4525342.0 29.68 62.04 83.09 91.13 97.32 98.80 99.36 99.77 1.20 0.64 0.23
28 2017201809 Apr 2017 to Mar 2018 (Period 09) West Midlands Trains 342796.0 23.57 52.93 75.36 85.90 95.40 97.90 98.82 99.60 2.10 1.18 0.40 4532138.0 29.82 62.26 83.29 91.28 97.38 98.84 99.38 99.78 1.16 0.62 0.22
28 2017201810 Apr 2017 to Mar 2018 (Period 10) West Midlands Trains 298767.0 25.57 54.73 75.63 85.20 94.45 97.30 98.50 99.41 2.70 1.50 0.59 4512448.0 29.70 61.99 82.92 90.96 97.20 98.74 99.32 99.75 1.26 0.68 0.25
28 2017201811 Apr 2017 to Mar 2018 (Period 11) West Midlands Trains 354458.0 29.81 61.24 82.14 90.84 97.77 99.19 99.58 99.84 0.81 0.42 0.16 4509410.0 29.72 61.94 82.82 90.88 97.20 98.74 99.32 99.75 1.26 0.68 0.25
28 2017201812 Apr 2017 to Mar 2018 (Period 12) West Midlands Trains 345292.0 28.07 58.76 79.71 88.41 95.75 97.76 98.65 99.36 2.24 1.35 0.64 4510568.0 29.59 61.67 82.54 90.66 97.08 98.67 99.28 99.73 1.33 0.72 0.27
28 2017201813 Apr 2017 to Mar 2018 (Period 13) West Midlands Trains 348623.0 27.60 57.74 79.57 88.96 97.08 98.83 99.38 99.79 1.17 0.62 0.21 4515515.0 29.27 61.05 82.02 90.33 97.00 98.64 99.26 99.72 1.36 0.74 0.28
28 2018201901 Apr 2018 to Mar 2019 (Period 01) West Midlands Trains 354035.0 30.12 61.87 83.09 91.32 97.61 99.02 99.51 99.82 0.98 0.49 0.18 4504512.0 28.87 60.42 81.55 90.04 96.93 98.62 99.25 99.72 1.38 0.75 0.28
28 2018201902 Apr 2018 to Mar 2019 (Period 02) West Midlands Trains 353098.0 28.45 59.65 81.00 89.89 97.09 98.77 99.40 99.84 1.23 0.60 0.16 4506715.0 28.52 59.88 81.11 89.76 96.83 98.58 99.24 99.72 1.42 0.76 0.28
28 2018201903 Apr 2018 to Mar 2019 (Period 03) West Midlands Trains 356478.0 29.23 62.34 83.66 91.63 97.50 98.82 99.35 99.74 1.18 0.65 0.26 4509549.0 28.43 59.80 81.09 89.77 96.85 98.59 99.24 99.72 1.41 0.76 0.28
28 2018201904 Apr 2018 to Mar 2019 (Period 04) West Midlands Trains 357149.0 26.40 57.43 79.03 87.95 95.75 97.80 98.69 99.49 2.20 1.31 0.51 4512344.0 28.09 59.28 80.61 89.40 96.68 98.49 99.18 99.69 1.51 0.82 0.31
28 2018201905 Apr 2018 to Mar 2019 (Period 05) West Midlands Trains 357030.0 29.05 61.08 82.42 90.74 97.20 98.71 99.31 99.79 1.29 0.69 0.21 4516372.0 27.77 58.80 80.22 89.15 96.60 98.45 99.15 99.68 1.55 0.85 0.32
28 2018201906 Apr 2018 to Mar 2019 (Period 06) West Midlands Trains 358259.0 29.97 62.51 83.83 91.71 97.57 98.85 99.29 99.69 1.15 0.71 0.31 4523329.0 27.63 58.61 80.07 89.04 96.56 98.43 99.13 99.67 1.57 0.87 0.33
28 2018201907 Apr 2018 to Mar 2019 (Period 07) West Midlands Trains 362192.0 24.96 55.24 78.04 88.06 96.47 98.53 99.19 99.77 1.47 0.81 0.23 4531333.0 27.48 58.42 79.97 89.00 96.56 98.43 99.13 99.68 1.57 0.87 0.32
28 2018201908 Apr 2018 to Mar 2019 (Period 08) West Midlands Trains 355712.0 23.19 52.91 76.60 87.30 96.52 98.67 99.36 99.80 1.33 0.64 0.20 4543889.0 27.41 58.40 80.07 89.13 96.66 98.49 99.17 99.69 1.51 0.83 0.31
28 2018201909 Apr 2018 to Mar 2019 (Period 09) West Midlands Trains 357289.0 20.12 48.24 71.72 83.19 94.30 97.36 98.63 99.57 2.64 1.37 0.43 4558382.0 27.13 58.01 79.77 88.91 96.57 98.44 99.15 99.69 1.56 0.85 0.31
28 2018201910 Apr 2018 to Mar 2019 (Period 10) West Midlands Trains 324285.0 27.51 59.62 82.04 91.01 97.82 99.12 99.58 99.90 0.88 0.42 0.10 4583900.0 27.26 58.34 80.20 89.30 96.80 98.57 99.22 99.72 1.43 0.78 0.28
28 2018201911 Apr 2018 to Mar 2019 (Period 11) West Midlands Trains 366412.0 28.84 61.73 83.47 91.71 97.87 99.11 99.53 99.84 0.89 0.47 0.16 4595854.0 27.19 58.39 80.31 89.37 96.81 98.56 99.22 99.72 1.44 0.78 0.28
28 2018201912 Apr 2018 to Mar 2019 (Period 12) West Midlands Trains 367307.0 29.48 63.11 84.90 92.68 98.07 99.15 99.53 99.83 0.85 0.47 0.17 4617869.0 27.30 58.73 80.72 89.70 96.99 98.67 99.29 99.76 1.33 0.71 0.24
28 2018201913 Apr 2018 to Mar 2019 (Period 13) West Midlands Trains 371726.0 29.46 63.05 85.04 92.69 98.11 99.18 99.56 99.83 0.82 0.44 0.17 4640972.0 27.45 59.16 81.16 90.00 97.07 98.70 99.30 99.76 1.30 0.70 0.24
28 2019202001 Apr 2019 to Mar 2020 (Period 01) West Midlands Trains 356181.0 29.91 63.51 85.16 92.87 98.15 99.26 99.68 99.91 0.74 0.32 0.09 356181.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202002 Apr 2019 to Mar 2020 (Period 02) West Midlands Trains 371431.0 28.73 61.01 82.70 90.90 97.23 98.67 99.26 99.73 1.33 0.74 0.27 727612.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202003 Apr 2019 to Mar 2020 (Period 03) West Midlands Trains 392021.0 24.61 53.96 76.87 87.11 96.11 98.38 99.20 99.77 1.62 0.80 0.23 1119633.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202004 Apr 2019 to Mar 2020 (Period 04) West Midlands Trains 392815.0 24.67 54.14 76.91 87.17 95.95 98.10 98.95 99.62 1.90 1.05 0.38 1512448.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202005 Apr 2019 to Mar 2020 (Period 05) West Midlands Trains 381436.0 23.54 51.36 73.23 83.68 93.80 96.76 98.10 99.28 3.24 1.90 0.72 1893884.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202006 Apr 2019 to Mar 2020 (Period 06) West Midlands Trains 393916.0 25.50 55.11 78.01 87.96 96.37 98.51 99.33 99.85 1.49 0.67 0.15 2287800.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202007 Apr 2019 to Mar 2020 (Period 07) West Midlands Trains 380914.0 20.75 47.59 70.39 82.21 93.66 97.04 98.47 99.53 2.96 1.53 0.47 2668714.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202008 Apr 2019 to Mar 2020 (Period 08) West Midlands Trains 369012.0 19.54 45.07 66.85 78.52 90.90 94.90 96.84 98.65 5.10 3.16 1.35 3037726.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202009 Apr 2019 to Mar 2020 (Period 09) West Midlands Trains 350213.0 15.47 39.07 61.57 75.00 90.42 95.52 97.71 99.30 4.48 2.29 0.70 3387939.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202010 Apr 2019 to Mar 2020 (Period 10) West Midlands Trains 336484.0 23.00 50.46 72.19 82.70 93.71 97.11 98.53 99.55 2.89 1.47 0.45 3724423.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202011 Apr 2019 to Mar 2020 (Period 11) West Midlands Trains 403328.0 25.67 54.73 77.24 87.61 96.53 98.62 99.39 99.84 1.38 0.61 0.16 4127751.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202012 Apr 2019 to Mar 2020 (Period 12) West Midlands Trains 391747.0 24.12 52.37 74.89 85.81 95.77 98.32 99.25 99.83 1.68 0.75 0.17 4519498.0 [z] [z] [z] [z] [z] [z] [z] [z] [z] [z] [z]
28 2019202013 Apr 2019 to Mar 2020 (Period 13) West Midlands Trains 358587.0 29.26 57.80 77.59 86.39 94.77 97.37 98.49 99.48 2.63 1.51 0.52 4878085.0 24.24 52.84 74.97 85.30 94.92 97.61 98.72 99.57 2.39 1.28 0.43
28 2020202101 Apr 2020 to Mar 2021 (Period 01) West Midlands Trains 239123.0 49.62 81.09 94.45 97.45 99.24 99.63 99.82 99.93 0.37 0.18 0.07 4761027.0 25.09 53.46 75.18 85.35 94.90 97.59 98.70 99.56 2.41 1.30 0.44
28 2020202102 Apr 2020 to Mar 2021 (Period 02) West Midlands Trains 232866.0 48.10 79.61 92.93 96.28 98.76 99.37 99.66 99.88 0.63 0.34 0.12 4622462.0 25.96 54.17 75.47 85.45 94.90 97.59 98.71 99.57 2.41 1.29 0.43
28 2020202103 Apr 2020 to Mar 2021 (Period 03) West Midlands Trains 266534.0 45.91 78.66 92.84 96.22 98.58 99.28 99.60 99.85 0.72 0.40 0.15 4496975.0 27.26 55.64 76.38 85.94 95.02 97.62 98.72 99.56 2.38 1.28 0.44
28 2020202104 Apr 2020 to Mar 2021 (Period 04) West Midlands Trains 280964.0 44.49 77.75 92.78 96.48 98.93 99.50 99.72 99.93 0.50 0.28 0.07 4385124.0 28.59 57.19 77.39 86.51 95.18 97.70 98.76 99.58 2.30 1.24 0.42
28 2020202105 Apr 2020 to Mar 2021 (Period 05) West Midlands Trains 284739.0 38.86 71.15 88.61 93.76 97.77 98.89 99.40 99.79 1.11 0.60 0.21 4288427.0 29.73 58.63 78.50 87.24 95.48 97.86 98.86 99.62 2.14 1.14 0.38
28 2020202106 Apr 2020 to Mar 2021 (Period 06) West Midlands Trains 313823.0 40.50 72.43 89.26 94.27 97.82 98.82 99.37 99.78 1.18 0.63 0.22 4208334.0 30.92 59.99 79.35 87.70 95.57 97.87 98.86 99.61 2.13 1.14 0.39
28 2020202107 Apr 2020 to Mar 2021 (Period 07) West Midlands Trains 322684.0 38.04 68.84 87.29 93.30 97.64 98.71 99.26 99.70 1.29 0.74 0.30 4150104.0 32.41 61.82 80.79 88.64 95.91 98.01 98.92 99.63 1.99 1.08 0.37
28 2020202108 Apr 2020 to Mar 2021 (Period 08) West Midlands Trains 328066.0 34.89 65.36 85.37 92.43 97.73 98.94 99.48 99.83 1.06 0.52 0.17 4109158.0 33.76 63.60 82.41 89.85 96.50 98.37 99.16 99.73 1.63 0.84 0.27
28 2020202109 Apr 2020 to Mar 2021 (Period 09) West Midlands Trains 328065.0 38.00 69.25 88.11 94.03 98.28 99.27 99.64 99.87 0.73 0.36 0.13 4087010.0 35.67 66.16 84.65 91.46 97.16 98.68 99.32 99.78 1.32 0.68 0.22
28 2020202110 Apr 2020 to Mar 2021 (Period 10) West Midlands Trains 276754.0 42.88 74.07 90.39 94.98 98.13 99.10 99.47 99.79 0.90 0.53 0.21 4027280.0 37.23 68.02 86.08 92.43 97.52 98.84 99.40 99.80 1.16 0.60 0.20
28 2020202111 Apr 2020 to Mar 2021 (Period 11) West Midlands Trains 292023.0 45.57 75.84 90.60 94.93 98.08 99.04 99.48 99.83 0.96 0.52 0.17 3915975.0 39.04 69.97 87.33 93.12 97.66 98.88 99.40 99.80 1.12 0.60 0.20
28 2020202112 Apr 2020 to Mar 2021 (Period 12) West Midlands Trains 303773.0 48.93 79.00 92.83 96.45 98.91 99.50 99.74 99.91 0.50 0.26 0.09 3828001.0 41.35 72.49 89.04 94.13 97.96 98.99 99.45 99.80 1.01 0.55 0.20
28 2020202113 Apr 2020 to Mar 2021 (Period 13) West Midlands Trains 271957.0 47.87 78.97 93.10 96.44 98.81 99.40 99.66 99.87 0.60 0.34 0.13 3741371.0 42.98 74.36 90.44 95.04 98.32 99.17 99.55 99.84 0.83 0.45 0.16
28 2021202201 Apr 2021 to Mar 2022 (Period 01) West Midlands Trains 349094.0 45.25 77.00 91.94 95.83 98.52 99.21 99.53 99.80 0.79 0.47 0.20 3851342.0 42.78 74.19 90.32 94.96 98.28 99.15 99.53 99.83 0.85 0.47 0.17
28 2021202202 Apr 2021 to Mar 2022 (Period 02) West Midlands Trains 320124.0 41.86 73.65 89.75 94.46 97.96 98.96 99.40 99.73 1.04 0.60 0.27 3938600.0 42.39 73.82 90.12 94.84 98.23 99.12 99.52 99.82 0.88 0.48 0.18
28 2021202203 Apr 2021 to Mar 2022 (Period 03) West Midlands Trains 317548.0 37.89 68.24 85.26 91.36 96.90 98.49 99.18 99.72 1.51 0.82 0.28 3989614.0 41.80 73.05 89.55 94.47 98.10 99.06 99.48 99.81 0.94 0.52 0.19
28 2021202204 Apr 2021 to Mar 2022 (Period 04) West Midlands Trains 303883.0 36.96 66.99 84.11 90.69 96.68 98.45 99.18 99.70 1.55 0.82 0.30 4012533.0 41.24 72.26 88.91 94.04 97.94 98.98 99.44 99.79 1.02 0.56 0.21
28 2021202205 Apr 2021 to Mar 2022 (Period 05) West Midlands Trains 302929.0 38.36 70.23 87.49 93.39 98.04 99.17 99.58 99.86 0.83 0.42 0.14 4030723.0 41.19 72.19 88.83 94.02 97.95 99.00 99.46 99.80 1.00 0.54 0.20
28 2021202206 Apr 2021 to Mar 2022 (Period 06) West Midlands Trains 315052.0 36.59 67.33 84.98 91.40 97.07 98.72 99.37 99.81 1.28 0.63 0.19 4031952.0 40.89 71.79 88.50 93.79 97.90 98.99 99.46 99.80 1.01 0.54 0.20
28 2021202207 Apr 2021 to Mar 2022 (Period 07) West Midlands Trains 326970.0 34.40 65.44 84.85 91.89 97.61 99.04 99.55 99.88 0.96 0.45 0.12 4036238.0 40.59 71.51 88.30 93.68 97.89 99.02 99.48 99.82 0.98 0.52 0.18
28 2021202208 Apr 2021 to Mar 2022 (Period 08) West Midlands Trains 315284.0 29.36 58.97 79.72 88.25 95.91 98.12 98.99 99.60 1.88 1.01 0.40 4023456.0 40.17 71.03 87.86 93.35 97.75 98.96 99.44 99.80 1.04 0.56 0.20
28 2021202209 Apr 2021 to Mar 2022 (Period 09) West Midlands Trains 318349.0 24.65 51.55 72.39 82.53 93.03 96.39 97.99 99.33 3.61 2.01 0.67 4013740.0 39.12 69.63 86.62 92.44 97.33 98.73 99.31 99.75 1.27 0.69 0.25
28 2021202210 Apr 2021 to Mar 2022 (Period 10) West Midlands Trains 282624.0 35.52 66.40 84.89 91.67 97.07 98.57 99.23 99.78 1.43 0.77 0.22 4019610.0 38.61 69.10 86.23 92.21 97.26 98.69 99.29 99.75 1.31 0.71 0.25
28 2021202211 Apr 2021 to Mar 2022 (Period 11) West Midlands Trains 313573.0 35.65 67.40 86.42 93.11 98.07 99.20 99.59 99.88 0.80 0.41 0.12 4041160.0 37.88 68.48 85.93 92.08 97.26 98.70 99.30 99.76 1.30 0.70 0.24
28 2021202212 Apr 2021 to Mar 2022 (Period 12) West Midlands Trains 316669.0 31.43 62.30 82.55 90.17 96.50 98.15 98.92 99.54 1.85 1.08 0.46 4054056.0 36.54 67.21 85.15 91.61 97.08 98.60 99.24 99.73 1.40 0.76 0.27
28 2021202213 Apr 2021 to Mar 2022 (Period 13) West Midlands Trains 304575.0 33.60 65.35 85.23 92.46 97.78 98.97 99.40 99.74 1.03 0.60 0.26 4086674.0 35.57 66.29 84.63 91.35 97.02 98.58 99.23 99.72 1.42 0.77 0.28
28 2022202301 Apr 2022 to Mar 2023 (Period 01) West Midlands Trains 338791.0 35.86 65.58 84.65 91.44 96.86 98.41 99.09 99.64 1.59 0.91 0.36 4076371.0 34.77 65.31 84.01 90.97 96.88 98.51 99.19 99.71 1.49 0.81 0.29
28 2022202302 Apr 2022 to Mar 2023 (Period 02) West Midlands Trains 333035.0 32.67 63.77 83.83 91.34 97.42 98.86 99.43 99.77 1.14 0.57 0.23 4089282.0 34.04 64.54 83.54 90.73 96.84 98.50 99.19 99.71 1.50 0.81 0.29
28 2022202303 Apr 2022 to Mar 2023 (Period 03) West Midlands Trains 285059.0 30.89 61.66 82.24 90.08 96.70 98.48 99.19 99.73 1.52 0.81 0.27 4056793.0 33.52 64.04 83.31 90.63 96.82 98.50 99.19 99.71 1.50 0.81 0.29
28 2022202304 Apr 2022 to Mar 2023 (Period 04) West Midlands Trains 318814.0 28.88 58.55 79.34 88.01 95.62 97.97 98.88 99.59 2.03 1.12 0.41 4071724.0 32.90 63.39 82.94 90.42 96.74 98.46 99.17 99.70 1.54 0.83 0.30
28 2022202305 Apr 2022 to Mar 2023 (Period 05) West Midlands Trains 275184.0 24.97 52.30 73.26 83.55 94.07 97.18 98.48 99.43 2.82 1.52 0.57 4043979.0 31.95 62.13 81.94 89.73 96.46 98.32 99.09 99.67 1.68 0.91 0.33
28 2022202306 Apr 2022 to Mar 2023 (Period 06) West Midlands Trains 342237.0 28.79 58.42 79.17 88.15 96.01 98.25 99.14 99.71 1.75 0.86 0.29 4071164.0 31.32 61.41 81.48 89.47 96.37 98.28 99.07 99.67 1.72 0.93 0.33
28 2022202307 Apr 2022 to Mar 2023 (Period 07) West Midlands Trains 308861.0 27.99 58.18 79.79 88.82 96.53 98.47 99.18 99.71 1.53 0.82 0.29 4053055.0 30.82 60.84 81.08 89.23 96.29 98.24 99.04 99.65 1.76 0.96 0.35
28 2022202308 Apr 2022 to Mar 2023 (Period 08) West Midlands Trains 297349.0 22.48 49.02 70.34 81.46 93.23 97.05 98.52 99.49 2.95 1.48 0.51 4035120.0 30.32 60.12 80.39 88.73 96.09 98.16 99.01 99.64 1.84 0.99 0.36
28 2022202309 Apr 2022 to Mar 2023 (Period 09) West Midlands Trains 323394.0 23.11 50.10 72.41 83.53 94.57 97.58 98.71 99.56 2.42 1.29 0.44 4040165.0 30.19 59.99 80.38 88.80 96.21 98.25 99.06 99.66 1.75 0.94 0.34
28 2022202310 Apr 2022 to Mar 2023 (Period 10) West Midlands Trains 148199.0 26.76 54.22 74.70 83.80 93.14 96.30 97.87 99.09 3.70 2.13 0.91 3905740.0 29.68 59.31 79.84 88.41 96.03 98.16 99.01 99.63 1.84 0.99 0.37
28 2022202311 Apr 2022 to Mar 2023 (Period 11) West Midlands Trains 312384.0 28.45 58.49 79.13 87.72 95.83 98.05 98.95 99.62 1.95 1.05 0.38 3904551.0 29.10 58.59 79.26 87.98 95.85 98.06 98.96 99.61 1.94 1.04 0.39
28 2022202312 Apr 2022 to Mar 2023 (Period 12) West Midlands Trains 343486.0 31.42 63.49 83.28 90.55 97.02 98.70 99.37 99.77 1.30 0.63 0.23 3931368.0 29.11 58.72 79.34 88.02 95.90 98.11 99.00 99.63 1.89 1.00 0.37
28 2022202313 Apr 2022 to Mar 2023 (Period 13) West Midlands Trains 303461.0 31.03 62.77 82.57 90.30 96.84 98.66 99.30 99.77 1.34 0.70 0.23 3930254.0 28.91 58.52 79.13 87.86 95.83 98.09 98.99 99.63 1.91 1.01 0.37
28 2023202401 Apr 2023 to Mar 2024 (Period 01) West Midlands Trains 339278.0 32.72 64.38 83.24 90.56 96.74 98.40 99.12 99.69 1.60 0.88 0.31 3930741.0 28.64 58.42 79.01 87.78 95.82 98.09 98.99 99.64 1.91 1.01 0.36
28 2023202402 Apr 2023 to Mar 2024 (Period 02) West Midlands Trains 318365.0 34.59 66.76 84.82 91.59 97.38 98.82 99.35 99.76 1.18 0.65 0.24 3916071.0 28.78 58.64 79.08 87.79 95.81 98.08 98.98 99.64 1.92 1.02 0.36
28 2023202403 Apr 2023 to Mar 2024 (Period 03) West Midlands Trains 304334.0 30.51 60.00 79.19 87.45 95.07 97.51 98.47 99.38 2.49 1.53 0.62 3935346.0 28.76 58.53 78.86 87.59 95.69 98.01 98.93 99.61 1.99 1.07 0.39
28 2023202404 Apr 2023 to Mar 2024 (Period 04) West Midlands Trains 315440.0 31.24 61.74 81.57 89.55 96.30 98.21 99.01 99.59 1.79 0.99 0.41 3931972.0 28.95 58.78 79.03 87.72 95.74 98.03 98.94 99.61 1.97 1.06 0.39
28 2023202405 Apr 2023 to Mar 2024 (Period 05) West Midlands Trains 314851.0 33.07 64.30 83.56 90.87 96.88 98.61 99.26 99.78 1.39 0.74 0.22 3971639.0 29.56 59.67 79.79 88.26 95.95 98.13 98.99 99.63 1.87 1.01 0.37
28 2023202406 Apr 2023 to Mar 2024 (Period 06) West Midlands Trains 309214.0 31.64 62.61 82.68 90.29 96.84 98.62 99.29 99.77 1.38 0.71 0.23 3938616.0 29.79 60.01 80.07 88.43 96.01 98.16 99.01 99.64 1.84 0.99 0.36
28 2023202407 Apr 2023 to Mar 2024 (Period 07) West Midlands Trains 308257.0 30.17 60.69 80.75 89.08 96.40 98.46 99.22 99.75 1.54 0.78 0.25 3938012.0 29.96 60.21 80.15 88.45 96.00 98.16 99.01 99.64 1.84 0.99 0.36
28 2023202408 Apr 2023 to Mar 2024 (Period 08) West Midlands Trains 333637.0 27.60 57.26 78.03 87.06 95.41 97.94 98.90 99.62 2.06 1.10 0.38 3974300.0 30.32 60.80 80.71 88.85 96.16 98.22 99.04 99.65 1.78 0.96 0.35
28 2023202409 Apr 2023 to Mar 2024 (Period 09) West Midlands Trains 313199.0 24.17 52.47 73.86 83.90 93.80 96.99 98.39 99.46 3.01 1.61 0.54 3964105.0 30.42 61.01 80.84 88.89 96.10 98.18 99.01 99.64 1.82 0.99 0.36
28 2023202410 Apr 2023 to Mar 2024 (Period 10) West Midlands Trains 292353.0 29.96 60.68 80.34 88.39 95.76 97.94 98.87 99.55 2.06 1.13 0.45 4108259.0 30.52 61.23 81.03 89.04 96.18 98.23 99.04 99.66 1.77 0.96 0.34
28 2023202411 Apr 2023 to Mar 2024 (Period 11) West Midlands Trains 324501.0 32.63 63.72 82.42 89.87 96.56 98.48 99.20 99.76 1.52 0.80 0.24 4120376.0 30.84 61.64 81.28 89.21 96.24 98.26 99.06 99.67 1.74 0.94 0.33
28 2023202412 Apr 2023 to Mar 2024 (Period 12) West Midlands Trains 337528.0 33.90 65.89 84.35 91.14 96.82 98.39 99.09 99.65 1.61 0.91 0.35 4114418.0 31.04 61.83 81.37 89.26 96.22 98.24 99.04 99.66 1.76 0.96 0.34
28 2023202413 Apr 2023 to Mar 2024 (Period 13) West Midlands Trains 345642.0 35.08 67.72 86.11 92.37 97.41 98.82 99.36 99.75 1.18 0.64 0.25 4156599.0 31.38 62.25 81.67 89.44 96.28 98.25 99.05 99.66 1.75 0.95 0.34
28 2024202501 Apr 2024 to Mar 2025 (Period 01) West Midlands Trains 315802.0 36.19 68.21 85.81 91.90 96.91 98.37 99.09 99.57 1.63 0.91 0.43 4133123.0 31.64 62.53 81.86 89.53 96.29 98.25 99.04 99.65 1.75 0.96 0.35
28 2024202502 Apr 2024 to Mar 2025 (Period 02) West Midlands Trains 321525.0 34.34 65.23 82.92 89.69 95.90 97.94 98.87 99.60 2.06 1.13 0.40 4136283.0 31.62 62.42 81.71 89.39 96.17 98.18 99.01 99.63 1.82 0.99 0.37
28 2024202503 Apr 2024 to Mar 2025 (Period 03) West Midlands Trains 335488.0 34.11 65.20 83.24 90.07 96.43 98.19 98.98 99.64 1.81 1.02 0.36 4167437.0 31.90 62.82 82.02 89.58 96.27 98.23 99.04 99.65 1.77 0.96 0.35
28 2024202504 Apr 2024 to Mar 2025 (Period 04) West Midlands Trains 341611.0 33.33 63.70 81.81 89.27 95.95 98.01 98.95 99.68 1.99 1.05 0.32 4193608.0 32.07 62.97 82.04 89.56 96.25 98.22 99.04 99.66 1.78 0.96 0.34
28 2024202505 Apr 2024 to Mar 2025 (Period 05) West Midlands Trains 342020.0 33.73 64.55 82.82 90.15 96.31 98.18 98.98 99.69 1.82 1.02 0.31 4220777.0 32.13 63.00 81.99 89.51 96.20 98.18 99.02 99.65 1.82 0.98 0.35
28 2024202506 Apr 2024 to Mar 2025 (Period 06) West Midlands Trains 347054.0 34.60 65.31 83.76 90.92 96.82 98.49 99.23 99.72 1.51 0.77 0.28 4258617.0 32.37 63.21 82.08 89.57 96.21 98.18 99.01 99.65 1.82 0.99 0.35
28 2024202507 Apr 2024 to Mar 2025 (Period 07) West Midlands Trains 341108.0 30.13 60.15 80.10 88.58 95.97 98.13 99.03 99.68 1.87 0.97 0.32 4291468.0 32.35 63.15 82.02 89.53 96.18 98.15 99.00 99.64 1.85 1.00 0.36
28 2024202508 Apr 2024 to Mar 2025 (Period 08) West Midlands Trains 342706.0 29.07 57.83 78.44 87.63 96.13 98.29 99.06 99.72 1.71 0.94 0.28 4300537.0 32.45 63.18 82.04 89.57 96.23 98.18 99.01 99.65 1.82 0.99 0.35
28 2024202509 Apr 2024 to Mar 2025 (Period 09) West Midlands Trains 334650.0 27.02 53.65 73.50 83.08 93.36 96.72 98.15 99.27 3.28 1.85 0.73 4321988.0 32.63 63.22 81.97 89.47 96.19 98.15 98.99 99.64 1.85 1.01 0.36
28 2024202510 Apr 2024 to Mar 2025 (Period 10) West Midlands Trains 301583.0 34.17 62.82 80.59 88.55 95.99 98.27 99.18 99.78 1.73 0.82 0.22 4331218.0 32.92 63.37 81.99 89.48 96.20 98.18 99.01 99.65 1.82 0.99 0.35
28 2024202511 Apr 2024 to Mar 2025 (Period 11) West Midlands Trains 352979.0 38.57 68.11 84.92 91.62 97.08 98.58 99.23 99.74 1.42 0.77 0.26 4359696.0 33.40 63.72 82.19 89.63 96.24 98.19 99.02 99.65 1.81 0.98 0.35
28 2024202512 Apr 2024 to Mar 2025 (Period 12) West Midlands Trains 361197.0 39.34 69.59 86.55 92.61 97.23 98.59 99.22 99.68 1.41 0.78 0.32 4383365.0 33.85 64.04 82.39 89.76 96.28 98.20 99.03 99.65 1.80 0.97 0.35
28 2024202513 Apr 2024 to Mar 2025 (Period 13) West Midlands Trains 380219.0 41.17 71.51 87.67 93.25 97.62 98.90 99.44 99.81 1.10 0.56 0.19 4417942.0 34.39 64.39 82.55 89.85 96.31 98.21 99.04 99.66 1.79 0.96 0.34
28 2025202601 Apr 2025 to Mar 2026 (Period 01) West Midlands Trains 335825.0 41.87 72.00 87.45 92.98 97.47 98.77 99.33 99.78 1.23 0.67 0.22 4437965.0 34.82 64.70 82.69 89.94 96.35 98.25 99.06 99.68 1.75 0.94 0.32
28 2025202602 Apr 2025 to Mar 2026 (Period 02) West Midlands Trains 358443.0 39.02 68.53 85.08 91.48 97.00 98.51 99.21 99.70 1.49 0.79 0.30 4474883.0 35.19 64.97 82.86 90.09 96.44 98.29 99.08 99.68 1.71 0.92 0.32
28 2025202603 Apr 2025 to Mar 2026 (Period 03) West Midlands Trains 350795.0 38.17 67.43 84.06 90.84 96.71 98.34 99.08 99.68 1.66 0.92 0.32 4490190.0 35.51 65.14 82.93 90.14 96.46 98.30 99.09 99.69 1.70 0.91 0.31
28 2025202604 Apr 2025 to Mar 2026 (Period 04) West Midlands Trains 347956.0 35.55 63.41 80.43 87.68 95.04 97.36 98.43 99.33 2.64 1.57 0.67 4496535.0 35.68 65.12 82.82 90.02 96.39 98.25 99.05 99.66 1.75 0.95 0.34
28 2025202605 Apr 2025 to Mar 2026 (Period 05) West Midlands Trains 345491.0 38.25 67.13 83.73 90.43 96.18 97.92 98.72 99.48 2.08 1.28 0.52 4500006.0 36.02 65.32 82.89 90.04 96.38 98.23 99.03 99.64 1.77 0.97 0.36
28 2025202606 Apr 2025 to Mar 2026 (Period 06) West Midlands Trains 358760.0 38.88 68.08 84.93 91.65 97.21 98.66 99.35 99.78 1.34 0.65 0.22 4511712.0 36.36 65.54 82.99 90.10 96.41 98.24 99.04 99.65 1.76 0.96 0.35
28 2025202607 Apr 2025 to Mar 2026 (Period 07) West Midlands Trains 360058.0 37.69 66.62 83.82 90.87 96.95 98.62 99.31 99.72 1.38 0.69 0.28 4530662.0 36.93 66.03 83.27 90.28 96.49 98.28 99.06 99.65 1.72 0.94 0.35
28 2025202608 Apr 2025 to Mar 2026 (Period 08) West Midlands Trains 355293.0 32.93 60.15 78.31 86.86 95.13 97.64 98.73 99.58 2.36 1.27 0.42 4543249.0 37.21 66.19 83.25 90.21 96.41 98.23 99.03 99.64 1.77 0.97 0.36
28 2025202609 Apr 2025 to Mar 2026 (Period 09) West Midlands Trains 353447.0 30.44 57.01 75.61 85.01 94.41 97.22 98.48 99.47 2.78 1.52 0.53 4562046.0 37.44 66.40 83.37 90.33 96.48 98.27 99.06 99.65 1.73 0.94 0.35
28 2025202610 Apr 2025 to Mar 2026 (Period 10) West Midlands Trains 319474.0 37.68 65.10 82.19 89.63 96.20 98.09 99.02 99.67 1.91 0.98 0.33 4579937.0 37.67 66.54 83.47 90.40 96.49 98.25 99.05 99.65 1.75 0.95 0.35
28 2025202611 Apr 2025 to Mar 2026 (Period 11) West Midlands Trains 343786.0 41.10 69.14 84.98 91.30 96.85 98.45 99.10 99.63 1.55 0.90 0.37 4570744.0 37.86 66.62 83.47 90.37 96.47 98.24 99.04 99.64 1.76 0.96 0.36
28 2025202612 Apr 2025 to Mar 2026 (Period 12) West Midlands Trains 361266.0 42.33 70.21 85.87 92.04 97.09 98.47 99.15 99.69 1.53 0.85 0.31 4570813.0 38.09 66.67 83.42 90.33 96.46 98.23 99.03 99.64 1.77 0.97 0.36
28 2025202613 Apr 2025 to Mar 2026 (Period 13) West Midlands Trains 390807.0 41.46 69.46 85.53 91.99 97.22 98.65 99.30 99.76 1.35 0.70 0.24 4581401.0 38.12 66.50 83.25 90.23 96.43 98.21 99.02 99.64 1.79 0.98 0.36
28 2026202701 Apr 2026 to Mar 2027 (Period 01) West Midlands Trains 413288.0 40.80 68.40 84.65 91.40 97.10 98.60 99.24 99.73 1.40 0.76 0.27 4658864.0 38.09 66.27 83.07 90.13 96.41 98.21 99.01 99.63 1.79 0.99 0.37
28 2026202702 Apr 2026 to Mar 2027 (Period 02) West Midlands Trains 333412.0 37.57 64.41 81.00 88.41 95.14 97.34 98.52 99.47 2.66 1.48 0.53 4633833.0 37.98 65.96 82.76 89.90 96.28 98.12 98.96 99.62 1.88 1.04 0.38
Source: Network Rail